Loading...
IR - 29783�,% N� 1t���3. Building Job Repo�t ''�' --- . ADURESS � �p'���� ��Q,� �i �{ � ��-�C� � . OWNER BUILDER � � I )(Rl �� a�' �L' 1 � DATE J�-�-L�� PERMIT NO. � DESCRIPTION ��� 3� � L ^ �.� � �l`'�� INSPECTION RECORD DATE REPORT �., i � _ : 1 ,r�. . _ .� •. � tl ��C'�S C 1 ct��. OWNER P PECTOR - I � .-� � ROOF PITCH AND EXPOSURE: Handsplit shakes should b�ised on � roofs where the slope or pitch is sufficient tb.iaSure good drainage. Mini- mum recommended pitch is 1/6th or 4=in-12 (4� (16pt+�tm) vertical ris�aor each 12" (300mm) horizontal run). Maximum recommen(fed weath�r expo- � sure is 10" (250mm) for 24" (609mm) shakes. � �� ROOF APPLICATIQN: Along the eave line, a 36" (914mm) wide strip of � � roofing felt is laid ove[ the sF�ea�hings'Ftr9i�nni�g cu starter course at the � !��,�aveline should be doubled. After each course of shakes is applied, an 18" J..1(457mm) wide strip of roofing felt is laid over the top portion of the shakes �... a,a►ad, ext�ndiq�g_onto the sheathing, with the bottom edge of the felt posi- -_. � _.. , . ' FASTENERS:OnIy ������ �` �' two approved corra �, .,�.� ' s'ion resistant nails ..► ��` �'�' c' or staples should be ��" �^ � �� �"'���.1��� �` driven into each � �t shake regardless of � ,r,► its width. Fasteners , should -be located ` ,� r.�* about 3/<" (19mm) ' � � : from.each edge and �. � � about 1 �/z' (38mm) �' ` � above the butt line of the next course. �= fasteners should be driven flush but not � : So the head crushes �ndivic(ual shakes sh�d be spaced aparc a ' the w0od 8nd should �e' (9mm) to a maximil�`i of 5/e" (17mm), to alli ble expansion. These joints or "spaces-berivi �- be long enOUgh to should be broken or offse; at least 1 Vz" (38i 'penetrate the shea- cent courses. thing a minimum of �`. ,/2" (13mm). �I�'L�tATURE:'Comp�ete details regarding recommend�d + and uses of handsplit shakes are given in literature �/ail�ile M from — Red Cedar Shingle & Hat�dsptit Shake Bureau, 515 ,�� N.E., Bell�v,�e, WA 98004. „ �..— ' '" . �