Loading...
RES 1969-183 - 00010241I RESOLUTION NO. 183 - 1969 A RESOLUTION ADOPTING A "STATEMENT OF UNDERSTANDING" IN CONJUNCTION WITH EXCAVATIONS AND CONSTRUCTION OVER EASEMENTS ON PUBLIC OR PRIVATE PROPERTY AS PROVIDED BY ORDINANCE NO. 437. WHEREAS, the City Council of the City of Fridley has adopted Ordinance 437, an ordinance pertaining to excavations and construction over easements on public or private property and requiring contractor or property owner to sign a "Statement of Understanding ", and WHEREAS, said "Statement of Understanding" text must be approved by Council Resolution, NOW THEREFORE, be it resolved by the City Council of the City of Fridley, Anoka County, Minnesota, as follows; 1. That the "Statement of Understanding" presented to the City Council and dated October 6, 1969 is hereby approved, adopted and placed in effect. 2. That public utilities shall be provided copies of the "Statement of Understanding" and any subsequent changes made to said statement text. PASSED AND ADOPTED THIS 6TH DAY OF OCTOBER BY THE CITY COUNCIL, CITY OF FRIDLEY, ANOKA COUNTY, MINNESOTA YOR - Jack 0. rkham ATTEST; CITY CLER Marvin C. Brunsell 1969 r" 284 STATEMENT OF UNDERSTANDING 1. I have been issued City of Fridley: Building Permit No. Dated Plumbing Permit No. Dated: Electrical-Permit No. Dated; 2. I understand that this building, plumbing or electrical permit does not constitute authority nor relieve me in any way of my responsibility for assuring myself that in digging on private or public property that I shall not cause damage to a public sewer, or watermain, or to pipes, telephone cables or electric cables. Also, that I shall notify immediately the owner of the facility if any damage is caused to any underground 'or above ground facility or utility. 3. I understand that at least 24 hours before digging, I am resonsible for contacting the following Municipal Departments and Public Utilities offices who will provide information on locations of installations or easements. (The 24 hour advance notice to be waived for emergencies involving public health). Electrical Underground_ Cable; Northern States Power Co. De- engergizing lines Telephone: 330 -6170 Address: 4501 - 68th Avenue North Minneapolis Gas Underground Pipes_ Minneapolis Cas Company Telephone; Day: 372 -4900 Weekends & After Hours: 372 -4920 Address: 739 Marquette Avenue Minneapolis 1 ?80 STATEMENT OF UNDERSTANDING PAGE 2 Underground_Telephone Cables: Northwestern Bell Telphone Co. (South of Rice Creek and — West of T.H. 1665) Telephone: 561 -2703 Address: 1101 - 65th Avenue North Brooklyn Center (North of Rice Creek and all of the area East of T.H. 4665) Telephone: 588 -2705 Address: 2643 Central Avenue N.E. Minneapolis Water and Sewer: City of Fridley Engineer Telephone: 560 -3450 Weekends & After Hours: 560 -3457 Address: Civic Center, 6431 University Ave.N.E. Fridley 4. I further understand, that upon my request, any of the above agencies will provide data and stake lines and stake underground installations of the municipalities or public utilities concerned. The decision as to the necessity for staking and stake lining will be that of the Public Utility or the City Engineer or his designated representative in the instance of water and sewer pipes. (Staking to be done during normal working hours only, except when public health is in jeopard.- 5. 1 understand that it is my responsibility to ensure that I am not constructing an obstruction on or over Municipal or Public Utilities Easements or installed facilities, without written authority to do so. 6. I understand that underground installations that I have exposed may be checked by their owner, prior to backfilling and that I ar responsible for coordinatiig with the owner for time and date of inspection. I further understand only the owner or his designated representative may waive inspection prior to backfilling. STATEMENT OF UNDERSTANDING PAGE 3 7. I understand that I am responsible for providing and placing such barricades and lights or reflectors as required by Minnesota State Statutes and the City of Fridley City Code around excavations and /or obstructions as are necessary to ensure public safety. 8. I understand that I will backfill, tamp and repair all excavations made in streets or easements and restore existing surfaces to its original condition, in accordance with specifications provided by the City of Fridley Engineer and shall be responsible for any repairs to excavation areas necessary within one year when such repairs.are necessi- tated due to faulty workmanship or-materials applied. 9. 1 further understand that I will ensure that water curb boxes are marked clearly with a stake and red flag and that any curb box damaged during construction shall be repaired or replaced at no cost to the City of Fridley. 10. I fully understand that when excavating operations involve the use of cranes, booms, or other apparatus that extend into the air, the same may come into contact with overhead electric lines, and that the safety regulations of the Industrial Commission of Minnesota require that any operator "prevent such mechanical equipment from operating within 15'feet of any energized power lines ". I will notify the owner of any energized power lines of any proposed operations within 15 feet of said lines and will not commence work in that area until the owner's representative has come on the site and has informed me that the lines are de- energized, otherwise protected, or that I must work outside of the 15 foot prescribed clearance because the lines cannot be de- energized. 11. I fully understand the abode responsibilities and that I can be found liable for damages. (DATE) . r' L (SIGNATURE OF CONTPACTO.". OR PROPERTY OWNEI:)