PRE 2010 DOCS9917
City of Fridley, Minn_ � 0
6431 University Ave. N.E., Minneapolis, Minn. 55432
BUILDING PERMIT
'Date: May 4, 1972
Viewcon, Inc. Same
Owner:- .Builder
Address - 5901 Brook1 yn 21vd . Address Same
LOCATION OF BUILDING
No. 1547 Stmt North Oberlin Circle part of Lot
Lot 2 Block 2 3 Addition or Sub -Division Innsbruck North
Corner Lot Inside Lot % . Setback __ Sideyard
Sewer Elevation
Foundation Elevation
DESCRIPTION OF BUILDING
To be Used as: 1240
Townhouse Front 20' Depth 31' Height ._ 28' Sq. It 620 Cu. Ft 17,360
Garage Font 20' Depth 22' Height 10' Sq. Ft. 440 cu. Ft. 4400
Type of Construction Wood Frame Est. Cost 21,417.80 To be Completed 10/1/72
Stipulations:
1. Developer$ agrees he will supply all the mAterials noted in the letter
written by the City Engineer dated 2®22/72 by May 30, 1972.
2.1 Sande as indicated on foundation permit.
In consideration of the issuance to me of a permit to construct bjdl.;� a b above, I agree to do
the proposed work in accordance with the description above set fo and p e►e l py�ith all provisions of
Ordinances of the city of Fridley. I / I M
In consideration of the a 41.00 Viewcon Inc.
p yment of a fee of $ , permit is hereby granted to
to construct the building or addition as described above. This permit is granted
the express condition that the person to whom it is granted and his agents, employees and workmen, in all work
done in, around and upon said building, or any part thereof, shall conform in all respects -to the ordinances of
Fridley, Minnesota regarding location, construction, alteration, maintenance, repair and moving of buildiage
oV1tWnnanthe
. city limits and this permit may be revoked at any time upon violation of any of the provisions of &aid
NASIM QURRE`S I c
Building Inspector
NOTICE:
This permit does not cover the construction, installation for wiring, plumbing, gas heating, sewer or water. Be sun to see
the Building Inspector for separate permits for these items.
r
APPLICATION FOR RESIDENTIAL, ALTERATION,
OR ADDITION BUILDING PERMIT
CITY OF FRIDLEY, MINNESOTA
OWNER'S NAME:- BUILDER:
ADDRESS • OADDRESS : b p
NO:. /"2 STREET: M -t -k) M tj-P 1 111"AI)
LOT: BLOCK: 1-9 ADDITION : -Jyk-,AQ -1 k -f Q e 1) dnj
T
CORNER LOT: INSIDE LOT: S_SETBACK: SIDEYARD:
Applicant attach to this form Two Certificates of Survey of Lot and proposed
building location drawn on these Certificates.
DESCRIPTION OF BUILDING
To Be Used As:
/n-tx 9-,1) ki_o-��Front : CJ 'f Depth: ,,31 1 Height: 018
1.240
Square Feet: lo020 Cubic Feet: /17,300
Front: r d Depth: .,2oZ Height: /O
Square Feet; W0 Cubic Feet:
Type of Construction: ?e d LjA Estimated Cost:_ $
To Be Completed:
The undersigned hereby makes application for a permit for the work herein
specified, agreeing to do all work in stfict accordance with the City of
Fridley Ordinances and rulings of the Department of Buildings, and hereby
declares that all the facts and representations stated in this application
are true and correct.
DATE: IV �r1�✓1 L��Z— SIGNATURE
(See Reverse Side For Additional Information.)
M /)0 0020
11)11)46
- a�� yS3 1993ao
sr �! /�79MJ0 1,9v2go 199,3a0 y 8 d
ficate of Survey for VIEWCON
INU*
-20p0-
-25,p0-
20.0 I y I I
.240
LZ O O
200
M b ► I �i � I
Z4.0 a
O
20.0 4
1 f G-)
20.0
U
No,eTN
_ ---- r'- -24.00
00-
OBER�IN
N , '
wofe7 iron monumen f
C)PCL E
U
Application for Power Phuft and Hookg. Cooling. Yeeeikdons Re�jer�otloe and J
Air Conditioning Systems and Device:
PARTIAL RATE SCHEDULE
GRAVITY WARM AIH: RATE TOTAL
Furnace Shell & Duct Work .......... .. $10.00 $
Replacement of Furnace 6.00 $
Repairs & Alterations—up to =500.00 6.00 $__
Repairs & Alterations each add. $500.00 3.00 $—__.
