2016-2020 Final CIP ~ 2016-2020 Capital Improvements Program October 12, 2015 Final 1 2016-2020 Capital Improvements Program Table of Contents Chapter 1: Tables I: Summary of Expenditures by Program Category & Method of Financing .................................... 2-1 II: Capital Equipment ......................................................................................................................... 2-2 III: Information Systems Internal Service Fund .................................................................................. 2-3 IV: Building Capital Improvements ..................................................................................................... 2-4 V: Parks Capital Improvement .......................................................................................................... 2-5 VI: Streets Improvement Fund ........................................................................................................... 2-6 VII: Storm Water Fund ........................................................................................................................ 2-7 VIII: Water Utility Fund ......................................................................................................................... 2-8 IX: Sewer Utility Fund ......................................................................................................................... 2-9 X: Liquor Fund ................................................................................................................................. 2-10 Chapter 2: Detail Project Pages Capital Equipment ..................................................................................................................... 3-1 to 3-38 Information Systems Internal Service Fund ................................................................................ 4-1 to 4-7 Building Capital Improvements ................................................................................................. 5-1 to 5-16 Parks Capital Improvement ......................................................................................................... 6-1 to 6-7 Streets Improvement Fund ....................................................................................................... 7-1 to 7-23 Storm Water Fund ..................................................................................................................... 8-1 to 8-12 Water Utility Fund ..................................................................................................................... 9-1 to 9-13 Sewer Utility Fund ................................................................................................................... 10-1 to 10-7 Liquor Fund ............................................................................................................................. 11-1 to 11-2 2 Capital Improvements Program The Capital Improvements Program (CIP) is a five-year plan to provide and maintain public facilities for the citizens and businesses of Fridley, balanced against the constraints of available resources Funding Priority Reinvestment for the replacement, maintenance or increased efficiency of existing systems will have priority over the expansion of existing systems or the provision of new facilities or services. Priority rankings include: 1. Assigned to projects that provide protection to health, safety, welfare and/or property, or to meet legal mandates. Examples of such benefits include providing for worker safety or preventing damage to facilities. 2. Assigned to projects that do not qualify for the highest rating, but provide efficiencies in operations or provide significant return. Examples of such benefits include increases to operational efficiencies and leveraging of outside funding sources. 3. Assigned to projects that do not meet the criteria for higher rating. While these projects are necessary and recommended, they do not in and of themselves provide immediate significant benefits, but rather provide benefit over the long term. This rating is assigned by staff, and is not necessarily reflective of overall priorities and sequencing of CIP projects approved by the City Council. The rating is provided to allow a quick reference categorizing the general need for the project. Planning Principles • The CIP will support achievement of the City’s long-term Strategic Goals. • The CP will be updated annually to reflect changing capital needs for new construction and maintenance of the City’s substantial investments in streets, utilities, parks, buildings and equipment. • Development of the CIP will be consistent with the annual operating budget. Future operating costs associated with new capital improvements will be projected and included in operating budget forecasts. Table I Capital Improvements Program 2016-2020 EXPENDITURES BY PROGRAM CATEGORY & METHOD OF FINANCING 2016 2017 2018 2019 2020 TOTAL Percent Expenditures Program Category Major Equipment 429,700$ 880,200$ 630,500$ 671,000$ 1,297,000$ 3,908,400$ 11.8% Technology Improvements 285,800 196,700 266,400 286,700 196,700 1,232,300 3.7% Municipal Buildings 267,000 346,000 581,000 156,000 2,100,000 3,450,000 10.4% Parks Improvements 2,250,000 269,000 184,000 234,000 197,000 3,134,000 9.5% Street Improvements 1,554,400 1,385,900 3,684,800 1,503,200 1,305,400 9,433,700 28.5% Storm Drainage Improvements 745,000 320,000 525,000 445,000 500,000 2,535,000 7.7% Water System Improvements 1,560,000 1,705,000 1,955,000 950,000 805,000 6,975,000 21.1% Sewer System Imp 100,000 615,000 195,000 735,000 365,000 2,010,000 6.1% Municipal Liquor Stores 400,000 25,000 - - - 425,000 1.3% Total Expenditures By Program 7,591,900$ 5,742,800$ 8,021,700$ 4,980,900$ 6,766,100$ 33,103,400$ 100.0% Method of Financing Property Taxes 50,000$ 50,000$ 50,000$ 75,000$ 100,000$ 325,000$ 0.9% Local Government Aid 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 5,500,000 14.5% Municipal State Aid 686,800 686,800 686,800 686,800 686,800 3,434,000 9.0% Federal Highway Aid 150,000 - 2,000,000 - - 2,150,000 5.7% Grants 200,000 50,000 175,000 - - 425,000 1.1% User Fees (External & Internal)2,855,000 2,715,000 2,725,000 2,205,000 1,770,000 12,270,000 32.2% Park Dedication Fees 5,000 5,000 5,000 5,000 5,000 25,000 0.1% Special Assessments 600,000 560,000 580,000 580,000 580,000 2,900,000 7.6% Interest on Investments 51,500 50,500 49,300 47,800 45,600 244,700 0.6% Auction Proceeds 30,000 30,000 30,000 30,000 30,000 150,000 0.4% Capital Improvement Bonds - - - - 2,100,000 2,100,000 5.5% Utility Improvement Bonds 4,372,400 - 2,905,000 - - 7,277,400 19.1% Transfers In (Liquor Proceeds)250,000 250,000 250,000 250,000 250,000 1,250,000 3.3% Total Method of Financing 10,350,700$ 5,497,300$ 10,556,100$ 4,979,600$ 6,667,400$ 38,051,100$ 100.0% 2 - 1 New (*) or Replacement ()2016 2017 2018 2019 2020 Unfunded Funding Sources Local Government Aid 925,000$ 525,000$ 525,000$ 525,000$ 525,000$ - Liquor Store Proceeds (Transfer)175,000 175,000 175,000 175,000 175,000 - Interest on Investments 7,500 7,500 7,500 7,500 7,500 - Auction Proceeds 30,000 30,000 30,000 30,000 30,000 - Total Funding Sources 1,137,500$ 737,500$ 737,500$ 737,500$ 737,500$ -$ Expenditures Police Police Squad / SUV / Pickup 188,000$ 194,000$ 200,000$ 206,000$ 212,000$ Outdoor Warning Sirens 47,500 - - - - 800 MHz Radio Replacement 78,700 78,700 - - - Fire Fire Engine - - - - 650,000 Rescue Truck(s)- 94,000 75,000 - - Aerial Ladder Paint/Rehab - - 80,000 - - 800 MHz Radio Replacement 61,500 61,500 61,500 - - SCBA Replacement - - - 250,000 - Public Works - Parks Division Mowers 10,000 22,000 26,000 - 45,000 Pickup Trucks 30,000 30,000 53,000 - 20,000 Dump Trucks with Plows - - 39,000 - - Utility Vehicle for Plowing - 97,000 - - - Utility Vehicles and Equipment 14,000 169,000 63,000 25,000 10,000 Public Works - Streets Division Dump Trucks with Plows - - - 170,000 170,000 Heavy Equipment - - - 130,000 Paving Equipment - - 3,000 20,000 60,000 Utility Vehicles and Equipment 92,000 14,000 - - Public Works - Garage Division Trailer-mounted Generator - 42,000 - - - Community Development Mid-size Passenger Vehicle - - 16,000 - - Total Expenditures 429,700$ 880,200$ 630,500$ 671,000$ 1,297,000$ Surplus (deficiency) of funding sources over (under) expenditures 707,800$ (142,700)$ 107,000$ 66,500$ (559,500)$ Estimated Beginning Fund Balance (14,056) 693,744 551,044 658,044 724,544 Estimated Ending Fund Balance 693,744$ 551,044$ 658,044$ 724,544$ 165,044$ Table II CIP 2016-2020 CAPITAL EQUIPMENT FUND Funding Sources and Expenditure Projections 2 - 2 2016 2017 2018 2019 2020 Unfunded Funding Sources Property Taxes 50,000$ 50,000$ 