PLM 03/20/2013
PLANNING COMMISSION MEETING
March 20, 2013
Vice Chairperson Oquist
called the Planning Commission Meeting to order at 7:03 p.m.
MEMBERS PRESENT:
Brad Dunham, Tim Solberg, Brad Sielaff, Dean Saba, Jack Velin, and
Leroy Oquist
MEMBERS ABSENT:
David Kondrick
OTHERS PRESENT:
Stacy Stromberg, Planner
Scott Hickok, Community Development Director
Scott Wiestling, Finn Daniels Architects
Tom Salmi-Sydalek, Industrial Equities
Justin Foell, 6005 Gardena Circle NE
Lee Bachman, Bachman’s, 8200 University Avenue
Approval of Minutes:
February 20, 2013
MOTION
by Commissioner Solberg to approve the minutes as presented. Seconded by Commissioner
Sielaff
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY.
PUBLIC HEARING
1. Consideration of a Special Use Permit, SP #13-04, by Scenic Sign Corporation for Sam’s
Club, to allow an electronic gas pricing sign on the canopy at the gas station, generally
located at 8150 University Avenue NE.
MOTION
by Commissioner Saba to open the public hearing. Seconded by Commissioner Sielaff.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS OPENED AT
7:04 P.M.
Stacy Stromberg
, Planner, the petitioner, Bob Gruber, of Scenic Sign Corp., who is representing
Walmart, the owner of the Sam’s Club at 8150 University Avenue, is requesting a special use permit to
allow an electronic gas pricing sign to be installed on the east side of the canopy that is over the existing
gas pumps.
Ms. Stromberg
stated the proposed electronic gas pricing sign will be 12.5 square feet in size. An
existing 18.99 square feet of Sam’s Club sign already exists on the canopy for a total of 31.49 square feet
of signage on the east side of the canopy.
Ms. Stromberg
stated the subject property is zoned C-3, General Shopping as is the Bachman property to
the north. The properties west and south are zoned industrial and the property to the east is a McDonald’s
st
that is zoned C-2, General Business. The property is located on the corner of 81 Avenue and University
Avenue Service Road. The existing warehouse building was constructed in 1986.
Planning Commission
March 20, 2013
Page 2 of 14
Ms. Stromberg
stated a permit was issued last year to do a major remodel of the existing building, which
included construction of a new canopy area in the front of the building for loading of merchandise. A
special use permit was issued in 2012 to allow motor vehicle fuel dispensing service. As a result, the
existing kiosk building and six fueling pumps that are covered by a canopy, were constructed.
Ms. Stromberg
stated the petitioner received sign permit approval also in 2012 to install the Sam’s Club
signs on the canopy. At that time, Sam’s Club wasn’t sure what they were going to need for a gas pricing
sign. They have since decided to go with an electronic changeable gas pricing sign, which requires a
special use permit.
Ms. Stromberg
stated electronic changeable signs are an approved special use in any zoning district,
except residential, provided the message doesn’t change more often than once every 45 seconds. The sign
also needs to be in conformance with the sign requirements for the zoning district, in which the property
is located.
Ms. Stromberg
stated the subject property is zoned, C-3 General Shopping, which requires that wall
signs cannot exceed 15 times the square root of the length of the wall. The maximum allowed signage on
the east side of the canopy is 140 square feet. An existing 18.99 square foot Sam’s Club sign already
exists on the canopy and the new electronic gas pricing sign is 12.5 square feet. The total sign area for
both signs is 31.49 which is well under what code would allow for signage.
Ms. Stromberg
stated City staff has not heard from any neighboring property owners.
Ms. Stromberg
stated City Staff recommends approval of the special use permit as electronic changeable
signs are an approved special use in the commercial zoning district, provided the sign complies with Code
requirements, subject to stipulations.
Ms. Stromberg
stated City Staff recommends that if the special use permit is granted, the following
stipulations be attached:
1. The petitioner shall obtain sign permit and current sign erector license prior to installing
any signage on site.
2. Message on L.E.D. sign shall not change more often than authorized under Section
214.07 of the Fridley City Code.
3. Message on L.E.D. sign shall never flash or have motion that may distract vehicular
traffic in the area.
4. Per Section 205 of the Fridley City Code, this Special Use Permit will become null and
void one year after the City Council approval date if work has not commenced or if the
Petitioner has not petitioned the City Council for an extension.
Commissioner Sielaff
asked whether the sign will only be used as a gas price sign?
