Loading...
Res 2015-13 RESOLUTION NO. 2015 - 13 RESOLUTION ORDERING FINAL PLANS, SPECIFICATIONS AND CALLING FOR BIDS: 2015 STREET REHABILITATION PROJECT NO. ST 2015 - 01 WHEREAS , the construction of certain improvements is deemed to be in the interest of the City of Fridley and the property owners affected thereby, and WHEREAS , the City of Fridley has prepared a Capital Improvement Plan to systematically reconstruct streets in the City to a standard section including concrete curb and gutter, and WHEREAS , the City of Fridley’s Engineering Department has completed preparation of a feasibility report and estimates of costs thereof for the improvements, and WHEREAS , it is the intent of the City of Fridley to fund a portion of the project costs through special assessments to benefiting property owners in accordance with its Roadway Major Maintenance Policy, and WHEREAS , pursuant to direction of the City Council, a report has been prepared by the City of Fridley Public Works Department with reference to the specific improvements, and WHEREAS , Resolution No. 2014-96 adopted November 24, 2014 received the feasibility report and called for a public hearing on the matter of the construction of certain improvements listed therein, and WHEREAS , a public hearing regarding said improvements was set for January 26, 2015, and ten days' mailed notice and two weeks' published notice of the hearing was given, and WHEREAS , at said hearing on improvements, the City Council heard all those persons that desired to address the Council, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY, ANOKA COUNTY, MINNESOTA : 1.Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2.The improvements proposed in the feasibility report are hereby ordered to be effected and completed as soon as reasonably possible, to-wit: Street improvements, including pavement rehabilitation, bituminous paving, water main replacement, hydrant replacement and utility repairs on street segments as follows: 3rd Street 49th Avenue to 53rd Avenue Altura Road 53rd Avenue to Horizon Drive Capitol Street Main Street to Hughes Avenue Resolution No. 2015-13 Page 2 Clearview Street Panorama Avenue to Horizon Drive Crown Road Main Street to Horizon Drive Gibraltar Road Roman Road to cul-de-sac Horizon Circle Main Street to Horizon Drive Horizon Drive 3rd Street to 53rd Avenue Hughes Avenue Panorama Avenue to Horizon Drive Panorama Avenue Main Street to 3rd Street Pilot Avenue Main Street to Roman Road Roman Road 49th Avenue to Panorama Avenue Topper Lane Horizon Drive to cul-de-sac Ventura Avenue Main Street to Horizon Drive 3.That the work be incorporated in the 2015 STREET REHABILITATION PROJECT NO. ST2015–01. 4.That the work be performed under this project may be performed under one or more contracts as may be deemed advisable upon receipt of bids. 5.That the Director of Public Works, James P. Kosluchar, P.E. is hereby designated as the engineer for this improvement. He shall oversee the preparation of plans, specifications and estimates of costs thereof for making of such improvements. 6.That final plans, specifications, and estimates are prepared by the Public Works Engineering Division and provided to the City Council as they are completed. 7.That the Engineering Division call for bids in order that project award and construction can be considered. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS th 9 DAY OF FEBRUARY, 2015 . __________________________ ATTESTED SCOTT J. LUND - MAYOR DEBRA A. SKOGEN - CITY CLERK