Loading...
PRE 2010 DOCSSUBJECT PER City of Fridley 184 8 AT THE TOP OF THE TWINS BUILDING PERMIT _ i CEIPT NO. ` ____-_ COMMUNITY DEVELOPMENT DIV. ~ r 1- PROTECTIVE INSPECTION SEC. 1 � 1 CITY HALL FRIDLEY 55432 '.J NUMBER REV. DATE PAGE OF APPROVED BY 612-571-3450 910-F15 5/29/86 JOB ADDRESS 1511 North Innsbruck Drive N.E. 1 LEGAL LOT NO. BLOCK TRACTOR ADDITION SEE ATTACHED DESCR. 1 11 Innsbruck Villages SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Darrel A. Farr Development Corp. 4600 Lake Road, Mpls. 55422 536-9936 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Same 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO. 6 USE OF BUILDING Townhouse & Garage 7 CLASS OF WORK ❑X NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Construct a 34' x 24' Townhouse and a 23' x 21' Garage with a 14' x 6' Deck 9 CHANGEOFUSEFROM TO STIPULATIONS Seed the lot recently graded on West Bavarian Pass just north of North Innsbruck Drive. Separate sewer and water services needed for each unit. Work with staff to provide the same landscaping (or better) than encountered before construction along west property lines (trees & foliage) WARNI� SEPARATEBefore digging call local utilities IRitVG ��`���= TELEPHONE -ELECTRIC -GAS Etc. ��1 HEATING, PLtlM13 fNG, � �i1r SQUIRED 6Y LACI SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SQ. FT. CU. FT. AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION I ISTALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $52,050 $ 26.03 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SACCHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRU ION OR TH PERF RMANCE OF CONSTRUCTION. $292,00 $475.00 PLAN CHECK FEE TOTALFEE 73.00 $866.03 SIGNATURE 6FgONTRACTOR OR AUTHORIZED AGENT (DATE) WHEN PROPERLY BLDG INSP VALIDATED THIS IS YOUR PERMIT nAT SIGNATURE OF OWNER 0F OWNER BUILDER)___ IDATEI NEW [ iU 1 ��y City of Fridley �C ffective 4/1/84 ADDN. [ l �R-1 AND R-2 V ALTER. [ Building Permit Application Construction Address: 1-:57-11AL SAA`�br`4�Gk Q Legal Description: Lai- / , B6clzbru k- lii! gsa" Owner Name s Address: �oaft"e.� 1a . �a1`r IJQS�@. i+o� Gor�aa _ % Tel. # Contractor: --;.-Tel. # Address: Mots, �iA. S`S�l12 LIVING AREA: GARAGE AREA: DECK AREA: OTHER Corner Lot ICI Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. DESCRIPTION OF IMPROVEMENT Length , Widthq Height l Sq. Ft. 1 Length _ Width .2 V Height Sq. Ft. 14 I'S'' Length_ Width 1 Hgt/Ground Sq. Ft. g�!_ t Inside Lot [ ] Ft. Yd. Setback _ Side Yard Setback J 8 r Type of Construction: tyoci ` �L Estimated Cost: $ .t Approx. Completion Date: "• U01�o�,t�� Alt. A Alt B Proposed Driveway Width If New Opening Is Desired: $ $ See Back Page for Explanation DATE: APPLICANT: Tel. # Permit Fee Plan Check State Surcharge SAC Charge Park Fee Sewer Main Charge TOTAL CITY USE ONLY $ 1�cw $ s'.00 $Al $ y�Sd� '' L, tI ice: Fee Schedule on Reverse Side 25% of Building Permit Fee $.50/$1,000 Valuation $425 per SAC Unit ' Fee Determined by Engineering Agreement Necessary [ ] Not Necessary [ STIPULATIONS: crm. ow _ k •. .��.� a J i Prow iZ��� "g �' ' 6c4+rc `e.si►a[E�rr� P f POv,'G 444 5� 645 ((W, i ( or 6e& ) e we g t4 N A 11m4 U2y t gybpt- � 11'4e,; (4,Be5 + 4 ii j e ✓�/f, /bS /3, .e`er � , ✓� / � GEOTECHNICAL ENGINEERING CORPORATION 1925 Oakcrest Avenue - Roseville, Minnesota 55113 - (612) 636-7744 Apple Valley, Minnesota - (612) 431-5266 REPORT OF SOIL TESTING °r PROJECT: REPORTED TO: PROPOSED TOWNHOUSE � �2— DARRELL A. FARR DEVELOPMENT INNSBRUCK VILLAGES 4600 LAKE ROAD BLOCK 11 MINNEAPOLIS, MINNESOTA 55422 FRIDLEY, MINNESOTA GEC JOB.NO: 4436 DATE: JULY 21, 1986 INTRODUCTION This report contains the results of soil testing that we performed at the referenced project. The soil testing included observing the base of exca- vations, conducting density tests in fill below proposed footings, and drilling hand auger borings and performing hand cone penetrometer probes in the base of the excavation. The soil testing was done at the request of Mr. Dan Farr. DESIGN INFORMATION We understand or assume that the proposed building: 1) will contain four single family residences; 2) will be two stories in height; 3) will have lowest floor levels at elevations as shown on the attached sketch (sketch #1); 4) will will have relatively light foundation loads (i.e. less than 1800 psf); 5) will have normal tolerance to settlement; 6) will be of con- ventional design and construction; 7) will be constructed in accordance with the U. S. Department of Housing and Urban Development (HUD) guide- lines, and 8) will be constructed in accordance with applicable building code requirements. Deviations from the above design information could necessitate altering our conclusions and recommendations. Elevations presented in this report are in reference to an iron which had been placed by others near the northeast building corner. The elevation of the iron, 877.2, was written on a lath alongside the iron. GEC #4436 - Page 2 SOIL TESTING At the time of our initial visit to the site on June 11, 1986, the peri- meter footings for the townhouse building had been dug and the footings for units 3 and 4 had been poured. The attached sketch (sketch #2) shows the approximate locations and elevations of the base of the excavation. Based on our observations of the sidewalls of the excavation and the soils exposed in the base, it was apparent that fill was present below some of the footings and floor slabs. The areas where fill was exposed in the base of the excavation are shown on the attached sketch (sketch #2). As requested by Mr. Dan Farr, we conducted four density tests on June 16, 1986, in fill which had previously been placed. The results of the density tests are attached. The locations at which the density tests were taken are shown on the attached sketch (sketch #2). Previously we had recommended that the fill be compacted to at least 95% of the standard Proctor density. Of the four density tests taken, the results of one test - #2 - was substantially less than 95%. Upon completion of the density tests, we discussed the results with Mr. Dan Farr. At that time, we recommended that because the density tests did not meet the compaction specifications, the existing fill should not be relied on for support of the proposed building. On June 20, we discussed two options with Mr. Farr. The options included: 1) excavate the existing fill from below and within the zone of influence of the proposed building, place controlled fill to attain grade, and construct the building on the controlled fill, or construct the footings on the underlying natural inorganic soils (i.e. lower the footings) and use extra reinforced slabs; or 2) do further testing to demonstrate that the existing fill is suitable for footing and slab support. GEOTECHNICAL ENGINEERING CORPORATION GEC #4436 - Page 3 Mr. Farr requested that we do further testing. Hereafter, we will refer to the further testing as Phase 2 of the testing program. Phase 2 included drilling 15 hand auger borings down through the fill and in to the underlying natural inorganic soils. In conjunction with drilling the hand auger borings, we conducted hand cone penetrometer probes (static cone tests) to evaluate the consistency or density of the fill. Refer to the attached sheets for information regarding hand auger borings and static cone tests. Also attached are sheets describing terminology used on the logs. The logs of the hand auger