2014-2018 CIP 2014-2018 Capital Improvements Program August 19, 2013 Final 1 2014-2018 Capital Improvements Program Table of Contents Chapter 1: Tables I: Summary of Expenditures by Program Category & Method of Financing.................................... 2-1 II: Capital Equipment ......................................................................................................................... 2-2 III: Information Systems Internal Service Fund .................................................................................. 2-3 IV: Building Capital Improvements ..................................................................................................... 2-4 V: Parks Capital Improvement........................................................................................................... 2-5 VI: Streets Improvement Fund ........................................................................................................... 2-6 VII: Storm Water Fund ........................................................................................................................ 2-7 VIII: Water Utility Fund......................................................................................................................... 2-8 IX: Sewer Utility Fund ......................................................................................................................... 2-9 Chapter 2: Detail Project Pages Capital Equipment ....................................................................................................................... 3-1 to 3-3 Information Systems Internal Service Fund ................................................................................ 4-1 to 4-6 Building Capital Improvements ................................................................................................. 5-1 to 5-12 Parks Capital Improvement ......................................................................................................... 6-1 to 6-5 Streets Improvement Fund ......................................................................................................... 7-1 to 7-6 Storm Water Fund ....................................................................................................................... 8-1 to 8-5 Water Utility Fund ....................................................................................................................... 9-1 to 9-6 Sewer Utility Fund ................................................................................................................... 10-1 to 10-5 2 Capital Improvements Program The Capital Improvements Program (CIP) is a five-year plan to provide and maintain public facilities for the citizens and businesses of Fridley, balanced against the constraints of available resources Funding Priority Reinvestment for the replacement, maintenance or increased efficiency of existing systems will have priority over the expansion of existing systems or the provision of new facilities or services. Priority rankings include: 1. Assigned to projects that provide protection to health, safety, welfare and/or property, or to meet legal mandates. Examples of such benefits include providing for worker safety or preventing damage to facilities. 2. Assigned to projects that do not qualify for the highest rating, but provide efficiencies in operations or provide significant return. Examples of such benefits include increases to operational efficiencies and leveraging of outside funding sources. 3. Assigned to projects that do not meet the criteria for higher rating. While these projects are necessary and recommended, they do not in and of themselves provide immediate significant benefits, but rather provide benefit over the long term. This rating is assigned by staff, and is not necessarily reflective of overall priorities and sequencing of CIP projects approved by the City Council. The rating is provided to allow a quick reference categorizing the general need for the project. Planning Principles • The CIP will support achievement of the City’s long-term Strategic Goals. • The CP will be updated annually to reflect changing capital needs for new construction and maintenance of the City’s substantial investments in streets, utilities, parks, buildings and equipment. • Development of the CIP will be consistent with the annual operating budget. Future operating costs associated with new capital improvements will be projected and included in operating budget forecasts. 2-1 Table I Capital Improvements Program 2014-2018 EXPENDITURES BY PROGRAM CATEGORY & METHOD OF FINANCING 2014 2015 2016 2017 2018 TOTAL PercentExpenditures Program Category Major Equipment 686,300$ 1,526,000$ 572,700$ 537,400$ 649,000$ 3,971,400$ 14.6% Technology Improvements 292,353 161,500 172,000 146,000 156,000 927,853 3.4% Municipal Buildings 696,000 1,176,000 359,000 481,000 221,000 2,933,000 10.8% Parks Improvements 170,000 95,000 95,000 145,000 180,000 685,000 2.5% Street Improvements 2,081,000 2,531,000 1,666,000 1,376,000 1,866,000 9,520,000 35.0% Storm Drainage Improvements 590,000 315,000 325,000 345,000 430,000 2,005,000 7.4% Water System Improvements 2,070,000 710,000 915,000 810,000 860,000 5,365,000 19.7% Sewer System Imp 635,000 260,000 275,000 305,000 285,000 1,760,000 6.5% Total Expenditures By Program 7,220,653$ 6,774,500$ 4,379,700$ 4,145,400$ 4,647,000$ 27,167,253$ 100.0% Method of Financing Property Taxes 175,000$ 175,000$ 175,000$ 175,000$ 175,000$ 875,000$ 3.2% Local Government Aid 1,211,400 1,211,400 1,211,400 1,211,400 1,211,400 6,057,000 20.3% Municipal State Aid 680,000 680,000 680,000 680,000 680,000 3,400,000 11.4% Federal Highway Aid 250,000 970,000 150,000 - 600,000 1,970,000 6.6% Grants 250,000 50,000 50,000 50,000 175,000 575,000 1.9% DWI Forfeiture Funds - - - - - - 0.0% User Fees (External & Internal)3,055,000 1,245,000 1,475,000 1,420,000 1,410,000 8,605,000 28.6% Park Dedication Fees 10,000 10,000 10,000 10,000 10,000 50,000 0.2% Special Assessments 1,100,000 700,000 700,000 560,000 580,000 3,640,000 12.2% Interest on Investments 50,000 48,200 46,200 45,600 45,000 235,000 0.8% Auction Proceeds 30,000 30,000 30,000 30,000 - 120,000 0.4% Miscellaneous - - - - - - 0.0% Equipment Certificates - 600,000 - - - 600,000 2.0% Utility Improvement Bonds - - 2,085,000 - - 2,085,000 7.0% Transfers In/Other Funds 225,000 675,000 325,000 175,000 175,000 1,575,000 5.3% Total Method of Financing 7,036,400$ 6,394,600$ 6,937,600$ 4,357,000$ 5,061,400$ 29,787,000$ 100.0% 2-2 2014 2015 2016 2017 2018 Unfunded Funding Sources Property Taxes 175,000$ 175,000$ 175,000$ 175,000$ 175,000$ Local Government Aid 611,400 861,400 861,400 811,400 811,400 Equipment Certificate Proceeds - 600,000 - - - Auction Proceeds 30,000 30,000 30,000 30,000 - Total Funding Sources 816,400$ 1,666,400$ 1,066,400$ 1,016,400$ 986,400$ Expenditures Note: Items in Bold are expenditures for equipment that expand the fleet. Police Police Squad / SUV / Pickup 181,300$ 185,000$ 188,700$ 192,400$ 195,000$ Equipment - - - - - Fire Fire Engine - 600,000 - - - Rescue Truck 40,000 30,000 - 70,000 - Rescue Truck Paint/Rehab - - - - 70,000 Rescue Boat - 8,000 - - - Engine #3 Paint/Rehab 40,000 - - - - Aerial Ladder Paint/Rehab - - - - 80,000 Station Alerting 20,000 - - - - Air Compressor - - 40,000 - - Public Works - Parks Division Mowers - 73,000 - - 36,000 Pickup Trucks - 35,000 34,000 - - Dump Trucks with Plows 15,000 - - 43,000 - Skidloader - - - - - Utility Vehicle for Trail Plowing 60,000 - - - - Utility Vehicles and Equipment - 28,000 100,000 - 170,000 Public Works - Streets Division Pickup Trucks - - - 28,000 - Dump Trucks with Plows 160,000 320,000 50,000 50,000 - Heavy Equipment 40,000 - 160,000 90,000 90,000 Paving Equipment - 21,000 - - - Traffic Marking and Safety Equipment 25,000 - - - - Aerial Equipment 90,000 200,000 - - - Utility Vehicles and Equipment - 26,000 - 64,000 - Public Works - Garage Division Equipment - - - - 8,000 Community Development Mid-size Passenger Vehicle 15,000 - - - - General Government Equipment - - - - - Total Expenditures 686,300$ 1,526,000$ 572,700$ 537,400$ 649,000$ Surplus (deficiency) of funding sources over (under) expenditures 130,100$ 140,400$ 493,700$ 479,000$ 337,400$ Estimated Beginning Fund Balance 161,383 291,483 431,883 925,583 1,404,583 Estimated Ending Fund Balance 291,483$ 431,883$ 925,583$ 1,404,583$ 1,741,983$ Table II CIP 2014-2018 CAPITAL EQUIPMENT FUND Funding Sources and Expenditure Projections 2-3 2014 2015 2016*2017*2018*Unfunded Funding Sources Charges for Services 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Interest on Investments - - - - - Transfers In 175,000 175,000 175,000 175,000 175,000 Total Funding Sources 185,000$ 185,000$ 185,000$ 185,000$ 185,000$ Expenditures Software & Equipment Purchases/Upgrades 48,853$ 40,000$ 27,000$ 45,000$ 45,000$ Computer & Printer Replacement 120,000 75,000 145,000 101,000 111,000 Fire Inspections Proj. #705011 - - - - - Special Assessments 2,500 - - - - Large Format Scanning - - - - - Interactive Whiteboards - - - - Financial System Upgrade 100,000 - - - - Police Tablet Computers 16,500 46,500 - - - Map Feeder Aerial Mapping 4,000 - - - - Records Management Database Upgrade 500 - - - - Image System - - - - - Total Expenditures 292,353$ 161,500$ 172,000$ 146,000$ 156,000$ Surplus (deficiency) of funding sources over (under) expenditures (107,353)$ 23,500$ 13,000$ 39,000$ 29,000$ Estimated Beginning Fund Balance 307,825 200,472 223,972 236,972 275,972 Estimated Ending Fund Balance 200,472$ 223,972$ 236,972$ 275,972$ 304,972$ * - The Information Systems Internal Service Fund has traditionally only done a three-year plan due to the fast changing technology world. There will be projects in the out years, but they have yet to be determined. Table III CIP 2014-2018 INFORMATION SYSTEMS INTERNAL SERVICE FUND Funding Sources and Expenditure Projections 2-4 2014 2015 2016 2017 2018 Unfunded Funding Sources Local Government Aid 500,000$ 250,000$ 250,000$ 250,000$ 250,000$ Interest on Investments 2,000 500 - 500 1,000 DWI Forfeiture Funds - - - - - Liquor Fund 50,000 500,000 150,000 - - Springbrook Nature Center - - - - - Total Funding Sources 552,000$ 750,500$ 400,000$ 250,500$ 251,000$ Expenditures Municipal Center Municipal Center Roof Replacement 10,000$ 210,000$ -$ -$ -$ Police Garage Roof Replacement - - - - - Municipal Center Parking Ramp Repairs 300,000 150,000 - - - Squad Room Remodeling - - - - - Municipal Center HVAC Retrofit 40,000 25,000 25,000 25,000 50,000 Municipal Center Security Upgrades - - - - - Police Storage Room - - - - - Municipal Center Feasibility Study 25,000 - - - - Municipal Center Exterior Repairs - 50,000 - - 100,000 Gun Range Backstop Retrofit - - 35,000 - - Municipal Center Lower Level Remodel - - 80,000 400,000 - Workstation Replacements/Repairs 20,000 20,000 20,000 20,000 20,000 Storage, Cabinets, Fixtures 6,000 6,000 6,000 6,000 6,000 Public Works Public Works Grage Heating Unit Replacement - - - - - Cold Storage Building for Police Forfeitures - - - - - Public Works Garage Gate Replacement 25,000 - - - - Public Works Garage Security