Loading...
07/30/1984 CONF - 5212) � �. � : ! 1 � `�� FRIDLEY CITY COUNCIL CONFEREP�CE MEETING JULY 30, 1984 1� MEADOWLAND PARK DRAINAGE 2� PRELIMINARY DISCUSSION OF 1985 BunsET 3� INDUSTRIAL REVENUE BONDS TIMETABLE FOR 1984 �i� FRIDLEY COMMUNITY BROCHURE 5� CIVIC CENTER LOWER LEVEL REMODELING STUDY 6� SUBURBAN RATE AUTHORITY REPORT FROM COUNCILMAN HAMERNIK %� OTHER 7/27/84 SOIL AND DRAINAGE PROBLEM IN MEADOWLAND PARK --HISTORY AND BACKGROUND John Flora to City Manager JF-241 Storm water work was accomplished in the Meadowlands Park Area in 1957 at $0.26/ 100 sq.ft. Adjoining sections of the defined watershed were assessed $1.13 in 1962 and a portion was put in by a developer in 1963. We have looked into the similar type problem and solutions used by Golden Valley and the University of Minnesota on their golf courses. It appears that by lowering the water table through construction of a pond and piping into this pond with stratification of the top soil area using fabric materials, a usable surface can be obtained from high water table and high peat areas. The drainage area directly affected by the Meadowland Park is approximately 32 acres, of which the park is about 10� acres. Cost of any substantial improvement could be excessive, as only a small number of homes are involved. If the Council would be interested in supporting a planned improvement of Meadowlands Park, consideration can be given to develop the east end by the sale of City owned property, for construction of approximately 12 residential sites. Funds from the sale could then be earmarked for the improvement. Also, 68th Avenue and Brookview Drive could be improved to MSAS Standards. These sections would then incorporate any storm water piping necessary to assist in deferring some of the costs. In any event, if we are to proceed, we should obtain soil boring information and hire a consultant to design the most cost effective method of stabilizing the soil. This initial cost would be around $7,000.00. After that, improvements could be planned so that as funds and materials are made available, we could progress towards a final solution and use of the property. JF:jmo cc: Chuck Boudreau Attachment: Maps _ � DATE : Ma SUB,IECT: From tbe desk d I�RS11d QURESHI CITY MAI�AGEB'S OFFICE � . n Fiora SOIL AND DRAINAGE PROBLEM IN MEADOWLAND PARK--HISTORY AND BACKGROUND � MEMORANDUM JF-241 ACT;C�PJ I INFO Please collect all the background regarding the soil and drainage problem in the park and different proposals presented to the neighborhood for the solution of it and discuss this with me so we can maybe give an update to the City Council. Thank you for your assistance. NMQ/ms To CM From John �lora 6/15/84 I am accumulating the information available on Meadowland Park, adjoining properties and storm sewer system proposals. Next week, I will be ready to sprea�d the history out and discuss the various options we may have. Recomnend Chuck Boudreau be involved in determining the park designs and what is deemed necessary for it's accomplishment. JGF:jmo cc: Chuck Boudreau � � s� , . .�� .�.•�.•�.' � CwEE� R 3.0� � �..�� • � � � � � r ~ � � E LO � • ` � V ' � �\ •` � � •��� • � N �1 � �.......: � . .' : : ;; i � �I : . �� : V I � � � � � i � � �� • � �- - ' / / ��' / =. 19ST JN � ,-�. 0.�6 • .• • N0. 3 .�� _. ._. 'ARK -- =-_-- r . .�.cc• � � � R . ' • ` • _ ` M 1 �'. E ' - ' = Nrr •vt��E � s _ � C�011t• - ' '• • •�- n •. �i .. ., '� �. � � • ,• , , / ' . � . , V� M � � � _ I 96 ,�� . - - � � • Q4 ; i � a � � , � ��' � � �• i . r r � � � � � " t • - a �r � I�, • " . ������Q�1/�� : s • ' AiEM1JE I w � � ' a� �M M�fr..F _ � �R ° o ► _ • o = � o / �w i � j i �• I � � t � � > � / ' • l. : � � - J _ � � � � � � � � � � ! � � vE =T. M . s »■ s�ns�r . A�tE l; � I��' � � RESOL � O � `� qt� 1 1( � ( � i ...-:: : : . ��� .• � 'O a M 'M .' _ � .,�. . ..:.,h ---�.. �- - s���♦ . .�....•...•.�•"" a � c�[ts ♦� � . �� � • .� ` � � � ♦ .� , � .,.�. PE R •_ . � .� � N 3.0 � I • - � � �e _ ���_ ��� _�' = ������ � _ _�� ,-�_;;:�, � : =� i . ;�., ,_;_;�, � �,� _�_ ����� � ,�,�;� , ,��_ i. „ , ,,:,;;:, - ,�;,;, ,�,._ : ,;;,:, ,:;;;,, , -,;,;, ., _,,. , : '. �� ,,,,,,,,; _„�,.; , -;,,,, ,� _„ . , , � - -,,;,�;,;;, ,;;;;;; , ;;;;, , ,;;, ; . � _ : ;, ;;.,_ ;;;,, , �;;;,; . �::;. -,�=:_ ;, � � ;,;,, : ,,. ,; _,,;; , ,,,;;; , ;;;;, _, ,,;;. . - _,,;. _ ,,,, _,;,_ , _,;;:,_ , ;,; �------- - 1• -� ' � ' ,-, , ,. . �1 ' ���� ������ �„ �„��-=� :__:�: :_�___ • ��� _, ;;,�� _ „� _„ �„„� .� _�„_ , � , , , , ; - __ , , � �-. . . ; ,_ : _ _�_ �. _ - �=� '�i�, � = �_ ,,�, : ; ; ; , , : _,_ _. _,_ ,,, ,,,;;;;,,,,,,,,,,_ �•o �-��� � _� -- _ , ��� r�� _���� _� __����_ �_ � �'— ��„ _�_ �--- �� ' �--- �� � � _��_ ����� ����� � � - ��� - � ��� ���� iiiii � � ' i � � f1i : .ii � i i ' -iii � „ iii_ii i i_I� __ _ !�� _� -- -- ii�� � �T �� � �_�_ �� �iii _i��i � iii T,=i __ __ i ��:: _�� � iiii :� ii � �� � i �iiii���� � � _ii�iii� • '� ' '� i'i i i i i i i ��j �ri��i i i i i i i i� � -t � � � 1 i_ i i i i� i i �I i 1-=������� � 1� 1 1 1 1 1 1 1 1 �1 1 1 1 1 1 1 1 1 1 1 1 i •�� •.�• �.'�....5 i i i�i � i� i � �_i �� i�i_� �� i i i i i i= ���� � �� �� i i i i �� i i �� ..���... - ' i i i i i � �i i i i� i i i i�� i �i _�� 'i � � � ii ' i iiiiiii _ _�� _ _! � f 4 i i i i i � _ i i i i i i i: �_ t . !:� . R�t[� ii � �4:�'Li � � iiiiii � i � _ .�! � Li ' i i i � f1F� a�'��i i i _i _i i i i _�:� = _� _� iiiiii � �'�Ta ii � ���L� � �� � �_� -� ��� � � �� �1'�'� � �� E . -- ----------- ._ ; ; ; ., ,_ , ; ,: :, ' a ��y_��!. =�M �M�C�� � : � _� :� i_i � � � � _� : '! '! ! =� �� � � �_ �_ t! � � � ��_i i � � i i C►Ort� �� ,. '.� ��. � �-, �' � .� � � s ' /' � ' � � � , , - • t�s � �' „�c ' , . - . � � : a4 : � _ _ . , � - = i.ia : � � . •� , - . , . • : . . . '. � . ... ............. � � . ' . • _ ' r���t 1 • � R�'w M�fr.,� � ' i � fM �R o e . s . - s o o s � � ' RYO s� . a � s ; • � � � � 1 v s � , � � ' � � r • � 1 � e�� / � • � I ���������! � � I I � � Mf tKK�f I" I Ir RESC �. 8� J • �• 1 i �s ' � i ���. h ,� . • � \F` I'� f •, y r • ♦ _ ` �O �� r � _ �J. '� N M . � r— . � � . ` 0 r r . 1 i\ Q�^�a..,� � '' \ - � . � : �., � i � p.�.�.. i � • � q- ' _ ,' � /' �' '- • • . � ~� ' ••• , • � �l ���� . ii. �r•,.~a � . 1 ' a , , M � '�� : ~ ���• : � � � � ; 1 � ��' ' , . � �� �''•�•, , '' 0�-/' ..�•, : 2 � , ; YALLEY,- '� � �� ,L. •.Y I . . �r � _ J t p� �M�. • . r . , . � �.t +� .A , s��� 2 � 4 ,•r'r'` ~" .. ' Y � `,i1 .. �.s''t�. �r/1 c•y•w7�C�i��.��,.-a��•r^.��RRp,CE ,.� �'/,T�/'�LJ. � '• , •+ . ,., � • • • . h ` \• , -:� 3 ._`.. ..�•�'• :T . � �„ �....:. t :� .� ��, � , � . 41 .� . .� °- ,�' r :. �,• � • C R E E K � ' =� 1 � � ; � •' ,'` r , ' .._ :. . a[ � v '• �°4 � ��� �� ", ''�. . •� � `' � "-�M , ;:��: . �68TH..�,,� `, P0 ti � 2 •t � c• ' � 1 � ""°' • ._ ---� � �� / •. �' � ?� • = � � ��i �.