Ms. Stromberg
replied, yes.
MOTION
by Commissioner Saba to close the public hearing. Seconded by Commissioner Sielaff.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS CLOSED AT
7:08 P.M.
Planning Commission
March 20, 2013
Page 3 of 14
Vice Chairperson Oquist
stated this is pretty straightforward. He asked whether the petitioner has seen
the stipulations?
Ms. Stromberg
replied, yes.
MOTION
by Commissioner Dunham approving Special Use Permit, SP #13-04, by Scenic Sign
Corporation for Sam’s Club, to allow an electronic gas pricing sign on the canopy at the gas station,
generally located at 8150 University Avenue NE with the following stipulations:
1. The petitioner shall obtain sign permit and current sign erector license prior to installing
any signage on site.
2. Message on L.E.D. sign shall not change more often than authorized under Section
214.07 of the Fridley City Code.
3. Message on L.E.D. sign shall never flash or have motion that may distract vehicular
traffic in the area.
4. Per Section 205 of the Fridley City Code, this Special Use Permit will become null and
void one year after the City Council approval date if work has not commenced or if the
Petitioner has not petitioned the City Council for an extension.
Seconded by Commissioner Velin.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY.
PUBLIC HEARING
2. Consideration of a Transit Oriented District (TOD) Master Plan TOD #13-01, by Industrial
Equities, LLP, to allow the construction of an office/warehouse building, and a future office
and multifamily housing development, generally located at 5601 East River Road NE.
MOTION
by Commissioner Velin to open the public hearing. Seconded by Commissioner Saba.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS OPENED AT
7:09 P.M.
Ms. Stromberg
stated John Allen of Industrial Equities LLP, is requesting a Transit Orientated District
(TOD) Master Plan for the property located at 5601 East River Road. This property is zoned C-3,
General Shopping; however, because it is within the TOD Overlay District, a TOD Master Plan needs to
be approved by the City Council before development can start on this site.
Ms. Stromberg
stated the petitioner is asking for TOD Master Plan approval for the subject property to
allow a phased project. Phase 1 will consist of the construction of a (1) level speculative
office/warehouse building along the east side of the property. Proposed additional phases could include
two (5) level professional office buildings with underground parking, a connected (2) level common core
and a parking structure; and a 120 unit multi-family/senior housing development with underground
parking.
Planning Commission
March 20, 2013
Page 4 of 14
Ms. Stromberg
stated the TOD Overlay zoning allows for a mixed use development without requiring
conversion of the underlying commercial zoning.
Ms. Stromberg
stated the subject property is located on the northeast corner of Interstate 694 and East
River Road. It is bordered by the railroad tracks to the east and an industrially zoned property to the
north. The property was zoned M-2, Heavy Industrial from the late 1950’s until 2009. The property as
originally developed in 1969, when an office/warehouse building was constructed.
Ms. Stromberg
stated in 1969, the site served as the headquarters, research, and production facility for
LaMaur Inc., who manufactured toiletries and cosmetics. Several additions were added to that original
building, which eventually made the building approximately 450,000 square feet in size. In 1999, Tiro
Industries, Inc., purchased the property from LaMaur Inc., and they were in business at this location until
May of 2005. Since the time it was known that Tiro Industries, Inc. would be vacating the building, the
owners had very little success in attracting industrial tenants to occupy the building and believed that,
with industrial trends changing and manufacturing users few, the property would be much more attractive
to tenants as a commercial property.
Ms. Stromberg
stated Tiro Industries Inc., sold the property to JLT Group in 2005; and JLT Group
applied for a rezoning from M-2, Heavy Industrial to C-3, General Shopping. The owners did not have a
commercial tenant identified to occupy the site; however, they were asking the City Council to consider
the rezoning so they could market the site to potential commercial buyers. Once a user or users were
identified for the site, the rezoning was to come back to the City Council for second reading of the
ordinance.
Ms. Stromberg
stated the City Council approved the first reading to rezone the property in September
12, 2005 and set a 24-month timeframe for the rezoning to come back for second reading. After the 24-
month timeframe had expired, an 18-month extension was approved to give the owner additional time to
come before the City Council for second reading. The Council eventually approved a commercial/retail
master plan for the site with the commercial rezoning in February of 2009. Once that was approved, if
the plan varied in overall footprint size by 10 percent or more, it would come back to the City Council for
further review. Otherwise the Master Plan that was approved, including a portion of the 57th Avenue
extension, was the plan that was to be built.