MECIL WARM AIA
Furnace Shell & Duct Work to 120,000 BTU ... .... ..$10.00
each add. 60,000 BTU .................... 3.00 ;
Replacement of Furnace 6.00 $
Repairs & Alterations --up to $500.00 6.00 $
Repairs & Alterations each add. $500.00 &00 $
STEAM or HOT WATER SYSTEM
Furnace Shell & Lines—to 400 sq. ft. EDR Steam $10.00 $.
Furnace Shell & Line—to 640 sq. ft. EDR Hot Water 10.00 $_
Each add. 200 sq. ft. EDR Steam 3.00
Each add. 320 sq. ft. EDR Hot Water 3.00
OIL BURNER—to 3 gal. per hour 6,00 $ —
over 3 gal. per hour—See Fee Schedule
GAS BURNER cup to 199,000 BTU) 8,00 $
over 199,000 BTU See Fes Schedule
GAS FITTING FEES: NO RATE TOTAL
1st 3 Fixtures x$ 200 $ �p
Additional Fixtures x .76 $
Gas Range to 199.000 a$ 6.00 $
AIR C019DITIONI3Ia
FAN HEATING SYSTEM
VENTILATING SYSTEM
ALTERATIONS & REPAIRS
ROUGH
FMAL d' .
a
Be* Fes I I • OL -b
TOTAL FEE
(SURCHARGE
Dept. of Mdg& Phos. 90-3480
t
City of Fridley:
The undersigned hereby makes application for a permit for the work herein
specified, agreeing to do all work in strict accordance with the City Ordinance:
and ruling of the Department of Buildings, and hereby declares that all the facts
and representations stated in this application are true and correct.
Fridley, Minn- X� /_T_ 19 ZL-
Owner _U
Kind of Building
Used as _ . ___ ... _
To be completed about
gra
Estimated Cost,
Old—New. Building Permit No. Permit No.
OESCAI PTiON OF WORK
HEATING or POWER PLANTS --Steam, Hot Water, Warn Air—No /
Trade Name
G_ s0 Sin Ne_ �i'!J -�9 f�
1
Uhl
Capacity 0 (/ Sq. Ft. E.D.R BTUH.P
Total Connected Load MW of Fue o
BURNER — Trade Name Size No
Capaci Sq. Ft. E.D-1t- BTU
1ffil!
(REMARKS -OVER)
i
6431 UNIVERSITY AVENUE N.E., FRIDLEY, MINNESOTA 56432
TELEPHONE ( 612)671-3450
September 1, 1977
Ms. Louisa H. Richardson
1547 North Oberlin Circle N.E.
Fridley, Mn. 55432
Re: Bath Tub Drain Leak
Dear Ms. Richardson:
The purpose of this correspondence is to document pertinent dates and
recent observations with reference to the above problem.
The building permit was issued for the structure in May of 1972.
The plumbing final was made on the 7th of June, 1973.
On Friday, August 26, 1977, the City Plumbing Inspector was notified of a
possible problem with the tub drain. On August 30, 1977, Mr. Sandin, the
Plumbing Inspector, and I made a field inspection.of the premises and
observed apparent water damage to the dining room ceiling and found that
the gasket on the tub overflow was not sealed against the tub. It was
also determined that the tub drain was leaking at one of its connections.
These are the cause of the water leaking down into the room located below.
The City has no way of determining when the leak started, therefore we
can not order the plumber to correct the faulty drain.
It is our hope and desire that you and your builder can work out the
solution to your problem.
y.
DARREL G. CLARK
Community Development Adm.
DGC/mh
CC: Mr. Jim London
Darrel Farr Development Corp.
" 56-73-52 CITY OF FRIDLEY
APPLICATION FOR PLIJMBING AND GAS FITTING PERMIT
RATE SCHEDULE
PLUMBING FIXTURE RATES:
NO.
RATE
e
New Fixtures
$
r
m
a
g
U
S
w
a
$
Nater
d
o
m
.+
e
•+
$
e
$
w
h
c
.a ro
m
5.00
m
N
a ►.
