Loading...
04/25/1988 CONF MTG - 50224 � CITY OF FRIDLEY CONFERFNCE MEETING - APRIL 25, 1988 7:30 P.M. l. Discussion of Civic Center Remodeling and Expansion 2. Discussion of MIS Computer StudY 3. Discussion of Geographic Information SYstem 4, Update on University Avenue Corritlor 5. niscussion of 57th Avenue & University Avenue Development 6, Discussion of Moore Lake Impro��ements 7, Discussion of Electronic Warning Sirens 8. Other MEMORANDUM TO: Nasim Qureshi, City Manager FROM: Richard D. Pribyl, Finance Director REGARDING: Draft of Computer Requirements Study DATE: April 22� 1988 Attached you will find a draft copy of the revised Computer Requirements Study. This document hopefully will give you more insight into the limitations that the current computer system has in relation to both short term and long term goals. The study defines broad long range goals that use the short and intermediate goals to provide a pathway. The long term goals must be broad in nature to allow the short and intermediate goals to be more specific and be based on current computer technology. One major change that this draft has incorporated, is that the Geographic Information System will become one of the ma�or information systems that the city has. It will retain all of the geographic related information and will be able to be portrayed through maps and graph5 or numerically. Our path to this system will begin with one station and evolve as the hardware and the software provide for multi-user envi�enments. This draft report also incorporates a comparison of the cost of the proposed system versus the C05t of no change. The incremental cost of an upgraded system would be approximately �51�,000 over five years. This figure assumes that no changes are made including no purchases of p.C.'s. Jim Stern f�om Chapel Consulti�g had hoped to provide a final copy to you for the conferance meeting on April 25, 1999 but because of the �hort time span it was not possible. We should use Monday nights meeting as a type of work session and if the Council has no further suggestions for the report, we could have Council take formal action on May 2, 1998. Jim will be unable to attend either Council meeting, because he is scheduled for back surgery on April 25th. 0 4r CITY OF FRIDLEY, MINNESOTA COMPUTER REQIIIREMENTS AND PI�ANNING STUDY March 15, 1988 D R A F T Z � , TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION � II. OBJECTIVES OF ZNFORMATION PROCESSING III. , IV. CURRENT STATUS OF AUTOMATION SYSTEM REQUIREMENTS A. Overview B. City Management C. Central Services D. Community Development E. Fire F. Police G. Public Works H. Recreation and Natural Resource I. System-Wide/EDP Staff V. MAJOR ISSUES AFFECTING DATA PROCESSING PLANNING A. Administrative System B. Public Safety System C. Geographic Information System D. Personal Computers E. EDP Staff F. Document Archiving System G. Parcel Data Base H. Host System I. Application Priority VI. ALTERNATE PLANS FOR AUTOMATION VII. COST ANALYSIS i 1 4 5 9 9 12 15 22 25 27 30 33 35 37 37 37 37 39 41 41 42 43 44 46 49 VIII. STJMMARY OF RECOI�Il�lENDATIONS 62 � a I. INTRODUCTION On August 18, 1987, Chapel Consulting was engaged to assist the City of Fridley fn improving the quality and effectiveness of its information processing systems. Our approach to meeting this objective was to divide the project into two phases. The phases are: Phase I: Needs Analvsis and Cost Estimate - Define the City's current and future data processing, word processing and data communications requirements. Determine the best approach and assess the cost of ineeting these requirements. Phase II: New Hardware and Software Selection - Finalize the detailed system requirements and prepare a Request for Proposal document. Solicit bids from computer vendors. Select the most appropriate new system (or systems). This report is the result of the work performed under Phase I. It describes the qeneral information processing requirements at the City. It also contains an analysis of the cost of upgrading hardware and software to meet these requirements. It is based on information collected through interviews with City Council, City personnel, non-City personnel and by reviewing various documents provided by the City. City personnel interviewed include: City Management o Nasim Qureshi o Bill Hunt o Sue Irber o Lynda Averette Central Service o Rick Pribyl o Shirley Haapala o Leon Madsen o Julie Burt o Carol Bartlett o Sara Ruth o Elsie Hanscom o Dawn Weigel o Barbara Ridout o Brian Hill o Julie Hammerstrom o Betty Okerstrom 1 � �, � t Community Development o Jock Robertson o Mary Hintz re o Robert Aldrich o Evelyn Loomis olice o James Hill o Tim Turnbull o Laurel Anderson Public Works o John Flora o Bob Nordahl �ecreation and Natural Resource o Jack Kirk o Susan Johnson �noka County Data Processin,g Department o Gene Oswald o Dale Kolstad �he Bottom Line (ArchivincL Consultants) o Nancy Freeman o Gloria Gold Bell & Howell (ArchivincL System Vendor) o Mike Mangano o Dick Verlo The remainder of this report is organized into seven sections. � Section II presents the long term goals for automation at the City. Section III includes a brief description of the existing hardware and software in use at the City. An assessment of user satisfaction with the automated systems has been included in this Section, when appropriate. Fa a: � , Section IV presents a general description of the information processing requirements at the City. The description are detailed only to the extent required to develop the cost estimates in Section VII. Section V includes a discussion of the major issues affecting data processing planning at the City. Section VI discusses the three major alternatives we considered for enhancing automation at the City. For each alternative this section includes a description and a summary of the advantages and disadvantages of the alternative. Section VIZ summarizes the initial and long term costs of each viable alternative. Section VIII presents a summary of our recommendations for improving automation at the City. 0 � � I II. OBJECTIVES OF INFORMATION PROCESSING This plan was prepared to guide the Gity in acquiring a computer system that will contribute to meeting its long term goals for automation. These goals are: o Provide better and faster information to improve the decision making process at the City. o Meet the information needs of property owners and residents in the City. o Improve the efficiency and productivity of City employees. o Operate an efficient and cost effective information system. These goals are very broad in nature and, by themselves, do not give the City a specific action plan for data processing. However, they do serve as a guide in formulating a specific short and intermediate data processing system plan. The plan presented in this report lays cut an evolutionary path to be followed by the City. This approach will allow the City to react to changes in computer technology and the changing requirements within the City government. This process of defining broad long range goals and specific short- and intermediate-term plans allows the City to stage enhancements to the information system as technology proves effective. The plan presented in this report covers the years 1988 through 1992. Each year, the City should update this plan by reviewing its progress against the plan, reassessing its needs and surveying the marketplace for new and effective uses of computer technology. 4 III. CURRENT STATUS OF AUTOI�iATION The City has been quite aggressive in automating in an attempt to meet its infonaation processing requirements. It started acquiring hardware and software in early 1983. Currently, the City uses two Texas Instrument minicomputers and ten personal computers. The two minicomputers comprise the nucleus of the hardware system; most processing is performed on these machines. One of the minicomputers (the public safety system) is used exclusively by the Police and Fire Departments. The personal computers are used for special analyses and miscellaneous applications. There are a total of thirty workstations (including six personal computers with terminal emulation capabilities) and twenty-four printers attached to the two minicomputers. These devices are distributed throughout the City and are used by City personnel to operate a variety of application software. The distribution by department is: HARDWARE Citv Manaaement 0 3 Terminals 0 2 Letter Quality Printers Central Services Finance: 0 4 0 3 0 3 0 1 0 5 0 1 Terminals Personal Computers (with terminal emulation) Personal Computers Letter Quality Printer Report Printers Graphics Printer 5 SOFTWARE o Word Processing o Personnel (currently under development) o Budqeting and General Ledger Accounting o Payroll o Cash Disbursements o Cash Receipts o Utility Billing . o Liquor Store Inventory Control o Word Processing o Job Accounting o Asset Inventory o Special Assessments (currently under development) o Budget Preparation .. 0 �ARDWARE City Clerk: 0 1 Terminal 0 1 Personal Computer (with terminal emulation) 0 1 Report Printer Assessor: 0 2 Terminals 0 1 Report Printer Data Processing: 0 2 Terminals 0 1 Personal Computer (with tenainal emulation) 0 1 Letter Quality Laser Printer 0 2 Report Printers (1 high speed) �ommunitv Development 0 2 Tenainals 0 1 Personal Computer 0 1 Report Printer 0 1 Letter Quality Printer 're 0 1 Terminal 0 1 Report Printer 0 1 Letter Quality Printer ol' e 0 5 Terminals 0 2 Report Printers 0 1 Letter Quality Printer 6 SOFTWARE o Word Processing o Investments Management o Insurance Claims Management o PRINTS o PRINTS o Tax Assessing System o Word Processing o Property Sales Tracking o Word Processing o PRINTS o Spreadsheeting o Fire Management o Word Processing o Training o Fire Relief o PRINTS i o Word Processing o Police Recordkeeping and Reporting o Data Communications with State Crime Reporting Computer Network � HARDWARE public Works 0 2 Terminals (1 at garage) 0 1 Personal Computer (with terminal emulation capabilities) 0 1 Report Printer 0 1 Letter Quality Printer Recreation and Natural Resource 0 2 Terminals 0 1 Letter Quality Printer SOFTWARE o Word Processing o Streets Inventory o Spreadsheeting o PRINTS o Word Processing In very rough terms, system usage is distributed as follows: City Management Central Services Community Development Fire Police Public Works Recreation and Naturalist Usacte 7% 47$ 4$ 4� 25$ 9$ 4$ City department heads and staff are (with one notable exception) dissatisfied with the existing information processing capabilities. Nardware complaints include a lack of terminals and printers and frequent slow performance of the system. The hardware is too small to support the existing users; adding additional users is out of the question. The system is configured such that it cannot be used while daily backup copies of data files are made. Backups take about three hours each day. These backups are currently performed after 5:00 p.m. An EDP staff person must be present during the entire backup process. Software complaints fall into several categories: o Existing software is poorly designed. � o Existing software is "paper intensive." o Existing software is cumbersome to use. o Existing software does not meet the users' needs. o The City does not have the appropriate software important requirements. to meet certain The users are especially dissatisfied with the word processing on the existing system. 7 The City administrative system vendor has announced that they will discontinue support on the administrative software. This means that it will be increasingly difficult to maintain and enhance the existing administrative software. Beyond the specific complaints about hardware and software inadequacies, the City manager recognizes that the City's information processing requirements are not being met in a coordinated, integrated fashion. Inefficiencies have developed and, in some cases, systems which were implemented have been discarded because they proved more difficult to use than they were worth. The exception noted above is the Police Department. This Department is satisfied with its systems (except for word processing). The Department is seeking hardware and software enhancements to make its systems work even better. 8 � IV. SYSTEM RE4UIREMENTS A. OVERVIEW This section describes the information processing requirements of the City of Fridley. The requirements are organized and presented by department. Some applications are required by more than one department. When this is the case, the requirement is listed under each department. The requirements of each department are shown below. An asterisk signifies a requirement which is not currently being met or which is being met inadequately: City Management o Word Processing * o Personnel o Graphics * o Desk Top Publishing * o Spreadsheeting * o System-Wide Access* Central Services Finance: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Fund/Budget Accounting and Payroll Cash Disbursements Cash Receipts * Purchasing Utility Billing Asset Accounting Special Assessments Liquor Store Merchandizing Word Processing * Spreadsheeting Graphics Desk Top Publishing * Business Licensing * City Clerk: Reporting * * o Street Address/Polling Place Cross Reference o Word Processing * o Insurance Claims Management o Investment Management o Spreadsheeting E Assessor: o Appraisal Data Base * o Word Processing * o Property Sales Tracking o Geographic Information System * Community Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Word Processing * Spreadsheeting Graphics Project Costing Parcel Identification Number/Street Building Permitting and Special Use Computer Aided Design * Geographic Information System * ire 911 Data Communications Interface * Hazardous Material Fire Fighting * Address Cross Reference Permitting * M�'IRS Reporting Equipment Management * Fire Management, Including Appraisal/Street Address Data Word Processing * Graphics * Desk Top Publishing* ol'ce Police Recordkeeping and Reporting State Crime Computer Network Data Communications Interface Casewriter * Multi-Jurisdiction Access * Business Contacts * Case Management * Word Processing * Spreadsheeting Graphics Desk Top Publishing * Equipment Management *. Data File Management and Disk Storage Utilization * ENFORC Report Generator * io � Public Works 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Word Processing * Spreadsheeting Graphics Geographic Information System * Project Costing Project Management * Work Order Management * Equipment Costing and Management * Streets Inventory Project Cost Estimating * Warehouse Parts Inventory Control * Engineering Design Tools * Computer Aided Desiqn * Gasoline Pump Management * Recreation and Natural Resource 0 0 0 0 0 0 0 0 Facilities Scheduling * Team and League Management * Class Registration * Inventory/Asset Management * Word Processing * Mailing List Management * Project Costing and Revenue Accounting Desk Top Publishing * Svstem-Wide Requirements o Uninterruptable Power Supply * o Reel-to-Reel Tape * o Fourth Generation Programming Language * o High Speed Printer o Report Generator * o Data Communications 11 B. CITY MANAGEMENT This office coordinates the activities of other departments, does proqram analysis, supports the Council and administers the City's personnel and cable TV functions. Software Requirements 1. Word Processing Word processing is a critical automated tool. It is used heavily by the clerical personnel in this office and throughout the City. Word processing is perhaps the single most important computerized tool for enhancing the efficiency of City staff. It is important that the word processinq system be easy to learn and operate but also include a wide variety of features to facilitate the preparation of lengthy documents. We recommend the City use personal computers to meet its word processing requirements City-wide. There are several reasons for this recommendation, including performance, quality of software, security of data and cost. Operating speed will be a highly critical feature of this system. If the word processing software is running on a single centralized minicomputer, speed will vary from very fast to very slow depending on the mix of jobs being run at any given time. If, however, the word processing software is running on a number of personal computers (one for each user), operating speed will be very fast for all users. The current centralized system is not fast enaugh to meet the demands placed on it by word processing users. Excellent word processing software is available to run on personal computers. In most cases it is superior to the software available for minicomputers. The security of word processed documents is easier to achieve on PC based systems than on a shared system. ! The cost of personal computers has fallen to the point where it is no longer cost prohibitive to provide a PC to each word processing user. The cost of the software is also low. The PCs will be equipped with terminal emulation software and wired to the City's central computer. This will allow them to be used as terminals to run non-word processing jobs when required. There are some problems associated with a PC based word processing system. The most serious is the enforcement of file backup procedures. We feel certain that this problem can be solved. 12 � 2. �ersonnel The data processing staff has just completed development of a personnel system. This system is in the early stages of implementation and it is too early to assess the success of the project. However, it is likely that the system will not meet the City's requirements. Therefore, it will be necessary to replace this software. 3. Sr�readsheeting Spreadsheeting software is used heavily by the clerical and management staff in this office and throughout the City. It. contributes to the staff's ability to efficiently analyze and manage numerical data. Currently, the City uses LOTUS 1-2-3 on PCs. This is a powerful, easy to use tool which meets the City's needs in this area. The City should continue to use LOTUS on PCs in the future. 4. Graphics Graphics software will be used by this office and in other departments at the City. LOTUS 1-2-3 can be used to generate most Iof the graphs and charts required by the Manager's office. Graphs will enhance the effectiveness of documents prepared by the staff. 5. Desk Top Publishinq Desk top publishing (DTP) is the use of PCs, laser printers, scanners and special software to typeset and lay out publications. For the City, DTP can save time and money in the production of a Iwide variety of documents. The City will be able to create better looking, more effective newsletters, brochures and reports. Although DTP could be used by several departments in the City, this capability should not be duplicated in each department. Rather, the City should acquire a single DTP system and share its use among the departments. One or two staff people should become expert in the use of the DTP and serve as the City's in-house publications resource. 6. System-Wide Inquirv The City Manager and the Assistant City Manager should have the ability to perform inquiries against all of the data stored in the central system. This means that they should be able to look at but not change or delete data stored for use by fund accounting, payroll recreation event scheduling, public works project management or any 13 � � other applications. A possible exception is the police record- keeping data. This ability would not extend to data stored on PCs. Hardware Reauirements City Manager Assistant City Manager Secretarial and Clerical PCs 1 1 8 (1 AT for DTP) 14 Printers 1 Report 1 Report and 1 Letter Quality 1 Laser for DTP 1 Scanner for DTP a 0 C. CENTRAL SERVICES This Department consists of several functional areas - finance, the City Clerk's office, the Assessor's office and data processing. €,INANCE Although some current financial applications are satisfactory, it is likely that all will have to be replaced in order to obtain desired improvements in the key module - fund/budget accounting and reporting. The existing fund accounting system is poorly designed and time-consuminq to use. Some of the most significant weaknesses in the existing system are: o The accounting system is not a multi-user system; it will bump a user off when another user with a high priority level logs on. The Finance staff has worked around this weakness by coordinating their use so that only one person is logged on at a time. This has caused inefficiencies during periods of peak accounting activity. o The accounting software is not a true fund accounting system. That is, it does not force each fund to balance. It allows for the entry of a transaction consisting of a debit in one fund and a corresponding credit in another fund. This control weakness has allowed for the entry of erroneous transaction which are difficult to trace and correct. It makes the process of closing the books at the end of each month more time-consuming than it should be. o The fund accounting and budgetary accounting modules are not integrated. This has resulted in inefficiencies in processing accounting transactions and in month-end processing. o The reporting capabilities of the fund accounting system are weak. In addition, there is no report generator available. The combination of these two limitations means that financial information cannot be efficiently presented in t�e most effective manner. ' . o The accounting system does not include any budget preparation tools such as a budget worksheet. This causes City staff to spend more time than is necessary preparing budget documents. o The utility billing system is not integrated with the fund accounting system. This means that staff people must spend time each month creating summary journal entries to post utility billing activity to the fund accounting system. This is an inefficient use of time. 15 o The payroll system does not have complete reporting capability. It does not report accrued leave time properly. Most reports do not include subtotals or totals. These weaknesses cause accounting staff to spend extra time preparing manual reports or enhancing computer generated reports. This is inefficient. o The payroll system does not automatically allow for salaried employees. This weakness causes extra effort during payroll processing. o The cash receipts module is not integrated with the fund accounting system. This means that accounting staff must spend extra time each month creating journal entries to post cash receipts to the fund accounting system. o Throughout the accounting system, most reports do not show an "as of" date. Instead, they show the actual date run. This causes problems when reports showing prior month activity are printed in the current month. The dates printed on these reports are confusing. The staff must spend extra time manually correcting these dates. Software Reguirements l. Fund/Budget Accounting and Reportina This module will be used to store account balances, appropriations and transaction detail for the current year. It will also store prior years account balances. It will provide fund and encumbrance accounting capabilities and accept automatic postings from other accounting modules. A wide variety of financial and budget comparison reports will be available. An easy-to-use report generator must be included in this module. This module must allow for separate accounting for the HRA. The module must easily interact with LOTUS 1-2-3, passing data to and accepting data from the spreadsheet software. 2, a rol This module will generate pay checks and stubs and maintain month- to-date, quarter-to-date and year-to-date pay and withholding data from each employee. It must allow for a wide variety of pay and withholding categories. The module must have the ability to automatically allocate all personnel expenses each month based on the distribution of payroll expenses to departments. The module must be capable of calculating and reporting accrued vacation, annual and wellness leave time and converting these accounts to dollars at year end. The module must track Medicare and FICA income and properly repor� these amounts on W2 forms at year end. PERA, E�� FICA, Federal and State reporting on magnetic media will be required. The module will interface with the project costing module to allow for single entry and allocation of employee labor costs to project. 3. Cash Disbursement This module will be used to generate checks to vendors. It will store information on payments due to vendors and the history of payments made to each vendor. As invoices are entered, the module will assist in verifying that the invoice is (1) not a duplicate, and (2) approved by matching it with an open purchase order. The module will print checks and remittance advices for invoices as they become due or on demand. Invoices entered will automatically be posted to the project costing module, when appropriate. 4. �ash Receigts The cash receipts module will allow for on-line entry of cash receipts at the customer service counter and in the finance office. Cash receipts will be for utility bills, recreation activities, permits, fines, etc. Receipts will be printed by the system when required. Terminals will be attached to a cash box to provide for automated cash control. As each cash receipt is entered, the module will prompt the operator for certain data - amount, general ledger number, utility customer number (if appropriate), operator ID, etc. The system will verify the data and create a cash receipts transaction file for subsequent updating of the utility billing and fund/budget accounting modules. The cash receipts terminals could be equipped with bar code scanners or optical character recognition devices to speed entry of utility cash receipts. 5. �urchasing The City uses an encumbrance accounting system to control major purchases. Therefore the purchasing module must be capable of interacting with the fund/budget accounting module to encumber funds as new purchase orders are entered. The module will store data on open orders until an invoice is entered in the cash disbursements module. Data on closed orders will be summarized and stored. 6. Utility Bil�inq The utility billing module will calculate and bill for utility services. Utility customer data will be entered for new customer data and automatically updated as usage data is entered. Usage history will be stored for verification of new meter read "reasonableness" and for customer usage analysis. Utility bills 17 will be printed; they could include bar codes or optical character print to speed entry of utility cash receipts. 7. �sset Accountinq This module will be used to track the location, cost, insured value and acquisition history of each major asset owned by the City. It would be capable of calculating depreciation expense amounts for assets held in enterprise funds. 8. �pecial Assessments The data processing staff is in the process of completing a special assessments module. It is likely that this software will meet the City's needs. It should be retained and used with any new hardware acquired. It is written in COBOL. 9. Liquor Store Merchandizinq Currently, the liquor stores are equipped with electronic cash registers capable of accumulating daily sales activity. The registers also maintain perpetual inventory counts for each inventory item. Nightly, each register is polled by the City's central system for the day's sales activity. The central system iaaintains a separate perpetual inventory for control purposes and to provide inventory valuation and cost of sales data. This dual system is inefficient. Ironically, it has not enhanced control over the liquor store inventory. Ideally, the liquor stores should be equipped with in-store systems capable of providing full inventory control, purchasing, sales analysis, processing required. profitability analysis and point-of-sale transaction capabilities. A total of five in-house registers will be 10. Word Processina The finance group is a light user of word processing. If PCs are used for word processing, one PC should be sufficient to meet this qroup's needs. li. Snreadsheetina The finance group is a heavy user of powerful and easy-to-use tool which software should continue being used. users in the finance group. 18 LOTUS 1-2-3 on PCs. This�is a meets the group's needs. This There are three spreadsheet 12. �raphics The finance group will use graphics as a tool to present financial data in various reports and publications. Most of the graphs and charts required can be generated by LOTUS 1-2-3. 13. pesk To� Publishing The finance group will use desk top publishing (DTP) to prepare the annual budget document. This need can be met through the use of the shared DTP system described above. 