� ��.t.: r�•� `.: � • • � :3:�. -� �•- � � 4 �,, •/'� - / > �'. � ' . ` : - ' ! . �`i.. r,. � '+..J �u�• 'a5 •� �r � �� -� v ., Q - . �9 � ,� ��j , � ._.!tis , s ,S • i � /Q ��� � � ''.�- ' 9 i 'L a : � ., °� . , � ;�``��.�o,.. � 3` �>>�.:t ;� : . �_ f `�. I p_d� . •i. �'� ' - _1L.. �, � ` sA � . �I. �����. y T�il, S� •, ',jf% ,_k_�il� ! •� - � � .....'� .-i ' / ' _ r_,p� S � �`� � �1 ----1Ly , ..�.. �,• . 2 .,.• + � ��-� .�-:� -; ' : _ N �:�; ' S,tnO; ' S 'Z p / � : • ,� r• _ �st�, . D - _rj 3 s __ �-�L f�.1 •� .� a _._U 1__1•�.I � �` r��� �:` � �1LK� 1O/'� ll :; i: : �r N �l � i ;. , 3 /3 �. B ;_ ;�.�/� r � ;.... _.... � � IA Z /� 0 ,D. • � .�.;._- ir`e. `� ',r��'- a: t �'-;.: W tp /" , �= ,,;.. ..-_w ; ,,.. e,,., q„ - : � t//'1- J : ,� ; , , � ,� � � 'LLq y',_ 1l� t .�' ; % � � ; .1/p . <Lt� ; T 3 � • f: ����'OQ. �' � �.; �: �:� O ,= : . Z �. -w + - .. „ 'ca ,/..� . � ... •.sw � s° !I'i �a • � ,. • .. r � �-- F --',.«� C8 T -AVE.�--.... — - -�� } ..�' �.68Tki�I�, Y =� ••i � liii' Q' • i.. •� .{ Z • • �� 1 I i � ' � � 1 .� � i� � � � . I 3 ` 1 � c'� � ✓lL �_' 1 I � �/J v = �/ -- � �.% {V � ✓s.� � � • Z • � �, ��ri / � `�• ^�\ ,���J ��� _ � � \ • �'• = 1 � �. R �N", �l1 �'� � 3 ��� � - . 6 � . .{:1. .;, 4,.,; Q ; Y � .�.. i J " i, � , Z� � � 0 _ �z .. . � - --- ` � , ,.� . . ` i . � ,y ., ` , � __ 6 q -,�: .. �.�� � . ,yo :f +r�t• .,, W �� ...,�,. 6 B ;�,< < . , � � Z ! W- - - ` :�. �� � �y � � x l• f- 6 C W; � ' . O � r • 0�----- ---� i il,ao.� �• /` O• 'Q_ . I '`; � � I � �: ; __— __ . .' Q . '4 — - NI_ � --60_:��r.: � � , r � � � `': � ; O � :: � � ~ �• ; , ' 6 E,.., ,�._.�6� i � - —:is..: ,t.r!' _ �' , -.. „ � - - � � ------- ,,... .�..... , 8�6 �, 6 A ° � ,15, °i a , ' � � • . ' � ' `'+- �B�EP, �, ,..,----;,,J ��W - _ . _ _ _ .....t `_ _��P.r�v � , ; � � --..,s � o.^=- � •' 8 F ,' C� . � •..� �.`.:,_ � s'� e , � � � " . . , � . : : . • � •� �. ----�• - .� T-- ' - Ll�:�l Q s • •'.� _ .. '�G/IIK ' ._....'..'_.._. _ . ,.� s� p ag I . �/ � � � � �'8G � : 3� ; , � � Pt�, , � ,.. • � � � � -L »,� _ � ��:,.. , � I �. O �'� 3 � � .,,�;..,. • ».3. � ..... o- -� �... s� � � O O � W � 9 A 9 C 9 �o? .° : �� � 8 C- �8 8 � , � � �. Q ,a„ _ ,� - ... ,� —J ��c,_8I �8H x 2 � a«. �� ; m � . � 0 �:�� � � -. _ � � Q � � ; :. c ' I - • i I w rn/• �r � it � r.�r.'.� o r^ u+ �� ��' ..�' .._:-1--'EO.-'S��AF[3-+{W1F.- N0.6 '_fr. :_.__-____�_- r . �iit Eb Eq — --- -- - . . :• . EC. 3 � y� � I� , ._ I'— — . _—_- - , " - _ ��-�•------ 0 A t �s, } G � � .�. [� + 1 . � b �- t••9 _ 3.4� 1► �RF4• � T. � �~ v,�. *d -' �K`�` ? _. ?��j �`w w • r v� �fI j � r 5 � � _ ' �f ' �° �t�w. _ �t ��s' � lI . i � /� � .o { . � ^ F _ ' � FI '� s '!' +' a. �11 tt_Y -� � f� /� .Il_ }- /t� �1 /! � id �� I � V � : `/'__ l . � /3 �e d ? ° � �'s L�J I'� i _ � ��•s_ � `1r�6s ��` �:slJ , ; --- . � •�� �`` Ic� ��' � � �4 : �� � 0 #•� �., ., - s�e, ife� :•sso� � s>;i - i: � .� � �� : ���.,�' '� e ` 1Lf� .��s�._y ..,/� _1��Rf_ JJi�! � � ^ �; sS Q . � � � .� i: :� S i� 1 I� �`'[ ; 0� �/ w� Q ��: /� � O � / 3 � �2 � I� I j v 1 ,�� .� � . � � • , •�,� ,� i , .....�IrvA� �e •ti �� �:W� ¢I 1f� t+ �'' z5o r51!�f7�� /03�� '} S� -p��ao 4i /_l� � ; rya .... �.. I:.. ^ a• t� fi' ��w F� ��C j. 1Lt�_ A�1tr N{L16 N�• c��s'_�► •L r :. ""_ � - —�- � -- - —7Hai—V � -��; �—� �S.s+! _'L — � lars 1Y. � ;:r� . , •. �� � � �"ai� �� • '� _ _ �: . r --a. nr- ' � �'*iI'�; iJ s' .s11� • � ~ ` . . � � R • ff �;� . .�` z '"� � . •. {U• •, � : Eas-r iWE 0 � — � '; ,� � � �.. � :� : ..� a � IjZ ���R. : -p y/ ' �., � �� ro � �:;_ ��slr _ . . . I - xs'i DitcN i � � � . - � � . • •1. • � (� :<; •_ .. . i 1 , �C�. r �. • • ;, :;, 4, 3 Q , � x � � -- � 7� _I( e � --- + as•�°►' `'` � � x�,'� . • � ,L � • , Z � i� � � . �, . ,� ,, � oq � , � , � ^.� � O � �' ,��kY � `� •�• �,��� �' � .�� I I � �.� • I � ., ��,ti �c�� V � 3 . ff� �"'I': ' . . • . • I ; � , ��� � �ss '. � � f•'�/ � � • • • • • • ' � i /���.�.� . �• � �� s� �`'o '�' j � � � �� ��,i� !�� I I �'.L / � � '�� �,'f �!r 'r� � � � �� � f • � � � ���irP �� 4 . � •�� �� � � � •�• •• • '✓'' �". � � /�/��'�' • • • /esI - - ---- — , ' /y• I / \ � �� � �. � �' � � �� • � �11+ � ;� �� M Ij t � � � � �..� � � � •'� • • �f� • �• i " Ci� �; ,S.' � ��Sy�i _n S: �e.y l.�i /' \ � 1..� - - - - � J `✓!� � ' :�,e� i �, � ��' �! � � �, 4: � � �,�ap � � r"� w •• •. CG) `J I lt.� � I � ti • �• w` J � :� ; � �7 • � ,�� �V 1 I � �! �, '�V17 • � � h `t 0 ---- �� -- --; � •�` � � ` c : � �� • O• C ] O , j � � � � '�3,7 t ��• � � r; � � � I � � O . h• 1,�1 f'ic. j,s l-e:.!_ C', `----'e.---!---w � • � � • �!, • • � 6s • � : � � • • • Ow � I �� I • ! �� 6 E � � �� � i � � �� � � � � ' � �y �� -�- � ����_�-- ---�--"-•' ---- it! '2/Ecl , �TT� C I . �� F� ^ l7 D '�,e .., O � � ; I J„•=,=e � � _ � 8 A , � s`°, � , �' , _ � ���- � �r��s.� _ _ rt�r,_�? _— � ' -- G•� �A Q �c"� . ���j� T �i//t!b . . � O ,"___.i . .. � t � � � �: � } w �'rs � '1'1:oJ ��r; [ t.�. •� �..,��= Jc � � ,¢c��,a � t i �� i � � . (� !l.`.,i/�'�U N.:/a � . , .�.i � ��' �•-• •-_L.. - -- jl�l� �_ ---�---•-- -- t — -- , - Re /�� iro�-•• rsr .: •�• KJ�?2io, � (s.:oJ �A o I o � '�: �.i=;,: i.� �f as Z,e • 0 3 a�� � � � � . 8 G �^.. _ ��;ff� - � i� 1 _ ',.;. �1 /�fjJ ' Nlla - is•�s ' i ' Jtir1i /IfJd � 1 . wf O I, ���t.i' •.� q _ ' ; N�2S3�i • !2fo"o' .FtC� � � }' (1G4o% ' ' � . E� . p/� n �� � , , � �_ C � 8 g ° � ° � ; J I�1 JC � �3oc: Zc'Sc� .,,� h Z � �,� , i/ ` � W� i ' $ � �j %� " � �� ` • '� ��'� I V (ZCE,i f I � � I � � I � ,•'s � sD I �y: - 7�v � ( :��.. p� .n' lF �?��. . : �'1 --��-��� a• °��c:�2�T: i�ioJH��1�r-.-'�(o.-�=,,,.P ' ------ ---- � - _^��— � � lY //SECb f3ER -� r� � ;,'_ , IC _ �. � ( — '; �; • --__'--•-- ■ �.- —•--.r — •- -� - - -- -- --. .._ . �- . . . � . i 1 ,l �S b ' d ` � � Q C�EEK • � W r ,~n o�NOQRA -----•.---. 18� � :�VLSTON �ti� ~ � ` - � �� 4 � � � ' N �,. h E � N � i� �5 . �5,. � Q "-- � �'• � _ � � , '�' > : � �' — � C v i s < z z ' ` s i i 3 � 3 � � ( �' �••� . ��ENUE � i�iC: C�CVER ,. — -- 33 —'`� j� —�7 �'-- ��� _ ^ _���� � � __�� --�/ _- �� ��- S�a� �.T �1 II ���'�~`,r -.`.�_—_-�C `E! _, � `;_- � � �-� u ' .. .. . . � , =, � J W � r � � � W N � � = Jf N r O J r = n � = h 2 = W �, O . � L � z Z t W � , C J 1 : 7 • � �� � . � "' rjil � ,'' � i! —\ -�f . \ 'f / o,. '�,� � s < � r---- � 1 � I ��` �- �'���G�/ \ • 6 � ' 7 r� 9 Y � .o ;'�'� � � f ' _ .(:. 5� Ld.�� I � ( 1 W �Gi.� �; �r� o �e `� _ •C. :C9•S �ss.�. �I S �- W' W j� e :� � N 2.� b �/S• � I �! T N � +�E �.E. � • N m• > �G ' C ; f�, � - �r �ff � � (•(..� G n ��—��"_'� -- — —; Nr, � 7' . , T!T � — I � - C� t'�' S «. S s��.�, S� [3 r K. y- . 9,er�.ev.� r � r�/t0 �_ S, t r: c� . tl 3"�• G i� — " ' J� i � N ► W s�;,�� ��att�e� �..�4 � r ! ��' r,�•s9 P�RK '" �-.r-- .. _ � 66*� c.Ea.,= � �{ s-.9 — i�-`=2-�– =2� - - <, ' —'4'- _�� _ j_ _ � V : 'l 2 � � �_'_'� � '��-� ___ � � � i ' I '= I i ^ , � i � _� � � � � J �` L.- __._ iz "< � 3\�: � • � I� e�%% — _ ( I � � I 2 1 ~ ' 1 e i � i! " i i �� i I �_!