.i
4
q
w
5.00
$
Heater
Rain Water Leader
$
5.00
$
.1
-
C
$
8
uAR�
$
"g
$
d
$
7.00
$
Hot Water Heater
$
S
g
Gas Range
$
10.00
g
Gas Dryer
g
�s
g
10.00
W
u
D
o�
A
a
�i
o �°.
w
w
u m°
. s
3
Reinspection fee $
chi
o
As
let
($15.00)
TOTAL FEE
$
10.50
Con
as
Dr
e -r
let
2nd
3rd
4th
(R) - Future connection Opening
Connected with Sever
(') - New Fixture, Old Opening
Water
RATE SCHEDULE
PLUMBING FIXTURE RATES:
NO.
RATE
TOTAL
New Fixtures
$
5.00
$
Future Fixtures
g
3.50
S
Old Opening, Nov Fixture
$
1.50
$
Beet Dispenser
$
4.00
$
Blow off Basin
$
5.00
$
Catch Basin
$
5.00
$
Rain Water Leader
$
5.00
$
Hydraulic Valve
$
5.00
$
Sump or Receiving Tank
$
5.00
$
Water Treating Appliance
$
7.00
$
Hot Water Heater
$
5.00
g
Gas Range
$
10.00
g
Gas Dryer
g
10.00
g
10.00
ALL OTHERS AND/OR REPAIRS AND ALTERATIONS
1% of Value of Fixture or
Appliance
g
State Surcharge
S
.50
Reinspection fee $
($15.00)
TOTAL FEE
$
10.50
EtteCtlVe Aug, 1, lydl
Job Address 1547 Oberlin Cir N®Zh(
Department of Buildings
City of Fridley
Tel. /571-3450
The undersigned hereby makes application for a permit for the work herein
specified agreeing to do all work in strict accordance with the City Codes
and rulings of the Department of Buildings, and hereby declares that all
the facts and representations stated in this application are true and correct.
Fridley, Nn. 23 Nov 87 l9
OWNER Doug Hanson
KIND OF BUILDING Fr
USED AS
res
TO BE COMPLETED ABOUT same -
ESTIMATED COST 3001
OLD 10IIfOi BUILDING PERMIT NO.— PERMIT NO.
Signed By
Tel. No.
ROUGH INSP.
Date
FINAL INSP.
Date
APPROVAL FOR PERMIT �%+'`
Minnegasco #342-5337
700 W. Linden Avenue
p. 0. Box 1165
Minneapolis, MN 55440-1165
M NIIU14 FEE FOR ANY PLUMBING PERMIT IS $10.00
PLUS THE $.50 ST4TE SURCHAHGE
DATE:
TO:
FROM:
SUBJECT:
Community Development Department
PLANNING DIVISION
City of Fridley
November 19, 1993
William Burns, City Manager
aZa'rbara Dacy, Community Development Director
Innsbruck Townhome Roof Repair
I have reviewed Monica Weinert's.letter of November 8, 1993, with
Tom Blazina. We are not aware of the circumstances around the
cancelled contract between Gittleman Construction and the
Homeowners' Association. Tom had worked extensively with Gittleman
regarding code requirements for the roof repair. It was Tom's
understanding that Gittleman was agreeable: and cooperative to
install the new roofs in compliance with the code.
The roof repair needed on the buildings is extensive. Repairs have
occurred over the years by different contractors and, in some
cases, without the appropriate permits (see attached memo dated
September 13, 1993).
Please contact me if you need further information.
BD:ls
M-93-688
A
Community Development Department
PLANNING DIVISION
City of Fridley
DATE: September 13, 1993
TO: William Burns, City Manager
FROM: Barbara Dacy, Community Development Director
Tom Blazina, Chief Building Official
SUBJECT: Innsbruck Townhome Association Roof Repairs
The Innsbruck Townhome Association has advised its residents of the
need to re -roof five of eight four-plex buildings. Upon submission
of building permit applications, the contractor arranged for a
meeting with the Building Official and a roofing products
distributor to review the problems and provide long term solutions.
Field review of the roofs revealed problems such. as flashing, loose
seams, improper fastening methods, product deterioration, improper
penetrations, installation compatibility problems with adjacent
roofing materials, and more.
Review of our card address file, the construction documents
submitted for the original building permit and discussions with
individual owners revealed that all of the roofs have been re -
roofed without the benefit of a building permit, inspections, and
concern for compatibility with adjacent roofing materials.
