IR - 29783�,% N� 1t���3.
Building Job Repo�t ''�' --- .
ADURESS � �p'���� ��Q,� �i �{ � ��-�C� � .
OWNER
BUILDER � � I )(Rl �� a�' �L' 1 �
DATE J�-�-L�� PERMIT NO. �
DESCRIPTION ��� 3� � L ^ �.� � �l`'��
INSPECTION RECORD
DATE REPORT
�., i � _ : 1 ,r�. . _ .� •.
� tl ��C'�S C 1 ct��.
OWNER P PECTOR
- I
� .-� �
ROOF PITCH AND EXPOSURE: Handsplit shakes should b�ised on �
roofs where the slope or pitch is sufficient tb.iaSure good drainage. Mini-
mum recommended pitch is 1/6th or 4=in-12 (4� (16pt+�tm) vertical ris�aor
each 12" (300mm) horizontal run). Maximum recommen(fed weath�r expo-
� sure is 10" (250mm) for 24" (609mm) shakes. �
�� ROOF APPLICATIQN: Along the eave line, a 36" (914mm) wide strip of �
� roofing felt is laid ove[ the sF�ea�hings'Ftr9i�nni�g cu starter course at the �
!��,�aveline should be doubled. After each course of shakes is applied, an 18"
J..1(457mm) wide strip of roofing felt is laid over the top portion of the shakes
�... a,a►ad, ext�ndiq�g_onto the sheathing, with the bottom edge of the felt posi-
-_. � _.. , .
' FASTENERS:OnIy ������
�`
�' two approved corra �, .,�.�
' s'ion resistant nails ..► ��` �'�'
c' or staples should be ��" �^
� �� �"'���.1���
�` driven into each � �t
shake regardless of � ,r,►
its width. Fasteners
, should -be located ` ,� r.�*
about 3/<" (19mm) ' � �
: from.each edge and �. � �
about 1 �/z' (38mm) �' `
� above the butt line of
the next course. �=
fasteners should be
driven flush but not �
: So the head crushes �ndivic(ual shakes sh�d be spaced aparc a
' the w0od 8nd should �e' (9mm) to a maximil�`i of 5/e" (17mm), to alli
ble expansion. These joints or "spaces-berivi
�- be long enOUgh to should be broken or offse; at least 1 Vz" (38i
'penetrate the shea- cent courses.
thing a minimum of
�`. ,/2" (13mm).
�I�'L�tATURE:'Comp�ete details regarding recommend�d +
and uses of handsplit shakes are given in literature �/ail�ile M
from — Red Cedar Shingle & Hat�dsptit Shake Bureau, 515
,��
N.E., Bell�v,�e, WA 98004. „
�..— ' '"
. �