� --O -- �1--= � ' rE ::.-. �I 0 Q N Q , � � ,J 1 I I ----� I � I--- -- - +--�_-'.. :E � ' �� �r �� - �� �'",ci►— /1'•' , i t � (Ofiicial �uDlication) �/;� y CI1T O! ltIn[.R! /�/ � P�LIC �OTI� Ir. cor.formance with Section 7.04 of Lhe City Charter, Lhe follwing City Nanager's preliminary DuCget for fiscal year 1985 will be submitted to the C1ty Council at the Auguat 6. 198k City Council Aleeting. LSTpLL1'� tE�AIIE G�ISR�I. P9pD Taxes and Special Assessments: Current Ad Yalore� Delinquent, Penalties, Forfeited Special As�essments Licen�es snd Permits: Licenses Permits Ir.tergoverr�mental : Federal State - Aomestead Credit (Current A� Yaloren) All Other Charges for Services Fir.e: and Forfeits Ir,terest on Investments Miaceilaneoas Aevenues Oter Financing Sources: Nur.icipal Stzte Aid Fund Reverue SharinE Fund LiSuor Fur.d TOTAL RE�ENi1PS I�D 071�t FUUICUG S�HCBS Fur.d Ba:ance: DesigrateC for Replacemer.t of Fixed Assets Cenersl Fund Surplus TOTAL P91ID B�1.�/f� TOTAL G�ER�1. POltD SPECIAL AEYHIDE PONAS State lid Yund xe�enue S6arin6 Puad Cable 14 Fund T07AL SPBCIAI. R�Y�OH PDlID6 D�T SP.R�ICE FUNDS Ci�ic Center Boad �und . Property Tax - Currer.t Ac Valores. Interest l+OTIIL D�T S0t7IC8 lO�DS C�PITAL PYQJS�T POI�S Capital Lpro�sent ivad Propert)' Tax - Current Ac Va:ore� Ir.:erest TOTAL CIPITAL PRQIBLT FONDS TOTN. �1.1. PQiDd NA�Il; M.. QUR£SHI City Manager =2�655,�79 35 � 8T0 3�300 141,628 100�000 31�000 367,395 2,003,�99 121�402 150�000 260,000 �t2 , 500 1 �10.000 232,652 50 , 000 6.33;.365 161,152 372,u26 �T 3.5T8 6,so7.9A3 402,821 232.652 53,550 689,023 3�,�85 6,666 41,/51 4L ,100 53�7�� 97.83� i7.635.948 Legislative: City Council Planning Commis�ions Other Commissions City Nanag�ent: General Manager Personnel Legal Central Services: Elections Finar.ce Aasessing Civic Center Police: Police Civil Defenae Animal Control Fire: PuDlic Morks: Code Enforcement Planning Technical Engineering Traffic Engineerin6 Street Lighting Storm Drainage PuDlic Works Nair.tenance Parks and Recre2tion: Naturalist Par ks Recreation Reserve: �PPZOPYI�iIONS = 151.59u 329.702 602,237 2,040.628 �65,857 1,521,8�2 �,��„7ua 3gp,�?o 6,a0T.9�3 �102 , 621 232,E5� 53 �55� 689.023 L1,1°,1 � �1.151 9T�83' 99,83� =�,635.9�8 i � ; � POBLIC YORb4 1985 BIIDGET OYER9I$ii July 23, 1984 � �■' .y� �M 1. Obtained St. Paul District Corps of Engineera aupport for a Federal Project to upgrade the levee along RivervieW Terrace. Division approval is expected this Pall and the design should be completed within 12 months after approval. This would upgrade the existing levee to Corps Flood Standards and eliminate the regquirements for individual flood insurance protection in this area. 2. Formed the Six Cities Watershed Management Organization� and Was elected Chairman. ile are progressing to�ards having a consultiag firm prepare the xatershed plan and modeling for Spring Brook Creek. This portin should be completed by June 1g85. 3. Removed the record snox accumlation received during the 1983/84 xinter. 4. Initiated use of the Community Action Program (CAP) personnel to complete CDBG projects for the citizen's handicap access to public facilities to include the Nature Center Trail System. 5. AbsorDed the resignations of Jerry Boardman and Bill Deblin from the Planning Department. fiith the elimination of the planning personnel, redistributed their duties to the Public Works Staff and temporary positions. 6. Continued a joint sealcoating contract procedure with the City of Columbia Heights. NeW Brighton was not prepared to identify their requirements due to the April tornado and Spring Lake Park decided not to join in this year. 7. Completed an electronic alarm system Por all Wells, well pumps and filter plant buildings. The alarm aystem provides immediate notiee of temperature drop, illegal entry and major equipment failure, reducing overtime costa for manual inspections. 8. Coordinated the design criteria for the Police/Ga,rage and Storage Area with the architect designing the Target Northern Operations Center construction. 9. Moore Lake Phase II permit approvals from DNR and Rice Creek Yatershed District for removing the xeeds from the East baain and placing a poly material liner to reduce phosphoroua levela vithin the basin. iiork is acheduled to commence on September 1984 - eompleted by May 1985. 10. Increased the production of wells 6 and 8 by 625 gpm each during the normal maintenance work for an additional cost of only #t6,894.50. Thia equals the establishment of one Ae� xell. 11. Received commendation from the American Water liorks Association for our outstanding aafety record during 1983• Not a single disabling aecident. 12. Completed analysis oF electrical generator requirements to maintain our water and seWer systems during emergency conditions. 1. Hired a t�ll time secretary - Jean Ottensmann - replacing Inez Rapala who retired in June 1982. 2. EstaDlished a temporary poaition of Code Enforcement Inspector to follorr-up and obtain compliance of Council and Staff stipulations on Rezoning, Speeial Use Permits, Variances, Platting and Building Permits. 3. Microfeched the Council and Commission records. 4. Progressed with the acquisition of residential properties on Apex Lane utilizing LAWCON and CDBG funds for a Riverview Park. 5. Used temporary laborer positions Within the Street sector for street pothole patching, sealeoat preparation and vacation au�entation. 6. Continued the concrete atreet joint resealing maintenance program initiated in 1982. 7. Progressed With the Municipal Utility Data Computer System xhich inputs all building permits, eontractors, eomplaints, atipulations and fo11oW-up information of retreval and completion. � •� 4 1. Planning - =1,000.00 Plan files Por development proposals and area design ooneepta. 2. Code Enforcement _ ;250.00 Plan Check Table for plan revie�r and draPting. 3. Bngineering _ =3,100.00 a. Radio acanner to pick up area emergency frequencies for mutual aid communications. b. Traffic counters to replace 14 year old equipment with directional output atate of the art equipment. 4. Public works - =93,028.00 a. SideWalk �nrnrbloWer to remove deep ano�+ and direct snow to different locationa. (fissential for Center City Walkway Syatem). b. Snow plows for our 4-iiheel Drive vehicles Which a11oWs directional plo�ring. c. Tar kettle for asphalt crack sealing and street repair to replace destroyed kettle. d. Three mobile radio replacements with multiple channel capability. e. 45RW emergency generator for Municipal Garage, booster or lift atation poaer. f. Emergency poWer hook-up for Garage. � •, 1. Initiate data imputting for the Municipal Otility Data Syst�. 2. Improve and timely initiate folloW-up actions for summertime completion oP eode and atipulated it�s. 3• Extend computer terminals and connection to the City Garage. 