14. Business Licensinq The business licensing system will generate licenses on demand and maintain a file of licenses issued. The system will use an "all-in- one" license form. It will create new licenses in response to operator entry of data. It will be capable of printing lists of licenses due for renewal. These capabilities will enhance the ability of staff to monitor business license activity in the City. Currently, all business licenses are prepared by hand. There is no system to track licenses due for renewal or other action. �ardware Requirements Central Services Director Assistant Finance Director Utility Billing Clerks Liquor Inventory and Fund Accounting Clerk Cash Receipts Counter Fund and Asset Accounting Clerk Payroll Clerk Cash Disbursements Clerk Special Assessments Clerk Liquor Stores Terminals Cs 1 1 2 1 1 1 1 1 1 5 PC/ Registers 19 Printers 1 Report 1 Report 1 Report 1 Report 1 Letter Quality 1 Report 5 Report/Receipt CITY C�ERK Software Requirements 1. �treet Address/Pollinq Place Cross Reference The Clerk is responsible for identifying the precinct number, ward number and all other political districts for each parcel in the City. In addition, the Clerk must be able to identify the polling place for each parcel. In the past, the City has used PRINTS to store this data. This has not worked well for the Clerk because of two problems - it is difficult to keep PRINTS up to date and PRINTS runs slowly .on the central computer to be used during peak demand periods. The Clerk and other City staff need a simple system to identify the polling place, precinct number, etc. for each street address in the City. It will display this information when a street address is entered. It must be very fast. It must allow for multiple simultaneous inquiries. In the future it could be a part of the geographic information system. Prior to elections, staff are occupied answering voter questions about the location of polling places. This tool will reduce the time required to answer these questions. 2. Word Processina The City Clerk will make extensive use of word maintain the City Code, prepare and index minutes of resolutions, type correspondence and maintain mailing 3. Insurance Claims Manaaement processing to meetings, index lists. The Clerk is usinq LOTUS 1-2-3 to manage claims filed against the City and its insurance companies. This is a satisfactory solution and should be continued. 4. Investment Management The Clerk is using LOTUS 1-2-3 to inventory over $32 million in City investments. The spreadsheet the Clerk is using is acceptable but additional capabilities are required. The module must be integrated with the fund/budget accounting module. It must be capable of storing and reporting based on certain key dates (interest due date, maturation date and anticipated sale date). These enhancements could be incorporated into the existing LOTUS spreadshaet assuming the new fund/budget accounting module will interface with LOTUS. 20 5. �preadsheetinq The Clerk is a heavy user of LOTUS 1-2-3 spreadsheet software on a PC. As noted above, both insurance claims management and investment management are processed using LOTUS. Hardware Requirements City Clerk 1�SSESSOR Software Requirements l. �npraisal Data Base gCs 1 Printers 1 Report and 1 Letter Quality The Assessor and his staff communicate changes in property descriptions to Anoka County by revising appraisal cards by hand. These are hand delivered to the County. The County in turn prints and delivers new cards with the updated information to the City. The Assessor also maintains the same data on a jacket envelope which contains historical appraisal data and other relevant documents. Neither system lets the Assessor do any analysis of the property data base or groups of properties. To facilitate this type of analysis the City has developed a third system on the computer called PRINTS which contains the same information that is on the jackets and the County's system. We recommend that the PRINTS system be dropped, that the County provide the City with updated property records weekly on computer tapes, and that the City program its system to retain the current property description from the County plus previous versions. This plan will reduce the number of duplicate systems from three to two. The Assessor needs a report generator and inquiry capab�lity to perform various ad hoc analyses of the property data. In the future, this module could be integrated with the geographic information system. These changes will make the Assessor effective. In particular, access combination with the report generator the Assessor to analyze property values parcels. 21 's staff more efficient and to current County data in will improve the ability of and other characteristics of 2. Word Processinq The Assessor's office is a light user of word processing. Word processing is used for occasional correspondence and reports. One PC will be sufficient here. 3. Property Sales Trackinq The Assessor uses this Bystem to store and analyze real property sales data. The data is used primarily to appraise property using the comparable sales method. The existing system is satisfactory and could be retained. However, the potential exists to integrate this module with the appraisal data base and, in the future, the geographic information system. 4. Geographic Information Sy.stem When the City acquires a geographic information system, the Assessor could utilize the system to create maps for analytical and presentation purposes. The appraisal data base could be integrated with this system. Hardware Requirements Terminals PCs �rinters Assessor's Office 1 1 1 Report and 1 Letter Quality D. COMMUNITY DEVELAPMENT 1. Word Processina This Department is a heavy user of word processing. At least two PCs will be required here. 2. Spreadsheetina LOTUS 1-2-3 spreadsheet software is used by this Department to perform project cost and, other analyses. This is a powerful and easy-to-use tool which meets the Department's needs. However, it is likely that new project costing software will be acquired to meet the needs of a number of Departments; this software could also be used by Community Development for project costing. 22 3. Graphics The Community Development Department will use graphics as a tool to present data in various reports. Most of the graphs and charts required can be generated by LOTUS 1-2-3. 4. Proiect Costinq The Department uses LOTUS 1-2-3 to perform some project cost analyses. This is an adequate tool. However, more capable project costing software will be acquired to meet the needs of other departments (primarily, Public Works). This new software could be used by Community Development. 5. Parcel Identification Number/Street Address Cross Reference Currently, the Department uses PRINTS to store the cross reference between street addresses and parcel identification numbers. If PRINTS is dropped, the City will have to create a new cross reference system using the Assessor's data base. In the future, this could be a part of the geographic information system. This is a critical tool for the Community Development staff. It greatly simplifies the process of using parcel identification numbers. 6. Building Permitting and Special Use Permittinq The Department will use a building permit system to issue and track permits and inspection activity. The system will allow for the entry of data on licensed contractors. Then, when a permit application is received, data on the application will be entered. When the application is approved, the system will print the permit. Inspections could be scheduled in the system. As inspections are performed, they will be logged to the computer. After the final inspection and approval, the system will print a certificate of occupancy. The system will be capable of generating a var�iety of reports summarizing permit and inspection activity. It will be used to process many types of permits issued by the City, including electrical, heating, plumbing, sign, moving, etc. This system will not save significant clerical during the permitting process. However, it will prepare the end-of-month reports. It could consolidate data collected by the Fire Department inspections. 23 time and effort make it easier to be designed to during fire code 7. Computer Aided Design The Department will occasionally make use of a computer aided design (CAD) system for landscape planning and other projects. This PC based system is described in more detail in the Public Works software requirements. The Community Development Department will share the CAD system with Public Works. 8. Geographic Information System The geographic information system (GIS) is an automated mapping and data storage tool. It will be used primarily by the Public Works and the Community Development Departments. GIS will be used by Community Development to store appraisal, zoning, flood plain, land use and other information on each parcel in the City. Of course, the physical location and dimensions of each parcel will also be stored. The Department will use GIS as a research and presentation tool when dealing with planning and economic development issues. �ardware Recruirements Community Development Department � Terminals gCs Printe�s 1 2 GIS (shared with Public Works) 1 GIS Digitizer (shared with Public Works� 24 2 1 Letter Quality 1 Report 1 GIS Report (shared with Public Works) 1 GIS Plotter (shared with Public Works) E. FIRE The Department uses software called the fire management system. This system performs several functions and is running on the public safety minicomputer. It stores and reports data on street addresses. It stores data on incidents and fire fighter activity. It prepares a variety of incident reports, some of which are used to prepare MFIRS reports. It prepares reports summarizing fire fighter activity. The Department is generally satisfied with this system with the exception of the items noted below. Software Recruirements 1. �11 Data Communications Interface Currently the County 911 dispatcher radios or telephones emergency calls to the Fridley Fire Department. The Department enters the address into its system to obtain further information on the location. This data is then printed and handed to the fire fighters if they are still in the station, or called to them on the radio if they are not. Time could be saved if the County keyed the call directly into Fridley's computer to trigger the printout. This time saved could translate into a faster response to calls for service . The new station, when built, will need a printer with appropriate communications to the public safety system so that printouts can be generated there simultaneously with printouts at the main station. 2. Hazardous Material Fire Fighting Fire fighters are faced with unknown hazardous substances on some fire calls. Treatment of the fire could vary depending on the nature of the substances encountered. Data bases of common chemicals, identification criteria and the proper procedures and counter chemicals to use have been created with retrieval software. A fire fighter could call the station with a description of the problem while a computer operator finds the answers he needs. This is probably a PC application. This application will enhance the ability of the Department to deal with hazardous materials and protect the public. 3. MFIRS Reporting The system currently used by the Department is generating the data required to prepare MFIRS reports by hand. This system should be enhanced to automatically generate these reports. This will enhance the efficiency of the Fire Department staff. In addition, building 25 . • inspection data needs to be added to the data base. This programming can be done by the City's staff. 4. Ec�ui�ment Costing and Management The Fire Department, like many other departments, will use a City- wide system to maintain records on the equipment entrusted to the Department. The system should contain only basic maintenance and usage information. 5. ��tiraisal/Street Address Data If PRINTS is eliminated, the data processing staff will have to write new software to update addresses in the fire management system with new addresses in the County appraisal data base. Also, new software will be required to pull the appraised value of property from the data base over to the fire management system. 6. Word Processina The Department is a moderate user of word processing. One PC will be sufficient here. 7. Graphics The Department will use graphs and charts in its annual report. Its graphics requirements could be met using LOTUS 1-2-3. 8. Desk Top Publishing The Department could use desk top publishing (DTP) to prepare its annual report. This need could be met through the use of the shared DTP system described elsewhere in this document. Hardware Reguirements Fire Secretary 911 Dispatch New Fire Station Terminals � 1 1 26 �rinters 1 Letter Quality 1 Report 1 Report F. POLICE Software Requirements 1. police Recordkeeping and ReportinqJState Crime Comnuter Network Data Communications Interface The Department is currently using the ENFORC system to provide incident and other recordkeeping and reporting. This system is also used to communicate with and update the State CJIS. It operates on a stand-alone public safety minicomputer. The Department is very satisfied with this system. Some enhancements are desired to make it a better tool for the Department. Some of these enhancements will be developed and delivered over time by the software author, MaSys. Some could require additional hardware (for example, the need to support six simultaneous data communication links with the State CJIS). 2. Casewriter The Department types both the fill-in-the-blanks and text portions of the patrolmen and investigator calls-for-service reports. The fill-in-the-blanks pertion of the data is then entered into the City's computer system. The casewriter program from Masys, which is now being tested at the City, will allow the Department's clerical personnel to add the text portion of the report to the computer version. If this test is successful, the Department should be encouraged to eliminate the manual typing step and use the computer printout instead for its permanent files. This will enhance the efficiency of the staff. 3. Multi-Jurisdiction Access Several years from now the Department may be able to access the records of other jurisdictions who plan to cooperate in the development of such a program by Masys. This effort is in the broad planning stages at this time and the estimates of �ost are very imprecise. This capability is not anticipated during the time frame of this data processing plan. 4. Business Contacts Commercial properties in the City should be indexed on a system which contains names and phone numbers of key individuals to be contacted in case of emerqencies outside of normal working hours. Special instructions may need to be added to this file. The Department performs this task manually now. This system need not be integrated with the qeographic information system. Automation of 27 this file will increase the efficiency of the staff by making it easier to maintain. 