Upgrades 5,000 - - - - Public Works Garage Paving Retrofit - 25,000 - - - Public Works Garage Roof Repairs 180,000 - - - - Public Works Garage Building Updgrades - 60,000 - - 40,000 Public Works Garage HVAC Retrofit - - 13,000 - - Community Center - Furniture & Fixtures 15,000 10,000 5,000 5,000 5,000 Fire Stations - Fire Entrance ADA & Entrance Upgrades - - - - - Fire Station 3 Roofing Replacement - - - - - Fire Station 2 Site Upgrades 20,000 - - - - Fire Station 2 & 3 Security Upgrades - 20,000 - - - Fire Station 3 Buidling Repairs - - - 25,000 - Floor Resurfacing - All Stations - - 25,000 - - Liquor Stores - Highway 65 Store Remodel 50,000 600,000 150,000 - - Springbrook Nature Center Roof Repair - - - - - Total Expenditures 696,000$ 1,176,000$ 359,000$ 481,000$ 221,000$ Surplus (deficiency) of funding sources over (under) expenditures (144,000)$ (425,500)$ 41,000$ (230,500)$ 30,000$ Estimated Beginning Fund Balance 1,025,297 881,297 455,797 496,797 266,297 Estimated Ending Fund Balance 881,297$ 455,797$ 496,797$ 266,297$ 296,297$ Table IV CIP 2014-2018 Building Capital Improvements Funding Sources and Expenditure Projections 2-5 2014 2015 2016 2017 2018 Unfunded Funding Sources Local Government Aid 100,000$ 100,000$ 100,000$ 150,000$ 150,000$ Park Dedication Fees 10,000 10,000 10,000 10,000 10,000 Interest on Investments 20,000 20,000 20,000 20,000 20,000 Miscellaneous Income - - - - - Total Funding Sources 130,000$ 130,000$ 130,000$ 180,000$ 180,000$ Expenditures Court Surfacing/Overlays 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ Park Furnishings 10,000 10,000 10,000 10,000 10,000 Community Park Lighting Upgrades - - - - - Community Park Parking Lot Replacement - - - - - Commons Park Irrigation System 80,000 - - - - SNC Boardwalk Replacement 25,000 25,000 25,000 25,000 - Security Cameras in Parks 25,000 - - - - Playground Equipment Replacement - 30,000 30,000 80,000 140,000 Total Expenditures 170,000$ 95,000$ 95,000$ 145,000$ 180,000$ Surplus (deficiency) of funding sources over (under) expenditures (40,000)$ 35,000$ 35,000$ 35,000$ -$ Estimated Beginning Fund Balance 1,731,711 1,691,711 1,726,711 1,761,711 1,796,711 Estimated Ending Fund Balance 1,691,711$ 1,726,711$ 1,761,711$ 1,796,711$ 1,796,711$ Table V CIP 2014-2018 PARKS CAPITAL IMPROVEMENT Funding Sources and Expenditure Projections 2-6 2014 2015 2016 2017 2018 Unfunded Funding Sources Municipal State Aid 680,000$ 680,000$ 680,000$ 680,000$ 680,000$ Federal Highway Aid 250,000 970,000 150,000 - 600,000 Special Assessments 1,100,000 700,000 700,000 560,000 580,000 Interest on Investments 28,000 27,700 26,200 25,100 24,000 Total Funding Sources 2,058,000$ 2,377,700$ 1,556,200$ 1,265,100$ 1,884,000$ Expenditures Street Rehabilitation Program 1,295,000$ 960,000$ 960,000$ 770,000$ 800,000$ Street Sealing Program 245,000 245,000 245,000 245,000 245,000 Trail/Walk Upgrades 100,000 100,000 100,000 100,000 100,000 Street Lighting Upgrade/Retrofit - 20,000 90,000 90,000 - 69th Avenue Railroad Crossing 250,000 - - - - Traffic Safety Improvement Projects - 15,000 30,000 30,000 30,000 Main Street Pedistrian Bridge Project 150,000 1,150,000 150,000 - - 57th Avenue BNSF RR Bridge - - 50,000 100,000 650,000 Transfer to the General Fund (Staff Allocation)41,000 41,000 41,000 41,000 41,000 Total Expenditures 2,081,000$ 2,531,000$ 1,666,000$ 1,376,000$ 1,866,000$ -$ Surplus (deficiency) of funding sources over (under) expenditures (23,000)$ (153,300)$ (109,800)$ (110,900)$ 18,000$ Estimated Beginning Fund Balance 2,797,965 2,774,965 2,621,665 2,511,865 2,400,965 Estimated Ending Fund Balance 2,774,965$ 2,621,665$ 2,511,865$ 2,400,965$ 2,418,965$ Table VI CIP 2014-2018 STREET IMPROVEMENT FUND Funding Sources and Expenditure Projections 2-7 2014 2015 2016 2017 2018 Unfunded Funding Sources Storm Water Utility Fees 601,856$ 625,931$ 650,968$ 677,007$ 704,087$ Grants and Other Revenue 250,000 50,000 50,000 50,000 175,000 Interest on Investments 13,400 12,400 12,300 12,100 11,900 Total Funding Sources 865,256$ 688,331$ 713,268$ 739,107$ 890,987$ Expenditures Operating Expenses (less depreciation)338,764$ 352,315$ 366,408$ 381,064$ 396,306$ Debt Service 30,838 35,163 34,413 33,663 32,912 Subtotal Operating Expenditures 369,602$ 387,478$ 400,821$ 414,727$ 429,218$ Capital Expenditures Water Quality Testing 5,000$ 10,000$ 10,000$ -$ -$ Pond Maintenance - 25,000 25,000 25,000 25,000 Misc. Drainage Improvements - - - - - Storm Sewer Replacement/Reconstr/Lining - 60,000 60,000 60,000 60,000 Storm Sewer System Upgrades 60,000 60,000 60,000 60,000 60,000 Oak Glen Creek Erosion Control - - - - - Stoneybrook Flood Control Project 105,000 - - - - Creek Ridge Park Flood Control Project - - - - - Watershed BMP Implementation 20,000 20,000 20,000 - - Pond Expansion - Oak Glen Creek Subwatershe 400,000 - - - - Mississippi WMO Water Quality Project - 70,000 - - - CCWD WMO Water Quality Project - 70,000 70,000 - Erosion Control Project TBD - 25,000 25,000 25,000 25,000 Locke Lake Dam Maintenance - 35,000 35,000 - - Moore Lake Subwatershed Flood Control Upgra - - - 55,000 - TMDL Water Quality Projects - 10,000 20,000 50,000 50,000 TBD Locke Lake Dredging (RCWD Cost Share)- - - - - 25,000 Locke Lake Dam Control Upgrades - - - - 35,000 35,000 Riverview Heights Flood Control Upgrades - - - - 175,000 35,000 Subtotal Capital Expenditures 590,000$ 315,000$ 325,000$ 345,000$ 430,000$ 95,000$ Total Expenditures 959,602$ 702,478$ 725,821$ 759,727$ 859,218$ Surplus (deficiency) of funding sources over (under) expenditures (94,346)$ (14,147)$ (12,553)$ (20,620)$ 31,769$ Estimated Beginning Cash Reserve 1,335,382 1,241,036 1,226,889 1,214,336 1,193,716 Estimated Ending Cash Reserve 1,241,036$ 1,226,889$ 1,214,336$ 1,193,716$ 1,225,485$ Table VII CIP 2014-2018 STORM WATER FUND Funding Sources and Expenditure Projections 2-8 2014 2015 2016 2017 2018 Unfunded Funding Sources Water Sales 2,801,589$ 2,885,411$ 2,971,635$ 3,060,474$ 3,151,941$ Interest on Investments 55,000 50,000 44,000 44,000 44,000 Bond Proceeds - - 2,085,000 - - Miscellaneous Income 140,600 140,600 140,600 140,600 140,600 Total Funding Sources 2,997,189$ 3,076,011$ 5,241,235$ 3,245,074$ 3,336,541$ Expenditures Non-Capital Expenditures Operating Expenses (Less Depreciation)1,844,263$ 1,881,148$ 1,918,771$ 1,957,147$ 1,996,290$ Debt Service 795,867 844,141 939,342 991,523 995,614 Transfers - - - - - Subtotal Non-capital Expenditures 2,640,130$ 2,725,289$ 2,858,113$ 2,948,670$ 2,991,904$ Capital Expenditures Distribution System Reconstruction 500,000$ 300,000$ 500,000$ 500,000$ 300,000$ Well Updates (building repairs and pump recon)110,000 90,000 90,000 90,000 90,000 Water Meter Replacement - AMR System 110,000 110,000 120,000 120,000 120,000 Commons Park Boiler Replacement Chemical Tank Replacement - - - - Water Plant Security Upgrades - - - - Meter Replacement - Pump Houses and Plants - - - - Dead End Line Elimination - Fireside & Central - - - - 100,000 Locke Park Plant Filters Media Replacment 275,000 - - - Locke Park Backwashing & Control System Update 500,000 - - - Fleet Vehicles - 30,000 - - Jet/Vac Combination Truck (split with Sewer)175,000 - - - 40hp Booster Pump Recondition at FTP #3 - - - - Variable Frequency Drives - 120,000 - - 35,000 Wheeled Excavator 150,000 - - - 150,000 Plant #3 Backwashing Control System Upgrade - 60,000 - - SCADA Hardware & Software Upgrade 250,000 - - - Chem Feed & Storage Sys Upgrade at Commons - - 165,000 - Recondition 63rd Ave Booster Pumps - - 40,000 - Storage Building - - - 100,000 250,000 Backhoe - - - - 15,000 Regulated Treatment Modifications - - - - - Subtotal Capital Expenditures 2,070,000$ 710,000$ 915,000$ 810,000$ 860,000$ 200,000$ Total Expenditures 4,710,130$ 3,435,289$ 3,773,113$ 3,758,670$ 3,851,904$ Surplus (deficiency) of funding sources over (under) expenditures (1,712,941)$ (359,278)$ 1,468,122$ (513,596)$ (515,363)$ Estimated Beginning Cash Reserve 4,256,327 2,543,386 2,184,108 3,652,230 3,138,634 Estimated Ending Cash Reserve 2,543,386$ 2,184,108$ 3,652,230$ 3,138,634$ 2,623,271$ Table VIII CIP 2014-2018 WATER UTILITY FUND Funding Sources and Expenditure Projections 2-9 2014 2015 2016 2017 2018 Unfunded Funding Sources Sewer Services 4,983,760$ 5,132,563$ 5,287,660$ 5,446,059$ 5,609,771$ Interest on Investments 25,000 25,000 30,000 30,000 Bond Proceeds - - - - - - Penalty Fee - Hookup Fees Miscellaneous Income 55,000 55,000 55,000 55,000 55,000 Total Funding Sources 5,063,760$ 5,212,563$ 5,372,660$ 5,531,059$ 5,664,771$ Expenditures Non-Capital Expenditures Operating Expenses (Less Depreciation)943,302$ 962,168$ 981,411$ 1,001,040$ 1,021,061$ Sewer Service Charge 3,668,034 3,741,395 3,816,223 3,892,547 3,970,398 Debt Service 44,300 43,400 42,500 41,600 45,625 Transfers - - - - - Subtotal Non-capital Expenditures 4,655,636$ 4,746,963$ 4,840,134$ 4,935,187$ 5,037,084$ Capital Expenditures Sanitary Sewer Collection System Recon 35,000$ 40,000$ 40,000$ 40,000$ 45,000$ Sanitary Sewer Collection System Lining 175,000 210,000 215,000 215,000 220,000 Sanitary Sewer Force Main Recon 90,000 - - - - Georgetown Lift Station Rehab - - - - - 62nd Street Lift Station Rehab - - - - - Lift Station Rehabilitation 10,000 10,000 20,000 - 20,000 Submersible Portable Pump - - - - - Large Diameter Interceptor Cleaning - - - - - CCTV Camera System - - - - - Fleet Vehicles - - - 50,000 - 15,000 Jet/Vac Combination Truck (split with Water)175,000 - - - - 175,000 MCES Overflow Connection 150,000 - - - - Replace/Recondition CCTV Trailer - - - - - 35,000 Subtotal Capital Expenditures 635,000$ 260,000$ 275,000$ 305,000$ 285,000$ 225,000$ Total Expenditures 5,290,636$ 5,006,963$ 5,115,134$ 5,240,187$ 5,322,084$ Surplus (deficiency) of funding sources over (under) expenditures (226,876)$ 205,600$ 257,526$ 290,872$ 342,687$ Estimated Beginning Cash Reserve 1,220,191 993,315 1,198,915 1,456,441 1,747,313 Estimated Ending Cash Reserve 993,315$ 1,198,915$ 1,456,441$ 1,747,313$ 2,090,000$ Table IX CIP 2014-2018 SEWER UTILITY FUND Funding Sources and Expenditure Projections 3 - 1 Project Category: Capital Equipment Project Title: Utility Vehicle for Trail Plowing Total Estimated Cost: $ 60,000 Funding Priority: 2 Account Number: 410-0666-435-4540 Future Unit Number: 561 Replaces Unit Number: New Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2014 2015 2016 2017 2018 Capital Equipment Funding $ 60,000 $ 0 $ 0 $ 0 $ 0 Justification: Public Works has proposed winter trail maintenance on several trail segments in the City. This equipment will enable Parks Maintenance staff to perform trail clearing after roadway and walk plowing are complete. Scheduling and Project Status: Purchase is planned for 2014, but may be advanced upon approval to utilize in 2013. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to fulfill goals of the Comprehensive Plan and Active Transportation Plan. Effect on Annual Operations Costs: This equipment will add slightly to fuel and equipment maintenance costs supported by Public Works Department budgets. Description: This equipment is for a new additional unit to allow staff to clear certain trails after plowing events as operators become available. 