4. Design an Equipment Control Management Computer System. 5. Continue those work and policy activities that were exceptional in 1983 and attempt to improve those that have proven not effective or responsive. 6/2/3 t � t / f + { � ( � j' �J CITY OF FRIDLEY � , a !lBNORANDQM T0: NASIM N. QURESHI, CITY MANAGER FROH: SID INMAN� DIRECTOR OF CENTRAL SERVICSS 3QBJECT: II�IDDSTRIAL DEVELOPI�:NT BOND ALLOCATION aers: .mi.Y 26, �g84 Attached is a eopy of the schedule for 1984 for the Industrial Development Bond allocation and the application of those funds to actual Industrial Development Bond issuers. lihile the City Council has some flexibility in selecting those Industrial Development Bond applicants that it prefers, they are someKhat restricted by the combination of schedules that are imposed by the State and by their oWn Couneil meetings. As you are aWare, the City Council currently has two issues before it which fall under the allocaton la�, i.e� the River Road Investors, �6�000,000 and North FreeWay Investors, �7,500.000. As you recall, we recommended to the Council When these issues first came to our attention that if there Were no other issues requested, the staff would recommend their approval. When the discussion of the allocation began, the City Council somewhat indicated that they would prefer to use its allocation in the tax inerement areas and the redevelopment districts. The particular question then that needs to be addressed is, at What point should the City Council finally make the decision as to Khere to apply their Industrial Development Bond allocation? Please note, that on August 31r 1984 the City has to secure its unused entitlement With a one percent deposit. The City has tWO choices at this time. 1) Is to secure the one perce nt deposit With their own funds and speculate that an Industrial Development Bond issuer Will come forward in the Tax Increment area. The problem With this ehoice is that if no developer comes foraard, there may not be enough time to complete the River Road or the North FreeWay developer issues and the City may lose its allocation for 1984. This, of course, could have a great effect on our 1985 allocation. 2) To inform the tWO current issuers that the City has placed priority on them and use the developer's funds to secure the one pereent deposit. Again� a potential problem here is that if another developer does come forward for an issue in the Center City after these deadlines, we would not be allor�ed to issue a bond to them. The August 20, 1984 Council meeting is the last possible time for any applieant to apply for Industrial Development Bonds prior to the 31st deadline. Zn order for someone to be on the agenda, �ae must legally publish a notification not more than 30 nor less than 15 days ahead. In order to secure that publication date, they Would have had to apply by Wednesday the 25th of July. Since we received no applications on the 25th, this leaves the City Couneil With the simple choice of either using their own money to secure the one percent deposit or a1loWing the River Road Investors and North Freexay Investors� tbe tWO current IDB applicants, the priority. NASIM M. QIIRESHI -2- JIILY 26. 1984 INDIISTRIAL DEVELOPI�NT BOND ALLOCATION After conferring with Mr. Jim 0'Meara, 0'Connor � Hanaan� it is our reeommendation that it Would not be prudent on the City Council'a part to use the City's tax dollars to secure the allocaton xhen We have a viable developer requesting funds. Because of this short period of time, it appeared to be alsost impractical for a developer to eome forr+ard at this late date in an attempt to secure funds. It is our opinion that the risk is not Worth the exposure. Therefore, I am recommending that at the August 6, 1984 City Council meeting that the City officially authorize the allocation of the Industrial Development Bond funds to the River Road Investors and the North FreeWay Investors applicants. SCI:sh • cc: Mr. Jim 0'Meara 3/o/u/10 4 !!ay 24 INDOSTRIAL DEVELOPl�NT BOND SCHBDIILE Fridley applied for Industrial Development Bond allocation. June 18 Fridley receives an 8 million dollar allocation. July 18 Regan signed bill. July 23 Fridley reapplied for Industrial Developaent Bond allocation. July 25 Last day to publish from August 20 meeting. August 2 Last day for City to reapply for Industrial Development Bond allocation. August 6 August 20 August 31 October 31 October 31 November 1 December 31 3/0/4/11 Fridley Council meeting. Last Council meeting prior to 31st deadline. Last day for City to secure entitlement with 1� deposit. Last day for City to return unused entitlement xithout loss of 1 x . Last day reallocation awarded on at least 4 of 19 point requirements. First day that no minimum points requirements needed for reallocation. Last day for City to issue bonds xithout loss of 1�. Ij . ' Chitectural Alliance � ���,��,.�.�� (612) 871-5703 Architecture • Pianning • Interior Deaiqn • Eneryy Deaign Mr. James P. Hill Director of Public Safety City of Fridley City Nall 6431 University Avenue N.E. Fridley, Minnesota 55432 July 24, 1984 Re: Proposal Architectural Planning Services Proposed Police Department Remodeling City of Fridley Dear Mr. Hill: Thank you for meeting with Dave Carlson and me at City Hall yesterday. Based on my tour of the present Police f acility on June 19, 1984, subsequent telephone discussions with you, and our presentation to the City Manager yesterday, I have prepared a proposal to provide professional architectural planning services. You are, at present, considering the remodelling of your present assigned spaced on the lower level of City Hall and the addition of a sally port at the north wall. Your basic concerns/space needs were spelled out in a memo directed to the City Manager dated March 20, 1984. Current space assignment is approximately 7600 square feet with an option to add approximately 1000 square feet at the adjacent storeroom to the west. There may also be an option to convert space further to the west (refer to attached floor plan). It has been noted that the Target Operation Center construction im mediately to the north (and across an expanded alleyway) from the Police Department includes heated parking for city vehicles (squad cars) and storage for city use. We understand also that there could be an opportunity to expand the internal entry to the Police Oepartment into the pubic corridor and turn the Police public entry 90 to f ace the open stairw ay to the east. Except for the probable addition of a sally port, the exterior boundaries of a remodelled Police facility are defined. Within those boundaries, however, there Nould appear to be a degree of flexibility in the rearrangement of spaces Nith few structural or mechanical "f 1 X@S" . Minneapolis/Saint Paul • Twin Ckies international Airport • Phoenix We would propose