RES 2010-12 - 14672RESOLUTION NO. 2010 - 12
RESOLUTION ORDERING FINAL PLANS, SPECIFICATIONS AND CALLING FOR
BIDS: 2010 STREET REHABILITATION PROJECT NO. ST 2010 - 01
WHEREAS, the construction of certain improvements is deemed to be in the interest of the City
of Fridley and the property owners affected thereby, and
WHEREAS, the City of Fridley has prepared a Capital Improvement Plan to systematically
reconstruct streets in the City to a standard section including concrete curb and gutter, and
WHEREAS, the City of Fridley's Engineering Department has completed preparation of a
feasibility report and estimates of costs thereof for the improvements.
WHEREAS, pursuant to direction of the City Council, a report has been prepared by the City of
Fridley Public Works Department with reference to the specific improvements, and
WHEREAS, Resolution No. 2010 -06 adopted January 25, 2010 received the feasibility report
and called for a public hearing on the matter of the construction of certain improvements listed
therein, and
WHEREAS, a public hearing regarding said improvements was set for February 8, 2010, and
ten days' mailed notice and two weeks' published notice of the hearing was given, and
WHEREAS, the public hearing regarding said improvements was held thereon on February 8,
2010 at which all persons desiring to be heard were given an opportunity to be heard thereon,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FRIDLEY, MINNESOTA:
1. Such improvement is necessary, cost - effective, and feasible as detailed in the
feasibility report.
2. That the improvements proposed in the feasibility report are hereby ordered to
be effected and completed as soon as reasonably possible, to -wit:
Street improvements, including milling and overlaying with hot -mix
bituminous pavement and ancillary work associated with these improvements,
to be constructed on the following streets:
Mississippi Street
Squire Drive
Dana Court
Camelot Lane
Rice Creek Road
Woodside Court
Briardale Road
Briardale Court
61St Avenue
McKinley Street
Trunk Highway 65 to Stinson Boulevard
Camelot Lane to Mississippi Street
Squire Drive to east terminus
Squire Drive to east terminus
Central Avenue to Stinson Boulevard
Benjamin Street to east terminus
Benjamin Street to Stinson Boulevard
Briardale Road to south terminus
Benjamin Street to Stinson Boulevard
61St Avenue to south terminus
Resolution No. 2010 -12
Kristin Court
Ben More Drive
Kerry Lane
Rice Creek Drive
Kerry Circle
Ferndale Avenue
60th Avenue
Oakwood Manor
River Edge Way
Riverview Terrace
Riverview Terrace
Mississippi Way
Alden Way
Ashton Avenue
641/2 Way
Page 2
Stinson Boulevard to south terminus
Kerry Lane to west terminus
Rice Creek Drive to Rice Creek Road
Kerry Lane to approx. 350' east
Kerry Lane to west terminus
Benjamin Street to west terminus
Benjamin Street to west terminus
Gardena Ave to 60th Avenue
East River Road to East River Road
62nd Way to approx. 180' north of Alden Way
Approx. 100' north of 631/2 Way to Mississippi Way
Riverview Terrace to East River Road
62nd Way to Riverview Terrace
Mississippi Way to approx. 160' south
Riverview Terrace to East River Road
4. That the work be incorporated in the 2010 STREET REHABILITATION
PROJECT NO. ST2010 -01.
5. That the work be performed under this project may be performed under one or
more contracts as may be deemed advisable upon receipt of bids.
6. That the Director of Public Works, James P. Kosluchar, is hereby designated
as the engineer for this improvement. He shall oversee the preparation of
plans, specifications and estimates of costs thereof for making of such
improvements.
7. That final plans, specifications, and estimates are prepared by the Public
Works Engineering Division and provided to the City Council as they are
completed.
8. That the Engineering Division call for bids in order that project award and
construction can be considered.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS
Stn DAY OF FEBRUARY 2010.
SCOTT .r L — MAYOR
ATTEST:
A1-44m