Loading...
Ordinance No. 1245 08-13-2007II III ORDINANCE NO. 1245 OFFICIAL TITLE AND SUMMARY Title AN ORDINANCE RECODIFYING THE FRIDLEY CITY CODE, CHAPTER 206, ENTITLED `BLTILDING CODE", BY AMENDING SECTIONS 206.01.2 and 206.03.3 Summary The City Council of the City of Fridley does hereby ordain as follows: That Chapter 206 of the city code of the City of Fridley, Minnesota, entitled "Building Code" is hereby amended to adopt by reference the 2007 Minnesota State Building Code, the International Building Code, the National Electrical Code, Minnesota State Rules, and certain state amended rules and appendices. The ordinance also adopts the state recommended schedule of fees for building permits, electrical permits, moving permits, wrecking permits, investigation and inspection fees. Water and sewer fees and land alteration permit plan check fees are also increased. Notice This Title and Summary has been published to clearly inform the public of the intent and effect of the City of Fridley's Building Code. A copy of the ordinance, in its entirety, is available for inspection by any person during regular business hours at the offices of the city clerk of the City of Fridley, 6431 University Avenue N.E., Fridley, MN 55432. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THE 13TH DAY OF AUGUST, 2007. ��� SCOTT J. L — MAYOR ATTEST: �� DEBRA A. SKOGEN — ITY CLERK First Reading: July 23, 2007 Second Reading: August 13, 2007 Publication: August 23, 2007 ORDINANCE NO. 1245 AN ORDINANCE AMENDING CHAPTER 206. BUILDING CODE ADOPTING THE 2007 MINNESOTA STATE BUILDING CODE AND AMENDING PERMIT FEES THE CITY COUNCIL DOES HEREBY ORDAIN THAT CHAPTER 206 OF THE FRIDLEY CITY CODE IS HEREBY AMENDED AS FOLLOWS: 206. BUILDING CODE SECTION 1. That Section 206.01 be hereby amended as follows: 206.01. BUILDING CODE 1. Building Code. The Minnesota State Building Code, established pursuant to Minnesota Statutes 16B.59 through 16B.75, one copy of which is on file in the office of the City Clerk of Fridley, Minnesota, is hereby adopted by reference as the Building Code of the City of Fridley and incorporated in this Chapter as completely as if set out here in full. 2. The following chapters of the Minnesota State Building Code including the following chapters of Minnesota Rules are adopted by the City: A. Chapter 1300 — Administration of the Minnesota Building Code. B. Chapter 1301 - Building Official Certification. C. Chapter 1302 - State Building Construction Approvals. D. Chapter 1303 — Minnesota Provisions of the State Buildin_� Code. E. Chapter 1305 - Adoption of the �999 2006 International Building Code F. Chapter 1306 - Special Fire Protection Systems (Ord 1159) Section 1306.0020. Municipal Option, Subp. 3; and E.1 G. Chapter 1307 - Elevators and Related Devices H. Chapter 1309 — Adoption of the �999 2006 International Residential Code; L Chapter 1311 — Adoption of the �999 Guidelines for the Rehabilitation of Existing Buildings; J. Chapter 1315 — Adoption of the �999 2005 National Electrical Code K Chapter 1325 - Solar Energy Systems L Chapter 1330 - Fallout Shelters M. Chapter 1335 - Floodproofing Regulations N. Chapter 1341 — Minnesota Accessibility Code O. Chapter 1346 —Adoption of the Minnesota State Mechanical Code P. Chapter 1350 - Manufactured Homes Q. Chapter 1360 - Prefabricated Buildings R. Chapter 1361 - Industrialized/Modular Building Ordinance No. 1245 S. Chapter 1370 - Storm Shelters T. Chapter 4715 - Minnesota Plumbing Code U. Chapters 7670, 7672, 7674, 7676 and 7678 - Minnesota Energy Code SECTION 2. That Section 206.03 be hereby amended as follows: 206.03. PERMITS AND FEES The fee schedules shall be as follows: A. Plan Review Fees B. Building Permit Fees. C. Plumbing Permit Fees D. Mechanical Permit Fees E. Electrical Permit Fees. �,�����-e�e�s Page 2 �-'���e�e�e� �oo� ��,.,ii i.o �.,;,a ., ,,,-,a;r,. +„ +�,o � ii,,.r ;r,. �,.�,o,a„io. i„� na;r;,,.,,,,. �� .. „ � �� „ � �� .. •� ._ „ �� „ � �� > > > > o;+i,o,- � r,a.,... �i,.,ii i.o ,. „+o,a � ,-.,+oi�, � �� � �� �� � �� > > > or+ � o,a o�+ ., ;,ao,a �,- ;r i.,� +�„-,,,,,.�, i;� 0 0 � �� �� �� �� Ordinance No. 1245 Page 3 �� � �� �� v �� �� � � �� . � •� � �� � � •� � •� llc\\ 7,� .,,�,�;+;,,,� +„ +L,o .,1.,,. o � o�• � �� � �� �� �� � I• �� �. •� � _ � I. � � � � � � � � _ � � � � � � � � � � � � � � � � � � •� ! _ � � � � � _ � � •� Ordinance No. 1245 • •� ._ � _ . � �� �� _ • •� . �� . � �� �� . �� • „ .. .. „ „ „ „ „ _ . . • •� . „ „ _ . Page 4 Ordinance No. 1245 Page 5 • •� . � � Property Owner Electrical Inspection Fees New Home or Associated Structure New Dwelling Service/Power Su�ply 0-400 ampere $35 401-800 ampere $60 New Dwelling Feeders/Circuits Up to 30 Feeders/Circuits $100 More than 30 Feeders/Circuits or up to 200(in addition to the above) $6 each Detached Garage or Other Associated Structure New Service/Power Supply 0-400 ampere $35 New Feeders/Circuits $6 each