that a Study be undertaken similar to the one we completed for Brooklyn Park this year. The Study would include the following: Inventory A revieN and assessment of the existing facility (envelope and support systems) as well as the site (related traffic) is to be completed. �ace Needs Survey Discussions with prime users (3 or 4 individuals) are to establish space uses. It is necessary to then project actual present and possible future space needs. Major issues are identified as discussion and planning tools. All space needs are analyzed according to zone. We have found it useful both in our Richfield and Brooklyn Park Studies to assign spaces according to the following zones: Public Areas Administrative Areas Administrative Areas Secure Areas Detention Area with Limited Public Access with No Public Access Traffic Flow (both internal and external) should respect (if possible) distinction between the zones. Space Options We would schematically test revisions to the existing defined spaces which would result in a plan (or plans)which best satisfies needs within established parameters and best locates the sally port. Cost Estimates/Staging Estimates as to construction and related costs (fees, furnishings/equipment, etc.) are established as is a plan (schedule) for accomplishing the work in an occupied facility. We would not, as part of this Contract, prepare Contract Documents for construction purposes. We do not anticipate the need to involve consulting (mechanical/ electrical/structural) engineers at this time. Our Inventory assessment of existing systems Nill include our own observations of those systems. Similarly, cost estimates Nill be done by us. At this point, we Nould estimate that construction costs (total remodel l ing and sal ly port addition) could range form 5280,000 to =400,000. Assignments from Architectural Alliance would be as folloNS: Principal-In-Charge Carl J. Remick, Jr. Project Architect C. David Carlson We would anticipate that our Study could be complete in four weeks from instructions to proceed. Based on the above-noted tasks (to be presented in written Report form), we would anticipate a fee of s5,000. In consideration of the above-stated assumptions, that fee should be considered as a Guaranteed Maximum Sum. We bill on an hourly basis. Billing is done monthly with payment due in thirty days. Normal reimbursables to include travel, copying, printing and postage are included. We would anticipate presenting you Nith copy-ready material for the printing of our Report. Copi es of our Report for Brook 1yn Park and R i chf i el d are avai 1 abl e should you wish to review them. Thank you very much for this opportunity to submit our qualifications and to express our interest in your project. We would very much appreciate the opportunity to work with you and others from Fridley. Should you wish us to proceed, please sign both copies of this letter. Retain one copy and return the other to us for our files. Sincerely, . • CARL J. REM , JR., AIA Principal cc: Ellsworth NAME Carlson Remick TITLE CITY OF FRIDLEY � U t0 n N N d � � � � b r� c rn a•.- U N �O N Q) � Q U N ' � � d �C ip N � •r C � � rn i Q� •r Q! L, N +� ep V► O .� Q d tn 1. ! , ; , I � . .� . ' ; , .. 1 • '_ '� :: . .• . J � N N � � � ' Z w f :E F- ._ � [Y Q C9 a �Z W �� p ' L� ' W LaJ U �i J ci o cn a � Z O � CC U uu —' �_ � �� O - C� � J �� W -- > �� J 'r u� cr _� w [� � �c O � �•/.! �l?s .{ � � t `.��p� c ���L►4'f� ��., �:�,. '�{}.+�� POLICE DEPARTMENT . City of Fridley ' Minnesota DATE MARCH 20, 1984 _ FROM PUBLIC SAF SUBJECT DIRECTOR, J.P.HILL POLICE FACILITY MODIFICATIONS MEMORANDUM TO NASIM QURESHI JOHN FLORA PB�L�is The i�ending developnent north of city haii has a direct effect upon construction of a police garage. The construction of a police garage has a direct effect upon facility modifications of the Police Department. s T'here are currently 17 parking stalls for police vehicles. It is rather i�erative that this number not be reduced. T'here are times during daylight hours and shift changes when all stalls are full. There are 15 city and 1 privately awned police vehicles that use these stalls daily. In addition there are other police jurisdiction vehicles that use the stalls for short periods of time. Options for parkirrg the$e vehicles at some other location is not realistic and clanqerous. In addition to the parking stall requireaents, the follawing must be considered; 1. Pris�er security and offioer safety. 2. No obstruction of emergency veh�cles by delivery/trash trucks at any time. 3• Rapid access to police vehicles from the police facility 4• t7nobstructed access fram police garage,/parkinq to main main city streets. 5• Heat, floor drains and lights inside garage. 6. 7. 8. Garage security, including roof. Good exhaust systea. Adequate vehicle maneuver area. Serious consideration should be given to naving the delivery and trash pick up area for safety and practical reasons. AC1'ION INFC X X The safety reasons have been addressed. From a practical standpoint, the double doors in the Police p�rking area no longer serve their intended purpose. The doors naw open into a narraw, congested area. Deliveries are d�nped into a small area Which creates further oongestion and potential OSHA violations. Some _ of the delivery vehicles are s�ni-trucks that have to �rk in the roadway blocking traffic. Since all the north side doors are secure, the drivers have to leave their vehicles and walk to the east entrance to make arangements for deliveries. It is suggested that deliveries be made at the east city hall entrance or another more suitable location. The east entrance area is always open for temporary parking. This is the entrance used by the truck drivers for delivery arrangements. There is double door access to both upper and lower levels of City Hall, and the delivered goods would be directed to the appropriate delivery location. The trash container location is both unsafe and unsightly. It is positioned in the area that exits fran the property and physical fitness room which would create a probl�n in event of fire or medical emergency. It is unsightly in that the trash overflows weekly. A well screened different location would much better serve this function. The need for a police garage has been expressed for several years. If the design of this garage to solve one problem creates new additional problems, it may be necessary to reconsider the garage construction. : For canparison purposes Fridley Police operations occupy approximately 7,620 eq. ft. A survey of police degartments that have had the most recent oonstruction of new facilities or modifications revealed the following: 1. Eden Prairie, new 16,000 sq. ft. Population 18,120 2. Brooklyn Park, under construction, 24,800 sq. ft. Population 45,280 3. Eagen, new 16,000 sq. ft. Population 23,590 4. Golden Valley, modification 13,158 sq. ft. Population 22,380 The Fridley Police is utilizing all 76@8 sq. ft. at this time. This space has become inadequate to professionally and safely maintain a 24 hour law enforcement function. With the exception of a single holding roan, the prisoner processing area is conducted in hallways which creates major safety and evidence problems. There is an imnediate need to have all of these functions in one area of the facility, away fram the normal employee traffic area and away from hearing distance of the public at the front counter. This specifically requires: 0 1. At least one additional holding roan. Individuals being held for interrogation can not be held in the same roanf individuals of different sex can not be held in the same room; individuals can not be placed in the same room with one that is canbative. ' 2. A segarate bookir�g room. 3. A separate video room for DUI recording. 