5. Case Manaqement System The Chief cannot stay up-to-date on the status of all active cases without some tools. A case management system keeps track of the chronology of events on a case, the action taken, the actions to be taken, investigative hours consumed, assigned personnel and problems encountered. This system has been developed by MaSys and is currently being tested in Minnetonka. If successful, it should be acquired. It would enhance the ability of the Chief to manage the Department. 6. Word Processina The Department is a light user of due to a lack of terminals and Department. With more hardware, will adequate. 7. Spreadsheeting word processing. This is in part letter quality printers in the usage would increase. Three PCs Spreadsheeting will be used to perform analytical studies of numerical data. LOTUS 1-2-3 on a PC is an appropriate tool for use in the Department. 8. Graphics The Department will use graphics software to create charts and graphs for presentation in the annual report and other documents. LOTUS 1-2-3 will meet the Department's requirements. 9. Desk Top Publishinq The Department will use desk top publishing (DTP) to prepare its annual report. This need will be met through the use of the shared DTP system described elsewhere in this report. 10. Ewipment Costinq and Management The Police Department will participate in a City-wide equipment management system. The system should contain only basic maintenance and usage information. 28 11. pata File Management and Disk Storaae Utilization The Department is running out of room to store new incident records ard other data on its system. This situation has been caused by two deficiencies in the existing software. First, there is no software the Department can use to easily purge old or unneeded data from the data files. Second, the software is designed to reside entirely on a single disk device. This means that 64MB, almost 30� of the total disk storage attached to the public safety system, cannot be used by the Department. The Department should acquire software from MaSys to allow it to delete old and unneeded data from the files. In addition, the City must work with MaSys to modify the ENFORC system to allow it to use multiple disk devices. This software will postpone the need to acquire more mass storage for the Public Safety system. 12. �NFORC Report Generator The ENFORC system generates a variety of standard reports. These reports provide the Department with useful information on incidents and activities. However, a report generator designed to work with the ENFORC data files will give the Department more flexibility in creating reports. These new reports will enhance the ability of the Chief to analyze incident and personnel activity in the Department. Hardware Reauirements Chief's Secretary Director of Special Proj ects Investigators Special Projects Personnel Front Office Records Personnel Patrol Room Patrol Sergeant Office Supervisor �erminals PCs 1 1 5 3 2 2 1 29 1 1 Printers 1 Letter Quality 1 Report 1 Report 1 1 1 1 1 1 1 Report Letter Letter Report Report Report Letter and Quality �Quality Quality G. PUBLIC WORKS 1. Word Processina The Public Works Department is a moderate user of word processing. It is used to prepare correspondence, various short documents and an occasional lengthy report. Two PCs will be sufficient. 2. S�readsheetinq Currently, the Department uses LOTUS 1-2-3 to prepare cost estimates on new projects and project costing on ongoing projects. The Department will continue to use LOTUS in the future. 3. Graphics The Department will use graphics as a tool to present numeric data in various reports. Most of the graphs and charts required can be generated by LOTUS 1-2-3. 4. Geographic Information System The qeographic information system (GIS) is an automated mapping and data storage tool. It will be used primarily by the Public Works and Community Development Departments. The Public Works Department wil l use the GIS to create and store a wide variety of City maps . Map data will show streets, utility lines, special assessment projects and other information. The GIS will become the primary mapping tool for the Department and the City. It will be a very effective tool for preparing working maps and maps for presentation purposes. The GIS could also be used to store property related data for the Assessor and other City personnel. 5. groject Costing The Department uses LOTUS 1-2-3 to perform some project cost analysis. This tool has proved useful, but specialized project costing software would be more effective. This software will also be used by other Departments. It would enhance the ability of City staff to track and control costs on a variety of projects. 30 6. Project Management The Department will use the computer to provide basic project manaqement tools. These could include actual-to-estimated cost comparison, CPM/PERT analysis and project task definition and Itracking. These low-cost tools will enhance the ability of the Public Works Director to manage large projects. 7. Work Order Management The Department will use a system to track the status of work orders for street repair, vehicle maintenance, parks maintenance and other activities. 8. �quinment Costinq and Manaaement This software will be used by the Public Works and other Departments. It will maintain usage, maintenance and cost data on equipment items. It should allow the ability to schedule preventative maintenance. This software will make it easier for the City to track the cost of owning and operating various equipment items. It will be useful in deciding when to replace old equipment. 9. Streets Inventory The Department is using a system to inventory street segments. The system stores descriptive location, maintenance history and other data about each segment. It can generate reports detailing this information. The system could be improved by enhancing its inquiry and reporting capabilities. This system was developed by Ameridata. It is written in Cobol. If the City acquires the source code to this system, it could be used in the future on a new administrative system. If not, new streets inventory software will have to be acquired. This system could be replaced by the GIS in the future. 10. o'ect Cost st mating The Department is currently using LOTUS 1-2-3 to prepare project cost estimate sheets. This approach is working well and will be continued. il. Warehouse Parts Inventory Control The Department will use a simple inventory control system to manage the store of parts at the garage. This system will maintain 31 perpetual counts and track inventory receipts and disbursements. It will help reduce the City's investment in parts inventory and reduce unnecessary purchases. It will allow the Public Works Director to better control the use of parts. 12. Engineering Desian Tools The Department will use several analytical tools to solve various engineering design problems. These include software to address problems involving hydrology, watershed analysis, pipe sizing, mass diagraming and surveying. This software will run on a PC. 13. Computer Aided Desian The Department will make use of a computer aided design (CAD) system for project design work. This system will consist of a powerful PC, graphics monitor, plotter, printer and CAD software. The Public Works Department will share the CAD system with Community Development. If the City acquires a GIS, it may not need a stand- alone CAD system. 14. Gasoline Pump Management The Department is currently soliciting bids for a stand alone qasoline pump management system. This system will not be integrated with the administrative system. It is not included in the cost analysis in this report. Hardware Requirements Public Works Director Public Works Assistant Director Engineer Garage Public Works Secretary � Public Works Department Terminals Cs 1 1 1 (AT for CAD) 1 1 2 GIS (shared with Community Development) 1 GIS Digitizer (shared with Community De- velopment) R�:J Printers 1 Report 1 Report 1 Letter Quality 1 GIS Report (shared with Community De- velopment) 1 GIS Plotter (shared with Community De- velopment) H. RECREATION AND NATURAL RESOURCE The recreation staff has been using the City's word processing software to accomplish many tasks which word processing technology was not designed to satisfy. The Department also uses the system to register students in classes. This software is cumbersome to use. All of the software listed here will enhance the ability of the Department to serve the public. Software Reguirements 1. Facil�ties Scheduling Fields, courts, gyms and classrooms will be inventoried and scheduled using the computer. Information on facilities out of service (those not available because of maintenance) will be entered and classified as unavailable during periods of maintenance by the Public Works Department. Use permits issued should be recorded. A copy of the schedule and facilities preparation work orders (for example, field chalking requirements) will be generated for the Public Works Department. 2. �eam and Leauue Manaqement Team managers and rosters, league schedules and standings, and fee payment requirements will all be kept on a system. The league scheduling system will interface with the facilities scheduling system to match the league's needs with available facilities. 3. Class Reqistration Minimum student identification and grade level information needs to be retained for each registrant. The class schedules and instructors will be matched with available facilities i�f class registration and facilities scheduling were integrated. Co•ll,ecting fees and material charges or issuing refunds and fee-waivers will be an on-line process at the registration counter. The system will also provide statistics on class participation levels and maintain waiting lists. This system will generate statistics for calculating the Economic Equivalent Index (EEI). 33 4. InventoryfAsset Management The Department has a small inventory of equipment that could be better controlled if there were an appropriate recordkeeping system. This will be a very simple asset management system. 5. Word Processina and Mailing List Management The Department is a heavy user of word processinq. It maintains extensive mailing lists and sends correspondence, announcements and other mailings to individuals on a regular basis. Word processing will continue to be an important tool for this Department. 6. Graphics The Department has a need for both business graphics (charts and graphs) and free form graphics (freehand drawings). The business graphics need can be met using LOTUS 1-2-3 or a low cost PC based busi»ess graphics package. The need for free form graphics will also be met using a PC based package. 7. roject Costing and Revenue Accounting The Uepartment needs to measure the financial and functional success of its programs more closely. An accounting system that records revenues and expenses by program will be helpful. Summarizinq all the programs in one area of service will also be helpful to measure the overall success of that area. These requirements will be met using a combination of project costing software and fund/budget accounting software. 8. Desk T,o� Publishina The Department will use desk top Publishing (DTP) extensively to prepare its various publications. The Department will use the shared DTP system described elsewhere in this report. �ardware �equirements Registration Counter Support Staff Nature Center Senior Center Terminals PCs 34 1 1 1 1 Printers 1 Report 1 Letter Quality 1 Report 1 Report I. SYSTEM-WIDE/EDP STAFF This section describes characteristics and features required to make a central system more useful to the City. It also describes the terminal and printer requirements of the EDP staff. 1. Uninterruptable Power Sup�ly The central system must be protected by an uninterruptable power supply (UPS) large enough to protect the CPU and mass storage devices of both the administrative and public safety systems. The purpose of this UPS will be to allow for an orderly shut-down of the systems in the event of a power outage. 2. Reel-To-Reel Tape Both the administrative and public safety systems must be equipped with reel-to-reel tape drives to facilitate tape transfer of County Assessor data files to the City and to speed back up. 3. Fourth Generation Programmina Languac�e A fourth qeneration programming language (4GL) will improve the productivity of the City's programming staff. Currently, the City uses Cobol, a third generation language. 4. Hiqh Speed Printer The City will require one high speed printer to generate large reports and other major print jobs. Currently, the City uses a 600 line per minute printer. 5. Report Generator A simple, easy to use report generator would be used by:a wide variety of City personnel. It would reduce the demand on City programmers by allowing users to create their own ad hoc reports. 6. Data Communications The public safety system will require data communications (DC) capabilities with the State CJIS network. This link must be capable of supporting four simultaneous DC sessions. If the Fire Department continues to use this system, a DC link to the new firehouse will be required. In addition, a link to the County 911 dispatcher could be required. 35 . . - The administrative system will require a DC link with the City qarage. This system will also require links to the nature center, the senior center and the liquor stores. EDP Staff Hardware Requirements Terminals PCs �rinters EDP Staff 1 1 1 High Speed i 36 V� �AT�R ISSUES AFFECTING DATA PROCESSING PLANNING This section describes several major issues which will affect planning for data processing. Where appropriate, we make recommendations for dealing with each issue. A. ADMINISTRATIVE SYSTEM The City should replace most of its financial and administrative support software. There is wide-spread dissatisfaction with most of these computerized tools. If the software is replaced, it is likely that the hardware will also be replaced. Although there is software available which runs on the City's existing Texas Instruments hardware, the City should not limit it's options by looking only at this software. Instead, the City should look at a wide variety of software and select the software which comes closest to meeting its overall requirements. The hardware selection should be a bi-product of the software selection. B. PUBLIC SAFETY SYSTEM The City should continue maintaining a separate Texas Instruments minicomputer for use by the Police and Fire Departments. This public safety system will run the ENFORC and fire management software. It does not make sense to replace this software because both the Police and Fire Departments are happy with their systems. The City already owns the Texas Instruments hardware which will be required by the Departments in the future. If the City replaces its administrative system, much of this hardware could be used by the Police and Fire Departments. Both Departments will have to have access to the administrative system. This could be accomplished by using wiring switches and PCs. C. GEOGRAPHIC INFORMATION SYSTEM A geographic information system (GIS) will be of great value to the City. It will be especially useful to the Public Works and Community Development Departments. 