Loading...
P - 75481Minnesota Dep ent of Labor and Industry 443 Lafayette pad North St. Paul, MN 155-4342 Phone: (651) 84-5064 TTY/MRS: (6 ) 297-4198 www.electrici .state.mn.us Contractor Re uest for Electrical I Date Rough-In Inspection Required? 07/010/2008 Contractor Must Schedule All Rou I �r1Arr�ss nf Insnactinn _ Rtriaat 243 ELY ST NE ERICA FISCHER vwi �Gi � GieNi wi ie �vu� � iuo� �a� — u iuuuc rv a (763) 784-8293 (612) 616-2106 CENTERPOINT ENERGY 757-6202 tion — One Famil Dwellin /Associated Structure Yes Single Inspection Other Than Rough-In: � Ready Now �ctions Contractor Must Schedule All Final Ins ections ✓0 Will Schedule City/Township County FRIDLEY ANOKA Project Description G,� WIRE/ RECONNECT AIR COIVDITION Contractor Mailing Address 9320 EVERGREEN BLVD NW SUITE B COON RAPIDS, MN 55433 Contractor E-mail Address Electrical Utility joann.zinKen(cvicenterromttnergy Contractor License Number CA01796 Fee Calculation Home or Associated Structure �.._ New Dwelling Service/Power @ $35 New Dwelling Service/Power Supply 401 — 800 ampere @$60 to 30 Feeders/Circuits - $100 New Home — Each (Specify) Detached Garage or Other Associated Structure New Service/Power Supply 0— 400 ampere @$35 New Feeders/Circuits ( ) @ $6 Each Other Job/Project Contact Person JOANN ZINKEN Existing Home/Structure Remodel or Addition New Service/Power Supply New Service/Power Supply Feeders/Circuits 0 — 400 ampere @ $35 401 — 800 ampere @ $60 — Up to _15 Feeders/Circ�its 6 Each or 16 to 30 C�a. $100 Detached Garage or Other Associated Structure New Service/Power Supply 0— 400 ampere @$35 New/Extended Feeders/Circuits ( ) @ $6 Each Reconnected Feeders/Circuits ( ) @ $2 Each Other (Speciry) $2 TOt11(the fee calculated above or $35 multiplied Total (the fee calculated above or $35 multiplied by the number of required inspection trips, by the number of required inspection trips, $35 �p whichever is greater) whichever is greater) Requests for Electrical Ir►specUon (REI) wlth a fee of $250 or less explre 12 months from the fiUng date. The contractor must have the work completed wtthin the 12 month perlod or submit another REI that includes the inspecUon fee for the uncompleted work. Inspection fees do not earry over from one REI to another. - A servlce charge of $30 wlll be added for all dlshonored checks. I hereby certity that I inspaded the electrical installation herein on the dates stated: For Department Use Only Rough — In Inspection(s) Date ^��� �� � ��� iX Final Inspection Date ��p J U L 16 2008 � .^ � This material can be made available in different forms, such as large t, Braille or on a tape. To request, call 1-800-342-5354 (DIAL-DLI) Voice or TDD (651) 297�1198. REI 02 (6/07)