Ms. Stromberg
stated market indicators soon made it clear that this site and approved master plan would
need to be re-evaluated. The window closed on the sale of the land to the interested retailer. Instead,
Sam's and Walmart rebuilt their stores in Fridley, both in their current location. Subsequent to that
decision, the market for big box completely dried up; and real estate investment/analyst folks began to
predict at least a 10-15 year dry spell before the market would come back to large retail centers like the
one envisioned. Too many centers did not make it and are now sitting empty, needing to be refilled or re-
purposed. Also, without certainty of when a 57th Avenue connection may happen, the market looking at
this site was very limited.
Ms. Stromberg
stated the property owner filed for bankruptcy and eventually the bank holding the
mortgage on this site insisted that the land price be reduced and that the land would then be sold. This
opened the door to many potential prospects, the majority of which wanted to purely develop industrial
warehouse alone. We had a large developer who indicated they placed an offer on the property
contingent on City approval of two large industrial warehouses to fill the site. After evaluating their use
Planning Commission
March 20, 2013
Page 5 of 14
against the TOD overlay, staff made it known to the developer that they could not support a purely
industrial warehouse proposal.
Ms. Stromberg
stated John Allen and his Industrial Equities Group were then successful in negotiating
purchase of the property and have committed to working with the City and the development market to
bring a mix of uses and TOD design to the site to make the project work for all. He met several times
with staff and proposed the current development of a mixture of uses.
Ms. Stromberg
stated an extremely important aspect to what develops on this site also has to do with the
Northstar Transit Tax Increment Finance District; that the Minnesota Legislature has allowed the City of
Fridley the Authority to create. This development will be within that district and would be the first
project to produce increment for infrastructure improvements in the Transit TIF District. The City
Council will hold a public hearing on May 6, 2013, regarding the creation of that district.
Ms. Stromberg
stated the petitioner has submitted a TOD Master Plan request for the property located at
5601 East River Road. The property is approximately 27 acres in size, and the TOD Master Plan was
th
developed with the City’s desire to extend 57 Avenue from Main Street through the subject property to
East River Road. In order to allow for the 57th Avenue extension, 68,921 square feet of land area will
need to be dedicated as right-of-way easement from this property. This square footage does not include
th
the land area for the 57 Avenue extension that is owned by US Corrugated which is north of the subject
property. Multiple easements on the property, including sanitary sewer and Xcel Energy easements, limit
how the site can be master planned. The petitioner envisions the property developing with three main
development areas.
Ms. Stromberg
stated the first area that will be developed is along the BNSF railroad tracks on the east
side of the property. The petitioner is proposing to construct a 134,192 square foot one-story office-
warehouse building. The front of the building will face the newly constructed “development parkway”
that will run north and south through the subject property. The service yard for deliveries will face the
railroad tracks and a landscape buffer will be installed between the railroad tracks and the buildings
service yard to provide the necessary screening required from this rail right-of-way. The petitioner
believes that constructing a high quality industrial building to provide a screen between the BNSF railway
and the rest of the development area; will attract high class office and residential tenant prospects.
Ms. Stromberg
stated this office/warehouse development will have 269 parking stalls. The building will
be constructed of precise concrete panels with a uniform rib texture and smooth band striping with a 32-
foot clear height inside. The aluminum framed glass windows will extend to 14 feet above grade and full
height glass will accent the corner and center entries along with brick detailing and matching aluminum-
edged canopies.
Ms. Stromberg
stated there are two remaining “schematically planned” development areas, which would
include a professional office development and a multi-family/senior residential housing project.
Ms. Stromberg
stated for the purpose of this application, the petitioner has submitted a site plan showing
what the potential could be for these two areas and he is currently marketing this site to parties in the
hopes to achieve the proposed uses. The manufacturing/office building will begin construction as soon as
this year, while the petitioner searches for potential users to achieve the mixed-use dense, development
the City is looking to have on this property. If the following “schematically planned” developments do
not occur as proposed in the submitted site plan, the petitioner will come back before the Planning
Planning Commission
March 20, 2013
Page 6 of 14
Commission and the City Council for a TOD Master Plan amendment. Further review may be triggered
by a 10 percent change in the total building’s footprint square footage or a change of use.
Ms. Stromberg
stated the first “schematically planned” development could include two (5) level,
150,000 square foot professional high quality designed office buildings with a 2-story common core
element that connects the two office buildings and underground parking. The buildings will be positioned
to align with the south-western edge of the property which abuts the off-ramp from Interstate 694. This
building will also be connected to a 4-level parking structure, 1-level below grade, 1-level at grade and 2-
levels above grade. A total of 1,311 parking stalls will accommodate this development.