3 - 2 Project Category: Capital Equipment Project Title: Station Alerting System Total Estimated Cost: $ 20,000 Funding Priority: 1 Account Number: 410-0550-425-4560 Future Unit Number: N/A Replaces Unit Number: N/A Equipment Selection: Fire Department Payroll Logged to Project: None Source of Project Funding 2014 2015 2016 2017 2018 Capital Equipment Funding $ 20,000 $ 0 $ 0 $ 0 $ 0 Justification: The current system is a combination of a radio pager, amplifier, speakers and a relay that turns on the lights in three rooms. The radio speakers in each area cannot be adjusted independently making the audio difficult to hear in different areas of the building. Speakers were acquired from the renovation of one of the liquor stores and from Radio Shack. They are not quality speakers also contribute to poor quality sound. The current alerting system fully opens to its set audio level and turns the lights fully on regardless of day or night operation. A new system would reduce stress by ramping audio and lighting at night. The new system would also be able to shut off appliances, close garage doors, and control the vehicle exhaust system. The system could also display information and count up or down from the time of the call giving firefighters a visual queue for when to wait for staff or respond. In general a new system would reduce stress, improve communication and provide for better security and safety. Scheduling and Project Status: Equipment could be purchased early in the year. Most of the equipment could be installed by firefighters and technicians from Central Communications. Some of the interfaces to the vehicle exhaust systems, garage doors, etc would require an electrician or contractor. The system should be able to be fully operational within a month of delivery of the equipment. Relationship to General Plan and Other Projects: This project is independent of other projects, but this project does meet the goal of providing worker safety and preventing damage to facilities. Effect on Annual Operations Costs: This project has no effect on annual operating costs. Description: This purchase is a replacement and improvement of the emergency call alerting system for Station 1. Radio paging is the primary method of receiving emergency call information from Central Communications. The current alerting system has been cobbled together by firefighters and technicians from Anoka County Central Communications over the past 25 plus years. The project involves purchasing all of the components to receive and deliver emergency call information as well as provide a healthy environment for firefighters in the station. 3 - 3 Project Category: Capital Equipment Project Title: Trailer-Mounted Crash Attenuator Total Estimated Cost: $ 25,000 Funding Priority: 1 Account Number: 410-0668-435-4540 Future Unit Number: 790 Replaces Unit Number: New Equipment Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2014 2015 2016 2017 2018 Capital Equipment Funding $ 25,000 $ 0 $ 0 $ 0 $ 0 Justification: A truck mounted attenuator (TMA) is an energy absorption device that serves as a temporary barrier when placed between live traffic and a work area on highways that must remain open to traffic during repairs or accidents. The TMA may significantly help to minimize injuries or fatalities associated with a collision between a vehicle and a truck used for protecting (blocking) a work area. The City of Fridley should have available use of a Trailer-Mounted Attenuators while performing certain work in the travel lanes, shoulder, or clear zone of higher speed (≥ 35 mph) roadways. Examples of use include when 1) changing traffic signal lamps, 2) removing snow from bus stops, 3) utility work, and 4) after an accident requiring prolonged clearing or investigation. Temporary work zone traffic control standards developed by federal and state authorities rank the use of TMAs as desirable to highly recommended for these types of work activities on County and State Highways, and certain City streets in Fridley. Scheduling and Project Status: Purchase is planned for 2014, but may be advanced upon approval to utilize in 2013. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to continue fulfilling current maintenance obligations while providing safety to both employees in work zones and the traveling public. Effect on Annual Operations Costs: This equipment will add slightly to equipment maintenance costs supported by Public Works Department budgets. Description: This equipment is for a new trailer-mounted crash attenuator (TMA) and messageboard combination for maintenance on higher-speed (≥ 35 mph) roadways. 4 - 1 Project Category: Technology Improvements Project Title: Technology Purchases/Upgrades Total Estimated Cost: $757,853 Funding Priority: 2 Account Number: 705-0000-415-XXXX Finance Project Number: 705017 Source of Project Funding 2014 2015 2016 2017 2018 MIS Fund $ 168,853 $ 115,000 $ 172,000 $ 146,000 $ 156,000 Justification: Systematic maintenance and upgrading of computers, network equipment, printers, peripheral devices, and software. Most PCs are on a five-year replacement cycle. Laptops are replaced every four years. Printers are eligible for replacement every four years but are only replaced if there are significant problems with an individual device. Software is typically purchased at the same time as the PC it will be loaded on to, and is usually only upgraded/replaced with that PC. Network equipment, including servers and LAN/WAN hardware, are eligible for replacement every four years. Scheduling and Project Status: PCs and printers are purchased through the year after consultation with the affected departments and users. Network equipment is analyzed on a yearly basis to determine if it is still meeting the needs of the city. Some specific expenditures include: 2014: Four core servers, including three VMware hosts, a database server, and necessary software, are scheduled for replacement in 2014 ($50,000). 2015: Network core switches ($50,000) and the city’s firewalls ($8,000) are eligible for replacement. Relationship to General Plan and Other Projects: Budgeting and purchasing technology equipment and software through the MIS Fund allows the city greater flexibility to direct resources where they are most needed rather than relying on individual department budgets. Effect on Annual Operations Costs: Annual maintenance costs may increase as old equipment is replaced or as new equipment is added. These maintenance costs are a part of the general fund operating budget. Description: Funding for replacement of computers, including desktops, laptops and servers, local area network equipment, printers, peripheral devices, telecommunication improvements, and software over the next 5 years. Also provides for the purchase of new equipment and software that serves the city as a whole. 4 - 2 Project Category: Technology Improvements Project Title: Upgrade of Special Assessments System Total Estimated Cost: $2,500 Funding Priority: 2 Account Number: 705-0000-415-XXXX Finance Project Number: 705018 Source of Project Funding 2014 2015 2016 2017 2018 MIS Fund $2,500 $ 0 $ 0 $ 0 $ 0 Justification: The special assessment database is currently based on Microsoft Access and has not been kept up to date with the latest releases. This is causing some necessary procedures to be band aided in order to work. Scheduling and Project Status: This project is expected to be completed by 3Q 2014. However, any upgrade to Special Assessments must wait until the features and technologies of the 2013- 2014 Financial System Upgrade are finalized so that the two systems interoperate and do not overlap. Relationship to General Plan and Other Projects: Any upgrade to Special Assessments must wait until the features and technologies of the 2013-2014 Financial System Upgrade are finalized. Effect on Annual Operations Costs: None. Description: Upgrade the current Special Assessments database to SQL with web interface 4 - 3 Project Category: Technology Improvements Project Title: Financial System Upgrade Total Estimated Cost: $250,000 Funding Priority: 2 Account Number: 705-0000-415-XXXX Finance Project Number: 705019 Source of Project Funding 2014 2015 2016 2017 2018 MIS Fund $100,000 $ 0 $ 0 $ 0 $ 0 Justification: The current financial system is operating on 1980s technology and is difficult to interface with other systems. It also has very limited capabilities to be expanded to include things like electronic timekeeping, employee access to personal records and payroll information, online utility bill lookup, online payments, etc. In addition, the system is very inflexible and difficult to modify where needed. The primary objective of this project would be to replace the financial system with up-to-date technology so that the city can take advantage of interconnectivity with other systems and can reasonably look into implementing other technologies that will increase the overall productivity of city employees and increase the overall efficiency of city operations. This could be done either by upgrading to a more current product from the same vendor, or by moving to a new vendor. The determination of which path to take would be part of the initial stages of the project. Scheduling and Project Status: It is anticipated that the entire project would be completed in 2014, though, if necessary, the old system may be kept in place beyond that time so that historical information may be queried. $150,000 of the total project cost was budgeted in 2013. Relationship to General Plan and Other Projects: Upgrading the current financial system will facilitate several other projects that have been discussed but which have been postponed due to the age and limited capabilities of the current system. These include: electronic timekeeping, employee access to personal records and payroll information, online utility bill lookup, online payments, and many others. Effect on Annual Operations Costs: Depending on the system selected, this project could have a significant effect on the annual operating costs of the Finance Department. No matter the type of system chosen, operating costs will likely rise, though how much remains to be determined. Description: Upgrade/replacement of current, green-screen financial system that has been in place since the early 1990s. Includes upgrades to General Financials, Utility Billing, Payroll, and Human Resources. 