Loading...
RES 2003-18 - 00002313RESOLUTION NO.18 -2003 RESOLUTION APPROVING A PLAT, P.S. #03 -01, NORTON MANOR FIRST ADDITION, BY MICHAEL JUAIRE, PMJ GROUP, INC., FOR THE PURPOSE OF CONSTRUCTING AN 8 -UNIT TOWN HOME DEVELOPMENT, GENERALLY LOCATED AT 1152 AND 1170 NORTON AVENUE WHEREAS, the Planning Commission held a public hearing on February 19, 2003, and recommended approval of said plat; and WHEREAS, the City Council approved the preliminary plat for NORTON MANOR FIRST ADDITION at their March 3, 2003, meeting, with stipulations attached as Exhibit A; and WHEREAS, a copy of the plat NORTON MANOR FIRST ADDITION has been attached as Exhibit B. NOW, THEREFORE, BE IT RESOLVED, that the City Council approves the Final Plat for NORTON MANOR FIRST ADDITION and directs the petitioner to record plat at Anoka County within six months of this approval or such approval shall be null and void. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 14th DAY OF APRIL, 2003. 4v;� SCOTT J. LUND - MAYOR ATTEST: "aAjAt? DEBRA A. SKOGE - CITY CLERK Resolution No. 18 -2003 FXHTBTT A STIPULATIONS - NORTON MANOR FIRST ADDITION Page 2 1. The final landscape plan shall meet code requirements for number of and sizes of plantings and be reviewed and approved by City staff prior to issuance of a building permit. 2. A landscape plan for the ponding area, in lieu of fencing, to be reviewed and approved by City staff prior to issuance of a building permit. 3. A storm pond maintenance agreement shall be filed with the City prior to issuance of a building permit. 4. All landscaped areas shall have irrigation installed. 5. The proposed walkway shall be concrete. 6. Brick type and application on elevations and other external building materials to be reviewed and approved by City staff prior to issuance of a building permit. 7. A grading and drainage plan shall be submitted and approved by the City's engineering staff prior to issuance of a building permit. 8. The sewer connection shall be located near cul -de -sac. 9. Six inch watermain to the looped according to City engineering staff s specifications. 10. A 12 -foot utility and drainage easement shall be granted along the entire southern edge of the property prior to final plat. 11. A 25 -foot easement from the centerline of Norton Creek on the west side of the property shall be granted prior to final plat. 12. The parking lot shall be constructed to code standards. 13. All elements of the building shall meet the current building code and be approved by the City Building Official. 14. The petitioner shall pay applicable park dedication fee of $1,500 per unit prior to the issuance of any building permits. 15. The fire turn around shall be re- designed to meet the City's Fire Department standards. 16. The driveway and fire turn around shall be designed to 9 -ton standards. 17. The fire turn around shall be posted, "No Parking Fire Lane ". 18. The size of the landscape islands shall be reduced by 5 feet in order to accommodate fire equipment. 19. The petitioner shall meet all Rice Creek Watershed District requirements prior to issuance of a building permit. 20. Provide proof that any existing wells or individual sewage treatment systems located on the site are properly capped or removed. 21. A Development Agreement outlining the Developer's obligation to install utilities, etc., will be prepared by the City and shall be signed by the Petitioner, prior to final plat approval. Resolution No. 18 -2003 EXHIBIT B NORTON MANOR FIRST ADDITION Page 3