Ms. Stromberg
stated the second “schematically planned” development could include a 3-4 story, 120
unit multi-family or senior housing development with underground parking for 112 stalls and at grade
parking for another 88 stalls. The building design will be of a high quality finish to comfortably co-exist
with the professional office buildings adjacent to it. This building will be positioned to align with the
th
corner of East River Road and the future 57 Avenue extension.
Ms. Stromberg
stated all areas within the development proposed include extensive landscaping with
required storm ponding elements. The remaining development area will need to be seeded, mowed and
maintained until development occurs.
th
Ms. Stromberg
stated the petitioner envisions this development occurring whether or not 57 Avenue is
th
extended from Main Street to East River Road. He wanted to design the development showing the 57
Avenue extension; however, he has stated that he does not feel that it is needed to make this development
a success. The site has also been analyzed by staff and the petitioner’s consultant to ensure that traffic
th
flow will work on this site with and without the 57 Avenue extension and that the “development
parkway” will connect to the extension when it’s constructed.
Ms. Stromberg
stated the Planning Commission and City Council will recall that in 2011, the Transit
Oriented Development (TOD) Overlay District was approved. The subject property is within the TOD
Overlay District. See map to the right, for the TOD district boundaries.
Ms. Stromberg
stated the purpose for the adoption of the TOD Overlay is to:
A. Implement code requirements that will encourage dense, mixed use, pedestrian-friendly
development within a one-half mile of the Northstar Commuter Rail Station in Fridley.
B. Create multi-modal connections to the Fridley Northstar Commuter Rail Station that
allow for safe access to the station no matter what means of transportation someone uses.
C. Create a neighborhood identity with the Northstar Station that promotes the use of mass
transit, human interactions, safety and livability.
D. Reduce automobile dependency by locating a variety of land uses within a half mile of
the train station.
E. Provide life cycle housing for people of different income levels and housing space needs
within one half mile of the train station.
Ms. Stromberg
stated the proposed development is the City’s second TOD Overlay Master Plan request
that aims to achieve the desires the City set forth when creating this district. As a result, the project needs
to comply with the TOD standards that were designed to enhance the pedestrian scale and safety of any
particular development. The TOD Overlay allows for flexibility when designing a redevelopment project
Planning Commission
March 20, 2013
Page 7 of 14
that encourages dense, mixed use, pedestrian-friendly developments. It was also created to minimize the
use of the automobile by allowing reduction in parking requirements, if certain conditions can be met and
sidewalks are constructed.
Ms. Stromberg
stated, as set forth above, the proposed project will include the construction of several
new buildings that will offer a mix of uses, such as an office/warehouse building, a professional multi-
story office building and a multi-level residential building. The petitioner is very interested in designing
the project to TOD standards as the criteria will enhance the development, through use of high quality
building materials and design, as well as enhance pedestrian site circulation through installation of
sidewalks which will provide better access to public transportation such as the Northstar Commuter Rail
and the Metro Transit bus system. Ms. Stromberg presented a table showing the TOD development
regulations and how the petitioner plans to comply with them.
Ms. Stromberg
stated the petitioner has designed a good project that overall achieves what the City was
hoping for with a TOD development. The proposed office/warehouse building will be backed up towards
the railroad, with an architectural design and concept that will enhance the property. The “schematically
planned” 5-story office building with an attached parking structure and multi-family/senior housing
building encourages the dense, mixed used development that the City was looking for on this site. The
site circulation and connections to existing walkways/bikeways will enhance the multi-modal
opportunities for this property and Fridley as a whole. Constructing additional connections and
landscaping features/amenities within the future developments on the site will only continue to enhance
this project.
Ms. Stromberg
stated the amount of building square footage on this site will require the petitioner to
complete an Environmental Assessment Worksheet (EAW). The petitioner’s consultants are working on
completing that document now, which will include a traffic analysis.
Ms. Stromberg
stated staff received comments from the Minnesota Department of Transportation, which
recommends that a traffic study be completed due to the volume of new trips to this location and the
proximity of the Interstate 694 and East River Road interchange.
Ms. Stromberg
stated City Staff recommends approval of the TOD Master Plan Amendment with
stipulations as it meets the purpose of the TOD Overlay District; and the proposed uses meet the goals
highlighted in the 2030 Comprehensive Plan. The stipulations are as follows:
1. The property shall be developed in accordance with the master site plan, A100 by Finn
Daniels Architects dated, 2/15/13.