4 - 4 Project Category: Technology Improvements Project Title: Police Tablet PCs Total Estimated Cost: $63,000 Funding Priority: 2 Account Number: 705-0000-415-XXXX Finance Project Number: 705020 Source of Project Funding 2014 2015 2016 2017 2018 MIS Fund $16,500 $ 46,500 $ 0 $ 0 $ 0 Justification: The objective of this project is to put information access and management tools directly in the hands of the officer, no matter where they are, by replacing the MDTs mounted in the squad cars with tablet PCs that are assigned to individual officers. This will allow officers to fill out forms, add drawings, add photographs, send and receive information, store, search and review notes, and convert notes to reports. Tablet PCs are portable, flexible, and can be docked in the squad car or in the office. Assigned tablet PCs would be carried by officers on traffic stops, during field contacts, at accident and crime scene investigations, providing instant access to critical information that may relate directly to the officer’s safety as well as allowing on-scene data query and recording capabilities. Tablet PCs can also be used as both audio and visual recording devices, replacing dedicated recorders and cameras. Use of tablets would also bring the Department into conformity with CJIS security policies. Scheduling and Project Status: As requirements of the coming Public Safety Data System become known (anticipated 2013 4Q) begin implementation of 11 tablet PCs for detective and administrators in 2014. Complete implementation of 31 tablet PCs for patrol officers, CSO Unit, Reserve Unit, and spares by end of 2015 Q1. Relationship to General Plan and Other Projects: Implements a cost effective solution that provides tools for first responders to receive and act upon critical, officer and community safety information while handling incidents; provides a means of efficiently collecting, accessing and managing data; addresses CJIS security deficiencies. Effect on Annual Operations Costs: Annual operating costs to the City and Department are anticipated to be unaffected. Setup, training, maintenance and support will be covered under existing contracts and/or with existing city staff. Description: Assign tablet PCs to each licensed police officer and to the CSO and Reserve units to replace laptop computers and other equipment in squad cars. 4 - 5 Project Category: Technology Improvements Project Title: MapFeeder Aerial Mapping Total Estimated Cost: $6,500 Funding Priority: 2 Account Number: 705-0000-415-XXXX Finance Project Number: 705021 Source of Project Funding 2014 2015 2016 2017 2018 MIS Fund $ 4,000 $ 0 $ 0 $ 0 $ 0 Justification: Would improve efficiencies in field inspections on properties by allowing Planning staff to view variance and special use permit data on a property from the field so that they can enter correct code violation data for letter preparation. Scheduling and Project Status: Land Use Tracker (LUT) would be connected in 2013 prior to the summer inspection season, allowing us to become familiar with its use in the field. The system would expand to include the Code Tracking System (CTS) for use in the summer of 2014. Relationship to General Plan and Other Projects: Planning inspects commercial/residential properties every third year. We have delayed the scheduled inspection of commercial/industrial property for 2012 to 2013 due to being short staffed Effect on Annual Operations Costs: There is a $600/yr hosting fee for the mapping application. Description: A mobile app which would allow Planning staff to view variance and special use permit data on a property from the field so that we can enter correct code violation data for letter preparation. 4 - 6 Project Category: Technology Improvements Project Title: Upgrade of Records Mgmt Database Total Estimated Cost: $500 Funding Priority: 2 Account Number: 705-0000-415-XXXX Finance Project Number: 705022 Source of Project Funding 2014 2015 2016 2017 2018 MIS Fund $ 500 $ 0 $ 0 $ 0 $ 0 Justification: The objective of this project is to update a 13 year old Access database to SQL and create a web interface for the Records Management System. This would provide for the ability to print to a label (for a folder) and to paper (for inside of folder/box for checkout). With the use of a tablet, the program would allow for the entry of information while in the records areas creating a more efficient process. The web interface would be accessible via the intranet as "read-only" to other employees within the City to allow them to search and access the location of the documentation. Scheduling and Project Status: In order to allow for new records to be entered into the system, it is important to have the projected completed during the first quarter. Relationship to General Plan and Other Projects: Would allow users in all city departments to search for and locate paper records that are in records storage areas. Effect on Annual Operations Costs: None. Description: Upgrade the current Records Management database to SQL with web interface and purchase a tablet for use in records areas 5 - 1 Project Category: Buildings Project Title: Municipal Center Roof Replacement Total Estimated Cost: $ 220,000 Funding Priority: 1 Account Number: 408-0005-415.4520 Finance Project Number: 418516 – Phase II Engineering Project Number: 452 Reimbursements: Possible Power Grant through Xcel Energy Design and Inspection: Contracted Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 10,000 $ 210,000 $ 0 $ 0 $ 0 Justification: The existing HDPE membrane roof over the Fire Department is 20+ years old and requires seasonal repair to minimize damage from leaks. A similar membrane roof was replaced in 2012 over the remaining Fridley Municipal Center with a TPO roof. This project is needed to maintain building integrity and avoid damage to building contents. Scheduling and Project Status: Design will be completed in 2014, with construction ensuing in 2015. Relationship to General Plan and Other Projects: The project provides a needed second phase of replacement of the Municipal Center roof. The first phase was completed in 2012. Effect on Annual Operations Costs: This project will provide a modest decrease in annual operating costs in Municipal Center Operations through energy savings and lower repair requirements. The project will be administered and coordinated by the Engineering Division. Description: This item funds the second phase of replacement of the existing roof for the Fridley Municipal Center Building. 5 - 2 Project Category: Buildings Project Title: Municipal Center Parking Ramp Repairs Total Estimated Cost: $ 300,000 Funding Priority: 1 Account Number: 408-0005-415.4530 Finance Project Number: 418515 – Phase II Engineering Project Number: 438 Reimbursements: None Design and Inspection: Contracted Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 300,000 $ 150,000 $ 0 $ 0 $ 0 Justification: The existing post-tensioned parking ramp structure at the Fridley Municipal Center, constructed in the 1980s, requires structural repairs to maintain its use in the years to come. Elements at the south and east walls and east beam have experienced corrosion and concrete stresses due to water intrusion. Use of the structure is shared with Fairview through an agreement with the Fridley HRA. Scheduling and Project Status: The testing and inspection work is ongoing in 2013. Depending on results, design and construction may immediately ensue. Relationship to General Plan and Other Projects: The ramp is in need of immediate attention in order to ensure the safety and integrity of the structure. Effect on Annual Operations Costs: Upon project completion, annual inspections will be needed to evaluate cost-effective future maintenance. The project will be administered and coordinated by the Engineering Division, and supported through reconstruction of surface elements by the Street Division. Description: This item funds a major repair of the parking ramp at the Fridley Municipal Center Building. 5 - 3 Project Category: Buildings Project Title: Municipal Center HVAC Retrofit Total Estimated Cost: $ 265,000 Funding Priority: 2 Account Number: 408-0005-415-XXXX Finance Project Number: 408521 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 40,000 $ 25,000 $ 25,000 $ 25,000 $ 50,000 Justification: This project consists of multi-year replacement or retrofit of rooftop HVAC units at the Municipal Center. There are 16 units that serve to heat and cool the building housing staff from all City Departments. These are over 20 years old, and are becoming inefficient and maintenance-intensive. The proposed budget includes $40,000 in 2014 for this work. Scheduling and Project Status: This is the fifth year of replacements under this program. The 2014 project includes addition of controls to operate the units installed since 2010. Completion of this project is anticipated in 2018. Relationship to General Plan and Other Projects: In 2014, the fifth of ten phases of HVAC retrofit is proposed. Effect on Annual Operations Costs: The project is anticipated to provide an annual savings of approximately $2,500 in reduced power consumption and maintenance. The project will be administered and coordinated by the Engineering Division. Description: This item funds a phase of a multi-year HVAC retrofit at the Fridley Municipal Center. 5 - 4 Project Category: Buildings Project Title: Municipal Center Feasibility Study Total Estimated Cost: $ 25,000 Funding Priority: 3 Account Number: 408-0005-415-XXXX Finance Project Number: 408527 Reimbursements: None Design and Inspection: Contracted, Coordination with Various Departments Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 25,000 $ 0 $ 0 $ 0 $ 0 Justification: This project consists of a stand-alone analysis of the future of the Fridley Municipal Center and intends at defining costs and benefits for the long-range needs and use of the existing facility and other alternatives. Scheduling and Project Status: This project was proposed for the 2013 CIP, but was removed at that time. Relationship to General Plan and Other Projects: The 2013 City Council/Commission Survey supported this analysis. Effect on Annual Operations Costs: The immediate effect of this analysis will be negligible; however, defining a long-range plan to provide a functional building responding to future staff needs could provide large savings in costs and operating efficiencies through plan results. The project will be administered and coordinated by the Engineering Division. Description: This item funds a consultant analysis of the future use of the existing Fridley Municipal Center and comparison to alternatives. 5 - 5 Project Category: Buildings Project Title: Municipal Center Cubicle Replacements/Repairs Total Estimated Cost: $ 100,000 Funding Priority: 3 Account Number: 408-0005-415-XXXX Finance Project Number: 408528 Reimbursements: None Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 Justification: This project consists of replacement or retrofit of cubicles at the Fridley Municipal Center. More efficient and functional work components are available to replace the existing cubicles. The existing cubicle fabrics are worn and trap moisture and particulates. Replacing fabric alone approaches the cost of replacement with slightly used components that are known to be available currently. Scheduling and Project Status: 2014 is proposed as the first year of a five year project. A shorter timeframe for replacement may be considered if substantial savings would result. Relationship to General Plan and Other Projects: This project is proposed to be coordinated with Municipal Center Work Station Replacements/Repairs. Effect on Annual Operations Costs: There will be a slight reduction in repair costs and increase in efficiencies anticipated through this project. The project will be administered and coordinated by the Engineering Division. Description: This item funds replacement / retrofit of cubicles serving staff located at the Fridley Municipal Center from all Departments. 