50,000$ 75,000$ 100,000$ Local Government Aid 150,000 150,000 150,000 150,000 150,000 Charges for Services 50,700 50,700 62,900 50,700 50,700 Interest on Investments 1,500 1,500 1,500 1,500 1,500 Total Funding Sources 252,200$ 252,200$ 264,400$ 277,200$ 302,200$ Expenditures Software & Equipment Purchases/Upgrades*34,500$ 45,000$ 41,000$ 41,000$ 41,000$ Computer & Printer Replacement*115,000 101,000 115,000 115,000 115,000 Microsoft SA Licenses (server CALs)*- - 25,000 - - Switching Infrastructure Replacement*- - - 75,000 - Firewall Replacements*- - - 15,000 - Two Factor Authentication 40,700 40,700 75,400 40,700 40,700 Image System Enhancements 10,000 10,000 10,000 - - Phone System Replacement - - - - - 50,000 EOC Smartboard 30,000 - - - - Facilities Registration System 15,000 - - - - Code Enforcement System 40,600 - - - - Remodeling IT Costs - - - - - 80,000 Total Expenditures 285,800$ 196,700$ 266,400$ 286,700$ 196,700$ 130,000$ Surplus (deficiency) of funding sources over (under) expenditures (33,600)$ 55,500$ (2,000)$ (9,500)$ 105,500$ Estimated Beginning Fund Balance 128,544 94,944 150,444 148,444 138,944 Estimated Ending Fund Balance 94,944$ 150,444$ 148,444$ 138,944$ 244,444$ * - These items are grouped into one project sheet Table III CIP 2016-2020 INFORMATION SYSTEMS CAPITAL PROJECTS FUND Funding Sources and Expenditure Projections 2 - 3 2016 2017 2018 2019 2020 Unfunded Funding Sources Local Government Aid -$ 300,000$ 300,000$ 300,000$ 300,000$ Interest on Investments 7,500 7,500 7,500 10,000 10,000 Capital Improvement Bonds - - - - 2,100,000 Total Funding Sources 7,500$ 307,500$ 307,500$ 310,000$ 2,410,000$ -$ Expenditures Municipal Center Municipal Center HVAC Retrofit 25,000$ 25,000$ 50,000$ 30,000$ -$ Municipal Center Site Analysis 75,000 - - - - Municipal Center Electrical/Mechanical Repair - - - - 2,100,000 Municipal Center Exterior Repairs - - 100,000 100,000 - Gun Range Backstop Retrofit 96,000 - - - - Municipal Center Lower Level Remodel - 80,000 400,000 - - Workstation Replacements/Repairs 20,000 20,000 20,000 20,000 - Storage, Cabinets, Fixtures 6,000 6,000 6,000 6,000 - Municipal Center Campus Renovation - - - - - 14,150,000 Public Works Public Works Storage Yard & Drainage Retrofitss - 85,000 - - - Public Works Campus Renovation (phases 1-2)- - - - - 7,000,000 Community Center Furniture & Fixtures 5,000 5,000 5,000 - - Fire Stations Fire Station 3 Building Repairs - 25,000 - - - Floor Resurfacing - All Stations 25,000 - - - - Fire Station 1 Kitchen Improvements 15,000 - - - - Propane Fire Simulator - 100,000 - - - Total Expenditures 267,000$ 346,000$ 581,000$ 156,000$ 2,100,000$ 21,150,000$ Surplus (deficiency) of funding sources over (under) expenditures (259,500)$ (38,500)$ (273,500)$ 154,000$ 310,000$ Estimated Beginning Fund Balance 200,471 (59,029) (97,529) (371,029) (217,029) Projects Carried Forward from Prior Years Estimated Ending Fund Balance (59,029)$ (97,529)$ (371,029)$ (217,029)$ 92,971$ Table IV CIP 2016-2020 Building Capital Improvements Funding Sources and Expenditure Projections 2 - 4 2016 2017 2018 2019 2020 Unfunded Funding Sources Local Government Aid 25,000$ 125,000$ 125,000$ 125,000$ 125,000$ Park Dedication Fees 5,000 5,000 5,000 5,000 5,000 Liquor Store Proceeds (Transfer)75,000 75,000 75,000 75,000 75,000 Interest on Investments 15,000 15,000 15,000 15,000 15,000 State Bond Funds 2,000,000 - - - - Total Funding Sources 2,120,000$ 220,000$ 220,000$ 220,000$ 220,000$ Expenditures Court Surfacing/Overlays 30,000$ 32,000$ 32,000$ 32,000$ 35,000$ Park Furnishings 10,000 12,000 12,000 12,000 12,000 Parking Lot Replacement 125,000 90,000 - 50,000 - SNC Boardwalk Replacement 25,000 25,000 25,000 25,000 - Security Cameras in Parks 30,000 30,000 - - - Playground Equipment Replacement 30,000 80,000 115,000 115,000 150,000 SPRING Progect/Springbrook Nature Center 2,000,000 - - - - Total Expenditures 2,250,000$ 269,000$ 184,000$ 234,000$ 197,000$ Surplus (deficiency) of funding sources over (under) expenditures (130,000)$ (49,000)$ 36,000$ (14,000)$ 23,000$ Estimated Beginning Fund Balance 1,533,311 1,403,311 1,354,311 1,390,311 1,376,311 Estimated Ending Fund Balance 1,403,311$ 1,354,311$ 1,390,311$ 1,376,311$ 1,399,311$ Table V CIP 2016-2020 PARKS CAPITAL IMPROVEMENT Funding Sources and Expenditure Projections 2 - 5 2016 2017 2018 2019 2020 Unfunded Funding Sources Municipal State Aid - State Aid Routes 317,400$ 317,400$ 317,400$ 317,400$ 317,400$ Municipal State Aid - Local Routes 369,400 369,400 369,400 369,400 369,400 Federal Highway Funds 150,000 - 2,000,000 - - Special Assessments 600,000 560,000 580,000 580,000 580,000 Interest on Investments 20,000 19,000 17,800 13,800 11,600 Total Funding Sources 1,456,800$ 1,265,800$ 3,284,600$ 1,280,600$ 1,278,400$ Expenditures Street Rehabilitation Program 800,000$ 770,000$ 800,000$ 800,000$ 800,000$ Street Sealing Program (Chip Sealing)235,000 235,000 245,000 245,000 250,000 Street Sealing Program (Crack Sealing)35,000 35,000 35,000 35,000 35,000 Trail/Walk Upgrades 100,000 100,000 100,000 100,000 100,000 West Moore Lake Ped & Bike Improvements - - 500,000 - - Street Lighting Upgrade/Retrofit 90,000 90,000 - - - Traffic Signal Maintenance/Retrofit 20,000 20,000 180,000 180,000 20,000 Capital Signage Replacements - 15,000 15,000 15,000 - Traffic Safety Improvement Projects 30,000 30,000 1,722,000 30,000 30,000 Main Street Pedestrian Bridge Project 150,000 - - - - Transfer to the General Fund (Staff Allocation)94,400 90,900 87,800 98,200 70,400 Total Expenditures 1,554,400$ 1,385,900$ 3,684,800$ 1,503,200$ 1,305,400$ Surplus (deficiency) of funding sources over (under) expenditures (97,600)$ (120,100)$ (400,200)$ (222,600)$ (27,000)$ Estimated Beginning Fund Balance 1,998,749 1,901,149 1,781,049 1,380,849 1,158,249 Estimated Ending Fund Balance 1,901,149$ 1,781,049$ 1,380,849$ 1,158,249$ 1,131,249$ Table VI CIP 2016-2020 STREET IMPROVEMENT FUND Funding Sources and Expenditure Projections 2 - 6 2016 2017 2018 2019 2020 Unfunded Funding Sources Storm Water Utility Fees 1,044,100$ 1,065,000$ 1,086,000$ 1,107,000$ 1,129,000$ Grants and Other Revenue 200,000 50,000 175,000 150,000 150,000 Interest on Investments 12,000 12,000 12,000 12,000 12,000 Total Funding Sources 1,256,100$ 1,127,000$ 1,273,000$ 1,269,000$ 1,291,000$ Expenditures Operating Expenses (less depreciation)625,300$ 637,900$ 650,700$ 663,700$ 676,900$ Debt Service 34,413 33,663 32,912 32,163 32,163 Subtotal Operating Expenditures 659,713$ 671,563$ 683,612$ 695,863$ 709,063$ Capital Expenditures Water Quality Testing 10,000$ -$ -$ 5,000$ 5,000$ Pond Maintenance 25,000 25,000 25,000 25,000 30,000 Storm Sewer Replacement/Reconstr/Lining 60,000 60,000 60,000 65,000 65,000 Storm Sewer System Upgrades 60,000 60,000 60,000 100,000 100,000 Watershed BMP Implementation 20,000 20,000 20,000 20,000 20,000 Watershed District Water Quality Projects 70,000 50,000 100,000 60,000 80,000 Sediment Removal Projects 90,000 - - - 100,000 Moore Lake Subwatershed Flood Control Upgrades - 55,000 - - - TMDL Water Quality Projects 220,000 50,000 50,000 150,000 100,000 Locke Lake Dredging (RCWD Cost Share)- - - 20,000 - Locke Lake Dam Upgrades - - 35,000 - - Riverview Heights Flood Control Upgrades - - 175,000 - - Capital Equipment 190,000 - - - - 200,000 Subtotal Capital Expenditures 745,000$ 320,000$ 525,000$ 445,000$ 500,000$ Total Expenditures 1,404,713$ 991,563$ 1,208,612$ 1,140,863$ 1,209,063$ Surplus (deficiency) of funding sources over (under) expenditures (148,613)$ 135,437$ 64,388$ 128,137$ 81,937$ Estimated Beginning Cash Reserve 1,020,459 871,846 1,007,283 1,071,671 1,199,808 Estimated Ending Cash Reserve 871,846$ 1,007,283$ 1,071,671$ 1,199,808$ 1,281,745$ Table VII CIP 2016-2020 STORM WATER FUND Funding Sources and Expenditure Projections 2 - 7 2016 2017 2018 2019 2020 Unfunded Funding Sources Water Sales 3,017,723$ 3,468,856$ 3,572,594$ 3,679,490$ 3,789,563$ Interest on Investments 44,000 44,000 44,000 44,000 44,000 Bond Proceeds 4,372,400 - 2,905,000 - - Antenna Lease Fees 35,000 35,000 35,000 35,000 35,000 Miscellaneous Income 140,600 140,600 140,600 140,600 140,600 Total Funding Sources 7,609,723$ 3,688,456$ 6,697,194$ 3,899,090$ 4,009,163$ Expenditures Non-Capital Expenditures Operating Expenses (Less Depreciation)2,123,846$ 2,166,323$ 2,209,650$ 2,253,843$ 2,298,919$ Debt Service 714,699 1,088,930 1,092,086 1,094,011 1,119,648 Subtotal Non-capital Expenditures 2,838,545$ 3,255,253$ 3,301,736$ 3,347,854$ 3,418,567$ Capital Expenditures Distribution System Reconstruction 500,000$ 500,000$ 300,000$ 400,000$ 500,000$ Hydrant Repairs 20,000 20,000 20,000 20,000 20,000 Well Updates 180,000 40,000 190,000 - 200,000 Water Meter Replacement - AMR System 600,000 720,000 10,000 10,000 10,000 Well House Building Repairs 40,000 20,000 40,000 20,000 40,000 Distribution System Interconnection - - 500,000 - - 600,000 Fleet Vehicles - 35,000 60,000 - - Variable Frequency Drives 35,000 - 35,000 - 35,000 Chem Feed & Storage Sys Upgrade at Commons 165,000 - - - - Treatment Plant Retrofits - 370,000 - 500,000 - Transmission System Reconstruction - - 800,000 - - Storage Building - - - - - 350,000 Well 13 Analysis & Availability 20,000 - - - - Subtotal Capital Expenditures 1,560,000$ 1,705,000$ 1,955,000$ 950,000$ 805,000$ 950,000$ Total Expenditures 4,398,545$ 4,960,253$ 5,256,736$ 4,297,854$ 4,223,567$ Surplus (deficiency) of funding sources over (under) expenditures 3,211,178$ (1,271,797)$ 1,440,458$ (398,764)$ (214,404)$ Estimated Beginning Cash Reserve 637,613 3,848,791 2,576,994 4,017,452 3,618,688 Estimated Ending Cash Reserve 3,848,791$ 2,576,994$ 4,017,452$ 3,618,688$ 3,404,284$ Table VIII CIP 2016-2020 WATER UTILITY FUND Funding Sources and Expenditure Projections 2 - 8 2016 2017 2018 2019 2020 Unfunded Funding Sources Sewer Services 4,959,846$ 5,307,505$ 5,678,031$ 5,962,832$ 6,260,724$ Interest on Investments 25,000 30,000 30,000 30,000 30,000 Miscellaneous Income 55,000 55,000 55,000 55,000 55,000 Total Funding Sources 5,039,846$ 5,392,505$ 5,763,031$ 6,047,832$ 6,345,724$ Expenditures Non-Capital Expenditures Operating Expenses (Less Depreciation)775,356$ 790,864$ 806,681$ 822,815$ 839,271$ Sewer Service Charge 3,938,323 4,135,239 4,342,001 4,472,261 4,606,429 Debt Service 42,500 41,600 45,625 44,575 45,500 Subtotal Non-capital Expenditures 4,756,179$ 4,967,703$ 5,194,307$ 5,339,651$ 5,491,200$ Capital Expenditures Sanitary Sewer Collection System Recon 80,000$ 40,000$ 85,000$ 45,000$ 50,000$ Sanitary Sewer Collection System Lining - 520,000 - 520,000 260,000 Sanitary Sewer Force Main Recon - - 90,000 - - Lift Station Rehabilitation 20,000 - 20,000 20,000 20,000 Fleet Vehicles - 55,000 - - 35,000 MCES Overflow Connection - - - 150,000 - Subtotal Capital Expenditures 100,000$ 615,000$ 195,000$ 735,000$ 365,000$ Total Expenditures 4,856,179$ 5,582,703$ 5,389,307$ 6,074,651$ 5,856,200$ Surplus (deficiency) of funding sources over (under) expenditures 183,667$ (190,198)$ 373,724$ (26,819)$ 489,524$ Estimated Beginning Cash Reserve 406,825 590,492 400,294 774,018 747,199 Estimated Ending Cash Reserve 590,492$ 400,294$ 774,018$ 747,199$ 1,236,723$ Table IX CIP 2016-2020 SEWER UTILITY FUND Funding Sources and Expenditure Projections 2 - 9 2016 2017 2018 2019 2020 Unfunded Funding Sources Liquor Sales (3% Growth)5,907,800$ 6,203,200$ 6,513,400$ 6,839,100$ 7,181,100$ Interest on Investments - - - - - Miscellaneous Income - - - - - Total Funding Sources 5,907,800$ 6,203,200$ 6,513,400$ 6,839,100$ 7,181,100$ Expenditures Non-Capital Expenditures Cost of Sales (24% Gross Profit Target)4,489,900$ 4,714,400$ 4,950,200$ 5,197,700$ 5,457,600$ Operating Expenses (Less Depreciation)1,013,100 1,033,400 1,054,100 1,075,200 1,096,700 Transfers 338,600 338,600 338,600 338,600 338,600 Capital Outlay-Other Subtotal Non-capital Expenditures 5,841,600$ 6,086,400$ 6,342,900$ 6,611,500$ 6,892,900$ Capital Expenditures Breakroom Addition to Fridley Market -$ 25,000$ -$ -$ -$ Highway 65 Store Remodel/Feasibility 400,000 - - - - 3rd Store Location - - - - - 900,000 Subtotal Capital Expenditures 400,000$ 25,000$ -$ -$ -$ 900,000$ Total Expenditures 6,241,600$ 6,111,400$ 6,342,900$ 6,611,500$ 6,892,900$ Surplus (deficiency) of funding sources over (under) expenditures (333,800)$ 91,800$ 170,500$ 227,600$ 288,200$ Estimated Beginning Cash Reserve 39,461 (294,339) (202,539) (32,039) 195,561 Estimated Ending Cash Reserve (294,339)$ (202,539)$ (32,039)$ 195,561$ 483,761$ Table X CIP 2016-2020 LIQUOR FUND Funding Sources and Expenditure Projections 2 - 10 3 - 1 Project Category: Capital Equipment Project Title: Police Squad Car Replacement Total Estimated Cost: $ 188,000 (2016) Funding Priority: 1 2016 Account Number: 410-2110-703100 Project Code: 410.16.21 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 188,000 $ 194,000 $ 200,000 $ 206,000 $ 212,000 Justification: Consistent with previous years, four vehicles out of the Police Department fleet of 29 vehicles will be replaced. For 2016: Replace unit 377 (2011 Chevrolet Tahoe) with a Chevrolet Tahoe at a cost of $52,000. This unit is used as a K9 vehicle and is equipped for that purpose. Unit 377 will be sold at auction. Replace unit 379 (2012 Chevrolet Tahoe) with a Chevrolet Tahoe at a cost of $51,000. This unit is used as a supervisor vehicle and is also equipped to function as a mobile command post during emergency incidents. Unit 379 will be rotated to secondary service replacing unit 327 (2006 Ford Expedition) currently used as a Reserve Unit vehicle. Unit 327 will be sold at auction. Replace unit 346 (2012 Chevrolet Caprice) with a Chevrolet Caprice at a cost of $44,000. This unit is used in traffic enforcement as well as primary patrol service. Unit 346 will be rotated to secondary service replacing unit 332 (2010 Ford Crown Victoria) currently used as a Pawn Detective vehicle. Unit 332 will be sold at auction. Replace unit 384 (2014 Ford Utility) with a Ford Utility at a cost of $41,000. This unit is used in primary patrol service. Unit 384 will be rotated to secondary service replacing unit 334 (2009 Ford Crown Victoria) currently used as a command staff vehicle. Unit 334 will be sold at auction. Replacements are made on a regular, systematic rotation based on mileage, maintenance and safety concerns in close consultation with the City Mechanic. Replacements are typically made of primary patrol service vehicles which are then transitioned to secondary service within the fleet. The individual vehicle replacement costs indicated above includes all associated equipment and setup ($48,000) as well as the cost of replacing the 800 MHz squad mobile radios ($19,000) that was not made a part of the 800 MHz Radio Replacement CIP. The Police Department fleet consists of:  12 marked squad cars assigned to primary patrol service;  6 marked squad cars assigned to secondary service for SRO, CSO, and Reserve Unit activities  10 unmarked cars assigned to secondary service for Investigation, Pawn, Special Projects, and command staff activities  1 All Terrain Vehicle 29 total vehicles in service Relationship to General Plan and Other Projects: This equipment replacement will allow the Police Department to effectively patrol and respond to incidents and emergencies consistent with their public safety responsibilities. Description: This item provides for the replacement of a portion of the Police Department squad car fleet. 3 - 2 Project Category: Capital Equipment Project Title: Outdoor Warning Siren Head Replacement Total Estimated Cost: $ 92,700 Funding Priority: 1 Account Number: 410-2110-703100 2016 Project Code: 410-16-21 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 47,500 Justification: The May 6, 1965 tornado outbreak that affected Fridley was the first time in Twin Cities history that civil defense sirens were used to warn of severe weather. Presently, outdoor warning sirens are primarily used to provide warning of severe weather conditions and they are still the most effective method to warn the population at large in the shortest amount of time. The City has eight outdoor warning sirens that were purchased and installed in 1988. Each of the outdoor warning sirens consists of two parts – a controller and a siren head. In 2014 the City began to upgrade the aged outdoor warning siren equipment to avoid a failure to warn the public in an emergency. In 2014, all eight of the outdoor warning siren controllers were replaced. In 2015, half of the siren heads will be replaced with the other half to be replaced in 2016. Relationship to General Plan and Other Projects: This equipment replacement will maintain the integrity of the emergency outdoor warning siren system consistent with emergency management responsibilities. Description: This item provides for the replacement of the siren head component of the outdoor warning siren system. 