RES 2010-07 - 14669RESOLUTION NO. 2010 - 07
RESOLUTION REQUESTING MUNICIPAL STATE AID SYSTEM CONSTRUCTION FUNDS
FOR OTHER LOCAL USE
WHEREAS the City of Fridley receives Municipal State Aid System (MSAS) funds for construction and
maintaining 20% of its City streets, and
WHEREAS 22.9 MSAS miles are currently authorized and have been improved to State Aid standards
and are in an adequate condition that they do not have needs other than additional surfacing, and
WHEREAS the City currently has 88.3 miles of local streets that require maintenance and upgrade, and
WHEREAS it is authorized by MN Rules 8820.1800 to use part of the MSAS construction appropriation
of our City's State Aid allocation on local streets not on the approved State Aid system, and
WHEREAS it is proposed to systematically resurface these streets and upgrade the storm sewer system
for improved surface water drainage and provide additional strength to the streets for traffic survivability,
and
WHEREAS it is proposed to use a portion of the City's population allocation funds to upgrade local
streets, and
WHEREAS the City of Fridley has identified the following MSAS and local (non -MSAS) streets for
inclusion in its 2010 Street Improvement Project No. ST. 2010 -1, as listed in attached Exhibit A,
WHEREAS the majority of these streets require surface repair and drainage adjustments, and
WHEREAS the City indemnifies saves and holds harmless the State of Minnesota and its agents and
employees from claims, demands, actions or causes of action arising out of or by reason or matter related
to constructing the local streets as designed, and
WHEREAS the City further agrees to defend at its sole cost any claims arising as a result of constructing
the local streets, and
WHEREAS the final approval of the State Aid for Local Transportation Division is therefore required.
NOW THEREFORE BE IT RESOLVED that the City of Fridley, Anoka County, Minnesota, requests the
release of MSAS funds for the upgrade and reconstruction of City municipal streets, identified as 2010
Street Rehabilitation Project No. ST. 2010 -1.
PASSSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 25th DAY
JANUARY, 2010.
ATTESTED
& � I
9"n-Ve
DEBRA A. SKOGEN &ITY CLERK
SCOTT . LUND - MAYOR
Resolution No. 2010 -07
EXHIBIT A
STREET REHABILITATION PROJECT NO. ST. 2010 -1
PROPOSED IMPROVEMENTS
Page 2
Street improvements, including grading, aggregate base, bituminous asphalt, concrete curb and
gutter, water and sewer upgrades, landscaping, and other facilities located as follows:
Mississippi Street
Trunk Highway 65 to Stinson Boulevard
Squire Drive
Camelot Lane to Mississippi Street
Dana Court
Squire Drive to east terminus
Camelot Lane
Squire Drive to east terminus
Rice Creek Road
Central Avenue to Stinson Boulevard
Woodside Court
Benjamin Street to east terminus
Briardale Road
Benjamin Street to Stinson Boulevard
Briardale Court
Briardale Road to south terminus
61St Avenue
Benjamin Street to Stinson Boulevard
McKinley Street
61St Avenue to south terminus
Kristin Court
Stinson Boulevard to south terminus
Ben More Drive
Kerry Lane to west terminus
Kerry Lane
Rice Creek Drive to Rice Creek Road
Rice Creek Drive
Kerry Lane to approx. 350' east
Kerry Circle
Kerry Lane to west terminus
Ferndale Avenue
Benjamin Street to west terminus
60th Avenue
Benjamin Street to west terminus
Oakwood Manor
Gardena Ave to 60th Avenue
River Edge Way
East River Road to East River Road
Riverview Terrace
62nd Way to approx. 180' north of Alden Way
Riverview Terrace
Approx. 100' north of 631/2 Way to Mississippi Way
Mississippi Way
Riverview Terrace to East River Road
Alden Way
62nd Way to Riverview Terrace
Ashton Avenue
Mississippi Way to approx. 160' south
641/2 Way
Riverview Terrace to East River Road