borings are attached. The locations of the hand auger borings are shown on the attached sketch (sketch #2). The fill encountered in the hand auger borings was basically inorganic. We did not encounter topsoil below the fill, which indicated the fill was placed in a controlled manner. Generally, the upper fill was softer than the lower fill. Based on the results of our testing and the design information, it is our opinion that the existing fill should provide adequate support for the pro- posed building. However, as discussed with Mr. Dan Farr on June 30, 1986, we recommended that prior to construction of any footings on the existing fill, all areas below footings, and within 1-1/2' of both sides, should be thoroughly compacted with a "jumping jack" type compactor. Upon completion of compaction, and before any footings are poured, the footing excavation should be probed with a hand cone penetrometer. If any soft pockets are present, such pockets will need to be subcut and refilled and compacted as they are filled. On July 14, 1986, Mr. Farr notified us that some of the footing trenches had been excavated deeper, and requested we observe the trench excavations. At that time, we went to the site. The footing trenches which had been excavated since our last visit to the site had all been taken down through the fill and into natural inorganic soils. The locations and the eleva- tions of the excavations as of July 14, 1986, are shown on the attached sketch (sketch #3). GEOTECHNICAL ENGINEERING CORPORATION GEC #4436 - Page 4 We discussed the results of our July 14 observations with Mr. Dan Farr that afternoon. We told him that all footing trenches excavated to date had been taken down through the fill and into natural inorganic soils. We also recommended that any interior footings which are to bear on the existing fill should be surface compacted with a jumping jack type compac- tor (directly below and 1-1/2' on both sides of the footing). Hand cone penetrometer probes should then be done to evaluate the fill. Alterna- tively, as discussed with Mr. Farr on June 20, the footings could be lowered onto the underlying natural inorganic soils. CLOSURE The following sheets are attached and constitute an integral part of this report: Logs of Soil Borings Test Boring & Logging Methods (2 sheets) Terminology on Boring Logs - Drilling, Sampling and Testing Terminology on Boring Logs - Groundwater Geologic Terminology Report of Density Tests Sketches (3) Report Prepared By: 4?:�" W.3 " harles W. Bisek Under the Supervision of: AfTcPendeFgast,P.E. MN Reg. No. 8450 GEOTECHNICAL ENGINEERING CORPORATION Vriv rviin�vAr. i■�Y■■��1.i.■1..�� ��f7rrflA6 ■rA GEC JOB NO: 4436 LOG OF BORING NO. 1 PROJECT: INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA DEPT{. IN SURFACE ELEVATION: 980.4FIELD N MPL REC. & LABORATORY TESTS MC DEN P q C FEET IDENTIFICATION GEOLOGY BPF TYPE 9 1/2 _ 11 1 - 6 11/2 - 14 2 _ FILL 9 21/2 16 3 - 16 31/2 - 16 GLACIAL 4 - — END OF BORIN TILL 13 41/2 - 5 - 51/2 - 6 - 61/2 - 7 - 71/2 _ 8 _ 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 4: HA DATE TIME SAMPLED DEPTH CANG0- DEPSITHCDEPTH AVE DRILLING. FLUID LEVEL WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG NonE taken BORING COMPLETED: 6/24/86 CC: CA: MZ Rig: 0% w'qpwwuul^Am !unlumw01uld camonnAvIAu GEC JOB NO. 4436 LOG OF BORING NO. 2 PROJECT. INNSBRUCK VILLAGE; BLOCK 11 FRIDLEY MINNESOTA DEPTH, 980.6 FIELD 3 LABORATORY TESTS MC DEN qc IN FEET SURFACE ELEVATION: IDENTIFICATION GEOLOGY BPF WB TYPE REC. PL 4 1/2 - 6 t - 9 11/2 - 6 2 _ FILL 16 21/2 10 3 - 8-16 31/2 - GLACIAL 16 4 TILL 16 16 41/2 - — END OF BORING 5 - 51/2 - 6 61/2 - 7 - 71/2 _ 8 - 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY 0- 4-1/2: FIA DATE TIME SAMPLED DEPTH CASING DEPTH CAVE-IN DEPTH DRILLING FLUID LEVEL WATER LEVEL None taken BORING6/24/86 COMPLETED: ON THIS LOG . CC: CA: MZ Rig: YiV GVt1A�VAr riAr�n����s�w �wmm 'wwmw■ wn GEC JOB NO: 4436 LOG OF BORING NO. 3 PROJECT: INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA DEPTH. SURFACE ELEVATION: 982.4 N WB MPL REC. FIELD 3 LABORATORY TESTS FEET I DENT I F I CAT ION GEOLOGY BPF TYPE MC DEN P L q C 6 1,2 _ 6 t - 6 11/2 - 7 2 _ FILL 9-13 21/2 _ 16 3 _ 16 31/2 _ 16 4 _ 16 4 8-16 5 _OtACIAt 16 TILL 51/2 - END OF BORING 13-16 6 - 61/2 - 7 - 71/2 _ 8 _ 81/2 - 9 - 91/2 - 10 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO O- 51 : HA DATE TIME DEPTH CASINGSAMPLED C AVE4N DEPTH DEPTH DRILLING FLUID LEVEL WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG NonE taken BORING6/24/86 COMPLETED: CC: CA: MZ Rig: GEOTECHNICAL ENGINEERING CORPORATION GEC JOB NO: 4436 LOG OF BORING NO. 4 INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA PROJECT: DEPTH, 9 981 •BPF FIELD 6 LABORATORY TESTS MC DEN PP q C IN FEET SURFACE ELEVATION: IDENTIFICATION GEOLOGY TYPE REC. 3 8 1 - 16 11/2 - 16 2 _ FILi- 5-8 21/2 _ 4-1 3 _ 16 31/ _ 16 4 _ 16 41/2 - 4-6 5 - 9 51/2 _ 10 6 _GtACIAE 16 61/2 - END OF BORING TILL 11-16 7 - 71/2 _ 8 _ 81/ - 9 - 91/2 - 10 - 101/ - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 61/2: FIA DATE TIME SAMPLED DEPTH ING DEPTH -INLLE DECAVEPTH FLUID EL WATER THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken BORING 6/24/86 COMPLETED: CC: CA: MZ Rig: GEOTECHNICAL ENOINEEmmu wulslawmmillum OEC JOB NO: 4436 LOG OF BORING NO. 5 PROJECT: INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA DEPT 9$1.3 N MPL FIELD 8 LABORATORY TESTS MC DEN q C FEET SURFACE ELEVATION: IDENTIFICATION GEOLOGY BPFWB TYPE REC. P.L. 5 1/2 - 3 1 - 6 11/2 - 7 FILL 16 2 _ 15 21/2 - 3 - 6 31/2 - 6 4 6 41/2 - 16 5 - 51/2 6 - 61/2 - 16 7 - 16 71h TILL 16 e END OF BORING 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMEN S NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF O- $: HA DATE TIME SAMPLED DEPTH CASING DEPTH I CAVE-IN DEPTH DRILLING FLUID LEyEL WATER LEVEL Ont rafren BORING TERMINOLOGY COMPLETED: ON THIS Loo MT CC: CA: Rig: ..� . ■ ��■�■��Qlw�t/A AAA w ��■w�■ u ww w %o own GEC JOB NO: 4436 LOO OF BORING NO. 6 PROJECT: INNSBRUCK VILLAGE; BLOCK 11 FRIDLEY MINNESOTA DEPTH, IN SURFACE ELEVATION: 980 • N WB MPL REC. FIELD 6 LABORATORY TESTS MC DEN L �' P.L. q C FEET I DENT 1 F I CATION GEOLOGY BPF TYPE 2 1/ - 4 1 - 4 11/ - 3 2 - FILL 4-16 21/ - 16 3 - .16 31/ - 10 4 _ 6 41/ _ 10 5 _ 10 51/2 — 6 7 61/2 - 9 7 - 9-16 71/2 - 16 8 16 END OF BORING 81/2 — 9 — 91/2 — 10 — 101/ — DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 8• HA DATE TIME SAMPLED DEPTH CASING DEPTH CAVE-INDRILLING DEPTH FLUID LEVEL WATER LEVEL _THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken BONG COMPLETED: 6/25/86 CC: CA: MZ Rig: A■ asSlV/% AAS llAIMMAa■ YGV I GVnnlVwr nnlms wrllr nw I own GEC JOB NO: 4436 LOGO F BORING NO. 7 PROJECT: INNSBRUCK VILLAGE; BLOCK 11 FRIDLEY MINNESOTA DEPTH,ql;j IN SURFACE ELEVATION: _ p N WB MPL REC. FIELD a LABORATORY TESTS MC DEN L �' P.L. q C FEET IDENTIFICATION GEOLOGY BPF TYPE 6 1/2 - 16 1 - 10 11/2 - 16 2 - FILL 8 21/2 - 6-12 3 _ 11-12 31/2 _ 4 - 16 41n _ 14 TILL 5 - 13-16 END OF BORING 51/2 - 6 - 61/2 - 7 - 71/2 _ 8 _ 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 5 • HA DATE TIME SAMPLED DEPTH ESPTH CAVE-IN EVPTH FLUID LEVEL ATER ,LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken BORING -COMPLETED: 6/25/86 PL CC: CA: MZ Rig: .■ r.afAmamww^ AAA A..... YCV CVEfA�vA� GOAV�n�in�nr wn nw■lvA GEC JOB NO: 4436 LOG OF BORING NO. 8 INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA PROJECT: DEPTH, IN SURFACE ELEVATION: 981 5 N WB MPL REC FIELD & LABORATORY TESTS MC DEN P L q C FEET IDENTIFICATION GEOLOGY BPF TYPE 4 1 rz - . 