37 Some of the uses of a GIS include: o An analysis tool for the Assessor, Community Development and Public Works staffs. o A presentation tool when dealing with land related issues. o Efficient creation and updating of maps. o An engineering desiqn tool, eliminating the need for a CAD system. o Use as a partial data base for parcel related information. The City's GIS should be configured as a single-user system. However, this system should have the potential of being expanded to allow for additional workstations in the future. The cost estimates in this report assume a second workstation will be added to the GIS configuration in 1990. A GIS will significantly contribute to meeting the City's long-term goals for automation by improving the efficiency of the Assessor, Public Works and Community Development staffs. In addition, it will enhance the ability of staff and Council to analyze information and make decisions regarding land related issues. The City should wait on acquiring a GIS until Anoka County has made a decision on its GIS. There are several reasons for waiting. By waiting, the City can guarantee that its GIS will be compatible with the County's. Compatibility with the County is a critical issue because of the desirability of sharing maps due to the high cost of creating new maps in a GIS. By waiting, the City might be able to participate with the County in the acquisition of a GIS. This could result in the sharing of hardware and software with the County. The cost of GIS hardware is likely to be less expensive in the future. Currently, the City is investigating the possibility of participating in the joint purchase of a number of GIS's in cooperation with Anoka County, Coon Rapids, Columbia Heights, Blaine and Andover. The benefits of such a joint action incl�de: o By purchasing a number of GIS's simultaneously, the Cities and the County can neqotiate significant purchase discounts from the GIS vendor. o The Cities and Counties will be purchasing GIS's which are highly compatible. The timetable for acquisition of GIS's by this "consortium" of buyers has not been established. Realistically, the City should plan on acquirinq a GIS in 1989 or 1990. 38 , < The GIS must operate on hardware separate from the administrative and public safety systems. This will complicate the interchange of property related data for City-wide use. D. PERSONAL COMPUTERS Personal computers (PCs) should be used extensively by the City in the future. All word processing and spreadsheeting will be performed on PCs. It is likely that some users now using terminals will use PCs in the future. Eventually, the City could be using between 25 and 30 PCs. It will be much easier to manage these PCs if they are all similarly configured. The City should strive to acquire its PCs in three configurations: (1) Upgraded existing PCs for word processing users: o MSDOS Operating System o Existing CPU 0 640KB Main Memory 0 30MB Hard Disk 0 1.2MB 5.25" Diskette o Monochrome Graphics Screen o Existing Keyboard 0 1 Parallel Port 0 1 Serial Port o Administrative or Public Safety System Terminal Emulation Capability (2) New PCs for word processing users: o MSDOS Operating System 0 8088 CPU 0 640KB Main Memory 0 30MB Iiard Disk 0 1.44MB 3.5" Diskette o Monochrome Graphics Screen 0 101 Key Enhanced Keyboard 0 1 Parallel Port 0 1 Serial Port o Administrative or Public Safety 5ystem Terminal Emulation Capability (3) New PCs for "power" users users): o MSDOS Operating System 0 80286 or 80386 CPU o iMB Main Memory 0 30MB Hard Disk I (CAD, DTP and heavy spreadsheet 39 0 1.44MB 3.5„ Diskette o Monochrome Graphics Screen 0 101 Key Enhanced Keyboard 0 1 Parallel Port 0 1 Serial Port o Administrative or Public Safety System Terminal Emulation Capability Al1 of these PCs will be IBM PC compatible. New PCs could be either IBM PS/2s or compatible clones. While these machines would not be running OS/2 software initially, it may be desirable to do so in the future. If so, the City could upgrade some of its 8088 PCs with 80286 or 80386 CPUs when there is a need. Occasionally, data will need to be moved from one of the existing PCs equipped with a 5.25" diskette to a new PC with a 3.5" diskette. This will be done using "data migration" software and an interconnect cable. All of the PCs will be wired to either the administrative or public safety systems. Some will be wired to both. The City should not discard its existing PCs. Rather, it should investigate the cost of upgrading them. In some cases, however, it may not be cost effective to .acquire additional disk or memory. These PCs could end up being used by staff which do not have heavy usage requirements. A problem associated with this extensive use of PCs is data file backup. All data stored on the public safety and administrative systems will be backed up daily by the EDP staff. Because these systems are centralized, this activity is relatively easy to perform and control. Because of their decentralized nature, backing up PCs is hard to control. Most PC users do not have the discipline to do it consistently. PC users not backing up are wlnerable to losing data because of bad diskettes, hardware malfunctions, power fluctuations, operator errors and other problems. There are several possible solutions to this problem. The City could store all data on the central systems until needed by a PC user. When needed at a PC, the data could be "down loaded" electronically. When finished, the PC user would "up load" the data back to the central system. This would make it easy for the EDP staff to back up all data each day. Another approach involves networking all of the PCs to a single large data storage device. Data would be Btored on this device until needed at a PC. Again, the EDP staff could easily back up this system. There are other technical solutions to this problem. When selecting its new system, the City should closely review each vendor's approach to solving this problem. _� 4 0 E. EDP STAFF The City will require a small staff to manage its administrative and public eafety systems and to undertake modest system development projects. The staff should consist of two people - a manager and a programmer/operator. The manager should be qualified to design and program simple new systems. This staff will also be responsible for training other City employees in the use of the systems. The staff will be resppnsible for the conversion of a number of existing programs to run on the new administrative system. These include: o Special Asse�sments o Property Sales Tracking In addition, the staff could be responsible for developing several new applications, including: o Street Address/Polling Place Cross Reference o Appraisal Data Base o Parcel Identification Number/Street Address Cross Reference o MFIRS Reporting/Building Inspection Data o Fire Management/Appraisal and Street Address Data F. DOCUMENT ARCHIVING SYSTEM The City is currently assessing various solutions to its document archiving problem. The most attractive of the alternatives being considered involves the use of a document imaging system incorporatinq a microcomputer and data base management software to access archived documents. The imaging systems being considered use either optical disk, microfilm or microfiche as the storage medium. It might be possible to link the archiving system to the administrative computer system. However, there are strong reasons for not making this a high priority. There is no overriding need for linking the two systems together. The City would not achieve any significant productivity increases through such a linkage. In addition, most of the systems the City is considering are not usually linked to computers of the type the City will need for its administrative system. It would be difficult to link these two systems. 41 - G. PARCEL DATA BASE The existing PRINTS system has not proved to be an effective tool. There are several reasons for this, including: o PRINTS data is difficult to maintain. o Responsibility for data maintenance is not clearly defined. o PRINTS is not well supported by the software vendor. o PRINTS operates to slowly to be useful to all users. For these reasons, we recommend that the PRINTS system be discontinued. However, the City does have a need to store parcel related data. This requirement affects primarily: o City Clerk - Street Address/Polling o Assessor - Appraisal Data Base o Community Development - Parcel I.D./ Reference o Fire - Appraisal/Street Address Data o Public Works - Streets Inventory Place Cross Reference Street Address Cross In theory, a unified system should be the best way to meet the City's needs for parcel data. The City has learned from its experience with PRINTS that practical realities can limit the effectiveness of a unified system. We are skeptical that a new unified system to replace PRINTS will be significantly more effective than PRINTS. At this time, it appears that the best way of ineeting the City's parcel data processing requirements is through a set of stand alone applications. The problem of data consistency and integrity could be minimized by using the assessment data supplied by the County ta update each stand alone application with new street address and parcel number data. This is not a perfect solution, but it appears better than the available options. Despite this preliminary recommendation, the City should nbt close its mind to a solution involving a unified system. If a�viable option incorporating a unified system is proposed to the City, it should be carefully evaluated in light of the City's experience with PRINTS. It could turn out to be workable. In the future, a GIS could be used to store and present much of the parcel data required by the Public Works and Community Development Departments and the City Clerk and Assessor. There could be technical problems associated with providing widespread, easy access to this data in a GIS. 42 H. HOST SYSTEM This eection shows the most favorable distribution of application Boftware between the administrative and public safety systems and variaus PCs. Application Word Processing Personnel Graphics Desk Top Publishing Spreadsheeting Fund/Budget Accounting and Reporting Payroll Cash Disbursements Cash Receipts Purchasing Utility Billing Asset Accounting Business Licensing Special Assessments Street Address/Polling Place Cross Reference Insurance Claims Management Investment Management Appraisal Data Base Property Sales Trackinq Project Costing Parcel Identification Number/Street Address Cross Reference Building Permitting and Special Use Permitting Computer Aided Design 911 Data Communications Interface Hazardous Material Fire Fightinq Equipment Costing and Management Fire Management Police Recordkeeping and Reporting State Crime Computer Network Data Communications Interface Casewriter Business Contacts Case Management ENFORC Data File Management Geographic Information System Project Management Work Order Management Streets Inventory Project Cost Estimating Warehouse Parts Inventory Control Engineerinq Design Tools 43 System PCs Administrative PCs DTP PC PCs Administrative Administrative Administrative Administrative Administrative Administrative Administrative Administrative or PC Administrative Administrative PC PC Administrative Administrative Administrative Administrative Administrative CAD PC Public Safety Public Safety or PC Administrative Public Safety Public Safety Public Safety Public Safety Public Safety or PC Public Safety Public Safety GIS Computer PC Administrative Administrative PC Administrative PCs `.. . Gasoline Pump Management Facilities Scheduling Team and League Management Class Registration Inventory/Asset Management Mailing List Management ENFORC Report Generator Liquor Store Merchandizing I. APPLICATION PRIORITY This section shows the relative priority application. Hiqh Priority Applications Personnel Word Processing Project Costing Appraisal Data Base Parcel Identification Number/Street Address Cross Reference Casewriter ENFORC Data File Management Geographic Information System Class Registration Mailing List Management Fund/Budget Accounting and Reporting Payroll Cash Disbursements Purchasing Utility Billing State Crime Computer Network Data Communications Znterface Spreadsheeting Special Assessments Police Recordkeeping and Reporting Project Management Streets Inventory Fire Management Property Sales Tracking 44 System Stand Alone PC PC Administrative PC PC Public Safety PCs for automation of each Year Implementation Starts 1989 1988 1989 1989 1989 1988 1988 1990 1989 1988 1989 1989 1989 1989 1989 1988 (Existing) 1989 1988 1989 1988 1989 1988 (Existing) (Existing) 1988 (Existing) (Existing) (Existing) Medium Priority Applications Building Permitting and Special Use Permittinq Computer Aided Design Desk Top Publishing Equipment Costing and Management Business Licensing Business Contacts Case Management Liquor Store Merchandizing Engineering Design Tools Facilities Scheduling ENFORC Report Generatar Insurance Claims Management Investment Management Cash Receipts Low Priority Applications Team and League Management Graphics Asset Accounting 911 Data Communications Interface Work Order Management Project Cost Estimating Hazardous Material Fire Fighting Warehouse Parts Inventory Control Inventory/Asset Management Street AddressjPolling Place Cross Reference 45 Year Implementation Starts 1989 1988 1988 1989 1989 1989 1989 1990 1988 1988 1989 1988 (Existing) 1988 (Existing) 1989 1988 1988 1990 1989 1990 1988 1989 1990 1988 1990 � • VZ. ALTERNATE PLANS FOR AUTOMATION This section describes three alternative system configurations which could meet the City's current and future data processing requirements. The major strengths and weaknesses of each approach are listed and a recommendation is made on the most appropriate alternative. Each of the alternatives discussed below assumes that the public safety system will be retained and that it will continue being run on its own hardware. In addition, it is assumed that the GIS will run on a separate system when it is acquired. Because of these assumptions, the alternatives focus on the hardware and software configuration of the administrative system. Option One - A Central Computer And No PCs This