2. The office/warehouse building shall be developed in accordance with the architectural
office/warehouse exterior elevations sheet, A300, by Finn Daniels Architects dated,
2/15/13.
3. The petitioner shall obtain all necessary permits prior to construction.
4. The petitioner shall meet all Building code, Fire code, and ADA requirements.
5. The petitioner shall ensure that the proposed free-standing signs meet code requirements
and shall obtain a separate sign permit prior to installation.
6. Landscape plan to be reviewed and approved by City Staff prior to issuance of building
permit.
7. The petitioner shall receive Mississippi Watershed Management Organization approvals
prior to issuance of a building permit.
Planning Commission
March 20, 2013
Page 8 of 14
8. City engineering staff to review and approve grading, drainage and utility plans prior to
issuance of building permits.
9. The petitioner shall pay all water and sewer connection fees prior to issuance of a
building permit.
10. Drip irrigation shall be installed in all median and walkway planting areas and a plan
shall be reviewed and approved prior to issuance of a building permit.
11. All lighting in the development shall be shielded and downcast. Lighting shall be
provided through free-standing lighting which shall adequately illuminate the sidewalk.
12. All crosswalks shall be installed using a colorized pavement pattern when connecting the
sidewalk on each side of a driveway. A minimum of two colorized crosswalks shall be
incorporated that connect the office/warehouse building to the rest of the development
and shall be installed with the construction of the “development parkway.” All
connections shall be accessible.
13. The petitioner shall receive and file at Anoka County an access agreement from the
th
neighbor at 5851 East River Road for the portion of the proposed 57 Avenue extension
that extends onto their property.
14. Additional walkways shall be incorporated on the proposed future professional office
development and multi-family/senior housing development to ensure internal circulation
and adequate connections to existing mass transit opportunities. Plan to be reviewed and
approved by City staff prior to issuance of a building permit.
15. Additional outdoor amenities and landscaping shall be installed on the multi-
family/senior housing development portion of the project. Plan to be reviewed and
approved by City staff prior to issuance of a building permit.
16. Building façade on the proposed future professional office development and multi-
family/senior housing development shall comply with TOD requirements.
17. The “development parkway” with medians and landscaping shall be installed as part of
the construction of the office/warehouse building.
18. The second median within the “development parkway” shall be eliminated or a
surmountable curb shall be installed to allow ingress and egress for truck traffic and the
cul-de-sac on the south end of the “development parkway” shall also be redesigned to
accommodate for truck/bus traffic.
19. The petitioner shall maintain, through sod or seed and mowing, the remaining
development area after construction of the office/warehouse building until development
occurs.
th
20. The furthest east driveway shall be removed when 57 Avenue is extended from Main
Street to East River Road; this removal shall not constitute a taking.
21. The petitioner shall complete an environmental assessment worksheet (EAW), which
shall include a traffic study. The recommendations found in these documents shall be
adhered to by the petitioner. The City will determine if an environmental impact
statement (EIS) is required upon completion of the EAW. If an EIS is required the
developer shall provide a complete EIS in accordance with MN State Rule 4410.
22. If the square footage of the footprint of any of the buildings proposed changes by more
than 10 percent at that phase of the development or the proposed building use changes, a
TOD master plan amendment shall be required.
23. A Development Agreement outlining the Developer’s obligation to install utilities, etc.,
will be prepared by the City and shall be signed by the Petitioner prior to issuance of a
building permit for the office/warehouse building.
Planning Commission
March 20, 2013
Page 9 of 14
th
Vice Chairperson Oquist
asked if where are the plans at to extend 57Avenue?
Scott Hickok
, Community Development Director, replied they are continuing the planning process on
th
that. In fact it appears an underpass will be the likely preferred solution to extending 57 Avenue.
Timing of that is going to be the critical piece. It is a very expensive project and will not happen without
the concurrence of BNSF, and the timing of the installation will have to do with when they will allow the
City to get under there. It will require federal funding and state and various other levels of governmental
funding which will happen through a series of applications the City makes when those funding cycles
happen. It is the City’s goal to do that and it’s a priority. Very realistically it may be five years or even
longer before any sort of an extension could happen. In the stipulation where it talks about taking out the
easternmost driveway on the site plan, they will see that it does allow trucks to get out right now on the
alignment that would eventually be depressed as an underpass. That is where that piece would come out
at such time as they do the underpass and then they have Plan B routing for the trucks that allow them to
th
circulate in and circulate out onto that development parkway rather than going out onto the 57 Avenue
extension.