1 1 - 16 11/2 - 10 2 _ FILL 16 21/2 _ 16 3 _ 16 31/2 - 16 16 4 - 16 al/2 - 7-16 5 _ GLACIAL 51/2 _ TILL 16 16 6 - 61/2 END OF BORING 16 7 - 71/2 _ B _ 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENT NOTE: REFER TO 61/2: HA DATE TIME SAMPLED DEPTH -IN0- DEPTH CAVE PTH FLUID LLE EL 1LEVELR THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken BORING 6/25/86 COMPLETED: CC: CA: MZ Rig., ee� ■ filPdAfflfl"AYV^ wA® S AsmiA&m Q w 1 CGHNNU 16 CF+ WIMMr■n1nv vvn nw I own GEC JOB NO: 4436 LOG OF BORING NO. 9 PROJECT: INNSBRUCK VILLAGE; BLOCK 11 FRIDLEY MINN ESO A DEPTH, q81' 9 N MPL FIELD S LABORATORY TESTS IN FEET SURFACE ELEVATION: IDENTIFICATION GEOLOGY BPF TYPE REC. MC DEN LL P.L. q C 2 1/2 2 1 - 9 11/2 - 11 2 - FILL 16 21/2 11 3 - 11 31/2 _ 16 4 10-16 41/2 10-12 5 - 10 51/2 - 9 6 - GLACIAL TILL 61/2 - END OF BORING 16 7 - 71/2 - 8 - 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMEN S NOTE: REFER TO - 140 FiA DATE TIME SAMPLED DEPTH CASING DEPTH CAV DEPTH IN DRILLING FLU FD LEVEL WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken BORING6/25/86 COMPLETED: CC: CA: MZ Rig: wmwmwwum,■■w A ■ !&A0%0" WM0U/llk AAssAs A�wr■ r■ry ■ ivnn�vwr. �■��■..��.....� �W"W-wrsw ■ 5vn GEC JOB NO: 4436 LOG OF BORING NO. 10 PROJECT: INNSBRUCK VILLAGE• BLOCK 11 FRIDLEY, MINNESOTA DEPTH, SURFACE ELEVATION: 981.6 N MP FIELD S LABORATORY TESTS MC DEN LL P.L. q� FEET IDENTIFICATION GEOLOGY BPF Ws TYPE REC 4 to _ 1 3 - 5 11/2 - 16 2 - FILL 16 21/2 - 16 3 - 16 31/2 - 16 11 4 - 414 - 16 5 - 16 51/2 _ 9 6 - 16 GLACIAL 61/2 - TILL 16 16 7 - END OF BORING 71/2 _ 8 - 81/2 - 9 - 91/2 - 10 101/2 - DEPTFt 7 COLLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO DATE T e CASING CAVE-IN ING WATER DEPTH TH DEPTH FLUID LEVEL LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG 6/25/86 BORING ML COMPLETED: CC: CA: Rig: �■■.■■��■ ���w�ul�s�Vl� Il�AweAa��w.■ YGV GV�fA�VA�■ �iAY��rrr��� wwrwr%FrwA■0vn GEC JOB NO: 4436 LOO OF BORING NO. 11 PROJECT: INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA DEPTH, IN SURFACE ELEVATION: 978.6 6 N W13MPL REC. FIELD & LABORATORY TESTS MC DEN LL- q FEET IDEM 1 F I CAT I ON GEOLOGY BPF TYPE 12 11 _ 11 1 _ 10 11/2 - 9 2 - FILL 21/2 _ 16 3 _ -12 311 - 8 4 5 411 _ 5 GLACIAL 5 TILL 16 ND OF BORING 51/2 - 6 - 61/2 - 7 - 71, _ 8 _ 81/2 - 9 - 91/2 _ 10 - 1011 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 5: HA DATE TIMESAMPLED DEPTH CASING D PTH DEPTH VN DRILLING FLUID LEVEL WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken BORNG COMPLETED: 6/25/86 CC: CA: MZ Rig: wuwuwwuuw A ■ AIMPffiwu YiV iV�7A�VAr inM��rr.�s�M wvrllrvf7A ■ §VA GEC JOB NO: 4436 LOQ OF BORING NO. PROJECT: INNSBRUCK VILLAGE• BLOCK DEPTH, SURFACE ELEVATION Q77. �' N MPL REC. FIELD � LABORATORY TESTS MC DEN P.L. q G FEET IDENTIFICATION QEOLOQY BPF TYPE 1/2 - 13 1 - 16 11/2 - 9 2 - FILL 10 21/2 - 9 3 _ 9 31/2 - 9 4 16 41h - END OF BORIN 16 5 - 51/2 - 6 - 61/2 - 7 - 71/2 _ 8 _ 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 41,�2 • HA DATE TIME SAMPLED DEPTH ING DESPTH CAVE-IN DEPTH DRILLING FLUID LEVEL WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOQ None taken BORING COMPLETED: CC: CA: Rig: w=w�wuu■w A ■ euAft■umismul! AAssws a�wIL■ Miv ivnn■vw� �.■�r■■..�...■..■... w■.rerW%w■ ■vn OEC JOB NO: 4436 LOG OF BORING NO. 13 PROJECT: INNSBRUCK VILLAGE; BLOCK 11, FRIDLEY, MINNESOTA DEPTH, 977 � 6 SURFACE ELEVATION:N WB SAMPLE REC, FIELD 3 LABORATORY TESTS MC DEN LL QC FEET IDENTIFICATION GEOLOGY BPF TYPE 4 112_ 6 11/2 - 16 2 _ FILL 10 21/2 - 11 3 - 11 31/2 - 16. a 16 a1 _ /2 16 GLACIAL TILL 5 END OF BORING 16 51/2 - 6 - 61/2 - . 7 - 71/2 _ 8 _ 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO 0- 5: HA DATE TIME SAMPLED DEPTH CASING DEPTH CAVE-IN DEPTH DRILLING FLU FD Lr&j WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF ON THIS LOO None taken BORING 6/25/86 COMPLETED:TERMINOLOGY CC: CA: MZ Rig: YiV � iVffA�Ywr r.�v�w`��.�r■ wr�rvnw■ SVA OEC JOB NO: 4436 LOG OF BORING NO. 14 PROJECT: INNSBRUCK VILLAGE; BLOCK 11 FRIDLEY MINNESOTA DEPTH. IN SURFACE ELEVATION: 977 - N WB PL REC FIELD & LABORATORY TESTS I MC DEN L' � P.L. qC FEET IDENTIFICATION GEOLOGY BPF TYPE 12 1 6 9 11/2 - FILL 13 2 - 10 21/2 - 11 3 - 11 31/2 - 11 4 - GLACIAL 16 41/2 - TILL 16 5 - END OF BORING 51/2 - 6 - 61/2 - 7 - 71/2 - 8 _ 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO _ DATE TIME SAMPLED DEPTH CASING DEPTH CAVE-IN DEPTH DRILLING FLUID LEVEL WATER LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken COMPLETED: 6/26/86 CC: CA: MZ Rig: I I I I I GROTECMNICAL ENIGINEERINO CORPORATION GEC JOB NO: 4436 LOO OF BORING NO. 15 PROJECT: INNSBRUCK VILLAGE• BLOCK 1.1 FRIDLEY MINNESOTA DEPTH, IN SURFACE ELEVATION: 977 � 7 N WB PL REC FIELD & LABORATORY TESTS L' L FEET IDENTIFICATION GEOLOGY BPF TYPE MC DEN P.L. q C 9 1/2 - 9 t - 11 11/2 - 14 2 - FILL 10 21/2 - 16 3 - 16 31/2 - 16• 4 16 --GLACITL 41h - `ND OF BORING TILL 16 5 - 51/2 - 6 - 61/2 - 7 - 71/2 _ 8 - 81/2 - 9 - 91/2 - 10 - 101/2 - DEPTH DRILLING METHOD WATER LEVEL MEASUREMENTS NOTE: REFER TO DATE TIME SAMPLED DEPTH CASING I CAVE-IN DEPTH DEPTH DRILLINGATER FLUM LEVEL LEVEL THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOG None taken COMPLETED: 6/26/86 CC: CA: MZ Rig: TEST BORING AND LOGGING METHODS STANDARD PENETRATION - SPLIT SPOON TEST A 1-3/8" ID, 2" OD steel sampling tube is driven into the soils with a 140 -pound hammer falling 30". The number of hammer blows required to drive the sampler 11, after an initial set of 1/2', is the standard penetration resistance ("N" value). The bore hole is advanced between sampling intervals with flight auger, hollow stem auger, casing, or by rotary drilling with drilling fluid. AUGER BORINGS Auger borings are drilled by hand or with a power -driven auger. The hand auger method consists of drilling the auger into the soil in increments of approximately 4", then retracting the auger and observing the material re- covered. This allows almost continuous observation of the soil'profile. Two procedures are available in drilling power auger borings: "spinning" and "pulling." - In the spinning procedure, the auger is drilled into the 'ground in incre- ments of 5', or less. The auger is then spun rapidly. Soil "rides up" the flights of the auger to the ground surface, where samples are taken. In general, this method results in reasonably accurate identification of the soil profile above the groundwater table, but it can be very misleading - particularly in sandy and gravelly soils - below the water table. - In the pulling procedure, the auger is drilled into the ground and then withdrawn to above the ground surface. The general soili profile can be observed, and samples of materials adhering to the auger are taken. In general, this method is considered to be a little more accurate than the spinning method in soil above the groundwater table, and considerably more accurate than the spinning method in soil below the groundwater table. THIN-WALLED TUBE SAMPLES Relatively undisturbed samples are taken with thin-walled tubes. The tube is pushed into the soil and retracted with the soil sample inside the tube. STATIC CONE TESTS The static cone test consists of measuring the force required'to push a steel cone penetrometer into soil. The cone is pushed at a rate of approximately 1/2" per second. The static cone bearing pressure, qc, is the total1 load divided by the projected end area of the cone. Cone diameters available are 1-3/411, 2-1/411, and 3". The apex angle is 60% A hand cone penetrometer is often used in conjunction with hand auger borings. It has a 30° apex angle and a projected end area of 0.5 square inches. 