option consists of using a large superminicomputer to meet all of the City's processing requirements (except for the public safety system and the GIS). The accounting, word processing, personnel, assessment, park and recreation, permit tracking, engineering and all other requirements would be met using this machine. No PCs would be used at the City. There are some advantages to this approach: o A single system would be easier to manage and control. o Many applications are better run on a central system because higher quality software is available. o Vendor support would be better on a centralized system than it would be on PC-based systems. o Some applications require multi-user capabilities. This could not be achieved using PCs. The disadvantages are: o A central system would be slow when a large number of users were active simultaneously. o By eliminating the use of PCs, the City would be forced into using the central system to run jobs better handled by PCs (word processing, spreadsheeting, graphics, etc.) This is a viable alternative for the City. 46 Qption Two - A Central Com�uter In Combination with PCs This option includes the use of both a central system and PCs. The central system would be used to process those applications best run on a central system. The PCs would be used to run the applications PCs are best at - word processing, spreadsheeting and other activities. The PCs would also be used as terminals to the central system. The PCs would be IBM compatible. The strengths of this approach are: o The City would be using the appropriate technology to meet each of its requirements - either the central system or a PC. o The City would get better support from its software vendor. o The central system would be used to run those applications requiring multi-user capabilities. The major disadvantages of this solu}ion are: o This approach makes it more difficult to control file back up on the PCs. o PCs are not perfect replacements for terminals. This alternative is viable for the City. Without considering costs, it provides the most flexibility and power of all of the options being considered. Q,ption Three - A Network of PCs And No Central Computer This alternative consists of using a network of PCs to meet all of the City's processing requirements (except for the public safety system and the GIS). The network would include a large number of PCs and printers and a large centralized mass storage capability. The PCs would be IBM compatible. The advantages to this approach are: o PC networks can be easily expanded. Additional PCs and printers can be added at will. o PC networks have build in hardware redundancy. The failure of one PC does not affect the operation of the rest of the network. o PCs are the best solution for some of the City's processing requirements - word processinq, spreadsheeting, computer- aided-design, etc. 47 _The disadvantages of a PC network are: o The City would be forced to use PC software even when it is not the best solution available. Some applications (utility billing, assessors data base, payroll, etc.) are better run on a minicomputer using minicomputer software. Some applications probably could not be successfully run on a microcomputer. o PC networks are difficult to manage. o PC users are difficult to control. This is true of both networked and non-networked PC users. o PC software is not well supported by software vendors. o The distributed nature of a PC network makes it impossible to focus maximum computer power on a job, if necessary. This alternative is not viable for the City. 48 VII. �OST ANALYSIS This section shows the costs of the two viable data processing alternatives described in Section VI and the cost of continuing with the existing system. Cost summaries of each alternative are shown first. The cost detail follows. A comparison of the cost of the existing system and the most appropriate new system is also shcwn. This cost analysis is based on several assumptions: o The existinq administrative system will be replaced. o Some existing administrative software will be converted to run on the new hardware. o The existing public safety software will be retained. The public safety hardware will be upgraded by using the old administrative system hardware. o All new hardware and software (except for the GIS) will be acquired in 1988. o The GIS will be installed in 1990. It will be a stand alone system. The cost of the GIS does not include the personnel cost associated with digitizing the existing maps. The costs reflect direct cash outlays for each alternative. The cost categories included in this analysis are: o�iardware - The cost of acquiring computer hardware including the processor, main memory, mass storage, I/O controllers, data communications hardware and software, terminals, printers, plotters and other equipment required for reasonable system performance. System software such as the operating system, utilities and compilers are also included here. o Software - The cost of acquiring computer programs from software developers to meet the primary and secondary application requirements. Not all software will be purchased; some applications will be developed in-house or converted to new hardware from the existing T.I. computer. o jnstallation Conversion and Trainina - The cost of installing and implementing the new system. This category includes the cost of freight, insurance, installation, electrical wiring (when necessaryj, traininq, documentation and data conversion. 49 o Data Communication Lines - The cost of leasing telephone lines to provide communications between City Hall and the remote terminal/PC sites, the State CJIS and the County 911 dispatcher. o�ardware Maintenance - The cost of ongoing hardware maintenance from the hardware manufacturer or a third party. This is a recurring cost and is assumed to increase at 6$ annually. o Software Support - The cost of ongoing software support for purchased software. This support will be supplied by the software vendor and could take the form of software enhancements or modifications. This is a recurring cost and is assumed to increase 10� annually. 50 � �iDMINISTRATIV� Hardware Software Znstallation Subtotal COST SUMMARY ALTERNATZVE ONE: A CENTRAL C(1MPUTER WITH NO PCs (Assume All Implementation Begins In 1988) 1988 1989 1990 1991 1992 TOTAL $197,400 104,500 10.000 $311,900 � --- $ 5,000** --- 100 --- $ 5,100 --- Hard. Maint.- EXist. $ 21,000 $ 10,000 --- --- --- Soft. Maint.- Exist. 15,000 --- --- --- --- Hard. Maint.- New* 16,000 17,000 $ 18,000 19,000 $20,000 Data Comm. Lines* 1,800 1,900 2,000 2,100 2,300 Soft. Maint.- New* 10,500 11.000 12,000 12.000 13,000 � TOTAL $376,200 $ 39,900 $ 32,000 $38,200 $35,300 PUBLIC SAFETY Hardware Software Installation Subtotal Hardware Maint.* Data Comm. Lines* Software Maint.* TOTAL $202,400 104,500 10.100 $317,000 $ 31,000 15,000 90,000 10,100 58.500 $521,600 $ 18,000 --- --- --- --- $ 18,000 29,000 --- --- --- --- 29,000 1,000 - --- --- l.000 $ 48,000 --- --- --- --- $ 48,000 10,000 $ 10,600 $ 11,200 $11,900 $12,600 56,300 2,400 2,500 2,700 2,900 3,000 13,500 7.000 7.400 7,900 8.400 8.900 39.600 $ 67,400 $ 20,500 $ 21,800 $23,200 $24,500 $157,400 G� i Hardware --- --- $ 57,000 $15,000 --- � Software --- --- 28,000 --- --- Installation --- --- 20,500 500 --- Hardware Maint.* --- --- 6,000 7,000 $ 7,000 Software Maint.* --- --- 5,000 5,000 6.000 � TOTAL --- --- $116,000 $27,500 $13,000 � GRAND TOTAL S443.600 s'��4Q S169�800 � i� * Inflated 6$ annually ** Additional mass storage 51 $ 72,000 28,000 20,500 20,000 16.000 $156,500 S$�,5 , 500 �OST SUNirSARY AT.�ERNATIVE TWO• A CENTRAL COMPUTER IN COMBINATION WITH PCs (Assume Al1 Implementation Begins In 1988) 1988 1989 1990 1991 1992 TOTAL ADMINISTRATIVE Hardware Software Installation Subtotal $212,400 85,000 10.000 $307,400 --- --- $ 5,000** --- $217,400 --- --- --- --- 85,000 - 100 - 10.100 --- --- $ 5,100 --- $312,500 Hard. Maint.- Exist. $ 21,000 $10,000 --- --- --- Soft. Maint.- Exist. 15,000 --- --- --- --- Hard. Maint.- New* 17,000 $18,000 $ 19,000 21,000 $22,000 Data Comm. Lines* 1,800 1,900 2,000 2,100 2,300 Soft. Maint.- New*_ 8.000 9.000 9.000 10.000 10,000 � TOTAL $370,200 $38,900 $ 30,000 $38,200 $34,300 PUBLIC SAFETY Hardware Software Installation Subtotal $ 26,000 --- --- 18,100 --- --- _ 1,000 --- --- $ 45,100 --- --- $ 31,000 15,000 97,000 10,100 46.000 $511,600 $ 26,000 18,100 l.000 $ 45,100 Hardware Maint.* 10,000 $10,600 $ 11,200 $11,900 $12,600 56,300 Data Comm. Lines* 2,400 2,500 2,700 2,900 3,000 13,500 Software Maint.* 7.000 7.400 7,900 8.400 8.900 39,600 TOTAL $ 64,500 $20,500 $ 21,800 $23,200 $24,500 $154,500 �� Hardware --- --- $ 57,000 $15,000 --- Software --- --- 28,000 --- --- Installation --- --- 20,000 500 --- Hardware Maint.* --- --- 6,000 7,000 $ 7,000 Software Maint.* --- --- _ 5.000 5,000 6.000 � TOTAL --- --- $116,000 $27,500 $13,000 � GRAND TOTAL � 4 3 4. 7 0 0 y'� .��Q. $.16 ?�.$.Q4. y� „� s'���$..� * Inflated 6$ annually ** Additional mass storage � $ 72,000 26,000 20,500 20,000 16.000 $156,500 22,600 � �OST SIJMMARY (Assume Implementation Is Spread Over Three Years) 1988 1989 1990 1991 1992 TOTAL AUMINISTRATIVE Hardware Software Installation $ 81,100 $111,300 $ 20,000 $ 5,000** --- 21,500 52,500 11,000 --- --- 4.000 5.000 1 000 100 --- � Subtotal $106,600 $168,800 $ 32,000 $ 5,100 --- Hard. Maint.- EXist. $ 21,000 $ 10,000 --- --- --- Soft. Maint.- Exist. 15,000 --- --- --- --- Hard. Maint.- New* 6,800 17,000 $18,000 $20,000 $21,000 Data Comm. Lines* --- 1,900 2,000 2,100 2,300 � Soft. Maint.- New* 2.000 7�000 9.000 10.000 1U.000 � TOTAL $151,400 $204,700 $ 61,000 $37,200 $33,300 UBLIC SAFETY Hardware Software Installation � Subtotal Hardware Maint.* Data Comm. Lines* Software Maint.* ( TOTAL $217,400 85,000 10.100 $312,500 $ 31,000 15,000 82,800 8,300 38.000 $487,600 $ 8,000 $18,000 --- --- --- $ 26,000 5,600 12,500 --- --- --- 18,100 300 700 --- --- 1,000 $ 13,900 $31,200 --- --- --- $ 45,100 8,000 10,600 $ 11,200 $11,900 $12,600 54,300 600 2,500 2,700 2,900 3,000 11,700 5.000 7,400 7,900 8.400 8.900 , 37•600 $ 27,500 $51,700 $ 21,800 $23,200 $24,500 $148,700 �S Hardware --- --- $ 57,000 $15,000 --- Software --- --- 28,000 --- --- Installation --- --- 20,000 500 --- Hardware Maint.* --- --- 6,000 7,000 $ 7,000 � Software Maint.* --- --- 5.000 5,000 6.000 � TOTAL --- --- $116,000 $27,500 $13,000 � GRAND TOTAL y�LZ� 2 5 6. 4 0 0 S 19 8, 8 0 0 s� ii_Z�Q * Inflated 6� annually ** Additional mass storage 53 $ 72,000 28,000 20,500 20,000 16,000 $156,500 s�� COST SUI�II�ARY Continue Usinq Existing System 1988 1989 1990 1991 1992 TOTAL ADMINISTRATIVE Software License $ 12,000 --- --- --- --- Hardware Maint.* 21,000 $ 22,000 $ 24,000 $25,000 $27,000 Software Maint.** 15.000 16.000 17,000 18.000 19,000 TOTAL $ 48,000 $ 38,000 $ 41,000 $43,000 $46,000 �UBLIC SAFETY Hardware Maint.* $ 7,000 $ 7,000 $ 8,000 $ 8,000 $ 9,000 Software Maint.* 4,000 4,000 4,000 5,000 5,000 Data Comm. Lines* 600 700 700 800 800 TOTAL $ 11,600 $ 11,700 $ 12,700 $13,800 $14,800 GRAND TOTAL S 59� 600 S 49 . 700 S 53 , 700 y'��$�, i'��p. .� * Inflated 6$ annually ** Assume 200 hours per year at $75.00 per hour. 54 $ 12,000 119,000 85.000 $216,000 $ 39,000 22,000 3.600 $ 64,600 S28o,600 Inflated 6� annually Proposed New System Existing System NET COST OF NEW SYSTEM OVER EXISTING SYSTEM COST SUi�II�iARY Comparison Of Existing System To Proposed New System 1988 1989 1990 1991 1992 TOTAL $178,900 $256,400 $198,800 $87,900 $70,800 $792,800 � 59.600) j 49.700) � 53,700) j56.800) j60,800) ,j,280.600) �� �. �� �� �� � ��� �� 55 COST DETAIL ALTERNATIVE ONE• A CENTRAL COMPUTER WITH NO PCs gDMINISTRATI�IE SYSTEM �Iardware CPU with: 6MB Main Memory 400MB Mass Storage 48 I/O Ports Reel-To-Reel Tape Operating System Software, Utilities and Compilers 4 Data Communication Line Support 5 Cash Register/PCs for Liquor Store 35 Terminals 8 Letter Quality Printers - Laser - 8PPM 15 Report Printers - 100CPS 1 High Speed Printer - 300LPM 1 CAD PC 1 DTP PC with Scanner 4 9600BPS Modems TOTAL Software Word Processing Personnel Graphics Desk Top Publishing Spreadsheeting Fund/Budget Accounting and Reporting Payroll Cash Disbursements Cash Receipts Purchasing Utility Billing Asset Accounting Special Assessments Liquor Store Merchandising Business Licensing Street Address/Polling Place Insurance Claims Management Investment Management Cross Reference � Purchase $103,000 20,000 27,300 16,000 9,600 5,000 4,000 6,500 6,000 $197,400 $ 5,000 5,000 5,000 1,000 (on PC) 5,000 5,000 . 