5 - 6 Project Category: Buildings Project Title: Municipal Center Storage, Cabinets, and Fixtures Total Estimated Cost: $ 30,000 Funding Priority: 3 Account Number: 408-0005-415-XXXX Finance Project Number: 408529 Reimbursements: Possible rebates through Xcel Energy and CenterPoint Energy Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: Public Works Department Engineering, Streets, and Parks Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 Justification: This project consists of replacement of storage cabinets, appliances, and fixtures in common areas of the Fridley Municipal Center. Most of these elements are over 25 years old and some have been identified are inefficient or in need of repair. Scheduling and Project Status: 2014 is proposed as the first year of a five year project. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: There will be a slight reduction in repair costs and increase in efficiencies anticipated through this project. The project will be administered and coordinated by the Engineering Division. The Streets and Parks Divisions have skilled carpenters that can support the project with construction and installation. Description: This item funds replacement of storage, cabinets, and fixtures serving staff located at the Fridley Municipal Center from all Departments. 5 - 7 Project Category: Buildings Project Title: Public Works Garage Gate Replacement Total Estimated Cost: $ 25,000 Funding Priority: 1 Account Number: 408-0005-415-XXXX Finance Project Number: 408530 Engineering Project Number: 439 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering, Streets, and Parks Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 25,000 $ 0 $ 0 $ 0 $ 0 Justification: This project consists of replacing the existing powered gate at the Fridley Public Works Garage, and installation of a second gate. The layout will be modified for safety of workers and visitors to the Public Works Garage, including those using the facility for regular recycling drop off events. The single gate is currently a point of conflict for vehicles entering and exiting the facility, and sight lines are poor. The existing gate requires emergency repair on a regular basis. Elements are proposed to be salvaged insofar as possible. Scheduling and Project Status: This project is proposed to be initiated and completed in 2014. Relationship to General Plan and Other Projects: This project will be coordinated with the Public Works Garage Security Upgrades. Effect on Annual Operations Costs: There will be a reduction in repair costs and increase in safety anticipated through this project. The project will be administered and coordinated by the Engineering Division. The Streets and Parks Divisions have skilled employees that will support the project with construction and installation. Description: This project funds replacement of the existing powered gate and installation of a second gate at the Fridley Public Works Garage. 5 - 8 Project Category: Buildings Project Title: Public Works Garage Security Upgrades Total Estimated Cost: $ 5,000 Funding Priority: 1 Account Number: 408-0005-415-XXXX Finance Project Number: 408531 Engineering Project Number: 439 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering, Streets, and Parks Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 5,000 $ 0 $ 0 $ 0 $ 0 Justification: This project consists of purchase and installation of a control system to allow entrance into the Fridley Public Works Garage. Currently, there is no means to control access. The Police Department impound storage is located within the facility, and persons often access the grounds in search of their vehicles. The gate arm system would be controlled by personnel within the facility and via a transponder or swipe card system. Scheduling and Project Status: This project is proposed to be initiated and completed in 2014. Relationship to General Plan and Other Projects: This project will be coordinated with the Public Works Garage Gate Replacement. Effect on Annual Operations Costs: There will be a potential increase in safety anticipated through this project, and possible reduction in costs due to incursions to the impound facility. The project will be administered and coordinated by the Engineering Division. The Streets and Parks Divisions have skilled workers that will support the project with construction and installation. Description: This project funds equipment to control access to the Fridley Public Works Garage at its entrance gate. 5 - 9 Project Category: Buildings Project Title: Public Works Garage Roof Repairs Total Estimated Cost: $ 180,000 Funding Priority: 1 Account Number: 408-0005-415-XXXX Finance Project Number: 408514 Engineering Project Number: 440 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 180,000 $ 0 $ 0 $ 0 $ 0 Justification: The existing membrane roof over the original Fridley Public Works Garage building is requires regular repair to minimize damage from leaks. This project is needed to maintain building integrity and avoid damage to building contents. Scheduling and Project Status: Design and construction is proposed to be completed in 2014. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: This project will provide a modest decrease in annual operating costs in Garage Operations through energy savings and lower repair requirements. The project will be administered and coordinated by the Engineering Division. Description: This project funds replacement a portion of the existing roof for the Fridley Municipal Garage Building. 5 - 10 Project Category: Buildings Project Title: Fridley Community Center Furnishings and Fixtures Total Estimated Cost: $ 40,000 Funding Priority: 3 Account Number: 408-0005-415-XXXX Finance Project Number: 408532 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Streets Divisions Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 15,000 $ 10,000 $5,000 $ 5,000 $ 5,000 Justification: This multi-year project consists of replacement of indoor and outdoor fixtures and furnishings at the Fridley Community Center. Non-serviceable pieces will be selected for replacement. Scheduling and Project Status: 2014 is proposed as the first year of a five year project. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: There will be a slight reduction in repair costs anticipated through this project. The project will be administered and coordinated by the Recreation Department. Description: This project funds replacement of indoor and outdoor fixtures and furnishings at the Fridley Community Center. 5 - 11 Project Category: Buildings Project Title: Fire Station 2 Site Upgrades Total Estimated Cost: $ 20,000 Funding Priority: 2 Account Number: 408-0005-415-XXXX Finance Project Number: 408533 Engineering Project Number: 440 Reimbursements: None Design and Inspection: Engineering Staff & Outside Consultant Payroll Logged to Project: Public Works Engineering Division & Fire Department Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 20,000 $ 0 $ 0 $ 0 $ 0 Justification: This project consists of site design and reconfiguration of the entrances and parking areas at Fire Station 2 to provide for additional parking for personnel responding to fire service requests. At present, the parking area overfills and creates issues with safe maneuvering of vehicles on the site and at the entrances. Scheduling and Project Status: This project is proposed to be designed and completed in 2014. Relationship to General Plan and Other Projects: This project is stand alone. Effect on Annual Operations Costs: Reduced maintenance costs are anticipated in the near-term; additional pavement will require more maintenance in the long-term. The project will be designed and coordinated by the Engineering Division. The Streets Divisions will support the project with construction and installation. Description: This project funds reconfiguration of the parking lot and entrances at Fire Station 2. 5 - 12 Project Category: Buildings Project Title: Highway 65 Liquor Store Remodel Total Estimated Cost: $ 800,000 Funding Priority: 2 Account Number: 609-9200-415-XXXX Finance Project Number: 6098 Engineering Project Number: 442 Reimbursements: Possible rebates through Xcel Energy and CenterPoint Energy Design and Inspection: Consultant Payroll Logged to Project: Finance Department Source of Project Funding 2014 2015 2016 2017 2018 Capital Improvement Fund $ 50,000 $ 600,000 $ 150,000 $ 0 $ 0 Justification: The Highway 65 Liquor Store is in need of major maintenance and updating. The interior has not been upgraded in three decades. Exterior elements are also in need of repair and replacement. The store is dated well beyond what is customary for other retail stores in the area, which affects its ability to compete with other upgraded establishments. The store is also not compliant with ADA. This project consists of design and construction to remodel the store. The work would include repair of building elements and retrofit of the entire interior of the facility. Equipment would be replaced and upgraded for energy efficiency. Scheduling and Project Status: This project funds design in 2014, and construction in 2015-16. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: There will be a significant reduction in repair costs anticipated through this project. There are also anticipated revenue increases through improvements of this retail space. The project will be administered and coordinated by the Finance Department. Description: This project funds remodeling of the Highway 65 Liquor Store. 6 - 1 Project Category: Parks CIP Project Title: Court Surfacing and Overlays Total Estimated Cost: $ 150,000 Funding Priority: 2 Account Number: 408-0007-455-XXXX Finance Project Number: 408701 Reimbursements: Parks Reserve Fund and/or USTA funds Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Public Works Parks Maintenance Division Source of Project Funding 2014 2015 2016 2017 2018 Parks Reserve Funding $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 Justification: Court resurfacing is needed on the City's basketball and tennis courts with a color coating material. Color coating material needs to be reapplied every 3-4 years in order to keep the courts in acceptable playing condition. Scheduling and Project Status: Courts to be color coated are determined annually by the Park Maintenance Supervisor and the Parks and Recreation Director. Tennis court resurfacing is included. Also, some courts will require asphalt overlays or replacement of the asphalt surface Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project involves resurfacing of tennis and basketball courts. 