8/85 GEOTECHNICAL ENGINEERING CORPORATION CORING Coring is done with a diamond or carbide bit on a double -tubed barrel. LOGGING Both factual data and interpretive information is included on boring logs. In general, the information on the righthand side and the bottom of a log is considered to be essentially factual data. In the "Identification" and "Geology" columns, the intent is to portray the soil profile, or stratigraphy, based on interpretation of available,data. Since the information shown is interpretive, it is subject to error. The accuracy of the information shown is controlled by the type and amount of data available. In general, there are three basic categories of information shown: 1) the soil identification, or "classification" of materials; 2) geologic identification of the soils; and 3) the depths of the contacts between soil layers. Determination of the depth to contacts between soil layers is arrived at by taking into consideration the action of the drill tools and the appearance of materials recovered. On a given boring log, contacts shown with solid and dashed lines are used to indicate higher and lower accuracy, respectively. In general, the entire soil profile is not observed or sampled., Consequently, indicated depths of contacts may be incorrect, and some materials or layers may be undetected in a boring and may not be indicated on a boring log. Boulders and other large objects generally are not recovered from test borings. This is due to limitations on the size of particles that can be recovered. Though there may be no specific reference to such materials on boring logs or in a report, they may be present in the ground. This is particularly applicable to deposits such as coarse alluvium, uncontrolled fill, glacial till, outwash, tumblerock, and weathered bedrock. Typewritten logs are prepared based on field logs. A field log may contain in- terpretive information - such as notes regarding unusual drilling conditions - which is not indicated on the typewritten log. 8/85 1 GEOTECHNICAL ENGINEERING CORPORATION A,B,N,H: AC: CA: CAS: CC: CONS: COT: DEN: DM: FA: HA: HSA: HYD: LL: MC: N: PAP: PL: qp: qc: qu: RD: REC: REV: SA: SS: TW: VANE: WASH: TERMINOLOGY ON BORING LOGS: DRILLING, SAMPLING, AND ESTIN NOTATION (Refer to attached sheets for additional information.) Size casing or core. At completion of boring. Crew Assistant. Casing. Crew Chief. One dimensional consolidation test. Clean-out tube. Dry density, pounds/cubic foot. Drilling mud fluid. Flight auger, power driven. P -pull; S -spin. Hand auger. Hollow stem auger. Hydrometer analysis. Liquid limit. Moisture Content, percent of dry weight. Standard penetration test, penetration resistance, or N value, in blows/foot (unless otherwise noted). Paper plug. Plastic limit. Pocket penetrometer strength, tons/square foot. Static cone bearing pressure, tons/square foot. Unconfined compressive strength, tons/square foot. Rotary drilling, using drilling fluid and a cone-typelroller bit. In split spoon and thin wall tube sampling, the length of sample recovered, in inches. In rock coring, the length of core recovered as a percentage of the total core run. Revert drilling fluid. Sieve analysis. Standard split spoon sampler. Steel. 1-3/8" inside diam., 2" outside diam. Thin-walled tube sampler. Vane shear strength, tons/square foot. L - Laboratory; F - Field. Sample of coarser -grained material from rotary drilli g fluid. Obtained by screening the returning fluid or with a split spoo� sampler at the bottom of the bore hole. WAT: Water. WB: Describes whether the sample appears to be waterbearing. WH: Sampler advanced by static weight of drill rod and 140 lb. hammer. WR: Sampler advanced by static weight of AW size drill rod. -200: Amount of material finer than #200 sieve, per cent. V : Water level symbol. Note: The size of equipment is indicated by a number preceding the descriptive term. For example, 2-1/2 CAS represents 2-1/2" diameter casing. GEOLOGIC TERMINOLOGY The geologic description indicates the apparent depositional origin or stratigraphic name. Geologic identification is interpretive and subject to error. General categories of geologic deposits, and descriptive information is as follows: ALLUVIUM COARSE ALLUVIUM: Sandy (and gravelly). Stratified. Deposited from fast moving waters in streams, rivers, and deltas. FINE ALLUVIUM: Clayey and/or silty. Stratified. Deposited from slow moving waters in streams and rivers. BEDROCK Wide range of characteristics: from hlard, dense, consolidated rock; to soft, compressible; and uncon- solidated soil -like material. FILL CONTROLLED: Compact, uniform material; inorganic; no debris. UNCONTROLLED: Loose or variable density. Mixture of soil types. Often contains debris and organic material. GLACIAL TILL Normally contains a wide range of grain sizes, from boulders through clay. Usually non -stratified. Deposited directly from glaciers. LAKE DEPOSITS Clayey. Laminated. Deposited from very slow moving waters in ponds and lakes. LOESS Silty. Non -stratified. Upper layer. Deposited from wind. OUTWASH Coarse alluvium deposited from glacial meltwaters. SLOPE WASH Organic and/or inorganic material washed from slopes and redeposited. SWAMP DEPOSITS Peat, muck, and marl. Formed through accumulation of organic material under water. TOPSOIL Contains both inorganic and organic material. Upper, black layer of soil. Formed by weathering of in- organic soil and accumulation of organic material. TUMBLEROCK Dominantly gravel, boulders and rock slabs. Deposited from gravity flow down hills or cliffs. WEATHERED BEDROCK Bedrock which has been substantially weathered through disintegration or decomposition. Texture and composi- tion grades into bedrock. WEATHERED SOIL Texture, composition, and position is intermediate between topsoil and non -weathered soil. GEOTECHNICAL ENGINEERING CORPORATION 12/85 TERMINOLOGY ON BORING LOGS GROUNDWATER Groundwater information is shown on boring logs: 1) under "Water Level Measurements" and 2) in the "WB" column. Information under Water Level Measurements includes: - The depth to the water level (or drilling fluid, if used) and the depth to the bottom of the hole (cave-in). Water level and cave-in measurements are taken with a weighted measuring tape. If free-standing water is not encountered in the hole, the term wet, or dry, is indicated under "Water Level." This means that the soil adhering to the end of the measuring tape did, or did not, respectively, appear to be saturated. - The depth sampled and the depth of casing (or hollow -§tem auger) for measurements made during the progress of the boring. Date and time of measurements. Notation in the WB (waterbearing) column describes whether soil samples appear to be waterbearing or saturated. "Y" means yes, "N" means no, and "?" means questionable or indefinite. Frozen soil which has thawed appears saturated. This may account for an iso- lated "Y" symbol near the top of the WB column on a boring log. Determination of the depth to the groundwater table is an interpretive process. The determination is based on various factors, including: water level measure- ments, the presence and type of drilling fluid, the appearancelof samples, sub- surface conditions, site conditions, and weather conditions. The water level symbol, 1, in the WB column indicates the apparent depth to the groundwater table at the bore hole. The accuracy of the indicated depth to the groundwater table can be quite variable. The water level symbol with an arrow pointed downward (or upward) indicates that the water level is,at or below (or above) the level indicated. Absence of the water level symbol does not necessarily mean groundwater was not encountered, or that the water table or piezometric surface was not penetrated. The presence of groundwater in the soil and the level of the g'roundwater table can change with time. The information in the WB column is based on observations and measurements made at the time the boring was drilled and the water level measurements were taken. 