5,000 3,000 5,000 3,000 5,000 2,000 Existing 5,000 2,000 In-iiouse Spreadsheet Spreadsheet Appraisal Data Base Property Sales Tracking Project Costing Parcel Identification Number/Street Address Cross Reference Building Permitting and Special Use Permitting Computer Aided Design Project Management Work Order Management Equipment Costing and Management Streets Inventory Project Cost Estimating Warehouse Parts Inventory Control Engineering Design Tools Facilities Scheduling Team and League Management Class Registration Inventory/Asset Management Mailing List Management Fourth Generation Programming Language and Data Base Management System TOTAL Data Communications Lines Liquor Stores - Dial Up Garage - Leased Line Senior Citizen Center - Leased Line Nature Center - Leased Line TOTAL $UBLIC SAFETY SYSTEM Hardware 1 Reel-To-Reel Tape 1 Upgrade T.I. CPU to �990/12 13 T.I. Terminals 4 Data Communication Line Support 4 9600BPS Modems (Fire) 4 9600BPS Modems (Police) TOTAL 5? Purchase In-House Existing $ 2,500 In-House 3,000 3,000 (on PC) 5,000 2,000 2,000 5,000 Spreadsheet 2,000 3,000 4,000 2,000 3,000 2,000 Word Processing 10,000 $104,500 N/C $50/month 50/month 50�month $150/month $ 8,000 N/ C N/C 4,000 6,000 N/C $ 18,000 Software 911 Data Communications Interface Hazardous Material Fire Fighting MFIRS Reporting Equipment Management Fire Management, Including Appraisal/ Street Address Data Police Recordkeeping and Reporting State Crime Computer Network Data Communications Interface Casewriter Business Contacts Word Processing Spreadsheeting Graphics Case Management Data File Management and Disk Storage Utilization ENFORC Report Generator TOTAL Data Communications Lines CJIS - 2 Leased Lines County 911 Dispatch - Leased Line New Fire House - Leased Line TOTAL 58 Purchase $ 2,000 2,000 Existing 2,000 Existing & In-House Existing Existing 2,000 2,000 Existing 5,000 5,000 3,500 2,000 3,500 $ 29,000 $100/month 50/month 50/month $200/month COST DETAIL ALTERNATIVE TWO• A CENTRAL COMPUTER IN COMBINATION WITH PCs �DMINISTRATIVE SYSTEM �Iardware CPU with: 5 9 16 10 8 15 1 1 1 4 3MB Main Memory 400MB Mass Storage 48 I/O Ports Real-To-Reel Tape Operating System Software and Utilities 4 Data Communication Line Support Cash Register/PCs for Liquor Store Terminals PCs Upgrade Existing PCs Letter Quality Printers - Laser - 8PPM Report Printers - 100CPS High Speed Printer - 300LPM CAD PC DTP PC with Scanner 9600BPS Modems TOTAL SQftware Word Processing Personnel Graphics Desk Top Publishing Spreadsheeting (15 PC users) Fund/Budget Accounting and Reporting Payroll Cash Disbursements Cash Receipts Purchasing Utility Billing Asset Accounting Special Assessments Liquor Store Merchandising Business Licensing Street Address/Polling Place Insurance Claims Management Investment Management Appraisal Data Base Cross Reference 59 Purchase $ 94,000 20,000 6,300 40,000 5,000 16,000 9,600 5,000 4,000 6,500 6,000 $212,400 $ 5,000 5,000 Spreadsheet Graphics 1,000 3,000 5,000 5,000 3,000 5,000 3,000 5,000 2,000 Existing 5,000 2,000 In-House Spreadsheet Spreadsheet In-House Property Sales Tracking project �osting Parcel Identification Number/Street Address Cross Reference Building Penaitting and Special Use Penaitting Computer Aided Design Project Management Work Order Management Equipment Costing and Management Streets Inventory Project Cost Estimating Warehouse Parts Inventory Control Engineering Design Tools Facilities Scheduling Team and League Management Class Registration Inventory/Asset Management Mailinq List Management Fcurth Generation Programming Language and Data Base Management System TOTAL Data Communications Lines Liquor Store - Dial Up Garage - Leased Line Senior Citizen Center - Leased,Line Nature Center - Leased Line TOTAL PUBLIC SAFETY SYSTEM Hardware 1 Reel-To-Reel Tape 1 Upgrade T.I. CPU To �990/12 9 T.I. Terminals 4 PCs 4 Data Communication Line Support 4 9600BPS Modems (Fire) 4 9600BPS Modems (Police) TOTAL 60 Purchase Existing $ 2,500 In-House 3,000 3,000 500 2,000 2,000 2,000 Spreadsheet 2,000 3,000 2,000 1,000 2,000 1,000 Word Processing 10,000 $ 85,000 N/C $50/month 50/month 50�month $150/month $ 8,000 N/ C N/C 8,000 4,000 6,000 N/C $ 26,000 $oftware 911 Data Communications Interface Hazardous Material Fire Fighting MFIRS Reportinq Equipment Management Fire Management, Including Appraisal/ Street Address Data Police Recordkeeping and Reporting State Crime Computer Network Data Communications Interface Casewriter Business Contacts Word Processing (5 PC users) Spreadsheeting (3 PC users) Graphics Case Management Data File Management and Disk Storage Utilization ENFORC Report Generator TOTAL pata Communications Lines CJIS - 2 Leased Lines County 911 Dispatch - Leased Line New Fire House - Leased Line TOTAL 61 Purchase $ 2,000 1,000 Existing 2,000 Existing & In-House Existing Existing 2,000 500 1,000 600 Spreadsheet Graphics 3,500 2,000 3,500 $ 18,100 $100/month 50/month 50/month $200/month VIII. SUHII�iARY OF RECOMMENDATIONS This section consists of a summary of our most significant recommendations on improving automation at the City. Some of these recommendations are explicitly stated elsewhere in this report; others are merely implied. o Replace the existing administrative system with new hardware and software. Utilize a combination of a central computer and PCs. o Use PCs for word processing, spreadsheeting and certain specialized applications. o Retain some software for use on the new administrative system. o Equip all PCs with terminal emulation capabilities. o Acquire a PC-based desktop publishing system. o Replace the PRINTS software with a set of software designed to meet the needs of each user department. Use the computer to simplify updating these multiple property files. Investigate the use of a GIS in the future to organize and present much of the required parcel data. o Retain the Police and Fire software. Upgrade the public safety hardware with the CPU, terminals and printers from the old administrative system. o Acquire a GIS which will be compatible with the future County GIS. Investigate sharing hardware and software with the County. o Do not attempt to integrate the document archiving system with the administrative system. o Maintain a small EDP staff to manage the City's systems and develop some new software. o Acquire the PCs in 1988. o Acquire the new administrative system and upgrade the public safety system in 1989. o Acquire the GIS in 1989 or 1990. 62 Engineering Sewer Wa�er Parks Streets Maintenance MEMORANDUM TO: Nasin► Qureshi, City Manager PW86-106 FROM: John G. F'lora,�Pub�lic Works Director DATE: April 21 , 1988 SUBJECT: GLS Meeting The Anoka Co�nty GIS irtterested parties met on Thursday, April 7, 1988 to review the c�onsultant pcaposal tor a Geographica]. Information Systen Request for Proposal (RFP) and a Joint Pawers Agreaaent to be disseminated to the Cointy cities and tawnships. The oonsulting fian � Deloitte, Haskins and Sells revised their sulmittal to include the preparation of an RFP, selection of a consultant and 4 other options for a' estimated cost of less than �36, 000. It was agreed by the participants that the proposal was reasonable and the firm of Deloitte, Haskins and Sells should be retair�ed by the Joir�t P�awers Task Forve, �t�en it is estab�lished to formalize the Task Fbroe neect�, prepare an RFP, idemify criteria for vendor selection and assist in the selectic� prooess for the determination of a Couity�wic7e GIS. A redraft ar rhe Joint Pvwers Agreenent was reviewed. It was suggested that the not to exceed �nant cf 536,000 be ideritifiecl and that the f�ding participation provide for m�nicipalities of less than 10,000 population aomnitment to be limited to 51,000 or the lessor anaait as ideritified by the Northern City Mayor's ftnding vonoept. All other partic�pants woul.d p�ay in a000rc7anoe with the Northern Mayor's vonvept with the Co�nty participation equal to the largest populatian and the largest assessed value. Assuning the cities of Blair�e, tblunbia Heic,�ts, .Coon Rapids, �ridley and the County enter into the Joi� P�wers Agreenent, F'ridley's share would a�aaalt to approximately 57,400.00. (The Coulty's share w�ould a�ao�t to 59,000.00). The Co�nty, via the County Engineer's office, will distribute the Joint Powers Agreement by April 15 and request the appraved agreements with the desic�ated rep�esentatives be retur�ed by May 24. The next meeting of the current group is sc3�ec�led for May 5 to review any �omnerits or inforn�ation and Thursday, May 26 has been established fa� the first meeting of the Anol� County Joirit Powers Task Force ��• upnn reoeipt a� the Joint P�owers Agreener�t, I would urge the Co�ncil to e.nter into it and desic�ate myself as pcimary menber and Bob Norclahl, Jock Robertson or Rick Pribyl as alternate meaber. Atta d�nent �� r :, ,; ; � � CITY Of FRlDLEY PLANNING D IVISION MEMOR,ANDUM I�ND �: Nasim Qureshi, City Manager Jock Robertson, Camn�nity Develapnent Director l�EI� FROM: Jim Robinson, Planning CoordinatorJ� . P�EMrJ D�1TE : April 21, 1988 RDGARDING: University Avenue Corridor Update In order to update the City Co�mcil on the status of the University Avenue Corridor implementation, it may be helpful to review the status of the project and outline a preliminary sdiec�ule for oodnpleting the first phase. The first phase of the University Avenue Corridor project includes the segnent s f rom 57th Avenue to 61st Avenue, incl uding both inte r se ct i ons, and 73rd Avenue to Osborne Road, including both intersections. 7xie improvements whidz are incl uded in the prop�sed desic� incl ude : A. Intersections - deoorative paving, riew curbing with handicap curb cuts, crosswalk striping, uniform signalization, bus shelters and benches, dectirative retaining walls and lae�►dscaping. B. Intervening seqnents - de�nonstrati� turf reseecling between 57th Avenue and 61st Avenue, �oniferous and evergreen trees along the highway shoulders, renwal of the fence on the commercial side of University Avenue and painting the residential fenoe o�n the west side o� University Avenue. Progress on the working drawinc}s ha: been delayed in order to allaw the City staff and City Council time to analyze the various lighting options (standarcts and luninaires) for the University Avenue Corridor, as well as other areas in the City. At this time there is a consensus that the gooseneck standarcls with white globes would be the most desirab�le option for the City. Lic�ting specif ications have very recently been reoeived f rom lighting oonsultant, Bob Ehlers. �ese specifications are being turned over to Barton Aschman tb be inoorporated into the final working drawings. We met with Barry Warner � Barton Ascizman on Tuesday, April 12, 1968 and agreed on a preliminary timelir�e for commencing work on the phase one project In addition, we discussed modificatians to the oonoept whi� will be incluc�ed. in the working drawanc�. At this time our estimate for finishing the projeck� is as f all aws : Canple�tion of working drawings -�ao months. Qomp7.e�tion of 1�IDdr review - Six to ei�t weeks. Bid letting - Mid September to early October. Camnenoement af sig�al work and paving - Late September doamenae�nent a� lanclscaping - Early Sgring, 1989. Final izatiaz of phase one projec� implenentatian - Early to early October. Stmaer, 1989. Staff will be pregared to make a presentation at the Council Conference meeting on April 25, 1988 which will provide more detail as to the refinements we are anticipating with the working drawings and also the aonoept far �ilizing the Fridley light standard on the University Avenue Corridor. JL�R/dn M-88-96 � ! - ..� 85TH AVENUE :� �J� 81 ST AVENUE OSBORNEROAD .� w°'� . � ', �,} !�j r s.�. ;\ � ��t, �� 7 3RD AV ENUE C �I 69TH AVENUE MISSISSIPPt �'�` p'��� .. _-: �� 61 ST AVENUE `�-� ;::�;� �f���, �r- -_.�1 57TH AVENUE `\, • ;._"_�, :_- i ' . ��-� C1TY O�_�___F FR _14L�Y _ .INR. �WM.Y. MM�S�,. _� ����W M'� tw rw, �� ti �w� �V �� N��M �r0�� N�M �rM M M.1 N�M �� ��� N��• M ��� �N• AIU M... � ,,,� S.� .�..—...— '.�� � '."„" . ��-w Yl��h WIL�Y -.-.� AY��� �� /r�y •��• .��� w�� W � lI<r �w� M��� �w �..�. W Mrw� \ • _ •— I9 «w� M � f) rw �... ... � O .�.. a..... w �w �r...�.�.rti _ ' t �r... • .��w.. _ �o a.•wy. •Oi ..... ' .... .,.. t ,...� � .,::� ... .......... �-�- _wl,_~._;�Il_�il1�� _�_ - �:----��_,� � ' �� �����:-,� --:-�.�._. . �.. ., - , _ _ =�--_-- — � _ --.-� = - ::�-- ...: #, � •�' ; ..Q�.':�.: S =,.��„�,��• �,����, \'p • � ��e �.,iy"�' � :c.�. s-�'e`o :, � ' . � ' � � _z .: ... - r�l �)��?I �+ = i� ��.t•:•:;:'I ,� �:.•.'. ; : : � p � �_ . : � ,':,;� ' ! �+t��., ..-_- �.;`.��i_ .�'' r, j" S- L PHASE I 7 �RD INTERSECTION TO OSBORNE IMPROVEMENTS PRAIRIE TE8T sE�iMEN PHASE I a �TH To s� sT TURF RESTORATION TEST SEGiMENT • � : : � 0 J � Z Y 2 a � O 2 � � m � � . . � ' �'t' • :�� 1 .. 1 � ;•�:k � r:�a: �. ,��� S.. ~� H � � _ —• '_'. �.-��� � t� � i i;t 0 Z � 0 m a .} � N ' z - - -- v� ,t - -� �� m ti � � i , I! I I W � r � - �� W 2 il � � �I � X � � W � I � �V ;'� '! I � x �: i � . � �i � � � I ;i m � . . � � ,; ;I .� x: , �. f . . ! � �` � � j � �� Z I � � �; ,� m �, �� � �, �p `i � � � � ` ' ,� � o i, � � � � . � ;b . � �� _ ;� � ;: �' i � � i . i, I � U '� � � I I.r�� 1 � • II � /• � �l` � ° : �h U :J �. I � I � � •'� . - . _ _. _� "_ . .� • W Q �� � � • • • lD . . � — � -- . � , � � U . ? o - , s • a. < � � . a �. -� u � t=' �- -- _ -- q� � ' � ----- — ��i . ii =�i �� II I {� il li �i x �� I' � „ �i �� II � �I I � ji ! ii u II ►� �� �� • �i ; . � � o cy� • . . • . �. c z �; .. � . • o , ij . z m II � . � '� I � x H �I ' I � n' • ' aa Z tii �� N II ' O W . • . Z � li � a �� x � � > . , � r '� • i y I � � � � ( j I X � i Z � ,1 •I • � � � ii X I �� �( 0 � ;� (� •-, b�' • (� • 7� � ��/i gASC ►'LNTE SLAU 1'-1'-0" P�c�oo4z6 I NQ1E /K.L, 'P141N1L"p �WRT'S 1p 8E TNRUIaGµLY CLEMNEI� ; WITH Md l'IUD /4M� PAS5IVNT�Tt, A R�t.YBUITYI ��in� pR�i�+�R SNW-� YE /1PPUEp 'BEFORE TNE UNEN? ; ALInHAT�G P01-%URET+►WNE YAiNT �S EItcTROS7�*"I� a�! �Y j A�'t-, c p, Go�.o2 I�5 'ReCX� f u�NY souQC.� oc� -so i�o N� r ��:r:; ��r��; 'P�j?TS 1.IST DFF++ P/�i.'T" QT: Pc�C�';"T�vN 1 �'B � U� I'�! � m� 11f' m ►� _',S Y ? I T/b�'G i��urv, /IR»'� pSSY 3 C i_o'�',,t t" � XT 4 I����r Wllii� F�xYGqv,� rLIJCC ; c..Y� .r n�ur�, ��PwProR 6 �r.-� -��.�J��� ��nAr�'TU� � �►, :T Al U.M� 'i n�tv� r� �r��c 8 ��1 ;� Al'.�M P.►'�,..E -9 y,t�x IS" GY�W a.E. � `IO° F�we��toN to rww �� �xr� of �M�wvtn auw�n r�sE wuwKws ua a�e�c�ra�s � nrt �ao�nn oF 1NESTEi1N 110MTIN6 STANDARDS AND SHALL NOT �E UlED M �� �: N7qLE OII MI iART N011 fNALL sE ASSKiNED TO A TIMIq MRTM ��: W!T TME EIIMFSS WNrtTEN PEIIMISS�ON OF: wes�� �wrn�o sTU�o�eoa n E v i s i o N s w a►� ��� CUSTOYER: �� V. /\ 1 a U n�_ �y �.o.M. .we: c Rr o r�;V�t y N�N E11CUD fT. FOUM7AIN VALLEr CA. �liM ��M'N' CHECK � 011AM�M6 M0(.� 771-SM'0lSO _ e!`A� c- ! . . . .. . �ATF. ^ _ l./. . P 1 I % � ( _ a ; � t � unroF F� �� �: FROM: � •� CO1�/LMUNITY DEVELOPMENT DEPART'IVIENT MEMORANDUM City Co�cil Members Planning Commissim �nbers Jim Robinson, Planning Coordinator�- Jock Robertson, Develo�nent Director April 16, 1988 RDGARDI NG : 57th Pl aoe Cartm�er ci al Devel opnent , The Winfield Develogr�er�t cgoup has mwed ahead with initiatives to develop the northeast cczrer c� 57th & University Avenue. f►t this time they have plaoed under purchase agreenent the c�glex property located at 349 - 57th Place. The purchase agreement is for an aa�uisition a�st � S98,500. Tn addition, the developer has hi red the Desic� Partnership Group to prepare prel iminary site pl ans and elevations which are attaci�ed for your review. Total estimated acquisition costs, ass�nning the developer ac�quires all properties and there are no relocation o�sts, are as fallows: A Rapid Oi1 paroel incl uding the single fa�;ily property - S400, 000 A duFl ex S 98, 500 Shorty's Towing 5175,000 Vacar�t lats S 50, 000 TOr!'AL � 723, 500 (asking prioe) (purd�ase agreement amo►nt ) (best guess ) (best quess) Additirnal oosts would include the relocation of the streets, as shaan in the attad�ed sketd�, and utility wurk including the reno�val of a sanitary sewer line which z�ns throuc� the vacated street area. The City Engineering Department is preparing estimates for �til ity w�rk whicfi will be forwarded to the Council and HRA when available. �e c3eveloper is willing to pay up to S4/sq. ft. for developnent ric�ts to this property. We are estimating that the parcel is approximately 100, 000 sq. ft. A 5400, 000 aoquisition prive would leave a def icit o�f S 323, 500 for aoquisition oosts only. Che solution to this def icit would be to enter into an equity agreener�t with the develcyper whereby the HRA subsidy w�ould be reimbursed upon sale of the develo�nent, along with any profits resulting frcm appreci�ation. TY�e HRA ir�form�lly reviewec3 the oonoept and cost analysis on April 14th and are supportive of the project. Upon sutmission of a copy of the duplex purchase agreenent the HRA a�horized staff to grant the developer the exclusive ric�t to a�nt inue to re got i ate a devel qment agreenent. Zoning issues include a rezoning of a p�rtion of the property fram R-2 duplex to C-2 general business �see map), the vacation of a portian of the existing service road and the platting of the. p�operty. We are anticipating that the mest diff ic�lt aaquisition at this point will be the Rapid Oil parvel. Zhe reaent aoquisitions by the Ashland Oil group of all the property invnlved equals 5285,000, we have been informed that their asking pric�e is 5400, 000. Tt may beoome neoessary for the HRA or the City to step in to acqui re this property. A�ssihle o�naie�nnation prooeedings and rezoning will need to be carefully 000rdinated. We are seeking the cn�sel of Herrick and Newman in this matter. JR:1 s oC Her r i ck and Newlran Nl-88-84 7 i � �.Z , � r- Z MIDI AC�UISITION B "'--J `--- � o; �`:� � .