Only eight of the four-plexes on East Bavarian Drive have roof
slopes of 2 -in -12 or less. Units further south of the proposed re -
roof four-plexes are constructed with 4 -in -12 slopes, which greatly
enhances the design performance of the four-plexes.
Tom Blazina is working with the roofing contractor and Mel
Gittleman, who represents the management company hired by the
Homeowner's Association. Tom has taken photographs of the roofing
problems/conditions for future verification.
This is brought to the City Council's attention for information
purposes only.
BD/dn
M-93-522
Nov moo
8 November 1993
Councilman Dennis Schneider
CITY OF FRIDLEY
6431 University Avenue N.E.
Fridley, MN 55432
Mr. Tom Blazina,
Building Inspector
CITY OF FRIDLEY
6431 University Avenue N.E.
Fridley, MN 55432
Dear Councilman Schneider and Mr. Blazina:
I reside at the Innsbruck North Townhomes in Fridley where the
townhome association has dictated and assessed a rigorous
repair/repainting project of the whole townhome area which began
this fall. Due to the circumstance that the current management
company - Gittleman Construction/Management Services - has
prematurely terminated its contract with the Innsbruck North
Townhome Association, the residences have no written assurances
that the work started this fall will be completed next spring.,
1994.
I am enclosing a copy of a letter that I am sending to the
Innsbruck North Townhome Association Board of Directors and to
Melvin C. Gittleman of Gittleman Construction/Management Services
outlining the work and related issues that have yet to be resolved
regarding this large project.and to apprise you of this situation
that has come up in a large development in the City of Fridley.
If I can provide you with any further information regarding this
issue, please feel free to contact me at work: 574-4447. Thank
you.
Sincerely,
OXWWA -- -
Monica J. ienert
1547 North Oberlin Circle
Fridley, MN 55432
Enclosure
8 November 1993
Ms. Toni DeMuse
Mr. Perry Peterson
Ms. Cathy Ostazeski
Mr. Bob Baker
Ms. Jan Poels
Mr. Merle Grimmer
Mr. Dean Enrooth
Board of Directors
Innsbruck North
Townhome Association
Fridley, MN 55432
Mr. Melvin C. Gittleman
Gittleman Construction/
Management Services
1920 Northwestern Financial Center
7900 Xerxes South
Minneapolis, MN 55431
Dear Board Members and Melvin C. Gittleman:
I am writing to inform you that due to the recent, unexpected
termination of agreement by the management company, Gittleman
Construction/Management Services, hired by the Innsbruck North
Townhome Association, I will not be making the second half of my
special assessment payment for repairs/painting on my townhome
unit. I made the first half of my special assessment payment on
October 9, 1993 in..the amount of $1,252.84 in good faith that the
scheduled repairs/painting on my townhome would be completed.
Since these repairs/painting will not be completed by the November
15, 1993.=due date, for the second half_. of, the special assessment
payment and are supposedly to be carried over into Spring, 1994,
and since the management company, Gittleman Construction/Management
Services, who oversaw the origination of these repairs/ painting,
will not be around to complete the task they started, I have no
written assurances that the repair/painting work will be completed
next year. The work yet to be completed is as follows:
1. Renailing was not done as is plainly visible in my courtyard
area.
2. I have paint shading/runoff on my townhome unit and garage
which is indicative of the fact that the paint was applied too
late in the season and that it rained right after it was
applied.
3. My front step platform off of my sliding glass door was not
painted.
4. I have a second story window painted shut (facing Innsbruck
Parkway) which I cannot free and cannot get to since I do not
have a ladder that will reach (and neither does Innsbruck
North Townhome Association).
5. I have paint splatters along the sides of my new screen door
in the courtyard.
Board of Directors-INTA/Melvin C. Gittlemen
8 November 1993
Page 2
6. My courtyard gutters are already peeling. I feel that I
should have been given some advance notice of the intended
painting date so that I would have been able to prepare those
surfaces by sanding.
7. My brand new garage service door needs to be repainted.
Mittelstaedt Painting painted the service door while it was
shut leaving a nice white border all around the new door.
Again, had I been given some advance notice of the intended
painting date, I could have made arrangements to be home so as
to unlock the service door.
8. The front door on my townhome unit, which is in the courtyard
area, has yet to be painted. _.
9. The window well areas need painting, since it is obvious they
were painted during the last painting and I have a distinct
line where the new and old paint end and begin.