3/86 1 GEOTECHNICAL ENGINEERING CORPORATION GEOTECHNICAL ENGINEERING CORPIORATION 1925 Oakcrest Avenue • Roseville, Minnesota 55113 a (612) 636-7744 7373 - 147th Street West a Apple Valley, Minnesota 55124 a (612) 431-5266 REPORT OF DENSITY TESTS PROJECT, REPORTED TOt PROPOSED TOWNHOUSE DARRELL A. FARR DE ELOPMENT INNSBRUCK VILLAGES 4600 LAKE ROAD BLOCK 11 MINNEAPOLIS, MINNESOTA 55422 FRIDLEY, MINNESOTA GEC JOB NO, 4436 COPIES TOt DATE, JULY 21, 1986 REPORT NOt 4416-1 FIELD DENSITY TEST DATA Date oct Laion Eley. DDry Molls. MT Percent Nc.No. Compaction Remarks 1 6/16/86 See attached sketch. 975 100.0 22.4 3 2 95 2 6/16/86 See attached sketch. 976-1/2 97.0 19.7 3 90 3 6/16/86 See attached sketch. 974-3/4 106.8 17.4 3 1 100-1/2 4 6/16/86 See attached sketch. 979-1/4 110.8 17.4 4 105 *Proctor #1 = Method C; Proctor #2 = Method A Method: Sand Cone (ASTM D1556) _X_; Nuclear (ASTM 02922) ; Balloon (ASTM D2167) LABORATORY MOISTURE -DENSITY RELATIONS OF SOILS IPROCTORI Soil 08p t. Mole. Max. Dry No. Description Go ent Depaifty 1 Sandy clay, brown, with a trace of gravel, (CL) 1 e0 108.0 2 Sandy clay, brown, (CL) 18.8 105.5 Procedure & Method, Standard (ASTM D696)_. -;Method mit, ;Modified (ASTM D1557)..�.—. GEOTECHNICAL ENGINEERING CORPORATION To protect the eddnuee, the pubUc, and ourselves, This reperl land all supporting intmade otiar is provided for the addressee's own use. No representations are made to parties other than th• addnasee. GEC Job No. 4436 BLOCK NO. 1 2 97yG� 9'7�i � 3 � 3 /ND/V/DUAL wr BASEMENT SLAB ELEVAT AND EXTERIOR GRADES SONS SKETCH #1 GEOTECHNICAL ENGINEERING CORP. 1925 Oakcrest Avenue 7373 W. 147th Street Roseville, MN 55113 Apple Valley, MN 55124 (612) 636-7744 (612) 431.5266 SHEET NO. 1 OF 2 , .-D rawn& BY CWB DATE 7/11/86 _ CHECKED BY DATE SCALE NnnP P&D m2ml Nies ft. Wnn. Mm 0101. J ` GEOTECHNICAL ENGINEERING CORP. 1925 Oakcrest Avenue 7373 W. 147th Street Roseville, MN 55113 Apple Valley, MN 55124 (612) 636.7744 (612) 431.5266 SHEET NO. 2 Of 2 Drawn .,BY CWB DATE — CHECKED SY DATE 7117186 None SCALE "MW M1NCi,9 6c. WIR Wp U41L � c[t@ct/se aoq. 1. 19111 CITY OF FRIDLEY APPLICATION FOR POWER PUNTS AND HEATING, CODLING, VENTILATION, REFRIGERATION AND AIR CONDITIONING SYSTEMS AND DEVICES RATE SQIEDULE MUSIDENTIAL Furnace Shell and Duct Work, Burner (Also replacement furnace) Gas Piping )piping meaded with new furnace) Gas Range Gas Dry" RATE TOTAL Job Address $ 20.00 $ 10.00 $ 10.00 $ 10.00 a Air Conditioning (all rises) $ 10.00 All Others/Repairs and Alterations 11 of Value of Appliance or Work CO!ltERCIAL/INDUSTRIAL 11 of Value of Appliance or Work State Surcharge Reinspection Fee ($15.00) Rough insp. Date Final Insp. l - 1� - Date Approval for Permit 44 HINIHUM FEE FOR ANY HEATING PERMIT IS $10.00 PWS $.So STATE SURCHARGE 1511 N. Innsbrook Dr. $ 20.00 Department of Buildinga. ball University Ave. N.t.. Fridley. HN 55432 City of Fridley $ 10.00 Tel. 1571-3450 S The undersigned hereby naked application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Bods $ and rulings of the Onwrt,rent of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. $ 10.00 Fridley. Rinn.Sept. 5, 1986 Farr Development S S $ .50 S 40.50 s Attach stack verification tots with replacsent furnace permits *Air Conditioners can not br placed in Keds yard without written permission from adjoining neighbor. OWNER f rame RIND or BUILDING USED AS residential To BE COMPLETED ABOUT ESTIMATED cast 3200.00 BLD - NEW BUILDING PERMIT MD. PERMIT 00. DESCRIPTION Or EUMA[NBUIMER HEATING or POWER PLANTS. Steam, Not Water. Wats Air- No. ,Frade %. Carrier slae m,, 58GS075 Capacity Sq. Ft. MR ITU y� HP Total Connected load Rind of Mel gas BURNER - Trade Name Sia@ No. Capacity Sq. Ft. WR BTU NP Dependable Htg. & Air Company Signed By" 757-5040 Tel. No. HEAT OSS CALCULAT Customer Name - City Dealer Nang EPE nivel t: HEATINIM ,a_ Street rGONDIT . City ION ° TEMP. DIFF.. Wi *ws and Doors—Crackage and Ara 3 Ila 23-2 y�737 No W'dth Height No. of Lin..l h. Ane of rve of sive Lights of are" q. h. No Width Height No. of Lin.el It. Are of one of pone L hit of crack p. h. 00 2 a Coef. Btu Infiltration o 3 Coef. I Btu Infiltration m? Net exp. wall 471 3 Glass Ceilings' 3 300 F loaf _Glass Exp. wall Exp. wall 00 Net exp. will Net exp. wall 6 61 i Int. wall Int. wall Ceiling Ceiling o0 3 ace Floor Total Btu. 12L _R aF1.1 fJ Room Length Width 5- Height 8 Windows and Doors—Crackage and Ara 3 Ila 23-2 y�737 No W'dth Height No. of Lin..l h. Ane of rve of sive Lights of are" q. h. ENT ('_ 00 2 a Coef. Btu Infiltration o 3 Glace _ Exp. wall L 'Sto Net exp. wall A Int. wall Ceilings' 3 300 F loaf _Glass Exp. wall Total Btu. i j L r Room I Length %v Width /o Height Windows and Doors—Crackage and Ara 3 Ila 23-2 y�737 N. W�A/h Height No. of Line.l h. Area of rwn• n1 "ne l n of arch eq. h. ENT ('_ 00 2 a Coal. Btu Infiltration o 3 Glass _ Exp. wall L 'Sto Net exp. wall A Int. wall Ceiling 00 3 300 Floor _Glass Exp. wall Total Btu. I 500 Type Construction - Windows Storm Sash Walls . Ins. Ceiling Ins. Flow F I. V/ /lY Room I Length _DV Width o b Height B Windows and Doors—Craduge and Ara 3 Ila 23-2 y�737 Width N.IgM No. of Lineal ft. At" No, of of M Limit" of Week p• h• ENT ('_ 00 2 a CoM. Btu Infiltration o 3 coef.1 Btu Infiltration Exp. wall L 'Sto Net exp. wall A Glace Ceiling G? _Glass Exp. wall S Net exp. will a SL i Int. wall Ceiling o S Floor Total Btu. 1 / 32 ::) F I.I FJ) Room I Lenath J5— Width /a Height e Windows and Doors—Crm*age and Ara a 3CJPJ q sea No. Width Night No. of Lineal h. Ano of M M no Lash" of crwa . N. 00 2 CoM. Btu Infiltration o 3 Coef. Btu Infiltration Exp. wall L 'Sto Net exp. wall /® 'VeRb Glace Ceiling G? Exp. wall I-V I. Net exp. wall /?3 /✓ �� Int. wall Ceiling o S Floor Total Btu. I F1.1 Room I L a Width /,8 ~t S Windows and Doors—Cradcage and Ara I a 3CJPJ q sea Nn. of Pam 'eight Pam No. o eifwal h. Annf crwk 111- 00 2 CoM. Btu Infiltration o 3 Glass /� Exp. wall Net exp. wall /® 'VeRb Int. wall Ceiling Floor Total Btu. It _59,410 CITY OF FRIDLEY APPLICATION FOR PLUMBING AND GAS FITTING PERMIT RATE SCHEDULE PLUMBING FIXTURE RATES: NO. RATE y New Fixtures T y Future Fixtures q $ 3.50 U Old Opening, New Fixture X T $ Mater m e V .a Blow Off Basin a $ 5.00 N a ra $ 5.00 m 4 M LL $ 5.00 $ Hydraulic Valve Heater S 5.00 d C $ 5.00 $ star Treating Appliance CZ~ua$O3C4u 00u $ Hot Mater Heater $ 5.00 Gas Range $ 10.00 $ Gan Dryer O a $ ALL OTHERS AND/OR REPAIRS AND ALTERATIONS °•Ci t Appliance g State Surcharge $ .50 Reinspection Pea $ ($15.00) b FEE w