6 - 2 Project Category: Parks CIP Project Title: Park Furnishings Total Estimated Cost: $ 50,000 Funding Priority: 2 Account Number: 408-0007-455-XXXX Finance Project Number: 408702 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Public Works Parks Maintenance Division Source of Project Funding 2014 2015 2016 2017 2018 Parks Reserve Funding $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 Justification: This project consists of selective replacement of picnic tables, park benches, signs and other fixtures throughout City parks to maintain the quality and safety of City parks. Scheduling and Project Status: Fixture replacements are determined annually by the Park Maintenance Supervisor and the Parks and Recreation Director based on regular equipment inspections. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project consists of selective replacement of picnic tables, park benches, signs and other fixtures throughout the City park system. 6 - 3 Project Category: Parks CIP Project Title: Commons Park Irrigation System – Phase II Total Estimated Cost: $ 160,000 Funding Priority: 2 Account Number: 408-0007-455-XXXX Finance Project Number: 408726 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Public Works Parks Maintenance Division Source of Project Funding 2014 2015 2016 2017 2018 Parks Reserve Funding $ 80,000 $ 0 $ 0 $ 0 $ 0 Justification: This project consists of replacing the irrigation system throughout Commons Park. The current system has reached the end of its useful life and was experiencing increasing water breaks and maintenance costs. The first of half of this two phase project was completed in 2013. Scheduling and Project Status: The project will be completed in late spring or early summer. Relationship to General Plan and Other Projects: This is the second and final phase to replace the existing irrigation system. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project constitutes the second and final phase of work to replace the existing irrigation system at Commons Park. 6 - 4 Project Category: Parks CIP Project Title: SNC Boardwalk Replacement Total Estimated Cost: $ 100,000 Funding Priority: 2 Account Number: 408-0007-455-XXXX Finance Project Number: 408724 Engineering Project Number: 443 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Recreation Department and Public Works Parks Maintenance Division Source of Project Funding 2014 2015 2016 2017 2018 Parks Reserve Funding $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 0 Justification: This project includes replacement the existing boardwalk at the Springbrook Nature Center. There are repairs and replacement needed to bring the boardwalks into safe condition. Scheduling and Project Status: Construction will be completed in 2014. Relationship to General Plan and Other Projects: The 2014 project completes the second of five phases of replacement. Effect on Annual Operations Costs: This project will reduce maintenance costs needed to repair the existing boardwalk. Description: This project constitutes the second of five phases of work to repair and replace trail boardwalk at Springbrook Nature Center. 6 - 5 Project Category: Parks CIP Project Title: Security Cameras in Parks Total Estimated Cost: $ 50,000 Funding Priority: 1 Account Number: 408-0007-455-XXXX Finance Project Number: 408525 Engineering Project Number: 444 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Recreation Department and Public Works Parks Maintenance Division Source of Project Funding 2014 2015 2016 2017 2018 Parks Reserve Funding $ 25,000 $ 0 $ 0 $ 0 $ 0 Justification: Cameras will be installed as a disincentive to vandalism and other illegal activity, and as a way to monitor park usage. The systems will use wireless capabilities. Scheduling and Project Status: Installation of the first phase is to be completed in 2013; this second and final phase would be installed in 2014. Relationship to General Plan and Other Projects: The 2014 project completes the second and final phase of installation. Effect on Annual Operations Costs: This project will reduce maintenance associated with vandalism and other illicit activities. Description: This project includes the second of two phases of installation of camera equipment in our most highly-used parks, including Commons Park, Community Park, Moore Lake Park, and the Springbrook Nature Center. 7 - 1 Project Category: Streets Project Title: Street Rehabilitation Project ST2014-01 Total Estimated Cost: $ 1,295,000 Funding Priority: 1 Account Number: 574-0000-435-XXXX Finance Project Number: 201401 Engineering Project Number: ST2014-01 Reimbursements: Municipal State Aid/Special Assessments Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Municipal State Aid Special Assessments $ 195,000 $ 1,100,000 $ 0 $ 0 $ 0 $ 0 Justification: This project is included in the City’s long-range pavement management plan. Bi-annual road ratings have identified candidate segments based on condition. Other considerations include age, coordination with other projects, and upgrades needed. Scheduling and Project Status: This project is presently scheduled for 2014 construction. The project has been deferred twice since an initial date of 2011. Preliminary design, workshop, and assessment hearing ongoing in 2013. Relationship to General Plan and Other Projects: This project is consistent with the street pavement preservation program. Sewer, storm sewer, and water system surveys will need to be completed prior to plan development to determine the extent of repairs needed on the city’s utility systems. These costs are approximated in the above estimates. This project will be coordinated with CenterPoint Energy and other private utilities in regard to replacement of their aging systems. Effect on Annual Operations Costs: This project will reduce operating costs relating to street and utility maintenance in the project area. Description: This project involves the reclamation of various street segments and minor repairs to utilities in the North Industrial neighborhood. 7 - 2 Project Category: Streets Project Title: 69th Avenue Railroad Crossing Project ST2014-02 Total Estimated Cost: $ 250,000 Funding Priority: 2 Account Number: 574-0000-435-XXXX Finance Project Number: 201403 Engineering Project Number: ST2014-02 Reimbursements: Federal Highway Design and Inspection: MnDOT and/or Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Federal Highway Aid $ 250,000 $ 0 $ 0 $ 0 $ 0 Justification: The surface of this railroad crossing has been extremely difficult to maintain. While train traffic on this segment is limited and speeds are low, the skew of the crossing makes visibility difficult. Scheduling and Project Status: This project is presently scheduled for 2014 construction. We are awaiting confirmation from MNDOT that funding allocated in 2010 remains available for this project. In order to obtain funding, existing south leg streets servicing New Brighton and Fridley would need to be combined. Relationship to General Plan and Other Projects: This project would allow resurfacing of 69th Avenue from Central Avenue to the eastern City limits. Effect on Annual Operations Costs: This project will reduce operating costs relating to maintaining this railroad crossing. Description: This project involves the replacement and upgrade of the Minnesota Commercial RR crossing on 69th Avenue NE. It also reconfigures the intersection so that flashers and crossing arms can be reasonably implemented and access can be consolidated. 7 - 3 Project Category: Streets Project Title: Street Sealing Program, Project ST2014-10 (Chip Sealing) Total Estimated Cost: $ 220,000 Funding Priority: 2 Account Number: 574-0000-435-XXXX Finance Project Number: 201410 Engineering Project Number: ST2014-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2014 2015 2016 2017 2018 Street Reserve Funding $ 220,000 $ 220,000 $ 220,000 $ 220,000 $ 220,000 Justification: This project includes chip sealing of City streets on an eight-year rotation for pavement preservation purposes. The project for 2014 includes Area 5, bounded generally by I-694, University Avenue, Mississippi Street, and the Mississippi River. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2014. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is coordinated with resurfacing plans to avoid sealing streets that are scheduled for reconstruction in the near term. Effect on Annual Operations Costs: This project will reduce operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves street sealing Chip sealing is included in Area 5, which is bounded generally by I-694, University Avenue, Mississippi Street, and the Mississippi River. 7 - 4 Project Category: Streets Project Title: Street Sealing Program, Project ST2014-10 (Crack Sealing) Total Estimated Cost: $ 25,000 Funding Priority: 2 Account Number: 408-0006-435-XXXX Finance Project Number: 201410 Engineering Project Number: ST2014-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2014 2015 2016 2017 2018 Street Reserve Funding $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 Justification: This project includes crack sealing of City streets in order to prolong the life of newer pavement. With the limitations on staff time and large mileage of street rehabilitation projects in recent years, staff is unable to keep up with all crack sealing. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2014. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is performed on streets that have been recently resurfaced (within the last five years). Effect on Annual Operations Costs: This project will reduce operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves routing and sealing of cracks on recently paved streets, including East Moore Lake Drive and some segments reconstructed in 2010. 7 - 5 Project Category: Streets Project Title: Main Street Pedestrian Bridge Project ST2015-21 Total Estimated Cost: $ 1,450,000 Funding Priority: 1 Account Number: 408-0006-435-XXXX Finance Project Number: 201120 Engineering Project Number: ST2015-21 Reimbursements: Federal Highway Aid and Street Reserve Fund Design and Inspection: Consultant and Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2014 2015 2016 2017 2018 Federal Highway Aid Street Reserve Funding $ 150,000 $ 970,000 $ 180,000 $ 150,000 $ 0 $ 0 Justification: This project will provide an accessible crossing of I-694 for pedestrians and bicyclists between 7th Street and the Mississippi River Regional Trail. While these users cross the bridge at Main Street, this Anoka County bridge does not accommodate pedestrians and cyclists. Scheduling and Project Status: This project is presently scheduled in the 2016 Statewide Transportation Investment Plan (STIP). The City will be requesting advancing of this funding to coordinate with the 2015 street resurfacing project. Design work would be completed in 2014. Relationship to General Plan and Other Projects: The project meets goals of the City’s Comprehensive Plan and is consistent with the City’s Transit Oriented District Plan. Effect on Annual Operations Costs: This project will add future maintenance obligations to the City of Fridley. Description: This project involves construction of a shared use path from 43rd Avenue to 57th Avenue along the west side of Main Street (Anoka CR 102). This will include a trail bridge spanning Interstate 694. 