3 - 3 Project Category: Capital Equipment Project Title: 800 MHz Radio Replacement Total Estimated Cost: $ 424,017 Funding Priority: 1 Account Number: (Police) 410-2110-703100 (Fire) 410-2510-703100 2016 Project Code: (Police) 410.16.21 ( F i r e ) 410.16.25 2017 Project Code: (Police) 410.17.21 ( F i r e ) 410.17.25 2018 Project Code: (Fire) 410.18.25 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding Police Fire Total $ 78,700 $ 61,500 $ 140,200 $ 78,700 $ 61,500 $ 140,200 $ 0 $ 61,500 $ 61,500 Justification: Police Officers and Firefighters use two-way radios to conduct business and serve the public. This includes routine day-to-day activities such as traffic stops, investigations, inspections and general administrative duties as well as emergency activities involving response to crimes-in-progress, medicals, fires, and other disasters or incidents. Radio systems are a critical component in the communication and coordination of resources. The events of September 11, 2001 exposed and reinforced the urgent need for public safety agencies to adopt modern interoperable communication systems. In 2004 public safety agencies in Anoka County joined the Allied Radio Matrix for Emergency Response (ARMER) 800 MHz radio system, a communications network developed by the State of Minnesota. The portable and mobile 800 MHz radios obtained during implementation of that system have now reached their end of life. The current radios are no longer available for purchase and will no longer be serviceable by 2018. Anoka County Central Communications Radio Service has advised agencies to create a plan for purchasing new radios to ensure they do not experience any communication failures because of aged equipment. Relationship to General Plan and Other Projects: This equipment replacement will allow the Police and Fire Departments to effectively communicate and coordinate resources consistent with their public safety responsibilities. Description: This item provides for the replacement of 800 MHz two-way radios for the Police and Fire Departments. 3 - 4 Project Category: Capital Equipment Project Title: Rescue Truck Replacement Total Estimated Cost: $50,000 Funding Priority: 1 Account Number: 410-2510-703100 2017 Project Code: 410.17.25 Source of Project Funding 2016 2017 2018 2018 2020 Capital Equipment Funding $50,000 Justification: Rescue 1 is the primary rescue truck out of Station 1 and was purchased at cost of over $98,000 in 2008. The truck is used daily for routine transportation of the duty crew, inspections and response to calls for service including medical calls. The vehicle has high mileage in a city environment and many hours of time where it idles. The original concept of a larger truck that can carry lots of equipment for both fire and rescue response has proven to be less desirable. This vehicle that will be replaced with a Chevrolet Tahoe that has the ability to keep equipment warm or cool, depending on the season, and will be easier to maneuver and get better fuel consumption. The current truck also retains some value in 2017 if it were to be sold. Relationship to General Plan and Other Projects: Replacement is consistent with the Fire Department’s vehicle replacement schedule. Effect on Annual Operations Costs: It is anticipated that the smaller vehicle will be more fuel efficient and the equipment is anticipated to have a 5 year service life. Description: This item provides for the scheduled replacement of a Fire Department Rescue truck. 3 - 5 Project Category: Capital Equipment Project Title: Replacement Fire Vehicle Total Estimated Cost: $44,000 Funding Priority: 1 Account Number: 410-2510-703100 2017 Project Code: 410.17.25 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $44,000 Justification: This purchase was originally in the replacement schedule for 2014 to replace a 2009 Chevrolet Impala. It was deferred to 2017 because the Impala has low miles and is in good condition. The Fire Department is requesting that the sedan style vehicle be replaced with a Ford utility crossover vehicle consistent with the police patrol vehicles. Unlike the Impala, which has a trunk, the crossover would have cabin space for consistent heating and cooling of equipment, a larger cabin for work space, and room for storage of contaminated clothing outside of the passenger seating area. Relationship to General Plan and Other Projects: Replacement is consistent with the Fire Department’s vehicle replacement schedule. By using a vehicle similar to police the mechanics have knowledge of similar vehicles, emergency warning devices and access to parts. Effect on Annual Operations Costs: The equipment will not change operation cost and the equipment is anticipated to have an 8 year service life. Description: This item provides for the scheduled replacement of a Fire Department Fire Chief’s Vehicle. 3 - 6 Project Category: Capital Equipment Project Title: Rescue Truck Replacement Total Estimated Cost: $75,000 Funding Priority: 1 Account Number: 410-2510-703100 2018 Project Code: 410.18.25 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $75,000 Justification: Rescue 4 is the primary weekday rescue truck out of Station 1 and was purchased at cost of over $100,000 in 2007. The truck is used daily for routine transportation of the duty crew, and response to calls for service including medical calls. This truck also services as the primary “Rehab” vehicle on fire calls and other incidents that are longer in duration. The vehicle has high mileage in a city environment and many hours of time where it idles. The plan anticipates purchasing a replacement chassis on which the current rescue body could be mounted. The rescue body will be refurbished to new condition by the truck manufacturer. This would result in some savings as opposed to building a new truck. Relationship to General Plan and Other Projects: Replacement is consistent with the Fire Department’s vehicle replacement schedule. Effect on Annual Operations Costs: Reduced maintenance cost is anticipated. Description: This item provides for the scheduled replacement of a Fire Department Rescue truck. 3 - 7 Project Category: Capital Equipment Project Title: Fire Department Aerial Ladder Improvements Total Estimated Cost: $80,000 Funding Priority: 1 Account Number: 410-2510-703100 2018 Project Code: 410-18-25 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $80,000 Justification: Aerial 2 was delivered in 2006 and has an expected service life of 25 years. During the service life of the vehicle it is exposed to conditions that wear on the exterior and interior portions of the vehicle and changes in technology make available safer and more efficient options for firefighting and emergency work. It is anticipated that in 2018, when the truck has reached half of its service life, that there will be a need to repair exterior paint, provide updated highway visibility in the form of reflective markings and emergency lighting and provide updated technology for fire and rescue operations. NOTE: This vehicle has not had a good reliability record. Although the manufacturer has stood by its product and many of the repairs have come at no cost to the City the equipment is frequently out of service. The reliability of this piece of equipment may justify deferring improvements in 2018 and consider earlier replacement. Relationship to General Plan and Other Projects: Refurbishment and improvements at a vehicles half life is consistent with the Fire Department’s vehicle replacement schedule. Description: This item provides for the scheduled refurbishment and improvements of Fire Department Vehicles 3 - 8 Project Category: Capital Equipment Project Title: Self Contained Breathing Apparatus Total Estimated Cost: $250,000 Funding Priority: 1 Account Number: 410-2510-703100 2019 Project Code: 410-19-25 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $250,000 Justification: The Self Contained Breathing Apparatus (SCBA) is the firefighter’s most important personal protection. Respiratory protection is used not only on fires but also in environments were chemicals are present or oxygen is absent. The SCBA air cylinders are limited in life expectancy by the Department Of Transportation to 15 years. In 15 years the technology also changes significantly enough that firefighter’s benefit from improvements in safety and efficiency. Relationship to General Plan and Other Projects: The replacement of SCBA cylinders is required by DOT in the year 2019 and replacement of the SCBA technology is consistent with the Fire Departments practice of replacement with the cylinders. Effect on Annual Operations Costs: Annual cost of replacement parts and service may increase with the purchase of new technology SCBA. SCBA are required to be tested annually and advances in technology will add to the complexity of the units to be tested. It is also anticipated that advanced technology will also increase the cost of repair and parts. SCBA while new still experience very harsh conditions and physical abuse in protecting firefighters which leads to maintenance regardless of the age of the units Description: This item provides for the scheduled replacement the Fire Department’s Self Contained Breathing Apparatus. 