o wa U4 4162 o as lec lot 2nd 3rd 4th (R) 0 Future Connection Opening Connected with Sewer M - New Fixture, Old Opening Nater RATE SCHEDULE PLUMBING FIXTURE RATES: NO. RATE TOTAL New Fixtures $ 5.00 $ Future Fixtures $ 3.50 $ Old Opening, New Fixture $ 1.50 $ Beer Dispenser $ 4.00 $ Blow Off Basin $ 5.00 $ Catch Basin $ 5.00 $ Rain Nater Leader $ 5.00 $ Hydraulic Valve S 5.00 $ :Sump or Receiving Tank $ 5.00 $ star Treating Appliance $ 7.00 $ Hot Mater Heater _� $ 5.00 $ j QQ Gas Range $ 10.00 $ Gan Dryer $ 10.00 $ ALL OTHERS AND/OR REPAIRS AND ALTERATIONS 1% of Value of Fixture or Appliance $ State Surcharge $ .50 Reinspection Pea $ ($15.00) TOTAL FEE t[tective Aug. 1, lyai Job Address Department of Buildings City of Fridley Tel. 1571-3450 The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct j� / Fridley, Mn. 9 - OWNER _�Jac_r re- l A, P rr 049 UBOdbe'A"10 - Cav A9> KIND OF BUILDING USED AS TO BE COMPLETED ABOUT ESTIMATED COST OLD - NEN BUILDING PERMIT NO. PERMIT NO. Company A1114 Oki �D � =7n c . Signed By �iggZK ®'+.Tc - Tel. No. `f Z � - Z J Z ROUGH INSP. Date FINAL INSP. ?, — ;L — 0 7 Date APPROVAL FOR PERMIT 4i MINIHU4 FF:E FOR ANY PLUMBING, PERMIT IS $10.00 PLUS THE $.50 STATE SURCHARGE FF CIZYOF FRIDLEY CIVIC CENTER • 6431 UNIVERSITY AVE. N.E. FRIDLEY. MINNESOTA 55432 • PHONE (612) 571-3450 August 25, 1986 Daniel Farr Farr Development Corporation 4600 Lake Road Avenue Robbinsdale, MN 55422 RE: Townhouse under construction at .15��-Nort-h-.Inn-shrunk=-Dr_; Prior to issuance of the building permit for the above site we discussed the need to provide landscaping to replace that which was taken out and also to provide adequate screening for the area. Please submit a plan describing what plantings have been removed and if any others need to be taken out (I understand there may be dead trees that have to be removed), and what you propose to plant at the site to replace the lost plantings and to provide proper screening. Please respond by September 4, 1986. Sincerely, Ric Wiersma Code Enforcement Ww / lmn G-86-387 September 26, 1986 Dave Emery Innsbruck Village Assoc. Pres. 5633 W. Bavarian Pass Fridley, MN 55432 Dear Dave: There seems to be a concern regarding the tree line located behind the townhouse on N. Innsbruck Drive. We have talked about it in the past but there seems to be other residents worried enough about it that they have called the city about it. When I talked to the city, I told them that I had been in contact with you or. this matter, and that you didn't really care what happened to the trees. I told the city we would keep as many tress as possible as long as they didn't in- terfere with the decks. In my estimation, any trees within 8 feet of the actual building or withing 2 - 3 feet of the decks would have to be knocked down so they didn't overhang onto the decks. ._ I hope this will be acceptable to those residents that are concerned about the trees. . Sincerely, DARREL A. FARR DEVELOPMENT CORP. DANIEL J. FARR Project Coordinator DJF:seg C, C. 0—Q.°c�.� D �' "RREL A. rARR zvaopmmr COR, TELEPHONE 612/536-9936 4600 LAKE ROAD MINNEAPOLIS, MINNESOTA 55422 �s Cf[YOF FRIDLEY CIVIC CENTER - 6431 UNIVERSITY AVE. N.E. FRIDLEY, MINNESOTA 55432 - PHONE (612) 571-3450 January 9, 1987 Darrel Farr Development Corp. 4600 Lake Road Robbinsdale, M1 55422 Re: Final Inspection at 1511 North Innsbruck Drive N.E., Fridley Dear Sirs: A final inspection was conducted on January 8, 1987 of the above address and the following items were noted which must be completed before the structure can be" finaled: 1. Provide post support for back door landing by January 26, 1987. 2. Provide handrails on both garage steps and inside stairs by January 26, 1987. 3. Provide guardrail on inside stair by January 26, 1987, 4. Secure patio door on upper deck until permanent deck supports are provided, by January 26, 1987. 5. Provide and secure sump basket cover by January 26; 1987, 6. Provide cover for outside sewer clean-out by January 26, 19.87. We will expect the above items to be completed by the scheduled date when a reinspection will be conducted to determine compliance. If you have any questions on these items, please feel free to contact me at 571-3450. Sincerely, DARREL G. CLARK Chief Building Official DGC/mh CI7YOF FRIDLEY CIVIC CENTER - 6.431 UNIVERSITY AVE. N.E. FRIDLEY, MINNESOTA 55432 - PHONE (612) 571-3450 April 27, 1987 Mr. Dan Farr Darrel Farr Development Corp, 4600 Lake Road Robbinsdale, MN 55422 / Re: Final Inspections on 1511,✓ and 5462 Meister Road N.E. Dear Mr. Farr: 1513, 1515, 1517 North Innsbruck Drive N.E. Final inspections were conducted on April 24, 1987 of the above addresses and it was noted that the buildings are complete and the construction has been finaled. The buildings are approved for occupancy. If you have any questions on this matter, please feel free to contact me at 571-3450. Sincerely, A .,,W Z DA G. CLARK Chief Building Official DGC/mh City of Fridley SuB.IECT HstAWT NO. '? 4 9 ;? 9 AT THE TOP OF THE TWINS BUILDING PER MIT( N 'EIPT � • COMMUNITY DEVELOPMENT DIV. r PROTECTIVE INSPECTION SEC 1 r fl f "1 CITY HALL FRIDLEY 55432 NUMBER REV DATE PAGE OF APPROVED By 612-571-3450 910415 3/28/97 JOB ADDRESS See Below - Multiple Buildings 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO Columbus Exteriors Inc 2131 111 In, Coon Rapids MN 55433 868-9195 3509 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 6 USE OF BUILDING Townhouse Buildings 7 CLASS OF WORK C.; NEW C] ADDITION = ALTERATION REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Reside 11 Buildings 9 CHANGE OF USE FROM TO STIPULATIONS Install building wrap and have inspection of same unless manufacturer's specifications state it is not required. 5600,5602,5604,5606 North Innsbruck Ct;(-15-1-1)1513,1515,1517 North Innsbruck Dr; 1510,1512,1514,1516 Trapp Ct; 1531,1533,1535,1537 Trapp Ct; 1511,1513,1515,1517 Trapp Ct; 5610,5612,5614,5616 W Bavarian Pass; 5621,5623,5625,5627 W Bavarian Pass; 5631,5633,5635,5637 W Bavarian Pass; 5651,5653,5655,5657 W Bavarian Pass; 5680, 5682,5684,5686 West Bavarian Pass; 5691,5693,5695,5697 West Bavarian Pass SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, TYPE OF CONST OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING THISPERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO FT CU FT AUT,ORIZED IS NOT COMMENCED WITHIN 60 DAYS. .OR IF CONSTRUCTION OR VvORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED NO DWLG UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED @@ WITH WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT $232,000 $116.00 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PRO:;SIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STQ_�TION OR THE PERFORMANCE OF CONSTRUCTION $1,547.25 Fire SC $232.00 PLAN CHECK FEE TOTAL FEE p'� . I Lie SC/$ 5 $1,900.25 H N P ERLY V IDA'. ED THIS IS YOUR PERMIT _.. ----- '--- --- -_..--��- — - �7 DATE, iDG °.o ;<rf I suejEcr City of Fridley F12;- AT THE TOP OF THE TWINS BUILDING PERMIT R T NO. COMMUNITY DEVELOPMENT DIV. r PROTECTIVE INSPECTION SEC. ZS4 I � NUMBER REV DATE PAGE OF APPROVED BY CITY HALL FRIDLEY 55432 � L 612-571-3450 910415 11/16198 JOB ADDRESS 1511 North Innsbruck Drive NE 1 LEGAL LOT NO. BLOCK TRACTOR ADDITION SEE ATTACHED DESCR. 