Total (the fee calculated above or $35 multiplied bv the number of required inspection trips, whichever is reater Existing Home/Structure Remodel or Addition New Service/Power Supply 0-400 ampere $35 401-800 ampere $60 Up to 15 Feeders/Circuits $6 Each New Feeders/Circuits 16-30 Feeders/Circuits $100 More than 30 Feeders/Circuits up to 200 $6 Each Reconnected Feeders/Circuits Feeders/Circuits $2 Each Existing Detached Garage or other Associate Structure New Service/Power Supply 0-400 ampere $35 New Feeders/Circuits $6 Each Reconnected Feeders/Circuits $2 Each Total (the fee calculated above or $35 multiplied bv the number of required inspection trips, whichever is reater (2) Contractor Electrical Inspection Fee for Sin�le Family Dwellin�/Associated Structure New Home or Associated Structure New Dwelling Service/Power Su�ply 0-400 ampere $35 401-800 ampere $60 New Dwelling Feeders/Circuits Up to 30 Feeders/Circuits $100 More than 30 up to 200 (in addition to the above) $6 each Detached Garage or Other Associated Structure New Service/Power Supply 0-400 ampere $35 New Feeders/Circuits $6 each Total (the fee calculated above or $35 multiplied bv the number of required inspection trips, whichever is reater Ordinance No. 1245 Page 6 Existing Home/Structure Remodel or Addition New Service/Power Supply 0-400 ampere $35 401-800 ampere $60 New Feeders/Circuits Up to 15 Feeders/Circuits $6 Each 16-30 Feeders/Circuits $100 More than 30 Feeders/Circuits up to 200 $6 Each Reconnected Feeders/Circuits Feeders/Circuits $2 Each Existing Detached Garage or other Associate Structure New Service/Power Supply 0-400 ampere $35 New Feeders/Circuits $6 Each Reconnected Feeders/Circuits $2 Each Total (the fee calculated above or $35 multiplied bv the number of required inspection trips, whichever is reater (3) Contractor Electrical Inspection Fee for Multi-Family Dwellin�/Commercial Structure Service/Power Supply 0-400 ampere $35 401-800 ampere $60 Above 800 ampere $100 Feeders/Circuits Up to 200 A$6 Each Above 200 A $15 Each Reconnected Feeders/Circuits $2 Each Manufactured Home Park Lot Supply $35 Each Recreational Vehicle Site Supply Equipment $6 Each (for circuits originating in the Equipment) Street, Parking Lot, Lighting Standard $5 Each Transformers Up to 10 kva $15 Each Over 10 kva $30 Each Electric Signs and Outline Lighting Transformer/power supply $5 Each Technology System Devices 75¢ Each Separate Bonding Inspections for Swimming $35 Each Pools and Equipotential Planes Center Pivot Irrigation Booms $35 Each Electrical Drive Unit $5 Each Luminaire Retrofit Modifications 25¢ Each Concrete-Encased Electrode Inspection $35 Each Investigative Fee $70 OR Total inspection fee, whichever is greater up to $1,000 Special Inspection fee $80 Per Hour Plus the number of miles at the current IRS mileage rate Over 600 Volts Add the combined service/power supply and feeder/circuit fee to result in double the regular fee (does not apply to electric sign and outline lighting) New Multi-Family Dwellings - Up to 20 $70 Each Feeders/Circuits Above 20 allowed per unit $6 Each Total The fee calculated above or $35 multiplied by the number of required inspection trips, whichever is greater) Ordinance No. 1245 F G Moving of Dwelling or Building Fee. Wrecking Permit Fee. H. Water and Sewer Fees. (Re£ 901) Page 7 Hydrant Rental Agreement - Service Charge ................................................................... $50.00 (for use of hydrant only - City does not supply hose) Water Usage Metered .............................................................. $1.30 �.�5/1,000 gallons used Minimum ..................................................................................... $20.00 �9-99 Tanker ......................................................................................... $20.00 �-99 per fill Water Taps ,,, Q�nn nn �i„� ,.,,�+ �o o�„+ �,-+i,o ., o., +„ i.o ,-o�+,,,-o,a See En_in� eering. Permanent Street Patch — First5 sq. yds ...............................................................................................$300.00 Over5 sq. yds ................................................................................$30.00 per sq.yd. Temporary Street Patch (Nov. 1 through May 1) First5 sq. yd . ................................................ Over5 sq. yd ................................................. per sq. yd. plus cost of permanent street patch Water Meter Repair - Weekend & Holidays ............................ Water Connections Permit ........................... Sewer Connections Permit ........................... Inspection Fee for Water/Sewer Line Repair $400.00 . $40.00 $125.00 . $50.00 . $50.00 . $40.00 PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 13TH DAY OF AUGUST 2007. ,,���� SCOTT J. L D, AYOR ATTEST: DEBRA A. SKOGEN, TY CLERK First Reading: July 23, 2007 Second Reading: August 13, 2007 Publication: August 23, 2007