Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Inspections Address Card - 6342
' Skywood Lane N. E. INSPECTOR OF BUI�DINGS �OCATIONxx`��x�x�x�• 135fy OWNER 3�inder LOT 7 BLOCB 2 ADD, gWan�troffi Cc►urt Permit No. Canstruction Date Contractor � Cost 4353 3685 8l�fl 913 870 913 990 913 1253 12b1�0 840 8316 4835 17,429 10,921 4z �-se Building Pernit, House il/].0/59 Water & Sewer Permit 12/8/59 Plumbin� Flermit 12/2/59 Electrical Permit 12/l0/59 Heating Permit 1/5/60 Electrical Rough 1/11�60 Electrical Permit 1/2b/60 Electrical Rough 1/13/60 E1.aetrical Perndt 5/l0/6� Electrical Correct. Ord. 5/6/60 Plumbing Rough 12/5/59 Electrical Permit 10/5/70 Heating Permit 10/22/70 Building PermitiAlum.Tr � 3/'28/84 Heating Permit 10/24/91 9wanstrom Const. Co. Frank Surma Frank Surma Thompson �Electric Co Cronstrom's Heating Cronstrom�s Elec. O.B. Thompson 0. B. Thompson Ace Electric Inc. Mill Cit� Heating l�ilton L. �'ohnson Co. B,laine Htg, A/C, Elec �22.00 �30.00 12.50 13.25 14•50 2.00 2.00 3.00 10.00 32.50 30.Q0 Fiaat 12/ 15 /60 5/1/60 1/26/60 5/17/60 5/17/60 10/7/70 1Q/31/91 PR�`1o2� - 3/9/6? 2496-10/8/70 ���16388-11/15/71 B#64,733- 10/15/81 H#101,298-10/31/91 E#101,519-10/31/91 E#101,390-11/13/91 B��139,558-4/17./00 ` INSPECTOR OF BUILDINGS LOCATION .�.350 Skywood Lane NE LOT � OWNER Linder BLOCK 2 ADD. Swanstrom Court Pertnii No. Canatruction .,-.- 20,483 lectrtcal Permit 20,509 Electrical Permit 10�24/91 30,834 Building Permit(Reroof 11�8�91 ) 4/17/00 Contractor Blaine Heating & A/C Blaine Htg, A/C & El Tabor & Sons Roofing Cost 15.00 10.00 66.20 Page 2 Fiaal 10/ 11/13/91