Vice Chairperson Oquist
stated he remembers the last time a couple of years ago there was quite a bit of
discussion from the neighbors to the north in regard to that intersection. There was concern because they
also have truck traffic. Is that still a question?
Mr. Hickok
replied, staff has talked to the developer about that. In the presentation they called the
property to the north, U.S. Corrugated; it is now “Capstone.” U.S. Corrugated had negotiated with the
previous property owner and, although staff is not certain exactly where that negotiation ended because
that development did not happen, they are not certain whether they consummated any sort of an
agreement. However, each of these properties depends on the other for access. Capstone depends on this
project because they drive across it to get into their southern end. This project depends on Capstone for
th
that little triangular piece that cuts across where 57 Avenue extension would be. The developer is aware
that they need to work out some sort of arrangement. Staff is very optimistic this can all work quite well.
As far as the truck information goes, additional truck analysis will be necessary. Staff does know that
turning movements and so forth were designed to work here and, in their discussion with the previous
owners (U.S. Corrugated), they were not using the docks on the other end and did not anticipate much of
th
a turning movement going across 57 Avenue. They have not had that same discussion with Capstone
but, in staff’s observations of it, they use the building very much the same way their predecessor did.
Vice Chairperson Oquist
asked how are they going to get to the Northstar terminal from this property?
Will there be walkways?
Ms. Stromberg
replied, there will be connections made. There currently is a sidewalk on the west side of
East River Road.
Mr. Hickok
stated, yes. It is a bit of a circuitous route right now. In order for them to get to the station,
st
they could cross at the signal light and then take the trail along the west side up to the signal at 61
Avenue to cross.
Vice Chairperson Oquist
stated they have to make sure that is maintained and plowed so they can
actually walk it.
Planning Commission
March 20, 2013
Page 10 of 14
Mr. Hickok
stated they do also believe that through future TOD developments there will be a more direct
routes created which would not make people have to take such a circuitous route across East River Road
only to come back across again when they get to the station. Of course with the underpass there will be
pedestrian/bikeway links as well. Also, there is bus route there. Train and bus will be important access
there.
Commissioner Saba
asked whether there has been any thought of building a pedestrian walkway over
East River Road? Especially if there is senior housing put in.
st
Mr. Hickok
replied, not at this time. There are audible crossing signals at 61. They anticipate that same
kind of audible crossing signal device will be an important feature at some point in the future. Hopefully
st
their first pedestrian/bikeway crossway will be at University and 61.
Commissioner Sielaff
asked regarding “level speculative office”. What does that mean?
Ms. Stromberg
replied, it is just a general term that staff uses when the exact type the users inside the
space are not known but will be of an industrial nature, with a mixture of office, warehouse, and
potentially manufacturing.
Commissioner Sielaff
asked then how much can they change?
Scott Hickok
replied, the users, though speculative, have to meet the code. Since this is a TOD and
essentially a planned unit development, they would expect this would be technical and industrial type
users. They do have the good benefit of having two other John Allen projects in Fridley and know he is
very careful in his tenant selection. The term he uses is “blue chip” tenants, ones he knows are going to
be long-term tenants and will coincide with the other tenants in the building. Not only would it meet the
zoning requirements of the TOD, but he is an owner who makes sure the tenants are able to happily co-
exist within a complex. He typically finds tenants who are very long-term tenants. Oftentimes they are a
very technical type of tenant that have precision-type industries and type of thing you would not want to
rd
move often. One of the John Allen buildings exists right now is along 73 behind the Holiday/Taco Bell.
Also, down on Main Street where the Guardian Industries building had once been, just south of Reviva is
a complex that has two buildings. Very nice looking buildings. This building is going to be even a step
up in terms of additional glass and higher quality exterior materials.
Vice Chairperson Oquist
asked, what kind of timing of they talking about for the phases of this
development?
Mr. Hickok
replied the piece that is most known to John Allen and the City right now is that first
building because he would be ready to do it as soon as the EAW/EIS is done and the Planning
Commission and Council’s approval. As far as the office and residential buildings, Mr. Allen has been
speaking with some very interesting prospects, and he would be ready to go with those as soon as he has a
prospect ready to fill the locations. He does believe that the corner, for example, is a world headquarters
type location.
