Ordinance No. 1245 08-13-2007II
III
ORDINANCE NO. 1245
OFFICIAL TITLE AND SUMMARY
Title
AN ORDINANCE RECODIFYING THE FRIDLEY CITY CODE, CHAPTER 206,
ENTITLED `BLTILDING CODE", BY AMENDING SECTIONS 206.01.2 and 206.03.3
Summary
The City Council of the City of Fridley does hereby ordain as follows:
That Chapter 206 of the city code of the City of Fridley, Minnesota, entitled "Building
Code" is hereby amended to adopt by reference the 2007 Minnesota State Building Code,
the International Building Code, the National Electrical Code, Minnesota State Rules, and
certain state amended rules and appendices. The ordinance also adopts the state
recommended schedule of fees for building permits, electrical permits, moving permits,
wrecking permits, investigation and inspection fees. Water and sewer fees and land
alteration permit plan check fees are also increased.
Notice
This Title and Summary has been published to clearly inform the public of the intent and
effect of the City of Fridley's Building Code. A copy of the ordinance, in its entirety, is
available for inspection by any person during regular business hours at the offices of the city
clerk of the City of Fridley, 6431 University Avenue N.E., Fridley, MN 55432.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THE
13TH DAY OF AUGUST, 2007.
���
SCOTT J. L — MAYOR
ATTEST:
��
DEBRA A. SKOGEN — ITY CLERK
First Reading: July 23, 2007
Second Reading: August 13, 2007
Publication: August 23, 2007
ORDINANCE NO. 1245
AN ORDINANCE AMENDING CHAPTER 206. BUILDING CODE ADOPTING THE
2007 MINNESOTA STATE BUILDING CODE AND AMENDING PERMIT FEES
THE CITY COUNCIL DOES HEREBY ORDAIN THAT CHAPTER 206 OF THE
FRIDLEY CITY CODE IS HEREBY AMENDED AS FOLLOWS:
206. BUILDING CODE
SECTION 1. That Section 206.01 be hereby amended as follows:
206.01. BUILDING CODE
1. Building Code. The Minnesota State Building Code, established pursuant to Minnesota Statutes 16B.59
through 16B.75, one copy of which is on file in the office of the City Clerk of Fridley, Minnesota, is
hereby adopted by reference as the Building Code of the City of Fridley and incorporated in this Chapter
as completely as if set out here in full.
2. The following chapters of the Minnesota State Building Code including the following chapters of
Minnesota Rules are adopted by the City:
A. Chapter 1300 — Administration of the Minnesota Building Code.
B. Chapter 1301 - Building Official Certification.
C. Chapter 1302 - State Building Construction Approvals.
D. Chapter 1303 — Minnesota Provisions of the State Buildin_� Code.
E. Chapter 1305 - Adoption of the �999 2006 International Building Code
F. Chapter 1306 - Special Fire Protection Systems (Ord 1159)
Section 1306.0020. Municipal Option, Subp. 3; and E.1
G. Chapter 1307 - Elevators and Related Devices
H. Chapter 1309 — Adoption of the �999 2006 International Residential Code;
L Chapter 1311 — Adoption of the �999 Guidelines for the Rehabilitation of Existing
Buildings;
J. Chapter 1315 — Adoption of the �999 2005 National Electrical Code
K Chapter 1325 - Solar Energy Systems
L Chapter 1330 - Fallout Shelters
M. Chapter 1335 - Floodproofing Regulations
N. Chapter 1341 — Minnesota Accessibility Code
O. Chapter 1346 —Adoption of the Minnesota State Mechanical Code
P. Chapter 1350 - Manufactured Homes
Q. Chapter 1360 - Prefabricated Buildings
R. Chapter 1361 - Industrialized/Modular Building
Ordinance No. 1245
S. Chapter 1370 - Storm Shelters
T. Chapter 4715 - Minnesota Plumbing Code
U. Chapters 7670, 7672, 7674, 7676 and 7678 - Minnesota Energy Code
SECTION 2. That Section 206.03 be hereby amended as follows:
206.03. PERMITS AND FEES
The fee schedules shall be as follows:
A. Plan Review Fees
B. Building Permit Fees.
C. Plumbing Permit Fees
D. Mechanical Permit Fees
E. Electrical Permit Fees.
�,�����-e�e�s
Page 2
�-'���e�e�e�
�oo� ��,.,ii i.o �.,;,a ., ,,,-,a;r,. +„ +�,o � ii,,.r ;r,. �,.�,o,a„io.
i„� na;r;,,.,,,,. ��
.. „
� ��
„ � ��
.. •�
._ „
��
„ � ��
> > > >
o;+i,o,- � r,a.,... �i,.,ii i.o ,. „+o,a � ,-.,+oi�,
� �� � ��
�� � ��
> > >
or+ � o,a o�+ ., ;,ao,a �,- ;r i.,� +�„-,,,,,.�, i;�
0 0
� �� ��
�� ��
Ordinance No. 1245
Page 3
�� � ��
��
v
�� ��
� � ��
.
� •�
� ��
� � •�
� •�
llc\\ 7,� .,,�,�;+;,,,� +„ +L,o .,1.,,. o � o�•
� ��
� ��
�� �� �
I•
�� �. •�
�
_ �
I. � � � �
� � � � _ � � � �
� � � � � �
� �
� � � � �
� •�
! _
� � � � � _ �
� •�
Ordinance No. 1245
• •�
._ � _ .
� �� �� _
• •�
.
��
.
� �� ��
.
�� •
„ .. .. „ „
„
„
„ _ .
.
• •�
.
„
„ _ .
Page 4
Ordinance No. 1245
Page 5
• •�
.