10. Parts of the bottom of my fence in the courtyard were •not
painted.
11. Wherever caulking was done, the paint is cracking and the
white caulk is showing through.
12. All my windows need to be repainted to get the edges. Again,
had I been given some advance notice of the intended painting
date, I could have made arrangements to be home so as to open
the windows for painting.
13. My courtyard gate is not completely painted.
In addition to the work yet to be completed, the following issues
have yet to be resolved:
1. The cost of painting a middle townhome unit vs. painting an
end townhome unit. My townhome is a middle unit, it has less
exterior square footage, and should not cost the same to paint
as an end unit; particularly, since the end units have paid
more for painting in the past.
2. Materials/labor of repairs shared by myself and my neighboring
townhome unit (1543 North Oberlin Circle) were done by another
contracting firm hired by the 1543 North Oberlin Circle
townhome unit owner. We were both charged, again (double
charged), by Gittleman Construction/Management Services for
repairs they did not make.
Board of Directors-INTA/Melvin C. Gittleman
8 November 1993
Page 3
3. I am still waiting for a logical explanation as to why my
other neighboring unit (1551 North.Oberlin Circle), who had at
least twice the amount of work done on their townhome unit as
I did, was charged about the same for labor as I was. I was
charged 32 hours and they were charged 34 hours. (Reference
the October 1, 1993 invoice from Gittleman Construction
Corporation for carpenter work and bid proposals from
Mittelstaedt Painting Co. information sent to myself with
copies to Toni DeMuse, President, Board of Directors,
Innsbruck North Townhome Association.) I also have
photographs of the work done on my townhouse unit vs. the work
done on my other neighboring townhouse unit (1543 North
Oberlin Circle) who had more work done than I did and is being
billed at least half the amount of labor hours by the
contracting firm they hired than I am. In addition to the
fact that townhome units, whose garages are opposite mine, who
had approximately the same amount of repairs done are paying
for 19 hours of labor. I feel that I have been overcharged
for labor when one compares the amount of repair work I had
done with the amount of similar -work others have had done to
the amount of labor hours I have been charged.
4. I was refused a written estimate by Gittleman
Construction/Management Services_ for the repairs/painting
before the work was begun. It is the mere nature of the
construction/contracting industry that estimates are provided
to clients prior to any- work commencing. Once the client
agrees to the work to be done by basing a decision on the
written estimate and it is becoming 4pparent that as the work
is progressing the work is going beyond the scope of the
estimate, work is :stopped and the scope of the estimate is
revisited. As mentioned above, I was refused this right of a
written estimate; and, the only information I ever received
was a final bill in the mail.
Please also consider this letter as a written request for a meeting
with myself and the Innsbruck North Townhome Association Board of
Directors to discuss the above-mentioned unresolved issues. I can
be reached at work at 574-4447. I also expect a written response
to this letter, sent to me, within ten working days of receipt of
this letter. Thank you.
4ceely,
Monica J. W ener
1547 North Oberlin Circle
Fridley, MN 55432
CC: Councilman Dennis Schneider Mr. Tom Blazina,
City of.Fridley Building Inspector
City of Fridley
SUBJECT
P_ E. .
City of Fridley
7 5
AT THE TOP OF THE TWINS
BUILDING PERMIT
r
� • _______ COMMUNITY DEVELOPMENT DIV.
L PROTECTIVE INSPECTION SEC,
r
E , I CITY HALL FRIDLEY 55432
NUMBER
REV
DATE
PAGE OF
APPROVED BY
612-571-3450
910-F15
9/1/94
JOB ADDRESS 1547 North Oberlin Circle NE
1 LEGAL
LOT NO.
BLOCK
TRACT OR ADDITION
SEE ATTACHED
DESCR,
2
3
Innsbruck North Addition
SHEET
2 PROPERTY OWNER MAIL ADDRESS
ZIP
PHONE
3 CONTRACTOR MAIL ADDRESS
ZIP
PHONE LICENSE NO.
Tabor & Sons Inc 3716 St Francis Blvd Anoka 55303
789-1902 20014248
4 ARCHITECT OR DESIGNER MAIL ADDRESS
ZIP
PHONE LICENSE NO.
5 ENGINEER MAIL ADDRESS
ZIP
PHONE LICENSE NO.