Vice Chairperson Oquist
asked the petitioner whether they have any problems with the stipulations?
Scott Wiestling,
Finn Daniels Architects, stated, no. They have had several discussions with staff and
were ready for those. They know there are some issues to resolve yet before they bring the master plan
Planning Commission
March 20, 2013
Page 11 of 14
before them. It seems a lot of the multi-family housing developers they work with are interested in this
parcel. It is a great location, close to downtown. He presented some color sample showing the color
scheme they would be using.
Commissioner Sielaff
asked whether there were any financing issues?
Mr. Wiestling
replied, he does not believe so. The TIF will play a part of that. That question is really
outside of his realm.
Commissioner Velin
asked if they were looking at senior multi-family units?
Mr. Wiestling
replied, they are marketing the site right now to different developers who develop that
type of housing. Not sure if it would be senior or could be more of affordable housing. He is having
some of those developers do some diligence and find out which would be served by this project.
Commissioner Sielaff
asked how does this fit in with the City’s comprehensive plan?
Mr. Hickok
replied, this matches well as the comprehensive plan guides this property as redevelopment
district. Staff anticipated in the language that redevelopment district in this area would likely mean a mix
of uses that could include residential, commercial, or industrial office. The zoning (the TOD overlay) on
this property also matches in well with that redevelopment district. It is kind of a multi-tiered zoning.
Justin Foell
, 6005 Gardena Circle, stated he has the same concerns regarding how people are going to be
able to walk to the Fridley station on East River Road. Even on a nice spring day like today the trail
remains partially plowed. This being a transit oriented development project he wants to reinstate the
purpose and suggest that, before it gets approved, that there is a plan to be a sidewalk constructed on the
thst
east side of East River Road from 57 up to 61. There is definitely going to be an issue. People will be
walking in East River Road up to the development to get to the sidewalk.
Vice Chairperson Oquist
stated something like that really needs to be considered particularly when they
get to the multi-family and the office complexes. Probably not so much the warehouse unless it turns into
a lot of office space. They need to keep the foot traffic on the east side of East River Road.
MOTION
by Commissioner Velin to close the public hearing. Seconded by Commissioner Saba.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS CLOSED AT
7:50 P.M.
MOTION
by Commissioner Dunham approving Transit Oriented District (TOD) Master Plan TOD #13-
01, by Industrial Equities, LLP, to allow the construction of an office/warehouse building, and a future
office and multifamily housing development, generally located at 5601 East River Road NE with the
following stipulations:
1. The property shall be developed in accordance with the master site plan, A100 by Finn
Daniels Architects dated, 2/15/13.
2. The office/warehouse building shall be developed in accordance with the architectural
office/warehouse exterior elevations sheet, A300, by Finn Daniels Architects dated,
2/15/13.
Planning Commission
March 20, 2013
Page 12 of 14
3. The petitioner shall obtain all necessary permits prior to construction.
4. The petitioner shall meet all Building code, Fire code, and ADA requirements.
5. The petitioner shall ensure that the proposed free-standing signs meet code requirements
and shall obtain a separate sign permit prior to installation.
6. Landscape plan to be reviewed and approved by City Staff prior to issuance of building
permit.
7. The petitioner shall receive Mississippi Watershed Management Organization approvals
prior to issuance of a building permit.
8. City engineering staff to review and approve grading, drainage and utility plans prior to
issuance of building permits.
9. The petitioner shall pay all water and sewer connection fees prior to issuance of a
building permit.
10. Drip irrigation shall be installed in all median and walkway planting areas and a plan
shall be reviewed and approved prior to issuance of a building permit.
11. All lighting in the development shall be shielded and downcast. Lighting shall be
provided through free-standing lighting which shall adequately illuminate the sidewalk.
12. All crosswalks shall be installed using a colorized pavement pattern when connecting the
sidewalk on each side of a driveway. A minimum of two colorized crosswalks shall be
incorporated that connect the office/warehouse building to the rest of the development
and shall be installed with the construction of the “development parkway.” All
connections shall be accessible.
13. The petitioner shall receive and file at Anoka County an access agreement from the
th
neighbor at 5851 East River Road for the portion of the proposed 57 Avenue extension
that extends onto their property.
14. Additional walkways shall be incorporated on the proposed future professional office
development and multi-family/senior housing development to ensure internal circulation
and adequate connections to existing mass transit opportunities. Plan to be reviewed and
approved by City staff prior to issuance of a building permit.