3 - 9 Project Category: Capital Equipment Project Title: Fire Department Engine/Heavy Rescue Total Estimated Cost: $650,000 Funding Priority: 1 Account Number: 410-2510-703100 2020 Project Code: 410-20-25 Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $650,000 Justification: Engine 1 is one of three engines that service the City. This Engine is located in Station 1 in the central portion of the City and will be 20 years old at time of replacement. This truck also serves as the only Heavy Rescue in the department carrying specialized tools for stabilization and extrication. The Fire Department attempts to keep engines on a 20 year replacement cycle for the purpose of maintaining a reliable piece of equipment, limiting repair cost and providing new technology that benefits the firefighters in the form of efficiency and safety. One concept of technology that is being considered for this vehicle is a Compressed Air Foam System which reduces water damage in fighting structure fires and reduces the weight in a fire hose. The truck being replaced is the first line Engine and sees service and subsequent road miles much more often than the other two Engines. Maintenance cost for this vehicle will begin to increase more rapidly with age when compared to the other Engines. The fire department also benefits from modern equipment by attracting perspective firefighter applicants from Fridley and the surrounding communities. The cost of the project includes replacement of equipment and hose on the vehicle ensuring that equipment is replaced periodically. Scheduling and Project Status: Specifications for the truck will be drafted through a designated vendor in coordination with a contract with the Houston Galveston Area Consortium and would be scheduled for manufacture in the first quarter of 2020. This is assuming the truck manufacturer’s schedule is open the truck could be built before the end of the year 2020. Relationship to General Plan and Other Projects: The three fire engines contribute to the city’s overall ability to provide fire protection and are necessary to maintain the City’s Insurance Services Organization (ISO) rating. ISO gives points for distribution of engines every 1.5 miles, for required equipment on the engine and for the rate the pump can deliver water. Effect on Annual Operations Costs: With a more efficient engine the cost of fuel consumption will be reduced although with only a slight improvement. As the age of the existing vehicle increases there will be a noticeable savings in maintenance with the purchase of a new vehicle. Description: This item provides for the scheduled replacement of Fire Department Vehicles 3 - 10 Project Category: Capital Equipment Project Title Zero-turn Mower Total Estimated Cost: $ 10,000 Funding Priority: 2 Account Number: 410-3172-703100 2016 Project Code: 410.16.72 Future Unit Number: 516 Replaces Unit Number: 515 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 10,000 Justification: This is one of our front-line mowers for cutting grass in City parks. This mower is one of three zero-turn mowers in our fleet, which are used full-time from April/May through September. Scheduling and Project Status: Purchase is planned for 2016. The proposed amount includes trade-in of the replaced unit 515, which is a 2007 zero-turn John Deere Mower. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have an 8-10 year service life. Description: This equipment will replace one of our mowers used for grass cutting by the Parks Maintenance Division in City parks. 3 - 11 Project Category: Capital Equipment Project Title: Pickup Truck Total Estimated Cost: $ 30,000 Funding Priority: 2 Account Number: 410-3172-703100 2016 Project Code: 410.16.72 Future Unit Number: 512 Replaces Unit Number: 502 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 30,000 Justification: This vehicle is used as transportation for our crews, and is used by the Parks Maintenance trimming and turf management personnel. It is used full-time from April/May through September, and is utilized as a backup vehicle during low-use periods. Scheduling and Project Status: Purchase is planned for 2016. The proposed amount includes a trade-in of the replaced unit 502, which is a 2001 Chevy 3500, 1 Ton Pickup. The proposed equipment is similar to Unit 527, which is pictured. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service, with augmented summer work crews approved starting in the 2015 operating budget. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace one of our pickups used to transport Parks Maintenance crews and equipment. 3 - 12 Project Category: Capital Equipment Project Title: Utility Vehicle Total Estimated Cost: $ 14,000 Funding Priority: 2 Account Number: 410-3172-703100 2016 Project Code: 410.16.72 Future Unit Number: 574 Replaces Unit Number: N e w Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 14,000 Justification: This utility vehicle in the Parks Maintenance Division used for collection of brush, spraying weeds, and other maintenance needs within park and trail grounds and other off-road locations. The new utility vehicle will include a paint system used for striping the ball fields. Scheduling and Project Status: Purchase is planned for 2016. Unit 572 will remain in service for the Parks Department. For use as a mobile striping machine. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace one of the off-road utility vehicles used by the Parks Maintenance Division. 3 - 13 Project Category: Capital Equipment Project Title: Sidewalk Plow Total Estimated Cost: $ 97,000 Funding Priority: 2 Account Number: 410-3172-703100 2017 Project Code: 410.17.72 Future Unit Number: 519 Replaces Unit Number: 503 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 97,000 Justification: This plowing utility vehicle in the Parks Maintenance Division used for snow removal on walks and trails. It is also used for ice rink clearing after heavy accumulations. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 503, which is a 1995 MT Trackless, refurbished in 2008. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The new tractor is anticipated to have a service life of 15 years, which may be extended through overhauls if viable. Description: This equipment will replace one of the walk/trail plowing tractors used by the Parks Maintenance Division 3 - 14 Project Category: Capital Equipment Project Title: Front-Mount Tractor/Mower Total Estimated Cost: $ 22,000 Funding Priority: 2 Account Number: 410-3172-703100 2017 Project Code: 410.17.72 Future Unit Number: 544 Replaces Unit Number: 540 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 22,000 Justification: This is one of three front-mount mowers used by the Parks Maintenance Division to staff two full mowing crews to perform grass cutting in City parks. This unit would be used full-time from April/May through September. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 540 (pictured), which is a 2008 John Deere model 1435. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its level of service in City parks and rights-of-way turf maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 10 year service life. Description: This equipment will replace a front-mount mower used by the Parks Maintenance Division for grass cutting in City parks. 3 - 15 Project Category: Capital Equipment Project Title: Pickup Truck Total Estimated Cost: $ 30,000 Funding Priority: 3 Account Number: 410-3172-703100 2017 Project Code: 410.17.72 Future Unit Number: 545 Replaces Unit Number: 541 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 30,000 Justification: This vehicle is used as transportation for our crews, and is used by the Parks Maintenance trimming and turf management personnel. It is used full-time from April/May through September, and is utilized as a backup vehicle during low-use periods. A plow is included for plowing of park lots and rinks. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 541, which is a 2001 Ford F250. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace one of our pickups used to transport Parks Maintenance crews and equipment. 3 - 16 Project Category: Capital Equipment Project Title: Parking Lot/Trail Sweeper Total Estimated Cost: $ 32,000 Funding Priority: 2 Account Number: 410-3172-703100 2017 Project Code: 410.17.72 Future Unit Number: 550 Replaces Unit Number: 547 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 32,000 Justification: This is our single sweeper used by the Parks Maintenance staff to sweep parking lots in city parks and trails citywide. This unit is used from April through November on a part-time basis, with heavy use in the spring and fall. