Loading...
Res 2014-04 RESOLUTION NO. 2014 - 04 RESOLUTION REQUESTING MUNICIPAL STATE AID SYSTEM CONSTRUCTION FUNDS FOR OTHER LOCAL USE WHEREAS the City of Fridley receives Municipal State Aid System (MSAS) funds for construction and maintaining 20% of its City streets, and WHEREAS 22.9 MSAS miles are currently authorized and have been improved to State Aid standards and are in an adequate condition that they do not have needs other than additional surfacing, and WHEREAS the City currently has 88.3 miles of local streets that require maintenance and upgrade, and WHEREAS it is authorized by MN Rules 8820.1800 to use part of the MSAS construction appropriation of our City’s State Aid allocation on local streets not on the approved State Aid system, and WHEREAS it is proposed to systematically resurface these streets and upgrade the storm sewer system for improved surface water drainage and provide additional strength to the streets for traffic survivability, and WHEREAS it is proposed to use a portion of the City’s population allocation funds to upgrade local streets, and WHEREAS the City of Fridley has identified the MSAS and local (non-MSAS) uses for inclusion as listed in attached Exhibit A, and WHEREAS safety and non-motorized enhancements are proposed with the Safe Routes to School Project No. ST2011-21, and WHEREAS non-motorized improvements are proposed with the Main Street Bike/Walk Project No. ST2011-22, and WHEREAS the majority of the streets associated with the 2014 Street Improvement Project No. ST2014-01 require surface repair and drainage adjustments, and th WHEREAS the street and rail crossing improvements on 69 Avenue are proposed with the 2014 Street Improvement Project No. ST2014-02, and WHEREAS non-motorized enhancements are proposed on Anoka County right-of-way with the Main Street Pedestrian Bridge Project No. ST2015-21, and WHEREAS the City indemnifies saves and holds harmless the State of Minnesota and its agents and employees from claims, demands, actions or causes of action arising out of or by reason or matter related to constructing the local streets as designed, and Resolution 2014-04 Page 2 WHEREAS the City further agrees to defend at its sole cost any claims arising as a result of constructing the local streets, and WHEREAS the final approval of the State Aid for Local Transportation Division is therefore required, NOW THEREFORE BE IT RESOLVED that the City of Fridley, Anoka County, Minnesota, requests the release of MSAS funds for the upgrade and reconstruction of City municipal streets, identified as Safe Routes to School Project ST2011-21, Main Street Bike/Walk Project ST2011- 22 2014 Street Improvement Project No. ST2014-01 and 2014 Street Improvement Project No. ST2014-02, PASSSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY th THIS 6 DAY JANUARY, 2014. _____________________________ SCOTT J. LUND, MAYOR ATTESTED: ________________________________ DEBRA A. SKOGEN, CITY CLERK Resolution 2014-04 Page 3 EXHIBIT A SAFE ROUTES TO SCHOOL PROJECT NO. ST2011-21 PROPOSED IMPROVEMENTS Improvements relating to pedestrian and bicycle use including concrete sidewalk, accessible ramps, bicycle racks, LED enhanced stop signs, driver feedback speed signs, shared use path, security system, path lighting, and ancillary landscaping located as follows: st Fridley Middle School 61 Avenue and Fridley Middle School property th Hayes Elementary School Mississippi Street to 67 Avenue Stevenson School River Edge Way to 300’ south of Island Park Drive STREET IMPROVEMENT PROJECT NO. ST2011-22 PROPOSED IMPROVEMENTS Street improvements, including concrete sidewalk, accessible ramps, bicycle lanes, shared use path, and ancillary landscaping located as follows: Main Street 57th Avenue to 61st Ave STREET REHABILITATION PROJECT NO. ST2014-01 PROPOSED IMPROVEMENTS Street improvements, including grading, aggregate base, bituminous asphalt, concrete curb and gutter, water and sewer upgrades, landscaping, and other facilities located as follows: rd 73 Avenue Commerce Circle W. to University Avenue th 77 Avenue BNSF Railroad to Main Street th 79 Avenue Hickory Street to Main Street st 81 Avenue Beech Street to University Avenue rd 83 Avenue Main Street to University Avenue thst Beech Street 77 Avenue to 81 Avenue Commerce Circle South Commerce Circle E. to Commerce Circle W. rd Commerce Circle West Commerce Circle S. to 73 Avenue rd Commerce Lane 73 Avenue to Osborne Road rd Main Street Osborne Road to 83 Avenue STREET REHABILITATION PROJECT NO. ST2014-02 PROPOSED IMPROVEMENTS Street improvements, including grading, aggregate base, bituminous asphalt, concrete curb and gutter, railroad crossing elements, landscaping, and other facilities located as follows: th 69 Avenue Central Avenue to City Limits STREET IMPROVEMENT PROJECT NO. ST2015-21 PROPOSED IMPROVEMENTS Street improvements, including shared use path and bridge, accessible ramps, bicycle lanesand ancillary landscaping located as follows: Main Street 44th Avenue to 57th Ave