4. A separate breathalyzer room. In addition to the prismer processing area there is a need for the follawing: 1. One additional office for investigators. 2. Z1a�o interrogatior�/interview roans. This function is not effectively achieved in an office. 3. Larger secretary's office to accoaiodate data processing equipnent and administrative files. 4. Separate officer entrance away fran office activity and prisoner processing. 5. Separate building entrance for the public other than through City Hall. 6. �larged roll call/small classroan with chairs and tables. This function is currently done in a standup fashion in the Sergeants office. Z�ere is no provision for training functions. 7. E�cpanded locker area and larger lockers. �rrent room is full and lxkers will not �ccatadate coat hangers, jackets, etc. 8. A secure property room as part of the facility. Office assistants currently have to leave the building to get property while the public waits at the front counter. The problem areas that have been identified w�ould best be addressed by an architect e�cperienced in police facility design. It may be possible, however, for engineering/planning to develop some preliminary plans for consideration. , � ; � � � � ( � ��li� � i�-0�.'S (�% p,Eof�os �'J (a> �E�,�,�� / ��S �.��s�,�.�-, ��� ������ (3� 1-,� p���,�r— s�u�y �r �l cv�°� ��� � s � f,��c��rs� Cs� pu �n�iti� R�. r� � 2/�aN ,c r�r�� r,�s : �� Pou�n Office Memoraindum �Q�(n �JIOf 1 �,�, c,o� a�► Members of the Independent Management DATE July 16, 1989 To: Study Task Force FROM: SUBJECT: Judith A. Fletcher, Chairperson i� Attached for your information and use is a capy of the P4inute�; of the July 13, 1984 IMS Task Force meeting, and a cop�1 of ^.esollition �vo, 84-2g1 with attached draft of RFP that is heing presented to the Commission at its July 17, 1984 meeting. If you have any questions, please call-me at my office - 770-4624. JAF:SIL:sl 7.16.84 Attachments REC��� GD ��u` 1 g i9�� ��� OF B�R;�SV111� MINUTES OF INDEPENDENT MANAGEMENT STUDY TASK FORCE JULY 13, 1984 The Independent PZanagement Study Task Force held a meeting on Friday, July 13, 1984 from 9:00 to 9:50 A.M. at the Commission offices, 350 Metro S�uare Building, St. Paul, MN 55101. The following indiv�iduals were in attendance: m wc� � r�,�o�� Judy �tcher, Lou Breimhurst, Terry Bock, Jim Spore, ,� � ou'� �David A. Johnson, Phil Carruthers, John Bola,nd, � �,,�,��, .�,�' � f. �li'1 Vern Peterson, Ro Backes, Joe Sizer �C'r� � �I�1M �2fo SratE �cR�J�YU�, ,¢�yr-�c!i Ms. Fletcher asked for any additions, corrections, etc. to the� Minutes of the June 21, 1984 Task Force meetin�. Being none, the minutes stood as submitted. Ms. Fletcher opened the floor for discussion on the draft RFP. Mr. Breimhurst advised that the draft RFP included all comment:s made at the initial meeting of June 21 and that the RFP,as drafted, calls for a two Phase study. Additional language was added at the end of the third paragraF�h on the first page as follows: "It is the intent of the Metropolitar� Waste Control Commission to have the consultant and its subcontraci:or, if any, perform both Phases of the Study; ho��ever, the Commission reserves the right to specifically direct which areas will be stud��ed in Phase II, and if other consultants will be invited to participai:e.". Additional language was added to the first paragraph under SCOPE OF THE STUDY, second sentence to read, "...Commission's oner�iting charge and regional government relationships currently...". Paragraph 2 under PHASE I was changed to read, "The audit pro<�ess should encomnass assessment of the agency's organizational structu�_e, work environment, management, supervisory and personnel oractices, long and short-range planning, and the accounting and financial rePorti�zg systems and its system of internal accounting control. Submit interim report on Phase I, including audit summary and a�nropriate recommendations not contingent on Phase II activities.". PHASE II paragraph was changed to read, "Development of a comprehensive plan which addresses the constraints to effective performance as identified in Phase I and which includes recommenda�tions for organizational changes which will lead to improved efficienci��s in the activities performed by the Metropolitan Waste Control Comm.ission. The comprehensive plan will include dates for accomplishing recomm��ndatio: resources required, and change analysis measurement technic;ues.". SECTION VI paragraph under PROPOSAL COPJTENT was changed to re�id, "A schedule of fees and reimbursement for expenses by key individu��ls assigned to Phase I of the project (supporting staff may be grouped into classes) with a maximum total cost for Phase I. An estimated cost for Phase II should be included.". MINUTES OF INDEPENDENT MANAGE?�4ENT • STiJDY TASK FORCE - 2- JULY 13, 1984 Paragraph 3. under EV_�I,UATION CRITERIA was changed to read, "The capability of the consultant to perform the work, including specialized services within the time limitations, taking into consideration the current and planned workload of the firm and key individuals that will be assigned to the �roject.". Paragraph 6. under EVALUATION CRITERIA was changed to read, "The maximum total cost for Phase I and the estimated cost for Phase II of the project.". Six copies of the proposal should be submitted to the Metropolitan Waste Control Commission by 5:00 P.Pl., August 31, 1984. Inquiries and proposals should be directed to Louis J. Breimhurst, Deputy Chief Administrator., MWCC. A draft of the proposed RFP will be presented to the full Commission for their review and consideration at their meeting of July 17, 1984 at 2:00 P.M. The Task Force committee members were invited to attend this meeting. After July 17 the RFP will be advertised for proposals. The next meeting of the Task Force has been scheduled for September 5, 1984 at 9:00 A.M. sil ?.13.84 Commission "Other" 84-281 M E T R O P O L I T A N W A S T E C O N T R O L C O M*'[ I S S I O 1V 350 Metro Square Building, Saint Paul, Minnesota 55101 222-8423 RESOLUTION NO. 84-281 RESOLUTION AUTHORIZING REQUEST FOR PROPOSALS FOR AN INDEPENDENT MANAGEMENT STUDY WHEREAS The Governor's Commission to Review the Metropolitan Waste Control Commission requested that an Independent Management Study be conductec3 of the Commission; and WHEREAS The Commission concurred with the recommendations of the Gove�rnor's Commission and has established a Task Force to develop a Request for Proposal for an Independent Management Study; and WHE�tEAS The Task Force has met and has developed a Request for Propos�31 for a management study designed to insure the efficient and economica:L service by the Metropolitan Waste Control Commission; NOW, THERF.FORE, BE IT RESOLVED That the P4etropolitan Waste Control Commission authorizes its Chairman and Deputy Chief Administrator to request proposals for an Independent Management Study and to negotiate� a contract with the,successful pro�oser. Subject contract will be submitted to the Metropolitan Waste Control Commission for considerat:Lon and approval. Funding for the Independent Matiagement Study will be provided in Program 001, Account 5091. A�proved this 17th day of July, 1984 METROPOLITAN WASTE CONTROL COMMISSIOrI BY BY Peter E. Meintsma Louis J. Breimhurst Chairman Deputy Chief Administrator LJB:sl 7.13.84 M E T R 0 P 0 L I T A I3 �J A S T E C 0 N T R 0 L C 0 M M I S S Z 0 N 350 Metro Square Building, Saint Paul, Minnesota >j101 222-8423 NOTICE OF R:QUEST FOR PROPOSaI. FOR COIr'SULTZNG SERVICES TO PERF'OR*i A.'� INDEPrIv'DE1�T M.s.1�AG�SE.`�T STL'D�' The Metropolitan Waste Control Commission, located in the Minaeapolis- St. Paul area of Minnesota, is an operating agency which owns and operates the Metropolitan Disposal System servicing 101 communities scattered throughou: a seven-county area. The Commission was c:eated by the 1969 Minnesota Legislature. The Metropolitan Disposal System includes 14 was�e- water treatment plants and approximately 500 miles of interceptor sewer lines with numerous pumping, metering, and water quali�y monitoring stations tzroughout the system. There a:e nine appointed Commissioners and 930 + e��loyees.' Ir. the latter part �f 1983, Governor Perpica appointed a Commission to Re�iew the Metropo:itan k'aste Control Commission. Tiie Commission submitted its Repo:t ia December of 1983. A major reco�eadation contained in the �eport was that an Independent Management Study be conducted at the Metropolitan waste Control Commission. Subsequent to tne issuance of the Report, a strong show of interest and support for the reco�aended Management Study has been expressed by municipalities served by the Metropolitan Waste Control Commission. In June o_° 1984. the Metropolitan Waste Control Commission adopted Resolution 84-243 in support of the Study and established a broad-based Task Force charged with developing a Request for Proposal, receiving and reviewin6 �roposa2s, recommended action to the :Yletropolitan Waste Control Comsission, and monitoring :he progress of the Independent Management Study. In response to their charge, the Inde�endent Management Study Task Force is seeking proposals from qualified management consultants to cor.duct a two-phase Management Studv desigaed to insure efficient and economicai service by the Metropolitan k'aste Control Co�ission wnile maintaining compl�aace with all ieder2l and state regulations. It is the intent of the Metropolitan Waste Contr�l �.Omm1S61nT1 to have the consultant and its subcontractor, if any, perforr both Phases of the Study; howeve:, the Commission reserves the right to specifically direct which areas will be studied in Phase II, and if other consultants �ill be invited to participate. SCOPE OF TH� STL'��� The focus of the :Ylanageaeat Study will be to examine the i.nternal management and structuze of the Metropolitan k'aste Control Co�ission. The study will consi�er the :ietropolitan Waste Cont:ol Co�aission's operating charge and regional government relationships currently established by statute; however, minor technical legislative changes may be considered. Other external relationships and controls are extraneous to the scope of this Study. t7ork b�• the consul tar.t c:ill be in two phases : ?Ii.4SE I. Per:ora management audit of current organization for proble� identification and possible legislati�e change identi`:catio�n. The audit process should encompass assessment of the agency's organizational structure, work environment, management, supervisory and personnel practices, long and short-range planning, and the accounting and financial reporting systems and its system of internal accounting control. Submit interim report on Phase I, including audit summary and appropriate recommendations not contingent on Phase II activitie;s. PHASE II. Development of a comprehensive plan which addresses the constraints to effective performance as identified in Phase I and which includes recommendations for organizational changes which will lead to improved efficiencies in the activities performed by the Metropolitan Waste Control Commission. The comprehensive plan will include dates for accomplishing recommendations, resources required, and change analysis measurement techniques. I� is in the Metrepolitan Waste Control Co�nission's interest that �he en;:ire project be completed in tne shortest practical time. PkOPOS�:. CONT�'T : The proposal snould inclLde the �ollowing, in suificient depth or detail, to allow proper evaluation: SECTIOh I - Stateaer.t oi understandino of project scope and oojective:s SECTIOti II - Description o� two-phase workplan to accomplish the proje�:*_ obiec:ives SECTIO:� III - Dascription oi the work product to be provided in each phase of the work. SECTIO� IV - Description of qualificatior.s and relevant expe:ience of the firm and those specific consultants that will be a-ssigaed to the p:oject. Resumes should be furnisned. SECTION C - Staf�ing plan for the completion of ea�h phase oi the work, including the roles and time coammitment of each participant. If a subcontractor is to be used to perform an� portion of the work, a complete statement as to role and qualif�cations of t:�e subcontractor firm or individual must be included. There should be 2 statement as to the necessar} resource commitment of tne Metro�olitan Was:e Control Co�ission in the devel- egme^.t o: eacn phase of the preject. - � - 0 SECTION VI - A schedule of fees and reimbursement for expenses by key . individuals assigned to Phase I of the project (supporting � staff may be grouped into classes) with a maximum total cost for Phase I. An estimated cost for Phase II should be included. EVALUATIOh CRITERIA Proposals will be evz.luated by the Independent Management Study Task Force: based on responsiveness to items including, but not limited to: 1. The degree of understanding of the *ietropolitan k'aste Control Co�ission's needs and objectives including statutory consider- ations. 