1 1 11 Innsbruck Villages SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Jon Kittels 574-2119 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO Owner a ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 6 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW O ADDITION O ALTERATION jk REP IR O MOVE O REMOVE B DESCRIBE WORK Construct 24' x 6'10" deck 9 CHANGEOFUSEFROM TO STIPULATIONS See notations on plan. TYP OF CONST. OCC FANCY GROUP OCCUPANCYLOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT CU FT. AUTHORIZED IS NOT COMMENCED WITHIN ED DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. ' NO DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION ISTAL S GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $2188 $1.09 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR THE PERFORMANCE OF CONSTRUCTION $74.75 Fire SC $2,.18 %' PLAN CHECK FEE AL FEE 7$78. 0 yy��s��_ SIG OUR OF cR/aG7pwORAUTMOR4EDeGENT �OArEr PR ERLY TED THIS I OUR PERMIT 00 `� S,GNATURE OF OWNERoF OWNER BWLDERi iDATE, BIOG SP gA1E NEW [s ] Effective 1/1/98 ADDN [ ] CITY OF FRIDLEY ALTER [ ] SINGLE FAMILY AND DUPLEXES R-1 AND R-2 BUILDING PERMIT APPLICATION 7 ConstructionAddress: /,5-// Z14'tll Legal Description: Owner Name &Address: Tc) jrTel. # Contractor: MN LICENSE# Address: Tel. # Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it tol scale. LIVING AREA: GARAGE AREA: DECK AREA: OTHER: DESCRIPTION OF IMPROVEMENT' Length Width Height Length Width Height Length _ Width (o CLla Hgt/Gr�und Sq. Ft. Sq. Ft. Sq. Ft.� .% Aft Construction Type: l ,ca:r4 jAj1y,,yd Estimated Cost: $� (Fee Schedule on Back) Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $ DATE: E -;Z 7-119 APPLICANT: &® v`. I-eTTds®, Tel. # TOTAL $ 7., 0Y - STIPULATIONS: CITY USE ONLY Permit Fee $ .7S Fee Schedule on Reverse Side Fire Surcharge $ .24 .001 of Permit Valuation (1/10th%) State Surcharge $ $.50/$1,000 Valuation SAC Charge $ $1000 per SAC Unit License Surcharge $ $5.00 (State Licensed Residential Contractors) Driveway Escrow $ Alt. "A" or Alt. "B" Above Erosion Control $ $450.00 Conservation Plan Review Park Fee $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [ ] Not Necessary [ ] TOTAL $ 7., 0Y - STIPULATIONS: sueJEtr RMIT NO. City of Fridley 30745 AT THE TOP OF THE TWINS BUILDING PERMIT NO. COMMUNITY DEVELOPMENT DIV. PROTECTIVE INSPECTION SEC. 1#01�1 CITY HALL FRIDLEY 55432 NUMBER REV DATE PAGE OF APPROVED BY L J\ 612-571-3450 910415 3/17/00 JOB ADDRESS 1511, 1513, 1515, 1517 North Innsbruck Drive NE 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DEscR. 3 11 1 Innsbruck Villages SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO Stock Roofing Inc 3840 205 In, Anoka MN 55303 213-1455 3112 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 8 USE OF BUILDING Residential Townhouse Garage 7 CLASS OF WORK O NEW O ADDITION O ALTERATION] REPAIR O MOVE O REMOVE 8 DESCRIBE WORK Reroof Garage Building (20 Sq) Tear -off 9 CHANGE OF USE FROM TO STIPULATIONS SEPARATE PERMITS ARE REOUIRED FOR ELECTRICAL, PLUMBING. HEATING, TYPE OF CONST, OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT CU FT. AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $1,748 $.87 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR TH NCE OF CONSTRUCTION $63.15 Fire SC $1.75 a`) PLAN CHECK FEE TOTALFEE `�-�`S L nse SC $5 -OR $70.77 SIGNATURE OF CON TRACTOR OR AUTHORIZED AGENT [DATE, PROP VALIDATED THIS IS YOUR ERMIT A )WHEN BLDG IN v DAT S-GNATURE OF OWNEROF OWNER BUILDERI IDATEi NEW [ I Effective 1/1/2000 ADDN [ j CITY OF FRIDLEY (763) 572-3604 Bldg Insp� ALTER [ ] SINGLE FAMILY AND DUPLEXES R-1 AND R-2 BUILDING PERMIT APPLICATION �\ ��- r Construction Address: _ i S /. 3 - / Si7 a s J�ae c� per. Legal Description: Owner Name & Address: _ Tel. # Contractor.Sj1v� �og� i �C MN LICENSE # 311P- Address: 311ZAddress: 3��y z as �`:Z.v f'%.�-o,F,V s Sao _? Tel. # 6 /Z d/3- /ySS Attach to this application, a Certificate of Survey of.the CITY USE ONLY - Permit Fee Fire Surcharge State Surcharge SAC Charge License Surcharge Driveway Escrow Erosion Control Park Fee Call (763) 572-3604 for Permit Fees If mailing in application $ • �� Fee Schedule on Reverse Side $ �� %S� .001 of Permit Valuation (1/10th%) $ $.50/$1,000 Valuation $ ' $1100 per SAC Unit 66 $5.00 (State Licensed Residential Contractors) "A" or Alt. "B" Above $450.00 Conservation Plan Review $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [ ] Not Necessary [ ] TOTAL STIPULATIONS: lot, with the proposed construction drawn on it to scale. DESCRIPTION OF IMPROVEMENT LIVING AREA: Length Width Height Sq. Ft GARAGE AREA: Length Width Height Sq. Ft DECK AREA: Length Wd , Hgt/Gr. nd Sq. Ft OTHER: i O �O Construction Type: Estimated Cost. Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $ DATE: 3 " S' APPLICANT: Tel. # CITY USE ONLY - Permit Fee Fire Surcharge State Surcharge SAC Charge License Surcharge Driveway Escrow Erosion Control Park Fee Call (763) 572-3604 for Permit Fees If mailing in application $ • �� Fee Schedule on Reverse Side $ �� %S� .001 of Permit Valuation (1/10th%) $ $.50/$1,000 Valuation $ ' $1100 per SAC Unit 66 $5.00 (State Licensed Residential Contractors) "A" or Alt. "B" Above $450.00 Conservation Plan Review $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [ ] Not Necessary [ ] TOTAL STIPULATIONS: CITY OF FRIDLEY PERMIT N6.::::2004-01977 6431 UNIVERSITY AVENUE NE FRIDLEY, MN 55432 DATE ISSUED: 10/26/2004 572-36U4 YAX: (763) 571-1287 ADDRESS : 1511 N INNSBRUCK DR NE PIN : 243024410195 R or)6 8 3 LEGAL DESC : INNSBRUCK VILLAGES : LOT 1 BLOCK 11 PERMIT TYPE : BUILDING PROPERTY TYPE : MULTI DWELL CONSTRUCTION TYPE : ROOFING VALUATION : $ 21,739.00 NOTE: INSTALL PER MANUFACTU_RERS�SPE�WICATIO�NS. UNDERLAYMENT PER STATE BUILDING CODE. REROOF BUILDING WHICH INCLUDES 1511, 1513, 1515 AND 1517 NORTH INNSBRUCK DRIVE. STATE LICENSED CONTRACTOR 1 APPLICANT ALLSTAR CONSTRUCTION 840173 AVE N STE 80 BROOKLYN PARK, MN 55428- JZl GASSEN MGMT CO. 9 AGREEMENT AND SWORN STATEMENT This permit becomes null and void if work or construction authorized is not commenced witin 60 days or if construction or work is suspended or abandoned for a period of 120 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of worl will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulai% constriction or the performance of construction. BUILDING PERMIT FEE 349.25 FIRE SURCHARGE 21.74 STATE SURCHARGE, VALUE 10.87 LICENSE SURCHARGE 5.00 TOTAL 386.86 PAID WITH CHECK # 65625 Bldg Insp) Dat4 4 %i --) I / - ' ~ SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. NEW [ ] CITY OF FRIDLEY Effective 4/1/2004 ADDN [ ] 6431 University Ave NE, Fridley, MN 55432 (763) 572-3604 Bldg Insp ALTER SINGLE FAMILY AND DUPLEXES R-1 AND R-2 (763) 571-1287 Fax BUILDING PERMIT APPLICATION �- Construction Address: Legal Description: Owner Name & Address: UA9�6Q MANAc,�eAAVer - rM f�d /etc- 6ASSe� Tel. # Q'557!5 Contractor: 8I5 av— ConS4Ruciwfl IA -c- MN LICENSE# Address 801 31ZA AlUe- d 2 -M ClZ Tet. # -76,3 55-5-17-166 Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. DESCRIPTION OF IMPROVEMENT LIVING AREA: Length Width Height Sq. Ft. GARAGE AREA: Length Width Height Sq. Ft DECK AREA: Length Width / Hgt/Ground Sq. Ft. OTHER: ReP-001= E50lLbjA& 6�/��J�iL Construction Type: Estimated Cost: $ V -75'7— Driveway 3`7— Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $ DATE:/0/05/04 APPLIC&5� '�� , i��� ��% Tel. # 70535-M) Call (763) 572-3604 for Permit Fees if mailing in application. Fax to 763-571-1287 if using credit card and we will call you for card number. Permit Fee Plan Review Fire Surcharge State Surcharge SAC Charge License Surcharge Curb Cut Escrow Erosion Control Park Fee Sewer Main Charge TOTAL CITY USE ONLY - $�� Fee Schedule on Reverse Side $ �65% of Permit Fee .001 of Permit Valuation (1/10th%) $ /� �� $.50/$1,000 Valuation $ $1350 per SAC Unit $ . 