� .��_ , -��f�R 2 � � � e ��. '�� �a' Z►'3.i�', F� / w .NV �i ' � '� Z 2 Ps ' t --•=3- -2-- `��� 3, /;t' :,F.� . T.B� ) .. 1 � IB � � • �l�iS `3 � . z� � � ,�, � '' �tr� � � ?�'�0 • t �*� � �' �` �2 . ?. : l� s . � , 1 � � i� '' s . ` � ' 25�.i ` 's` • ^�� + 3�� ,'F�S M! ,�'0 .4�� � 2• �� • _ � l�l .. . — '��� Z - -z�' \ � �� : t3 � z � ,F �t, � i! la s ,. ,: � S� ��' 9 t: , : . s : 2 �' Z' �'� `'O t t =� �io ; : r�: �� � S� + •� ` �` s.. ; °r �-,. _f W �r° � �1B� `t J �t�� � �, . t!i/ rs �1 l �s i' .e �� � � �� �,� � � ��`�B I�� • \ ��1 �'^ • K,� !r•• � �� � Q ��� ��� � 1 ,. �i ii r i� ` � � C•� ; x i1 �L � s\� .s = � `�9 • ��� Z 1 ' ' �" .. „" -- •' �� •" �'O TH AV E N U E . • ��,l� :' ' •y : ;�� 1 : , � ;.. ...,. � 2i J '�J'� `� ` 1• o i�/ : , � I7 .;. � i `• -.'-s - = ,� ` 6 q i 2B� i' te •' �i i ZF..: 3 i� ,f ` � _�-. � l7�+� - s.. . �`�'�/S :� 2.' �'��/ 2 ` Z6 �� _ S Q 2F 3�� �'2�I� �l' � .��i/� L�� • • ltti rs -i W � s . ... . .i i '( 4 , ��3 ; � ' �� � 2 1 P4,� i ' II �� � �� � ' `C, i�� � k . �-� Z n , � _/3 1 e/f ¢ - .'�► -•- • � � r� � ' � l�'�B �� ,, .. _ . � W ... W Z _ .. ; : 2 `•9 ,R �i ,,• ' �, W i�s�iz . �r� � Z � '*�B �f s Z '► : ,,.� •'' •° z z � „ � Z - „. , '' �`' � `� 2� .�i��: ,� .:. , y •F' ,., `� ' � /� 6 • 2''/7 6 • `+ 11 - �1�. s , ,,, �C � . �s l s iB �: � ii ' , �� � � � � P O 'Q�7 F- ��r6 �1►. . ' �; i��: . �R `� ,.'.:�.. i � y a .t � � � y , ., v� ' : Vl /f. ,S ` • � � t� : /f • • . �, •r " ,+� N.E. � ��: . .. , ,;�4 `„� . _N,� B _ �s j �, � { - • .. '.�. � • .,�• , .: �+ •� . t r �n _ atl. � � p1,. � , :�'%1 (11�'' �. 6 �.i •• -~% l' /�F Y e 9 �?9 • =; •.y do��� ,�� � .. . . p - :E;- � '- ' P.F_� ..).. � :,�� �" R ���/Z �y f" $ � °'Z �" / i �t /G _ � � : � w 27 .i I � ; ' � �� 1� ' • , .��. �) � 1' 1 t �� . - M �'z� � ��5 : f�.� ` //r �n�� � t:�i.. - 3� : �? . ., Z�i ��• .i..r��� . 59 TH VE. � N.E. �«�.'Z� `t 7 , � � ��� -i..� i s . ..� , , �,� � B' , ..::„ ��+�, �Ea�. ���� s �...��r , r� ..,.,o _�, • �' - ` 9 � � is ' . _ �. w� 2i r� +Q � ; � l'�, � il�V M� z � �s'!' � i' ' � M ,� W -- -�.' :. . , .�:ZG � ,r /9 �2 1 = /* ' j @i+ t �S�f ��13 ; I i� 1 �� ' • �•'6 .� �f B �� j �1 r`�, � '� - .�r �. , . / � i � � � - �rf b �, f t� I /3.'Y� �i A' ► � � 't T �' / ± � `" `: : � � '�+ . �� , . � ^Y ��iZ ��5 /�' S �. E � ' i�: E ° � "' ' „ • - i� , � . � ; ��o : i ; � • i'i�� �/lf �'` � i�r� r � i �o'Gr� . �" �I i 9 n'' e 2 � �'� B � � 2 i� , n :i � 109 � •�0 ,�,� 1� 3--� . �o le l►� 7 � �� ( 7(�• a a � - - — � : �i�- - � � , • ,f �y� ,�� g •� � (I� B •ti •� �� s : �`!/lF : 5 :; s�' � p : . w �e r � • t. '� 3 �/ ^ — , 2 _ :, a � Av " - N.E.•_�^:"-- s - ,,, . :° -; „ „ ' . � � .,si sl � . � y, �) �. '� M � i 4 .p /,• /I 1 �Pf; � M !n '3 �1 / z 3 s .c � � + ro .v i• .. is � ' I . `�� j(�.j� � � � � .J S TN Z � �i� ..���+�. PLACE • ..�.s� � ��. `!� .:.. . ., � "9 � � � �: M /r; �'• �� �; �% i �'` i� � • r �•, . � ! .� � �r:sj� h �r ; � �.s s s�,vy�r,i.ya � - - i ; � 4` .s _ . , . . .. ' � , _ `o Ft, � vE�t�E -�t�-E-�'� 1�.. �---- r-- �a - � —� (----� �-1 t_'_.' � � J � � '_ . � , , , ' '' / ' ' • . . . � . . • , • , • � . ' 1 i '. i i i �-----------� �----------} L— ---- • . � i � . � � L------ -----1 i----------.� i ,. � i � � . . . � � � -- ,.r. ---- . .. _ � - , �, � ; ; , . , ��,�� i �_ � � ' --�-- � ��� I i _ � . . a � ' � � r ' _. �� ' ' � . ' .. � _.�.r N . , :z � • -- - - , � a f - I �, � � - { C �i ~ J i � _ _... '¢. Z I f`�!l 1 � � � M � ` ) • i ' - ' � � "1 � Z � � Z � ; � _ . . Q n . � ' ' I � . ' � ,� R � Z ' � � � � ' � o � � - . . ' � I 7 !. 2 � � i � � • I .. � `� � L. . '_ ! ; , , � . ,.- ,, • i �: �� � • � • I• 1 �� e � � ( �� � �' i , � � � I . � � �`� -'n.. • �' �. � � . _ �� _ � si �'�� �~� ' . O � ' . - . - - •- • - � . _.�-a�Ret�; E. - 1--- - _, � I — --�.._....----�.__--..� `� •� ' � �� � � . •� - • � • . ,�,�j .: .. _ _. . . . . � 1 . ... .:. 1.�� -, •I - . .• • - �...._ . . . . � . � - I I � '- - - — ( _'- -- _._ _ . . ._ I � . � � . � 1 � ( ' i � . � ' �� � r� c� — Z � w�r�w��1�.��a��� ..M, 6Af�.iCAPE CONCfM � �wnu0 � • � � �+` • � • � ` • • ��.+M���.�r� /�Y � '.. �Q .�.+�r���.���r�� � • Cf�iK�O i� t /� j � � • 1 . �\` � ' �•�'� ♦ � ���r�� w..w�� 1lEOEYEL�Dfr. . � w��o 0!'wA��Ii Gpw . .�, �L � /1� � . _ �•�' �� �. �='±•�:A� i/ Fi i'ii• '+ . �. . ' . . Orlr Oorn r.. r - -- -- - - — — —►. .I►. _ _ . . . . . . 0 n� .����� � ` i fi � � r I ' � � I i ... � � Z I M � �i � �� , II +� � � _ � � I � i i � � I � i i i � i -_ _ � -�------ T �y . N�MI ; 0 �� � r � I � � � ��I , �. I � � ` / I � ( � _ k� -� �I I � I I { I �--- � � � � � . . I ` . � � i � I � �i �----- -- _-�-�: �h� I �1 Engineering Sewer Water Parks Sireets Maintenance MEMORANDUM Pwss-ia3 TO: Nasim Qureshi, City Manager FROM: John G. F1ora,�Public Works Director DATE: April 21, 1988 SUBJECT: Moore Lake West Basin Aerator Within the Moore Lake Restoration Project, we have identified $23,000 f or an aerator in the west basin for prevention of winter fish kill. As an amenity to the Lake Pointe development, it has been proposed to construct a waterfall element at the southern end of the west basin. Within this water- f all element we could install a cascade type aerator to satisfy the DNR winter requirement. I have obtained photos of a similar element to present to you and the Council at the April 25, 1988 conference meeting. If the Council and HRA support this concept, we should work with Woodbridge to initiate this construction this summer so that the aerator system would be functional this winter and while the grant funding is available. JGF/mh I i i � � •� � � `-� _ � C[TY OF FRl DLEY CIVIC CENTER • tr331 �'NIVERSITti' AVE. N.E. FRIDLEY. MINNESOTA 55�32 • PHONE 161?) 571_3-i511 April 19, 198s Mr. James R. Anderson Divison of Water Quality Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, Minnesota 55155 Dear Mr, Anderson: In a letter dated July 2, 1986, the City of Fridley requested authorization from your Agency to include several additional work elements in the Moore Lake Phase II restoration project. The supplemental elements included 1) installation of a permanent aeration system in the West Basin; 2) replacement of the East Basin hypolimnetic aeration system compressor with a larger unit; 3) improvements to the BASFU system; and 4) an extension of the water quality monitoring program t}�rougi� 19�8. Funding for this work was available under the existing Phase II grant allocation. While several of the above elements have been completed to date, recent developments have precluded finalization of all work as proposed. Tasks remaining include the installation of the West Basin aeration system and the completion of the final project report. The proposed extension of the monitoring program through 1988 will, in addition to expanding the existing project data base, provide a means to evaluate the post-implementation effectiveness of the remedial elements included in the project. As you are aware, the project grant period expired on December 31, 1987. In order to complete all remaining project work, an extension through 1989 is now required. Such an extension would be one of time only, as monies remaining in the original grant are adequate to complete all remaining work. Reallocation of funding resources to the appropriate budget categories would however, be necessary to make these funds available. It is therefore the intent of'this letter to request a no-cost time and budget change amendment be approved for completion of the Moore Lake restoration project. The changes requested are detailed in Attachment No. 1 included with this letter. It is our understanding that formal approval for a project extension requires submission of a revised work plan outlining the elements to be completed, schedules and associated costs. The changes requested as to project milestones are detailed in Attachment No. 2 included Nith this letter. tlltimately, this process wi11 culminate in the issuance of a revised Substate Agreement and Amendment to the Federal Grant formally approving the extension. The attached budget and work plan will hopefully provide you with the information needed to approve the extension as requested. Mr. James R. Anderson April 19, 1988 Page Two The City of Fridley is totally committed to restoring and preserving the quality of Moore Lake. As a highly valued recreational resource, the importance of this water body to the community cannot be over-emphasized. To date, water quality improvements directly attributable to the project have resulted in marked increases in recreational and aesthetic use of the lake. Implementation of the remaining work elements will ensure this trend continues. It is for these reasons the City requests approval for the revisions as proposed. Should you have any questions concerning the information contained herein, please call me at 571-3450. Sincerely, .%, �`��z"'__ � John G. Flora Director of Public Works crs cc: Loren J. Larson, Hickok and Associates Attachments � 0 ATTACHMENT N0. 1 PROPOSED REVISIONS TO THE MOORE LAKE IMPROVEMENT GRANT ELEMENT FUNDING DISTRIBUTION Funding for the proposed work is available through reallocation of existing budgetary resources. The proposed budget revisions are su mnariZed as follows: Current Change New or Program Elements Approved Budget Requested Revised Budget Engineering Construction Legal and Administrative Testing and Inspection MPCA Administration Costs - Total � 253,354 580 , 000 127,84U 25 , 000 2U,OOU E1,006,194 - $ 3,737 + $ 9,732 - $ 8,918 + $ 2,923 -u- -U- $ 249,617 589,732 118 , 922 27,923 2U,UUU $1,006,19�1 Review of project expenditures through April 1988 indicates tt�at approximately $37,OU0.00 is available to complete all remaining work. The proposed allocation of this balance is itemized as follows: Work Element 1988 Monitoring Program West Basin Aeration System City of Fridley Administration Final Project Report Completion Date October 1988 November 1988 March 1989 March 1989 Total Estimated Cost $ 2,000 $23,OOU $ 2,OU0 $10,000 S37 ,OU� Incorporation of the above elements into the revised work schedule would necessitate a time extension through April of 1989. Such an extension is therefore urgently requested. i ATTACHMENT N0. 2 PROPOSED REVISIONS IN MOORE LAKE IMPROVEMENT GRANT TIMETABLE AND MILESTONES Completion of the remaining project elements will require a revision in the current project timetable. This will include an extension of the grant period to April 1, 1989. Proposed milestones are as follows: May 15, 1988 Jun 1, 1988 Aug 1, 1988 Oct 1, 1988 Nov 1, 1988 Dec 1, 1988 Jan 1, 1989 Mar 1, 1989 Apr 1, 1989 Finalize design and specifications for West Basin cascade aeration system, Request for bids issued. Award contract and begin construction for West Basin cascade aeration system. Finali2e outline for Final Project Report. Initiate preparation of Final Project Report. Construction on the West Basin aeration system complete. First draft of Final Project Report submitted to MPCA and U.S. EPA. MPCA and EPA submits comments on draft report to C�ty of Fridley. Final Project Report completed. Conduct final inspection to close project. e � MEMORANDUM , T0: FROM John Flora, City of Fridley Loren J. Larson E. A. Hickok and Associates DATE: April 18, 1988 RE: Proposed Work P1an to Affect Completion of Moore Lake Restoration Project The following work plan outlines the tasks associated with completion ofi tne Moore Lake restoration project. This work plan supersedes that proposed in a memo datea Jartuary 11, 1988 to you from Wa1t Eifert because it is constructea with more current information as to available funding. TASK 1: Complete the design and installation of an aeration system for the West Basin of Moore Lake Description: A permanent aeration facility will be designated and constructea at an appropriate West Basin location. Tne proposed system will be a land-based cascade design capable of supporting a limited resident fish population. It will be indepenaent of the unit presently operating in tne East Basin. Status: A preliminary design of the pump, housing, pumpage locations and plumbing network has been completed. A tenporary system was installed in the West Basin in December 19t�7 to prevent a potential fish winterkill. The unit is presently in operation and appears to be meeting its designed purpose. Estimatea omp etion Date: Estimated Cost: November 1988 $23,000 TASK 2: 1988 Water Quality Monitoring Program i Description: The water guality monitoring program proposed for 1988 will nasically follow past monitoring efforts. Two previously establishea stations in the East Basin and one in the West Basin will continue to be sampled in 1988. Monitoring protocols will include collection of samples on two separate dates between June and September 19�8. Status: Pending approval, Estimated Completion Date: October 1988 Estimated Cost: S[,000 CORR7.3/MEM0.40 L TASK 3: Prepare Final Project Report ► Description: The final project report will be proposed in accordance with � EPA Phase II guidelines. Due to the duration and extent of the project, an extension report is anticipated. Report contents will include a description of the project, chronology of events, an evaluation of remedial element effectiveness and a detailed summary of overall project results. Addenda to this report will include a water quality monitoring program summary and an aeration and maintenance plan. Prior to final report initiation nowever, an outline of the content and format will be submitted to tne appropriate agencies for review and ConCUrrence. Status: Pending project completion. Estimated omp ettion Date: March 1, 1989 Estimated Cost: a10,000 At the request of Mark Burch, E2,000 has been set aside to cover.administrative costs associated with the Grant incurred by the City. m