2. '*he e.�cperience and success that the consultant has demonstrated in pro�ects with similar scope and objectives. 3. The capability of the consultant to perform the work, including specialized services within the time limitations, taking into consideration the current and planned workload of the firm and key individuals that will be assigned to the pro.ject. 4. Evalua�ion or the ovezall completeness of the proposal including the workplan, schedule and �anpower estimates, and the estiaa�ed campletion dates foz each phase of the project. �. The consuitant's s:ated requi:ement for tae Metropolitan Waste Control Commission's resouzce commitment including requirements for the Metropolit2n �.'aste Control Commission staff involvement. 6. The maximum total cost for Phase I and the estimated cost for Phase II of the project. 7. Consultants' presentation and respoasiveness to the evaluation co�ttee's interview. In the event that there are numerous applicants for consideration ior thi:� prcject, there may be an initial reduction of proposers to approximately f ive (5) �.�no may then be invited f or an interview. The Independent Management Study Tasic Force reserves the right to reject any and all proposals. 'The Metropolitar. Waste Control Co�ission will enter into a contract w�th the successful proposer upon approval of tae Co�ission. Six (6) copies of the proposal should DE submitted to the Metropolitan Waste Control Co�ission by 5:00 p.m., August 31, 1984. Inouiries ar.d proposals should be directed to: Louis J. Breimhurst, Deputy Chief Administrator, Metropolitan Waste Control Commission, 350 Metro Square Building, St. Paul, MN 55101. � �� TO: FROM: DATE: RE : Background MEMORANDUM SRA BOARD OF DIRECTORS LeFEVERE, LEFLER, KENNEDY, O'BRIEN & DRAWZ JULY 18, 1984 1983 NORTHWESTERId BELL RATE CASE � � ��Ts_�"� On September 29, 1983, Northwestern Bell filed a petitior. with the Public Utilities Commission (PUC) asking for a $109.46 Mi?lion Dollar ir.crease in local telephone r�tes in Minr.esota. It's requested rate of return on common equity was 16.9 percent. Included in that petition was the proposed continuation of the Tier System. The Board authorized SRA to intervene for the purpose of opposing the Tier System. SRA retained Allen Buckalew of J. W. Wilson and Associates of Washington, D.C. to study and criticize the Tier System. SRA submitted direct testimony by Buckalew and Fred G. Moore. Activities Since Last Board Meeting The Administrative Law Judge (ALJ) has submitted his recommendations to the PUC. The ALJ recommends a$36.1 million increase using a 14.46 return on common equity, at a hypothetical equity ratio of 50.1 percent. This would result in an 11.76 percent overall rate of return. The ALJ further recommends that business and residential customers bear the revenue increases equally, rejecting the.Bell proposal that residential customers bear roughly 77 percent of the increase. The ALJ also rejected Bell's proposal that local r�easured service become the only alternative to flat rate service(Bell advocates the elimination of inetered service). Status of the Tier System The PUC Order, due on July 30, will reflect significant progress for the SRA. A member of the PUC staff has informed us that the Order will substantially modify tier ratios in favor of Tier II-IV customers. This ratio modification i� a d�rect result of 5 RA participation ir. this case and in the Bell 1982 rate filing. Exact d�llar figures cannot be determined at this point. However, the rate shift from Tier II, IIT and IV customers to Tier I customers will total well o��er a million dollars annually for residential customers alone. Since the instit�stion of the Tier System in 1980, the PUC has grar.ted uniform percentage increases across all metropolitan tiers. The ratio of tier rates has thus remained constant through each ir.crease: Tier �, as the base rate, - 1.0, Tier II - 1.06, Tier III - 1,21 an� Tier IV - 1.50. The July 30 PUC Order �i�ill reduce those ratios by 50 percent. The new ratios caill be: Tier I- 1.0, Tier�II - 1.03, Tier III - 1.10 and Tier IV - 1.25. The result ��ill mean a greater dollar increase for Tier I customers, a slightly lower dollar increase for Tier II and a significantly lower dollar increase for Tiers III and IV. The PUC Order, however, will not require the eventual abandonment or a study of the Tier System. Thus the issue of Tier System's arbitrar�ness remains unresolved. The above ratio �odification, though favorabl� to SRA members, is not ba�ed on c��rrent cost data. Bell has kept no statistics that vrould e.^.able it to deterMine •�hat is the current breakdown in cost for me*ropolitar. flat rate telephone s�rvice. 2 T0: FROM: DATE: RE : TIER I SRA Board of Directors LeFevere, Lefler, Ker.nedy, O'Brien & Drawz July 18, 1984 SRA Members by Tier Columbia Heights (Par�) Edina (Part ) Lauderdale (Part) Richfield Robbinsdale (Part) Roseville (Part) St. Loui� Park (Part) TTER III %, p2 � ��' ��� Brooklyr_ Park Champlin Deephaven Excelsior Greenwood Lake St. Croix Beach Loretto (Part) D4ir_netonka (Part) Orono Plymouth (Part) Shakopee Shorewood Spring Park Wayzata � Woodland ��J TIER I I �+ �� ��,, �� Blo�mington Brooklyn Center Burnsville (Part) Circle Pines Columbia Heights (Part) Eden Prairie Edina (Part) Fridley Hopkins I,auderdale (Part) Maplewood Mendota Heiqhts Mir.netonka (Part) Mounds View uew Brighton Nerth St. Paul Plymouth (Part) Ro�binsdale (Part) P.oseville tPart) St. Louis Park (Part) Shoreview ��adr.ais Heights TIER IV � •� None �,��� ?�10T IN BELL SERVICE AREA Hastings Loretto (Part) Burnsville (Part) N!aple Plain Minnetriska Osseo Victeria SRA Proposed 1985 Assessments City Bloomington Brooklyn Center Brooklyn Park Burnsville Champlin Circle Pines Columbia Heights Deephaven Eden Prairie Edina Excelsior Fridley Greenwood Hastings Hopkins Lake St. Croix Beach Lauderdale Loretto Maple Plain Maplewood Mendota Heights Minnetonka Minnetrista Mounds View Votes 17 7 9' 8 2 1 5 1 4 10 1 7 1 3 4 1 1 1 1 6 2 8 1 3 x $368.10 6,257.70 2,576.70 3,312.9D 2,944.80 736.20 368.10 1,840.50 368.10 1,472.40 3,681.00 368.10 2,576.70 368.10 1,104.30 1,472.40 368.10 368.10 368.10 368.10 2,208.60 736.20 2,944.80 368.10 1,104.30 ! 1 City New Brighton North St. Paul Orono Osseo Plymouth Richfield Robbinsdale Roseville St. Louis Park Shakopee Shoreview Shorewood Spring Park Vadnais Heights Victoria Wayzata Woodland TOTALS: Votes 5 3 2 1 7 8 3 8 9' 2 4 1 1 2 1 1 1 163 x $368.10 1,840.50 1,104.30 736.20 368.10 2,576.70 2,944.80 1,104.30 2,944.80 3,312.90 736.20 1,472.40 368.10 368.10 736.20 368.10 368.10 368.10 60,000.00