15. Additional outdoor amenities and landscaping shall be installed on the multi-
family/senior housing development portion of the project. Plan to be reviewed and
approved by City staff prior to issuance of a building permit.
16. Building façade on the proposed future professional office development and multi-
family/senior housing development shall comply with TOD requirements.
17. The “development parkway” with medians and landscaping shall be installed as part of
the construction of the office/warehouse building.
18. The second median within the “development parkway” shall be eliminated or a
surmountable curb shall be installed to allow ingress and egress for truck traffic and the
cul-de-sac on the south end of the “development parkway” shall also be redesigned to
accommodate for truck/bus traffic.
19. The petitioner shall maintain, through sod or seed and mowing, the remaining
development area after construction of the office/warehouse building until development
occurs.
th
20. The furthest east driveway shall be removed when 57 Avenue is extended from Main
Street to East River Road; this removal shall not constitute a taking.
21. The petitioner shall complete an environmental assessment worksheet (EAW), which
shall include a traffic study. The recommendations found in these documents shall be
adhered to by the petitioner. The City will determine if an environmental impact
Planning Commission
March 20, 2013
Page 13 of 14
statement (EIS) is required upon completion of the EAW. If an EIS is required the
developer shall provide a complete EIS in accordance with MN State Rule 4410.
22. If the square footage of the footprint of any of the buildings proposed changes by more
than 10 percent at that phase of the development or the proposed building use changes, a
TOD master plan amendment shall be required.
23. A Development Agreement outlining the Developer’s obligation to install utilities, etc.,
will be prepared by the City and shall be signed by the Petitioner prior to issuance of a
building permit for the office/warehouse building.
Seconded by Commissioner Saba.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY.
Receive the Minutes of the February 7, 2013, Housing and Redevelopment Authority
3.
Commission Meeting.
MOTION
by Commissioner Saba to receive the Minutes. Seconded by Commissioner Solberg.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY.
4. Receive the Minutes of the January 7, 2013, Environmental Quality and Energy
Commission Meeting.
MOTION
by Commissioner Velin to receive the Minutes. Seconded by Commissioner Sielaff.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY.
OTHER BUSINESS:
Ms. Stromberg
stated the Islamic University Special Use Permit and the Pet Vet Special Use Permit that
were before the Planning Commission in February were both approved by the City Council. She also
stated that the next meeting is scheduled for April 17, 2013.
Mr. Hickok
stated there have been some questions about what is the building being remodeled next to
Ashley Furniture. It is Furniture Mart, which is under the same umbrella of ownership as Ashley
Furniture. Their desire is to make a furniture plaza basically with a couple of different furniture options.
The commission is probably also noticing a lot of activity at the Fridley Market site where Cub Foods is.
This spring there is a lot of fun stuff that is going to be happening. The front portion of that building, 50
feet or more, will be coming off and then the exterior skin will be going on. On the highway side the Cub
Foods end looks pretty complete now, and the color scheme carries on down the building. As they get
more tenants identified, there will be more architect to go on that end of the building and then
surrounding the building there is going to be some interesting features. The owners may also be ready to
th
start construction on both tenant buildings along 57 Avenue this summer.
Planning Commission
March 20, 2013
Page 14 of 14
Commissioner Velin
stated McDonald’s is going in one.
Mr. Hickok
replied, yes, McDonald’s is one of those two buildings.
Commissioner Saba
asked what is happening with the old Gander Mountain space?
Mr. Hickok
stated, the City Liquor store is in part of it. The liquor store is in its new location, and the
City has been told there is potentially a tenant that would wrap around the liquor store and put some life
and excitement on the back of the building facing the highway.
Vice Chairperson Oquist
stated he has been approached by a couple of the neighbors stating the
resurfacing of Hackmann Circle, that whole area, was poorly done. It is literally like driving on a gravel
road because the pea rock did not seal and a lot of it is up on the boulevards. The people are kind of
getting upset about it. It needs to be addressed and resurfaced.
Mr. Hickok
replied the best thing to do is have a spokesperson call Jim Kosluchar. The City will be out
when weather provides.
ADJOURN
MOTION
by Commissioner Saba adjourning the meeting. Seconded by Commissioner Solberg.
UPON A VOICE VOTE, ALL VOTING AYE, ACTING CHAIRPERSON OQUIST DECLARED
THE MOTION CARRIED UNANIMOUSLY AND THE MEETING ADJOURNED AT 7:57 P.M.
Respectfully submitted,
Denise M. Johnson
Recording Secretary