6 USE OF BUILDING
Residential Townhouse
7 CLASS OF WORK
❑ NEW ❑ ADDITION ❑ ALTERATION REPAIR
❑ MOVE ❑ REMOVE
8 DESCRIBE WORK
Reroofing & Gutters
9 CHANGE OF USE FROM
TO
STIPULATIONS
TYPE OF CONST.
OCCUPANCY GROUP
OCCUPANCYLOAD
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING,
VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
ZONING
SO. FT
CU. FT.
AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION
OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT
ANY TIME AFTER WORK IS COMMENCED.
NO. DWLG. UNITS
OFFSTREET PARKING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION
1
STALLS
GARAGES
AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
VALUATION
SURTAX
AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED
WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT
$2,089
$1.05
DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PERMIT FEE
SAC CHARGE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON-
STRUCTION OR THE PERFORMANCE OF CONSTRUCTION
$54.00
Fire SC $2.09
PLAN CHECK FEE
TOTALFEE
License SC $5.00
$62.14
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT IDATEi
WHEN PROPERL ALIDAT D THIS IS YOUR PERMIT
BLD INSP
Da TE
S.GNATUREOFOWNERIIFOWNERBUILDERI IDATEI
NEW [ ] Effective 1/] /94
AODN . '{ ] CITY..OF FRIDLEY'
ALTER [ ] SINGLE FAMILY AND DUPLEXES R-1 AND R-2-���
Building Permit Application
Construction Address: 1547 - North Oberlin Circle, Fridley
Legal Description:
Owner Name & Address: Tel. #
'Contractor:Tabor and'Sons, INc. MNLICENSE# 'Pending*
Ad ;.. 3.716 :..fit•: Francis Blvd,, Anoka,.. l�fn:.. Tel. # 789-190.2
Attach to this application, a Certificate of Survey of the
lot, with the proposed construction drawn on it to scale.
DESCRIPTION OF IMPROVEMENT*
LIVING AREA: Length. Width Height Sq. Ft.
GARAGE AREA: Length WidthHeight Sq. Ft.
DECK AREA: Length Width Hgt/Ground Sq. Ft.
OTHER:
Corner Lot [ ] Inside Lot [ ] Ft. Yd Setback
Type of Construction: roofing/gutters
Approx. Completion Date:
Side Yard Setbacks
Estimated Cost: $ 2 0 8 9.0 0
(Cost on Back)
Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $
DATE: 9/1/94 APPLICANT: Tabor and Sons, Inc. Tel. # 789-1902
Permit Fee
$ 6--/00
Fire Surcharge
$ '?•0 C
State Surcharge
$ Z, o S
SAC Charge
$
License Surcharge
$ �' C
Driveway Escrow
$
Erosion Control
$
Park Fee
$
Sewer Main Charge $
TOTAL $ C��• /`
STIPULATIONS:
CLU USE ONLY
Fee Schedule on Reverse Side
.001 of Permit Valuation (1/10th%)
$.50/$1,000 Valuation
$800 per SAC Unit
$5.00 (State Licensed Residential Contractors)
Alt. "A" or Alt. "B" Alcove
$450.00 Conservation Plan Review
Fee Determined by Engineering
Agreement Necessary [ ] Not Necessary [ ]
•� .
3
FA
SUBJECT
IT NO.
City of Fridley
31037
AT THE TOP OF THE TWINS
BUILDING
PERMIT
i
RECEIPT NO.
1 _ COMMUNITY DEVELOPMENT DIV.
v PROTECTIVE INSPECTION SEC.
�� ^6 /�
NUMBER
REV
DATE�
PAGE OF
APPROVED BY
1 '1 CITY HALL -FRIDLEY 53432
612-571-34b0
910-F15
6/8/00
JOB ADDRESS 15399 3,-4,7, 51 North Oberlin Circle NE
1 LEGAL
LOT NO.
BLOCK
TRACTOR ADDITION
SEE ATTACHED
.
DESCR
-1-4
3
Innsbruck North Addition SHEET
2 PROPERTY OWNER MAIL ADORES$
ZIP PHONE
Innsbruck Townhome Association
651-224-5482
3 CONTRACTOR MAIL ADDRESS
ZIP PHONE LICENSE NO
. Garlock -French Roofing Corp 2301 E 25 St, Minneapolis, MN 55406 612-722-7129
4 ARCHITECT OR DESIGNER MAIL ADDRESS
ZIP PHONE LICENSE NO.