7 - 6 Project Category: Streets Project Title: Trail Preservation Project Total Estimated Cost: $ 500,000 Funding Priority: 2 Account Number: 408-0006-435-XXXX Finance Project Number: 201404 Engineering Project Number: ST2014-20 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2014 2015 2016 2017 2018 Street Reserve Funding $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 Justification: This project includes sealing and repaving of trails Citywide, with construction of short segments to provide connectivity. The project for 2014 will be defined by our trail pavement rating, which will be completed in August 2013. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2014. Relationship to General Plan and Other Projects: This work is coordinated with other resurfacing plans when advantageous. Short segments selected for connectivity will be in accordance with the City’s Active Transportation Plan. Effect on Annual Operations Costs: This project will reduce operating costs relating to maintaining trail pavement. Description: This project involves street sealing Chip sealing is included in Area 5, which is bounded generally by I-694, University Avenue, Mississippi Street, and the Mississippi River. 8 - 1 Project Category: Storm Water CIP Project Title: Water Quality Testing Total Estimated Cost: $ 25,000 Funding Priority: 3 Account Number: 603-7500-415-4340 Finance Project Number: 603004 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Storm Water Utility Fund $ 5,000 $ 10,000 $ 10,000 $ 0 $ 0 Justification: This project is to provide baseline data that is currently not under collection by watershed organizations in Fridley on surface water and storm water discharges in association with a newly issued MS4 permit. Scheduling and Project Status: The project will begin in 2014, and baseline data would be collected by 2016. Relationship to General Plan and Other Projects: This project is needed to advance planning activities for future projects. It is important to plan for data collection over at least two seasons due to annual fluctuations in conditions. The City may partner with its watershed organizations in conducting sampling. Effect on Annual Operations Costs: This project will not impact operations costs. Description: This project involves collection and analysis of water quality samples from surface water and storm water discharges. 8 - 2 Project Category: Storm Water CIP Project Title: Storm Sewer System Upgrades Total Estimated Cost: $ 300,000 Funding Priority: 2 Account Number: 603-7500-415-XXXX Finance Project Number: 603005 Engineering Project Number: ST2014-01 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Storm Water Utility Fund $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 60,000 Justification: This work is needed annually to mitigate flood prone areas and to maintain the integrity of the overall conveyance system and other infrastructure. A detailed work plan is typically identified through surveys conducted for outfall inspections, other rehabilitation projects, or as problem areas arise or are identified. The project will ensure resources are available to address immediate concerns or failures in a timely fashion, and to mitigate future issues. Scheduling and Project Status: This work is conducted annually and specific repairs will be identified by staff in 2013. Relationship to General Plan and Other Projects: The project allows the City to address problem areas in a timely fashion, particularly when other project work needs a coordinated improvement. Effect on Annual Operations Costs: This project will reduce operating costs relating to preserving existing infrastructure and mitigation of future flood damage. Description: This project includes upgrades and repairs to storm sewer conveyance system Citywide. 8 - 3 Project Category: Storm Water CIP Project Title: Stoneybrook Flood Control Project Total Estimated Cost: $ 105,000 Funding Priority: 1 Account Number: 603-7500-415-XXXX Finance Project Number: 6036 Engineering Project Number: 422 Reimbursements: None Design and Inspection: Engineering Staff and Consultant Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Storm Water Utility Fund $ 105,000 $ 0 $ 0 $ 0 $ 0 Justification: This work is needed to mitigate chronic flooding that affects properties along Beech Street and 79th Avenue. This area drains the intensely developed upper subwatershed. The project includes implementation of initial system improvements to limit flooding in the area. Future work will be needed that is to be identified. Scheduling and Project Status: This project is moved from the 2013 budget to coincide with a street rehabilitation project deferred to 2014. Relationship to General Plan and Other Projects: The project is scheduled in 2014 to coincide with the street rehabilitation project in this area. Effect on Annual Operations Costs: This project will reduce operating costs relating to preserving existing infrastructure and mitigation of future flood damage. Description: This project includes reconfiguration of infrastructure in the Stoneybrook Creek subwatershed in the North Industrial area to mitigate flooding. 8 - 4 Project Category: Storm Water CIP Project Title: Watershed BMP Implementation Total Estimated Cost: $ 60,000 Funding Priority: 1 Account Number: 603-7500-415-XXXX Finance Project Number: 540502 Engineering Project Number: 445 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Storm Water Utility Fund $ 20,000 $ 20,000 $ 20,000 $ 0 $ 0 Justification: This project will apply stormwater BMPs in the Oak Glen Creek subwatershed. Scheduling and Project Status: This project can be used to leverage additional support for BMP projects from our watershed organizations, property owners, and other sources. Relationship to General Plan and Other Projects: The project is scheduled in this subwatershed in 2014 to coincide with the street rehabilitation project in this area. Effect on Annual Operations Costs: This project will provide minor reductions in operating costs relating to sediment control. Description: This project includes water quality improvements through application of Best Management Practices (BMPs) for stormwater. 8 - 5 Project Category: Storm Water CIP Project Title: Pond Expansion – Oak Glen Creek Subwatershed Total Estimated Cost: $ 400,000 Funding Priority: 1 Account Number: 603-7500-415-XXXX Finance Project Number: 540503 Engineering Project Number: 446 Reimbursements: None Design and Inspection: Engineering Staff and Consultant, supported by Anoka Conservation District and Coon Creek Watershed District Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Storm Water Utility Fund Clean Water Fund Grant $ 150,000 $ 250,000 $ 0 $ 0 $ 0 $ 0 Justification: This project would expand an existing stormwater pond receiving flow from the Oak Glen Creek subwatershed to provide water quality benefit and reduce peak discharges to Lower Oak Glen Creek. This project will provide a major reduction in downstream erosion and sediment loading to the Mississippi River. Scheduling and Project Status: Anoka Conservation District and the City of Fridley applied for funding in 2012, but the request was unsuccessful. An application is planned for 2013. Property negotiations have been on hold pending funding allocation. Relationship to General Plan and Other Projects: The project will help to preserve an erosion mitigation project scheduled for construction in 2013-14. The project is located in the North Industrial Area, which is scheduled for pavement rehabilitation in 2014. Effect on Annual Operations Costs: This project will provide a major reduction in sediment loading and downstream erosion. Description: This project includes a stormwater pond expansion serving the Oak Glen Creek subwatershed. The expansion would add significant storage and iron-enhanced sand filter treatment to remove phosphorus. 9 - 1 Project Category: Water CIP Project Title: Distribution System Reconstruction Total Estimated Cost: $ 2,100,000 Funding Priority: 1 Account Number: 601-7500-415-XXXX Finance Project Number: 601010 Engineering Project Number: 447 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2014 2015 2016 2017 2018 Water Utility Fund $ 500,000 $ 300,000 $ 500,000 $ 500,000 $ 300,000 Justification: This project is to provide preservation and redundancy of the water distribution system. Annual funding is targeted to extend the life of existing infrastructure. The proposed 2014 project would provide for extension of a main loop along Trunk Highway 65 from Mississippi Street to Norton Avenue. Scheduling and Project Status: The 2014 project will be in design in the fall of 2013, when MnDOT plans for Trunk Highway 65 resurfacing can be coordinated. Relationship to General Plan and Other Projects: The project is part of a an effort by the City of Fridley to upgrade 50% of its water distribution system by the time it reaches 100 years of age. The project is to be coordinated with the Trunk Highway 65 resurfacing to provide cost savings related to traffic control. Effect on Annual Operations Costs: This project will reduce operations costs by providing a main connection across Rice Creek that will loop dead end areas of the system. Description: This project involves reconstruction, rehabilitation, and interconnection of the existing water distribution system. 9 - 2 Project Category: Water CIP Project Title: Well Updates Total Estimated Cost: $ 470,000 Funding Priority: 1 Account Number: 601-7500-415-XXXX Finance Project Number: 5208 Engineering Project Number: 448 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2014 2015 2016 2017 2018 Water Utility Fund $ 110,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 Justification: The project consists of removing and inspecting the column pipe, shafts, pumps, and motors, and repairing these components as required. The project includes updates and repairs to well house buildings as well. This annual project ensures that the City water system continues to have a constant water supply with a minimum amount of repairs. Scheduling and Project Status: The work will be completed in 2014. Relationship to General Plan and Other Projects: This is a project programmed annually. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs. It also provides upgrades to buildings that are needed to keep equipment in good operating condition. Description: This project involves reconstruction, rehabilitation, and interconnection of the existing water distribution system. 9 - 3 Project Category: Water CIP Project Title: Water Meter Replacement Total Estimated Cost: $ 470,000 Funding Priority: 2 Account Number: 601-7500-415-4340 Finance Project Number: 601007 Engineering Project Number: 412 Reimbursements: None Design and Inspection: None Payroll Logged to Project: Finance Department and Public Works Department Engineering and Water Divisions Source of Project Funding 2014 2015 2016 2017 2018 Water Utility Fund $ 110,000 $ 110,000 $ 120,000 $ 120,000 $ 120,000 Justification: The City’s residential water meters are typically beyond their expected life span for accurate reading. The City has also relied on voluntary meter reading for residential properties, which adds data entry and coordination time to collect readings. The project includes installation of water meters Citywide in a multi- year project with upgrades to an automatic meter reading system. City staff coordinates and performs installations of approximately 500 meters annually. Scheduling and Project Status: This will be the fourth year of AMR installations in residential properties under this program. Relationship to General Plan and Other Projects: This is a project programmed annually and would reach completion in 2022. Effect on Annual Operations Costs: This project provides for accurate and timely water billing and collection, and reduces staff time in meter reading collection, data entry, and collection of readings. Description: The project includes installation of water meters with upgrades to an automatic meter reading system (AMRs). 