Res 2013-05 RESOLUTION NO. 2013 - 05 RESOLUTION ORDERING FINAL PLANS, SPECIFICATIONS AND CALLING FOR BIDS: 2013 STREET REHABILITATION PROJECT NO. ST 2013 - 01 WHEREAS , the construction of certain improvements is deemed to be in the interest of the City of Fridley and the property owners affected thereby, and WHEREAS , the City of Fridley has prepared a Capital Improvement Plan to systematically reconstruct streets in the City to a standard section including concrete curb and gutter, and WHEREAS , the City of Fridley’s Engineering Department has completed preparation of a feasibility report and estimates of costs thereof for the improvements. WHEREAS , pursuant to direction of the City Council, a report has been prepared by the City of Fridley Public Works Department with reference to the specific improvements, and WHEREAS , Resolution No. 2012-84 adopted November 5, 2012 received the feasibility report and called for a public hearing on the matter of the construction of certain improvements listed therein, and WHEREAS , a public hearing regarding said improvements was set for December 10, 2012, and ten days' mailed notice and two weeks' published notice of the hearing was given, and WHEREAS , the public hearing regarding said improvements was held thereon on December 10, 2012, and continued to January 7, 2013, at which all persons desiring to be heard were given an opportunity to be heard thereon, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY, MINNESOTA : 1.Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2.That the improvements proposed in the feasibility report are hereby ordered to be effected and completed as soon as reasonably possible, to-wit: 3.Street improvements, including milling and overlaying with hot-mix bituminous pavement and ancillary work associated with these improvements, to be constructed on the following streets: Street improvements, including pavement rehabilitation, bituminous paving, hydrant replacement and utility repairs including street segments as follows: 73-1/2 Ave 261' West of Pine Tree Lane to East Terminus 75th Ave Central Ave to Stinson Blvd Resolution No. 2013-05 Page 2 75th Ave Cul-De-Sac 75th Ave to North Terminus 76th Ave Central Ave to Arthur St 76th Ave W Cul-De-Sac 76th Ave to North Terminus 76th Ave E Cul-De-Sac 76th Ave to North Terminus 76th Ave Lakeside Rd to McKinley St Arthur St 75th Ave to Osborne Rd Bacon Dr Onondaga St to 75th Ave Bacon Dr 76th Ave to Osborne Rd Evert Ct 73rd Ave to North Terminus Fireside Dr Central Ave to Hayes St Hayes St 73rd Ave to Onondaga St Hayes St Fireside Dr to 76th Ave Lakeside Rd Onondaga St to Osborne Rd McKinley St Onondaga St to 76th Ave Meadowmoor Dr 76th Ave to Bacon Dr Onondaga St Hayes St to Stinson Blvd Pinetree Ln 73-1/2 Ave to Onondaga St Jackson St 73rd Ave to Osborne Rd 4.That the work be incorporated in the 2013 STREET REHABILITATION PROJECT NO. ST2013–01. 5.That the work be performed under this project may be performed under one or more contracts as may be deemed advisable upon receipt of bids. 6.That the Director of Public Works, James P. Kosluchar, is hereby designated as the engineer for this improvement. He shall oversee the preparation of plans, specifications and estimates of costs thereof for making of such improvements. 7.That final plans, specifications, and estimates are prepared by the Public Works Engineering Division and provided to the City Council as they are completed. 8.That the Engineering Division call for bids in order that project award and construction can be considered. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS th 7 DAY OF JANUARY 2013 . ______________________________ SCOTT J. LUND – MAYOR ATTEST: ________________________________ DEBRA A. SKOGEN - CITY CLERK