1423
5 ENGINEER MAIL ADDRESS
ZIP PHONE LICENSE NO
8 USE OF BUILDING
Residential Townhomes
7 , CLASS OF WORK
O NEW O ADDITION O ALTERATION REPAIR O MOVE O REMOVE
6 DESCRIBE WORK
Reroof Building
9 , p CHANGE OF, USE FROM
TO
STIPULATIONS
underlayment must comply with the State
Building Code.
Permit ins ec ti®n Ceras
W"'�p
6 Mailed
Permit Inspection Cards
To 1�®�e0
Will Be Mailed
nor To Post
To Homeaviner To Post
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING,
TYPE OF CONST.
OCCUPANCY GROUP
OCCUPANCY LOAD
VENTILATING OR AIR CONDITIONING.
THIS PERMITBECOMES NULL AND VOID IF WORK OR CONSTRUCTION
ZONING
SO. FT
CU. FT.
AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION
OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT
ANY TIME AFTER WORK IS COMMENCED.
NO. DWLG. UNITS
OFFSTREET PARKING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION
4
STALLS GARAGES
AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
VALUATION
SURTAX
AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED
$7 801.96
$3.90
WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT
DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PERMIT FEE
SAC CHARGE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON-
STRUCTION OR THE PERFORMANCE OF CONSTRUCTION
PLAN CHECK FEE
TOTA FEE
License $5.00
169.95
$tGNA1URE0FCONTRACTOR ORAUTMORi2EDAGENT 104TEo
N OPEOEYVALIDATEoFTHIS IS Y PEM IT
iNSP BATE
S-GNATUREOF OWNERdF OWNERBWLOERI IOATEi
FA
SUBJECTRMIT
NO.
City of Fridley
3 1564
AT THE TOP OF THE TWINS
BUILDING PERMIT
COMMUNITY DEVELOPMENT DIV.
RECEIPT NO
I
PROTECTIVE INSPECTION SEC.
��
1
1 � r
CITY HALL FRIDLEY 55432
NUMBER
REV
DATE
PAGE Of
APPROVED BY
612-571-346
910415
11/14/00
JOB ADDRESS 1539, 1543, 1547, 1551 North Oberlin Circle NE
1 LEGAL
LOT NO.
BLOCK
TRACT OR ADDITION SEE ATTACHED
DESCR.
. 1-4
3
Innsbruck North Addition SHEET
T PROPERTY OWNER MAIL ADDRESS ZIP PHONE
Innsbruck North Townhomes
3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO
Columbus Exteriors Inc 2131 111 Lane NW, Coon Rapids, MN 55433 763-757-7530
4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO.
3509
5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO
8 USE OF BUILDING
4 Unit Townhouse Building
7 CLASS OF WORK
O NEW O ADDITION O ALTERATION] REPAIR O MOVE O REMOVE
B DESCRIBE WORK
Reside Building; replace trim
9 CHANGE OF USE FROM TO
STIPULATIONS
Per Section 1402, 1997 Uniform Building Code, requires that a weather
resistive barrier be placed over exterior sheathing to protect the interior
wall covering. Exceptions for this provision would be if sheathing is an
approved weatherproof panel or when the siding is an approved weather
barrier. Vinyl siding is not a weatherproof covering unless the manufacturer
states this in their application guidelines. Call for inspection of wrap
before covering.
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL. PLUMBING. HEATING.
TYPE OF CONST.
OCCUPANCY GROUP
OCCUPANCY LOAD
VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
ZONING
SO. FT
CU FT.
AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS, OR IF CONSTRUCTION
OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT
ANY TIME AFTER WORK IS COMMENCED.
NO DWLG. UNITS
OFFSTREET PARKING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION
4 ISTALLS
GARAGES
AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
VALUATION
SURTAX
AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED
WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT
$30,220
$15.11
DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PERMIT FEE
SACCHARGE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON-
STRUCTION OR THE PERFORMANCE OF CONSTRUCTION
$451.85
Fre SC $30.22
PLAN CHECK FEE
70 AL FEE
Lice C $5.
$502.18
uRE OF CON'aACTOR OR AUTNORQED AGENT iDATE,
Q66tG O � Y VALI T THIS IS/YOU PERMIT
S,GNATURE OF OWNER OF OWNER BUILDER, iDATEi