�
� Property Owner Electrical Inspection Fees
New Home or Associated Structure
New Dwelling Service/Power Su�ply 0-400 ampere $35
401-800 ampere $60
New Dwelling Feeders/Circuits Up to 30 Feeders/Circuits $100
More than 30 Feeders/Circuits or up to 200(in
addition to the above) $6 each
Detached Garage or Other Associated Structure
New Service/Power Supply 0-400 ampere $35
New Feeders/Circuits $6 each
Total (the fee calculated above or $35 multiplied bv
the number of required inspection trips, whichever is
reater
Existing Home/Structure Remodel or Addition
New Service/Power Supply 0-400 ampere $35
401-800 ampere $60
Up to 15 Feeders/Circuits $6 Each
New Feeders/Circuits 16-30 Feeders/Circuits $100
More than 30 Feeders/Circuits up to 200 $6 Each
Reconnected Feeders/Circuits Feeders/Circuits $2 Each
Existing Detached Garage or other Associate Structure
New Service/Power Supply 0-400 ampere $35
New Feeders/Circuits $6 Each
Reconnected Feeders/Circuits $2 Each
Total (the fee calculated above or $35 multiplied bv
the number of required inspection trips, whichever is
reater
(2) Contractor Electrical Inspection Fee for Sin�le Family Dwellin�/Associated Structure
New Home or Associated Structure
New Dwelling Service/Power Su�ply 0-400 ampere $35
401-800 ampere $60
New Dwelling Feeders/Circuits Up to 30 Feeders/Circuits $100
More than 30 up to 200 (in addition to the above) $6
each
Detached Garage or Other Associated Structure
New Service/Power Supply 0-400 ampere $35
New Feeders/Circuits $6 each
Total (the fee calculated above or $35 multiplied bv
the number of required inspection trips, whichever is
reater
Ordinance No. 1245
Page 6
Existing Home/Structure Remodel or Addition
New Service/Power Supply 0-400 ampere $35
401-800 ampere $60
New Feeders/Circuits Up to 15 Feeders/Circuits $6 Each
16-30 Feeders/Circuits $100
More than 30 Feeders/Circuits up to 200 $6 Each
Reconnected Feeders/Circuits Feeders/Circuits $2 Each
Existing Detached Garage or other Associate Structure
New Service/Power Supply 0-400 ampere $35
New Feeders/Circuits $6 Each
Reconnected Feeders/Circuits $2 Each
Total (the fee calculated above or $35 multiplied bv
the number of required inspection trips, whichever is
reater
(3) Contractor Electrical Inspection Fee for Multi-Family Dwellin�/Commercial Structure
Service/Power Supply 0-400 ampere $35
401-800 ampere $60
Above 800 ampere $100
Feeders/Circuits Up to 200 A$6 Each
Above 200 A $15 Each
Reconnected Feeders/Circuits $2 Each
Manufactured Home Park Lot Supply $35 Each
Recreational Vehicle Site Supply Equipment $6 Each (for circuits originating in the Equipment)
Street, Parking Lot, Lighting Standard $5 Each
Transformers Up to 10 kva $15 Each
Over 10 kva $30 Each
Electric Signs and Outline Lighting
Transformer/power supply $5 Each
Technology System Devices 75¢ Each
Separate Bonding Inspections for Swimming $35 Each
Pools and Equipotential Planes
Center Pivot Irrigation Booms $35 Each
Electrical Drive Unit $5 Each
Luminaire Retrofit Modifications 25¢ Each
Concrete-Encased Electrode Inspection $35 Each
Investigative Fee $70 OR
Total inspection fee, whichever is greater up to
$1,000
Special Inspection fee $80 Per Hour
Plus the number of miles at the current IRS mileage
rate
Over 600 Volts Add the combined service/power supply and
feeder/circuit fee to result in double the regular fee
(does not apply to electric sign and outline lighting)
New Multi-Family Dwellings - Up to 20 $70 Each
Feeders/Circuits Above 20 allowed per unit $6 Each
Total The fee calculated above or $35 multiplied by the
number of required inspection trips, whichever is
greater)
Ordinance No. 1245
F
G
Moving of Dwelling or Building Fee.
Wrecking Permit Fee.
H. Water and Sewer Fees. (Re£ 901)
Page 7
Hydrant Rental Agreement - Service Charge ................................................................... $50.00
(for use of hydrant only - City does not supply hose)
Water Usage Metered .............................................................. $1.30 �.�5/1,000 gallons used
Minimum ..................................................................................... $20.00 �9-99
Tanker ......................................................................................... $20.00 �-99 per fill
Water Taps ,,, Q�nn nn �i„� ,.,,�+ �o o�„+ �,-+i,o ., o., +„ i.o ,-o�+,,,-o,a See En_in� eering.
Permanent Street Patch —
First5 sq. yds ...............................................................................................$300.00
Over5 sq. yds ................................................................................$30.00 per sq.yd.
Temporary Street Patch (Nov. 1 through May 1)
First5 sq. yd . ................................................
Over5 sq. yd .................................................
per sq. yd. plus cost of permanent street patch
Water Meter Repair - Weekend & Holidays ............................
Water Connections Permit ...........................
Sewer Connections Permit ...........................
Inspection Fee for Water/Sewer Line Repair
$400.00
. $40.00
$125.00
. $50.00
. $50.00
. $40.00
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 13TH DAY
OF AUGUST 2007.
,,����
SCOTT J. L D, AYOR
ATTEST:
DEBRA A. SKOGEN, TY CLERK
First Reading: July 23, 2007
Second Reading: August 13, 2007
Publication: August 23, 2007