RES 2011-05 - 14785RESOLUTION NO. 2011 - 05
RESOLUTION REQUESTING MUNICIPAL STATE AID SYSTEM CONSTRUCTION FUNDS
FOR OTHER LOCAL USE
WHEREAS the City of Fridley receives Municipal State Aid System (MSAS) funds for construction and
maintaining 20% of its City streets, and
WHEREAS 22.9 MSAS miles are currently authorized and have been improved to State Aid standards
and are in an adequate condition that they do not have needs other than additional surfacing, and
WHEREAS the City currently has 88.3 miles of local streets that require maintenance and upgrade, and
WHEREAS it is authorized by MN Rules 8820.1800 to use part of the MSAS construction appropriation
of our City's State Aid allocation on local streets not on the approved State Aid system, and
WHEREAS it is proposed to systematically resurface these streets and upgrade the storm sewer system
for improved surface water drainage and provide additional strength to the streets for traffic survivability,
and
WHEREAS it is proposed to use a portion of the City's population allocation funds to upgrade local
streets, and
WHEREAS the City of Fridley has identified the following MSAS and local (non -MSAS) streets for
inclusion in its 2011 Street Rehabilitation Project No. ST. 2011 -1, as listed in attached Exhibit A,
WHEREAS the majority of these streets require surface repair and drainage adjustments, and
WHEREAS the City indemnifies saves and holds harmless the State of Minnesota and its agents and
employees from claims, demands, actions or causes of action arising out of or by reason or matter related
to constructing the local streets as designed, and
WHEREAS the City further agrees to defend at its sole cost any claims arising as a result of constructing
the local streets, and
WHEREAS the final approval of the State Aid for Local Transportation Division is therefore required,
NOW THEREFORE BE IT RESOLVED that the City of Fridley, Anoka County, Minnesota, requests the
release of MSAS funds for the upgrade and reconstruction of City municipal streets, identified as 2011
Street Rehabilitation Project No. ST. 2011 -1.
PASSSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 3rd DAY
JANUARY, 2011.
ATTESTED
41-47vie
DEBRA A. SKOGEN - VITY CLERK
SCOTT J. LUND - MAYOR
Resolution No. 2011 -05
EXHIBIT A
STREET REHABILITATION PROJECT NO. ST. 2011 -1
PROPOSED IMPROVEMENTS
Page 2
Street improvements, including grading, aggregate base, bituminous asphalt, concrete curb and
gutter, water and sewer upgrades, landscaping, and other facilities located as follows:
57th Place
Main Street to 3rd Street
58t11 Avenue
Main Street to 3rd Street
59' Avenue
Main Street to 3rd Street
60' Avenue
Main Street to 160' E. of 3rd Street
Main Street
57th Avenue to 61" Avenue
2nd Street
58th Avenue to 61" Avenue
21/2 Street
571/2 Avenue to 61" Avenue
3rd Street
60th Avenue to 61st Avenue
Commerce Circle S.
Commerce Circle E. to Commerce Circle W.
Commerce Circle W.
Commerce Circle S. to 73rd Avenue
73rd Avenue
400' W. of Commerce Lane to Commerce Lane
Commerce Lane
73rd Avenue to Osborne Road
Main Street
Osborne Road to 83rd Avenue
77th Avenue
BNSF Railroad to Main Street
79th Avenue
BNSF Railroad to Main Street
81st Avenue
Beech Street to Main Street
Beech Street
77th Avenue to 81st Avenue