Loading...
Inspections Address Card - 7561INSPECTOR OF BUILDINGS �OCATION OWNEit 5928 Woody Lane N.E. I.UT 6 -6.--C-�a�g���}.e�- Landes BLOCB 1 ADD. Meloland Lakeview P�rmit Na �� Comtruc3ioa D� Contractos � Cost 12,792 6379 8275 6297 10,6�4 14,927 12, 917 9160 17,421 15,311 19,278 28,426 13,591 26,968 —__ Building Permit(H&G) 11/5/74 Plumbing Permit 11�2���4 Water & Sewer Permit 11/26/74 Heating Permit 1/31/75 Electrical Permit 1/29%/5 Building Permi.t(Addn.) 9/19/78 Electrical Permit 11/21/78 Plumbing Permit 3/15/84 Building Permit(Repair 3/15/84 Electrical Permit 3/19/84 Building Permit(,Porch� 11/18/87 Building Permit(Reroof) 10/27/98 Heating Permit 3/24/99 Electrical Permit 3/23/99 G. Craig Willey G. Craig Willey G. Craig Willey C. Craig Willey C. Craig Willey Marvin Hill Const. David Landes David Landes David Landes Jim Killian Elect. Jim Landes tight Way Roofing Airco Htg & Air Cond RTS Electric Fiaai $ 60.00 1/22/76 33.00 1/22/76 30.00 36.00 8/24/76 37.75 9/10/75 15. 00 5.00 11/22/7g 30.00 170. 50 48.00 5/14/85 63.13 74.75 65.00 15.00 3/29/gg B#31,361-11/8/74 B#32,606-11/14/74 P#33,545-2/12/75 B#33,676-3/10/75 E#33,668-3/10/75 E#34,408-5/13/75 E#38,028-9/10/75 E#35,020-8/5/75 P#37,323-1/22/76 B#37.322-1/22/76 H#38,185-4/9/76 H#40,389-8/24/�6 B#52,021-9/22/78 B#52,143-10/5/78 B#52,911-11/22/78 E#52,912-11/22/78 B#73.240-12/28/83 B#73,453-2/8/84 B#73,458-2/9/84 P��73, 536-3/19/84 B��73, 535-3 /16/84 E#75,214-3/14/84 p#73,556-3/26/84 E#78.193-5/14/85 g#88,564-11/19/87 E#134,031-3/29/99