9 - 4 Project Category: Water CIP Project Title: SCADA Hardware/Software Upgrade Total Estimated Cost: $ 250,000 Funding Priority: 1 Account Number: 601-7500-415-XXXX Finance Project Number: 5300 Engineering Project Number: 449 Reimbursements: None Design and Inspection: Engineering and Water Division Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2014 2015 2016 2017 2018 Water Utility Fund $ 250,000 $ 0 $ 0 $ 0 $ 0 Justification: The existing supervisory control and data acquisition or SCADA system enables computer process control of the City’s Filtration Plants, Wells, and Lift Stations. This system is nearing 20 years of age. While ongoing repairs have been made throughout its life, SCADA components are failing at a high rate, and replacement equipment is becoming very difficult to find. The system also should be upgraded to interface with modern computers, provide enhanced security and capabilities with modern technology. Scheduling and Project Status: This project would be completed in 2014. Relationship to General Plan and Other Projects: This is a stand-alone project. Effect on Annual Operations Costs: This project will reduce the high costs associated with failures and repairs of components, and eliminate the need for staff time needed to operate systems manually in times of failure. Description: The project includes upgrade and replacement of the SCADA control system, which provides computerized operation and monitoring of Filtration Plants, Wells, and Lift Stations. 9 - 5 Project Category: Water CIP / Sewer CIP Project Title: Jetting/Vacuum Truck Total Estimated Cost: $ 350,000 Funding Priority: 2 Account Number: 601-7500-415-XXXX 602-7500-415-XXXX Finance Project Number: NA Reimbursements: None Design and Inspection: None Payroll Logged to Project: None Source of Project Funding 2014 2015 2016 2017 2018 Water Utility Fund Sewer Utility Fund $ 175,000 $ 175,000 $ 0 $ 0 $ 0 $ 0 Justification: The City does not have capabilities to clean large diameter storm and sanitary sewer piping, and has to contract this service ($30,000 budgeted in 2013). This equipment would provide staff with the capability to perform this work. When coupled with a wheeled excavator, the equipment will also provide the Water Division with capabilities to repair more main breaks without contracting services. The equipment will allow for faster repairs performed in a safer fashion. Scheduling and Project Status: Equipment is planned to be purchased in 2014 under this item. Relationship to General Plan and Other Projects: This equipment should be considered in conjunction with the wheeled excavator item in order to fully utilize its capabilities. Effect on Annual Operations Costs: This equipment will reduce operations costs significantly by eliminating the need for annual contracted sewer cleaning and most contracted water repairs when coupled with a wheeled excavator purchase. Description: The item is for addition of a Jetting/Vacuum Truck to the Public Works fleet for use in the Water and Sewer Divisions. 9 - 6 Project Category: Water CIP Project Title: Wheeled Excavator Total Estimated Cost: $ 150,000 Funding Priority: 2 Account Number: 601-7500-415-XXXX Finance Project Number: NA Reimbursements: None Design and Inspection: None Payroll Logged to Project: None Source of Project Funding 2014 2015 2016 2017 2018 Water Utility Fund $ 150,000 $ 0 $ 0 $ 0 $ 0 Justification: When coupled with a jetting/vacuum truck, the equipment will also provide the Water Division with capabilities to repair more main breaks without contracting services. The equipment will allow for faster repairs performed in a safer fashion. The Water Division requires repair of 20 or more water main breaks annually. Approximately half of these require contracted services to assist Water Division personnel currently. Most of these repairs could be made without contracted services with this equipment. While this equipment is new, it would be coupled with trade-in of an existing backhoe/loader, and would replace that equipment. Scheduling and Project Status: Equipment is planned to be purchased in 2014 under this item. Relationship to General Plan and Other Projects: This equipment should be considered in conjunction with the jetting/vacuum truck item in order to fully utilize its capabilities. Effect on Annual Operations Costs: This equipment will reduce operations costs significantly by eliminating the need for most contracted water repairs when coupled with a jetting/vacuum truck purchase. Description: The item is for addition of a Wheeled Excavator to the Public Works fleet for use in the Water and Sewer Divisions. 10 - 1 Project Category: Sewer CIP Project Title: Sanitary Sewer Collection System Reconstruction Total Estimated Cost: $ 200,000 Funding Priority: 1 Account Number: 602-7500-415-XXXX Finance Project Number: 201401 Engineering Project Number: ST2014-01 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Sewer Utility Fund $ 35,000 $ 40,000 $ 40,000 $ 40,000 $ 45,000 Justification: This project is to provide preservation of the existing sanitary sewer collection system. Annual funding is targeted to extend the life of existing infrastructure. Scheduling and Project Status: The 2014 project will be surveyed in 2013 and incorporated into the street rehabilitation project. Relationship to General Plan and Other Projects: The proposed 2014 project be for repairs in coordination with the pavement rehabilitation work in the North Industrial Area. Effect on Annual Operations Costs: This project will reduce operations costs by providing replacement and repair of sanitary sewer infrastructure. Description: This project involves repairs of the existing sanitary sewer collection system. 10 - 2 Project Category: Sewer CIP Project Title: Sanitary Sewer Collection System Reconstruction Total Estimated Cost: $ 1,035,000 Funding Priority: 1 Account Number: 602-7500-415-XXXX Finance Project Number: 602003 Engineering Project Number: 450 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Sewer Utility Fund $ 175,000 $ 210,000 $ 215,000 $ 215,000 $ 220,000 Justification: The project consists of relining of clay and concrete sanitary sewer collection piping to prolong its useful life. The 2014 project is proposed to include lining of large- diameter gravity sewers in the BNSF Northtown Rail Yard. Scheduling and Project Status: The work will be completed in 2014. Relationship to General Plan and Other Projects: The project is part of a an effort by the City of Fridley to upgrade 50% of its sanitary sewer collection system by the time it reaches 100 years of age. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs and potential failures. Description: This project involves lining of the existing sanitary sewer collection system. 10 - 3 Project Category: Sewer CIP Project Title: Sanitary Sewer Force Main Reconstruction Total Estimated Cost: $ 60,000 Funding Priority: 2 Account Number: 602-7500-415-XXXX Finance Project Number: 602004 Engineering Project Number: 433 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Sewer Utility Fund $ 90,000 $ 0 $ 0 $ 0 $ 0 Justification: The project consists of rehabilitation of a sanitary sewer force main serving the Embers Lift Station on 53rd Avenue and TH65. The force main has had three emergency leak repairs in the past four years. Scheduling and Project Status: The work will be completed in 2014. Relationship to General Plan and Other Projects: The project is part of an effort by the City of Fridley to avoid costly emergency repairs and provide for long- term service life of its sanitary sewer infrastructure. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs and potential failures. Description: This project involves rehabilitation of a sanitary sewer force main serving the southeast area of Fridley. 10 - 4 Project Category: Sewer CIP Project Title: Sanitary Sewer Lift Station Rehabilitation Total Estimated Cost: $ 60,000 Funding Priority: 2 Account Number: 602-7500-415-XXXX Finance Project Number: 5301 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Sewer Utility Fund $ 10,000 $ 10,000 $ 20,000 $ 0 $ 20,000 Justification: The project consists of replacement and repairs to sanitary lift station components to avoid failures that can lead to sewer backups. Scheduling and Project Status: Work on the Locke Lake Lift Station will be completed in 2014. Relationship to General Plan and Other Projects: The project is part of a an effort by the City of Fridley to avoid costly emergency repairs and provide for long-term service life of its sanitary sewer infrastructure. The City is nearing completion of its first round of rehabilitation on its 13 lift stations. In 2016, rehabilitations will be reduced to a bi-annual schedule. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs and potential failures. Description: This project involves rehabilitation of sanitary sewer lift stations on a regular and ongoing basis. 10 - 5 Project Category: Sewer CIP Project Title: MCES Overflow Connection Total Estimated Cost: $ 150,000 Funding Priority: 2 Account Number: 602-7500-415-XXXX Finance Project Number: 602005 Engineering Project Number: 451 Reimbursements: None Design and Inspection: Contracted through MCES Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2014 2015 2016 2017 2018 Sewer Utility Fund $ 150,000 $ 0 $ 0 $ 0 $ 0 Justification: The project consists of providing an overflow connection between the City’s main sanitary sewer interceptor with an interceptor owned and operated by the Metropolitan Council Environmental Services (MCES). During the severe rainfall event in 2011, the main sanitary sewer interceptor reached capacity and resulted in backing up our system. The overflow would help by providing additional capacity in such a future event. Scheduling and Project Status: The City is currently working out the scope and funding for this project with MCES consultants and staff. Relationship to General Plan and Other Projects: MCES coordination and participation in this project will be required. Effect on Annual Operations Costs: This project would provide capacity to the City’s main trunk system during severe rainfall events, to avoid backups due to stormwater inflows into the sanitary sewer system. Description: This project involves cost-sharing of a project to provide an overflow connection between the City’s main sanitary sewer interceptor with the MCES interceptor.