00 $5.00 (State Licensed Residential Contractors) $ Alt. "A" or Alt. "B" Above $ $450.00 Conservation Plan Review $ Fee Determined by Engineering $ Agreement Necessary [ ] Not Necessary [ ] $ '366.8 � STIPULATIONS: Building MECHANICAL Permit No.: 67� Inspections RESIDENTIAL APPLICATION Received By: 763-572-3604 CITY OF FRIDLEY Date R�'eQ ' 3 0 2 DATE �'��' UR E-MAIL ADDRESS SITE ADDRESS J5II = S � THIS APPLICANT IS: ❑ OWNER @e05N_ TRACTOR PROPERTY NAME: JMA). OWNER/ //��55�7 ADDRESS: �. I)S !4 ITY / ? STATE ZIPS7dh TENANT PHONE: CONTRACTOR COMPANY NAME: SUBMIT A COPY OF CONTACT PERSON:r� D Fj EXP DATE l' f1 C 7 YOUR STATE LICENSE WITH STATE LICENSE # / a ADDRESS:• CITY S STATENd IP 7 APPLICATION PHONE �// FAX PERMIT TYPE US GLE FAMILY ❑ TWO FAMILY ❑ TOWNHOUSE TYPE OF WORK: ❑ NEW EPLACEMENT ❑ ALTERATION/REMODEL DETAILED DESCRIPTION OF WORK > `? 2 041,II1 W 41 &Alb• PER MS 16B.665 the permit fee is a minimum of $15.00 or 5% of the total cost up to $500.00, whichever is greater, for the improvement, installation or replacement of a residential fixture, excluding the fixtures. (This should reflect only the cost of labor ) Labor cost under $300 = $15.00. Labor cost between $300 to $500 = cost of labor x.05 = FOR PROJECTS WHERE LABOR EXCEEDS $500, FEES ARE BASED ON $10.00 PER FIXTURE, EXCEPT WHERE NOTED. FIXTURES: (INDICATE TOTAL NUMBER OF EACH BELOW) Equipment Installed MFG: /o/ r? MODEL:�� �� SIZEIBTU MFG: MODEL: SIZEBTU / MFG: MODEL: SIZEIBTU '✓ A/C $25.00 FIREPLACE (GAS) $15.00 _GAS RANGE/OVEN $10.00 AIR TO AIR EXCHANGEER $15 PLACE (WOOD) $35.00 _NEW GAS GRILL $10.00 $35.00 10 FURNACE $35.00 _GAS UNIT HTR $10.00 _BOILER LINER $10.00 DRYER $10.00 _POOL HEATER $35.00 _CHIMNEY _GAS DUCT WORK $10.00 PIPING $10.00 VENTILATOR $15.00 _GAS _ .- E.:.. ._,... ._ Number of fixtures @ $10.00 x $10.00 = $ Permit Fee $ Surcharge $ .50 Number of fixtures @ $15.00 x $15.00 = $ TOTAL DUE $ Number of fixtures @ $25.00 x $25.00 = $— Number of fixtures @ $35.00 �_ x $35.00 = $ State Surcharge = $ 50 Total = $ THIS IS AN APPLICATION FOR A PERMIT-NOT VALID UNTIL PROCESSED I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Fridley and with the Minnesota Construction Codes; that 1 understand this is not a permit but only an application for a permit and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of all Hp which r uir s rev'e'w Pd approval of plans. /r A)aA DATE�� �! SIGNATURE OF APPLICANT G�� PRINT NAME I. r City of Fridley Building Inspections Department 6431 University Avenue NE, Fridley, MN 55432 763-572-3604 FAX: 763-502-4977 07 City of Fridley Residential Mechanical Application Page 2 REQUIRED INFORMATION NEEDED TO PROCESS PERMIT RESIDENTIAL PERMIT APPLICATION HVAC 0 NEW HOMES/ADDITIONS XEXISTING HOME ❑ MAKE-UP AIR REQUIRED FOR NEW/EXISTING HOMES 1. Combustion Air (See note below) a. Oil or solid fuel IMC Chapter 7 with MN Amendments b. Natural Gas or Propane/IFGC Chapter 3 with MN Amendments 2. Make-up Air (See note below) a. IMC Chapter 5 with MN Amendments 3. Venting a. Gas appliances IFGC Chapter 5 with MN Amendments b. Fuel other than gas IMC Chapter 8 with MN Amendments REQUIRED FOR NEW HOMES 4. Heat loss & cooling load per room a. Required on new construction IMC 1346.0312 5. Ventilation a. Per MN Energy Code 7670 or 7672 6. Duct Design Per IMC 1346.0603.2 a. ACCA Manual D NOTE: Centerpoint Energy Mechanical Code Guidelines software may be used for combustion and make-up air calculations. Building MECHANICAL Permit No.: + 515 Inspections RESIDENTIAL APPLICATION Received By: 763-572-3604 CITY OF FRIDLEY Da 'd 763-502-4977 FAX EFFECTIVE 1-1-08 DATE t O YOUR E-MAIL ADDRESS SITE ADDRESS 157/1- 6P r••E. THIS APPLICANT IS: ❑ OWNER CONTRACTOR PROPERTY OWNER/ NAME: r ; �..,, • n ADDRESS: �S"/I blr�k or- CITY r"i'4!& STATE�ZIP 5'54/3 TENANT X 23 PHONE: 7G-2- S 7/ —.13 2 3 CONTRACTOR COMPANY NAME: CONTACT PERSONHba Ei NOTE: SEPARATE CITY _ STATE LICENSE # Ucense 20512060 EXP DATE LICENSES ARE REQUIRED FOR GAS AND HVAC. 2700 N. Rdrview • DRESS: Rose0e, MH 55113 CITY STATE ZIP 6511103-21561 SUBMIT COPY OF BOND PHONE FAX AND INSURANCE PERMIT TYPE ❑ SINGLE FAMILY ❑ TWO FAMILY PdOWNHOUSE TYPE OF WORK: NEW ❑ REPLACEMENT ❑ ALTERATION/REMODEL DETAILED DESCRIPTION OF WORK 1 n s w (� GAwt F' < < < G % n Se / W �G �S •t - PER MS 1613.665 the permit fee is a minimum of $15.00 or 5% of the total cost up to $500.00, whichever is greater, for the improvement, installation or replacement of a residential fixture, excluding the fixtures. (This should reflect only the cost of labor ) OR Labor cost under $300 = $15.00. Labor cost between $300 to $500 = cost of labor x .05 = FOR PROJECTS WHERE LABOR EXCEEDS $50 , FEES ARE BASED ON $10.00 PER FIXTURE, EXCEPT WHERE NOTED. FIXTURES: (INDICATE TOTAL NUMBER OF EACH BELO �� Installed MFG: ca �1 10 MODEL: (3 -.�' N SIZE/BTU Equipment ,��_ MFG: MODEL: SIZEBTU MFG: MODEL: SIZEBTU $25.00 FIREPLACE (GAS) $15.00 _GAS RANGEIOVEN $10.00 _A/C TO AIR EXCHANGEER $15 (WOOD) $35.00 _NEW GAS GRILL $10.00 _AIR _FIREPLACE $35.00 $35.00 _GAS UNIT HTR $10.00 _BOILER _FURNACE LINER $10.00 DRYER $10.00 _POOL HEATER $35.00 _CHIMNEY _GAS WORK $10.00 GAS PIPING $10.00 _VENTILATOR $15.00 _DUCT ,dry^ Permit Fee $ Number of fixtures @ $10.00 x $10.00 = $ Surcharge $ .50 Number of fixtures @ $15.00 x $15.00 = $�s _ TOTAL DUE $ 7-l) OR Number of fixtures @ $25.00 x $25.00 = $ Number of fixtures @ $35.00 x $35.00 = $ State Surcharge = $ .50 MINIMUM $15.50 MINIMUM $15.50 Total = $ - THIS IS AN APPLICATION FOR A PERMIT -NOT VALID UNTIL PROCESSED I hereby apply for a mechanical permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Fridley and with the Minnesota Construc 'on Cod4; that I understand this is not a permit but only an application for a permit and work is not to start without a permit; that the work will be in accor ance with dx1pprove plan in the case of all work which requires review and approval of plans. SIGNATURE OF APPLICAN PRINT NAME tdi n�i s �l� L� D % APPROVED BY J�0 � Zoe __ .. e3� . ...... ....:. ,.... .� x...... ,.., .J.`.,..... `., wrr . ,„ City of Fridley Building Inspections Department 6431 University Avenue NE, Fridley, MN 55432 763-572-3604 FAX: 763-502-4977 City of Fridley Residential Mechanical Application Page 2 REQUIRED INFORMATION NEEDED TO PROCESS PERMIT RESIDENTIAL PERMIT. APPLICATION HVAC ❑ NEW HOMES/ADDITIONS ❑ EXISTING HOME ❑ MAKE-UP AIR �rt9 ,ea rstserrA of SMOH X4 rlflsi . We" is Ahs®H swamil pwit, tY89�t80S ,.: REQUIRED FOR NEW/EXISTING HOMES ' er ei! 14 i8q '� vA�:. eP��� � sowee��< 1. Combustion Air (See note below) a. Oil or solid fuel IMC Chapter 7 with MN Amendments b. Natural Gas or Propane/IFGC Chapter 3 with MN Amendments 2. Make-up Air (See note below) a. IMC Chapter 5 with MN Amendments 3: Venting a. Gas appliances IFGC Chapter 5 with MN Amendments b. Fuel other than gas IMC Chapter 8 with MN Amendments REQUIRED FOR NEW HOMES 4. Heat loss & cooling load per room a. Required on new construction IMC 1346.0312 5. Ventilation a. Per MN Energy Code 7670 or 7672 6. Duct Design Per IMC 1346.0603.2 a. ACCA Manual D NOTE: Centerpoint Energy Mechanical Code Guidelines software may be used for combustion and make-up air calculations.