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 547, which is a 1997 Powerboss sweeper. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service. The equipment also allows us to meet our stormwater permit requirements. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace our trail and parking lot sweeper used by the Parks Maintenance Division. 3 - 17 Project Category: Capital Equipment Project Title: Topdresser Total Estimated Cost: $ 12,000 Funding Priority: 3 Account Number: 410-3172-703100 2017 Project Code: 410.17.72 Future Unit Number: 569 Replaces Unit Number: 565 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 12,000 Justification: This is our single topdresser used by the Parks Maintenance staff to fertilize and level fields that the City maintains. This unit is used from April through September on a regular basis. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 565, which is a 2007 Turfco topdresser. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 10 year service life. Description: This equipment will replace our topdresser used by the Parks Maintenance Division for athletic field maintenance. 3 - 18 Project Category: Capital Equipment Project Title: Tanker Truck Total Estimated Cost: $ 125,000 Funding Priority: 2 Account Number: 410-3172-703100 2017 Project Code: 410.17.72 Future Unit Number: 576 Replaces Unit Number: 573 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 125,000 Justification: This is our single tanker truck used by the Parks Maintenance staff for summer watering and flooding of rinks that the City maintains. This unit is used from year-round on a regular basis. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 573, which is a 1999 Rosco Tanker Truck. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service for maintenance. The equipment also allows us to meet our stormwater permit requirements by watering of planted stormwater areas. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The new equipment is anticipated to have a 20 year service life. Description: This equipment will replace the tanker truck used by Parks Maintenance staff for watering and rink flooding. 3 - 19 Project Category: Capital Equipment Project Title: Trailer-mounted Genset Total Estimated Cost: $ 42,000 Funding Priority: 1 Account Number: 410-3176-703100 2017 Project Code: 410.17.76 Future Unit Number: 910 Replaces Unit Number: 720 Equipment Selection: Public Works Garage Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 42,000 Justification: This is our single trailer-mounted generator set that is stationed at the Public Works Garage to provide emergency power onsite and offsite during emergencies. This unit is used as needed and is positioned in permanent standby mode. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 720, which is a 1997 Onan genset. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service for maintenance and emergency response. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The new equipment is anticipated to have a 20 year service life. Description: This equipment will replace the trailer-mounted generator at the Public Works Garage, which is utilized offsite for emergency needs. 3 - 20 Project Category: Capital Equipment Project Title: Sidewalk Plow Total Estimated Cost: $ 92,000 Funding Priority: 2 Account Number: 410-31742-703100 2017 Project Code: 410.17.74 Future Unit Number: 761 Replaces Unit Number: 760 Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 92,000 Justification: This plowing utility vehicle in the Street Maintenance Division used for snow removal on walks and trails, and areas around municipal buildings. Scheduling and Project Status: Purchase is planned for 2017. The proposed amount includes trade-in of the replaced Unit 760, which is a 1993 MT Trackless, refurbished in 2009. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The new tractor is anticipated to have a service life of 15 years, which may be extended through overhauls if viable. Description: This equipment will replace one of the walk/trail plowing tractors used by the Street Maintenance Division 3 - 21 Project Category: Capital Equipment Project Title: Flail Mower (Attachment) Total Estimated Cost: $ 26,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 554 Replaces Unit Number: 514A Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 26,000 Justification: This will replace our side and rear flail mower attachment used by the Parks Maintenance to maintain vegetation on highway and street rights-of-way. This unit would be used full-time in spring and fall. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 514A, which is a 2000 Tiger mower. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in City rights-of-way turf maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 12 year service life. Description: This equipment will replace our mower attachment used by the Parks Maintenance Division for right-of-way maintenance. 3 - 22 Project Category: Capital Equipment Project Title: Extended-cab Pickup Truck Total Estimated Cost: $ 24,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 529 Replaces Unit Number: 518 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 24,000 Justification: This vehicle is used as transportation for our crews, and is used by the Parks Maintenance trimming and turf management personnel. It is used full-time from April/May through September, and is utilized as a backup vehicle during low-use periods. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 518, which is a 2003 Chevrolet 4x4 extended cab pickup. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace our extended cab pickup used to transport Parks Maintenance crews and equipment. 3 - 23 Project Category: Capital Equipment Project Title: Crew-cab Pickup Truck Total Estimated Cost: $ 29,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 539 Replaces Unit Number: 524 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 29,000 Justification: This vehicle is used as transportation for our crews, and is used by the Parks Maintenance trimming and turf management personnel. It is used full-time from April/May through September, and is utilized as a backup vehicle during low-use periods. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 524, which is a 2000 Chevrolet 3500 crew cab pickup. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have an 18 year service life. Description: This equipment will replace our crew cab pickup used to transport Parks Maintenance crews and equipment. 3 - 24 Project Category: Capital Equipment Project Title: 1-Ton Dump Truck Total Estimated Cost: $ 39,000 Funding Priority: 1 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 552 Replaces Unit Number: 530 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 39,000 Justification: This vehicle is used by the Parks Maintenance Division as a utility vehicle from April/May through September, and is used in the winter to plow cul-de-sacs and select streets. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 530, which is a 1998 Chevrolet 1-ton dump truck. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace one of our one-ton dump trucks used for Parks Maintenance and winter plowing. 3 - 25 Project Category: Capital Equipment Project Title: Turf Sweeper Total Estimated Cost: $ 15,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 520 Replaces Unit Number: 513 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 15,000 Justification: This is one of three turf sweepers used by the Parks Maintenance Division to perform leaf and debris collection in City parks. This unit would be used full- time in spring and fall. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 513, which is a 1998 Toro turf sweeper. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its level of service in City parks and rights-of-way turf maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace a turf sweeper used by the Parks Maintenance Division for debris collection in City maintained properties. 3 - 26 Project Category: Capital Equipment Project Title: Turf Sweeper Total Estimated Cost: $ 18,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 534 Replaces Unit Number: 521 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 18,000 Justification: This is one of three turf sweepers used by the Parks Maintenance Division to perform leaf and debris collection in City parks. This unit would be used full- time in spring and fall. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 521, which is a 2003 Smithco turf sweeper. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its level of service in City parks and rights-of-way turf maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace a turf sweeper used by the Parks Maintenance Division for debris collection in City maintained properties. 3 - 27 Project Category: Capital Equipment Project Title: Utility Vehicle with Groomer Total Estimated Cost: $ 15,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 571 Replaces Unit Number: 556 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 15,000 Justification: This will replace a utility vehicle with a groomer used by the Parks Maintenance staff to level fields that the City maintains. This unit is used from April through September on a regular basis. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 556, which is a 2003 John Deere Pro Gator. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 10 year service life. Description: This equipment will replace a utility vehicle with groomer used by the Parks Maintenance Division for athletic field maintenance. 3 - 28 Project Category: Capital Equipment Project Title: Turf Sweeper Total Estimated Cost: $ 15,000 Funding Priority: 3 Account Number: 410-3172-703100 2018 Project Code: 410.18.72 Future Unit Number: 584 Replaces Unit Number: 583 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 15,000 Justification: This is one of three turf sweepers used by the Parks Maintenance Division to perform leaf and debris collection in City parks. This unit would be used full- time in spring and fall. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 583, which is a 1990 Olathe turf sweeper. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its level of service in City parks and rights-of-way turf maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace a turf sweeper used by the Parks Maintenance Division for debris collection in City maintained properties. 3 - 29 Project Category: Capital Equipment Project Title: Asphalt Roller Trailer Total Estimated Cost: $ 3,000 Funding Priority: 2 Account Number: 410-3174-703100 2018 Project Code: 410.18.74 Future Unit Number: 749 Replaces Unit Number: 746 Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 3,000 Justification: This will replace a trailer used to transport one of our two pavement rollers in the Street Maintenance Division. This unit would be used full-time spring through fall. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 746, which is a 1999 Towmaster trailer. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in pavement maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace our pavement roller trailer used by the Street Maintenance Division. 3 - 30 Project Category: Capital Equipment Project Title: Compressor Total Estimated Cost: $ 14,000 Funding Priority: 2 Account Number: 410-3174-703100 2018 Project Code: 410.18.74 Future Unit Number: 786 Replaces Unit Number: 785 Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 14,000 Justification: This will replace our compressor used in the Street Maintenance Division for blowing out cracks and potholes when repairing pavement. This unit would be used full-time spring through fall. Scheduling and Project Status: Purchase is planned for 2018. The proposed amount includes trade-in of the replaced Unit 785, which is a 1988 Gardner/Denver compressor. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in pavement maintenance. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 30 year service life. Description: This equipment will replace our compressor used by the Street Maintenance Division for pavement maintenance. 3 - 31 Project Category: Capital Equipment Project Title: Utility Vehicle with Groomer Total Estimated Cost: $ 18,000 Funding Priority: 3 Account Number: 410-3172-703100 2019 Project Code: 410.19.72 Future Unit Number: 560 Replaces Unit Number: 531 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 18,000 Justification: This will replace a utility vehicle with a groomer used by the Parks Maintenance staff to level fields that the City maintains. This unit is used from April through September on a regular basis. Scheduling and Project Status: Purchase is planned for 2019. The proposed amount includes trade-in of the replaced Unit 531, which is a 1999 Toro Workman. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 10 year service life. Description: This equipment will replace a utility vehicle with groomer used by the Parks Maintenance Division for athletic field maintenance. 3 - 32 Project Category: Capital Equipment Project Title: Aeration Tool Attachment Total Estimated Cost: $ 7,000 Funding Priority: 3 Account Number: 410-3172-703100 2019 Project Code: 410.19.72 Future Unit Number: 588 Replaces Unit Number: 586 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 7,000 Justification: This will replace the existing aeration tool attachment used by the Parks Maintenance staff to condition soils on fields and parks that the City maintains. This unit is used on a limited basis from April through September on a regular basis. Scheduling and Project Status: Purchase is planned for 2019. The proposed amount includes trade-in of the replaced Unit 586, which is a 1997 Aera-vator AE60. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace our existing aeration attachment used by the Parks Maintenance Division for parks and fields. 3 - 33 Project Category: Capital Equipment Project Title: Dump Truck with Hot Mix Box Total Estimated Cost: $ 170,000 Funding Priority: 2 Account Number: 410-3174-703100 2019 Project Code: 410.19.74 Future Unit Number: 734 Replaces Unit Number: 730 Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 170,000 Justification: This will replace the existing dump truck with a pothole patch hot mix box used by the Street Maintenance staff to maintain asphalt pavements citywide. The truck is also outfitted for first-line winter plowing. This unit is used on a regular basis year round. Scheduling and Project Status: Purchase is planned for 2019. The proposed amount includes trade-in of the replaced Unit 730, which is a 2005 International. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to maintain its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace our existing pothole patching truck used by the Street Maintenance Division. 3 - 34 Project Category: Capital Equipment Project Title: Asphalt Roller Total Estimated Cost: $ 17,000 Funding Priority: 2 Account Number: 410-3174-703100 2019 Project Code: 410.19.74 Future Unit Number: 755 Replaces Unit Number: 745 Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 17,000 Justification: This will replace the smaller of our two pavement rollers in the Street Maintenance Division. This unit would be used full-time spring through fall. Scheduling and Project Status: Purchase is planned for 2019. The proposed amount includes trade-in of the replaced Unit 745, which is a 1999 Beuthling B150 roller. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in pavement maintenance. This equipment is paired with the replacement of one of our roller trailers, Unit 742. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace one of our pavement rollers used by the Street Maintenance Division. 3 - 35 Project Category: Capital Equipment Project Title: Asphalt Roller Trailer Total Estimated Cost: $ 3,000 Funding Priority: 2 Account Number: 410-3174-703100 2019 Project Code: 410.19.74 Future Unit Number: 757 Replaces Unit Number: 742 Equipment Selection: Public Works Street Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 3,000 Justification: This will replace a trailer used to transport one of our two pavement rollers in the Street Maintenance Division. This unit would be used full-time spring through fall. Scheduling and Project Status: Purchase is planned for 2019. The proposed amount includes trade-in of the replaced Unit 742, which is a 1995 Towmaster trailer. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in pavement maintenance. This equipment is paired with the replacement of one of our rollers, Unit 745. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace our pavement roller trailer used by the Street Maintenance Division. 3 - 36 Project Category: Capital Equipment Project Title: Highway Mower Tractor Total Estimated Cost: $ 45,000 Funding Priority: 3 Account Number: 410-3172-703100 2020 Project Code: 410.20.72 Future Unit Number: 554 Replaces Unit Number: 514 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 45,000 Justification: This will replace our tractor used with a side and rear flail mower attachment by the Parks Maintenance to maintain vegetation on highway and street rights-of- way. This unit would be used full-time in spring and fall. Scheduling and Project Status: Purchase is planned for 2020. The proposed amount includes trade-in of the replaced Unit 514, which is a 2000 John Deere 6410 tractor. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in City rights-of-way turf maintenance. This equipment is paired with our flail mower attachment. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life. Description: This equipment will replace our tractor used by the Parks Maintenance Division for right-of-way maintenance. 3 - 37 Project Category: Capital Equipment Project Title: Tandem Mower Trailers Total Estimated Cost: $ 10,000 Funding Priority: 3 Account Number: 410-3172-703100 2020 Project Code: 410.20.72 Future Unit Number: 578 & 579 Replaces Unit Number: 523 and 533 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 10,000 Justification: This will replace our two tandem axle trailers used to transport mowers for our Parks Maintenance Division. This unit would be used full-time spring through fall. Scheduling and Project Status: Purchase is planned for 2020. The proposed amount includes trade-in of the replaced Unit 523 and 533, which were purchased in 2005 and 2000, respectively. Relationship to General Plan and Other Projects: This equipment purchase will allow the City to keep its level of service in pavement maintenance. This equipment is paired with our mowing equipment, and preserves mileage and hours on this equipment. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment will replace two tandem axle mower trailers used by the Park Maintenance Division. 3 - 38 Project Category: Capital Equipment Project Title: Pickup Truck Total Estimated Cost: $ 20,000 Funding Priority: 2 Account Number: 410-3172-703100 2020 Project Code: 410.20.72 Future Unit Number: 564 Replaces Unit Number: 558 Equipment Selection: Public Works Parks Maintenance Division Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Equipment Funding $ 20,000 Justification: This vehicle is used as transportation for Parks Maintenance staff year-round. Scheduling and Project Status: Purchase is planned for 2020. The proposed equipment is similar to Unit 558, which is a 2007 GMC Sierra ¾-ton pickup truck. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 12 year service life. Description: This equipment will replace one of our pickups used to transport Parks Maintenance crews and equipment. 4 - 1 Project Category: Technology Improvements Project Title: Technology Purchases/Upgrades Total Estimated Cost: $878,500 Funding Priority: 2 Account Number: Project Code: 705017 Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $ 149,500 $ 146,000 $ 181,000 $ 246,000 $ 156,000 Justification: Systematic maintenance and upgrading of computers, network equipment, printers, peripheral devices, and software. Most PCs are on a four-year replacement cycle. Laptops used in difficult environments are replaced every three years. Printers are eligible for replacement every four years but are only replaced if there are significant problems with an individual device. Software is typically purchased at the same time as the PC it will be loaded on to, and is usually only upgraded/replaced with that PC. Network equipment, including servers and LAN/WAN hardware, are eligible for replacement every four years. Scheduling and Project Status: PCs and printers are purchased through the year after consultation with the affected departments and users. Network equipment is analyzed on a yearly basis to determine if it is still meeting the needs of the city. Some specific expenditures include: 2016: Several network servers are eligible for replacement. 2016: Costs related to the expansion of Springbrook Nature Center. 2016: Installation of projection equipment in conference room. Relationship to General Plan and Other Projects: Budgeting and purchasing technology equipment and software through the MIS Fund allows the city greater flexibility to direct resources where they are most needed rather than relying on individual department budgets. Effect on Annual Operations Costs: Annual maintenance costs may increase as old equipment is replaced or as new equipment is added. These maintenance costs are a part of the general fund operating budget. Description: Funding for replacement of computers, including desktops, laptops and servers, local area network equipment, printers, peripheral devices, telecommunication improvements, and software over the next 5 years. Also provides for the purchase of new equipment and software that serves the city as a whole. 4 - 2 Project Category: Technology Improvements Project Title: Police 2-Factor Authentication Total Estimated Cost: $338,658 (includes prior years) Funding Priority: 1 Account Number: Project Code: 705023 Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $40,700 $ 40,700 $75,400 $40,700 $ 40,700 Justification: Advanced authentication and encrypted communications for all police mobile units is mandated by the FBI and State of MN BCA as of 2014. This requirement is satisfied through the implementation of a two-factor authentication system requiring officers to both know a password and possess an authentication token to access Criminal Justice (CJIS) data. Scheduling and Project Status: System implementation will be completed in 2014. Fridley has partnered with the City of Blaine to spread fixed costs over more users. Based on a four-year lifetime, system hardware will likely require replacement in 2018. Relationship to General Plan and Other Projects: This project will integrate with the implementation of Police Tablet Computers to facilitate police data communications. Effect on Annual Operations Costs: Fridley Police Department will be responsible for their annual operating costs. Description: Implement Advanced (Two-Factor) Authentication and secure VPN for all police mobile units. 4 - 3 Project Category: Technology Improvements Project Title: Document Imaging Total Estimated Cost: $30,000 Funding Priority: 2 Account Number: Project Code: Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $10,000 $ 10,000 $ 10,000 $0 $ 0 Justification: The early stages of implementation of document imaging within the city have proven to be successful in improving access to information, speeding up retrieval times, and increasing the productivity of various operating departments. Based upon this success, it is believed that the expansion of the system into additional documents types, along with the building of additional workflow processes, will provide further improvements. In addition, the city will be able to leverage the ability of the city’s new financial system to integrate with document imaging archives. Scheduling and Project Status: Improvements are continual and ongoing. Relationship to General Plan and Other Projects: This project facilitates several other projects within the city, as well and productivity improvements in several departments. Effect on Annual Operations Costs: The city’s cost for annual maintenance will rise based on the number and type of additional user licenses required by the inclusion of various documents types and workflow processes. Description: Expansion and improvement of the city’s document imaging system. 4 - 4 Project Category: Technology Improvements Project Title: EOC Smartboard Total Estimated Cost: $30,000 Funding Priority: 2 Account Number: Project Code: Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $ 30,000 $ 0 $ 0 $ 0 $ 0 Justification: This Emergency Operations Center is used by both police and fire departments and is the backup EOC for Anoka County. Currently, public safety is using an ageing white board and projector. A smart board would allow the command staff to retain screen shots of what is being displayed during emergencies and would allow investigators to preplan their search warrants on the screen and then print the assignments off for their team members. This project would replace the white board with a plasma smart board, a new AV matrix for switching between inputs, a new computer to control the smart board, and a rack to hold all the equipment. Scheduling and Project Status: Costs would primarily be incurred at the beginning of the project when equipment and licenses are purchased. Implementation would occur thereafter. Relationship to General Plan and Other Projects: This project is independent of any other city IT projects. Effect on Annual Operations Costs: There is no expected annual maintenance unless any equipment needed to be repaired. Any repairs to future equipment would be handed by either the police or fire departments. Description: Installation of a Smartboard, and updating of associated AV equipment in the Emergency Operations Center. This is a joint project between Police and Fire. 4 - 5 Project Category: Technology Improvements Project Title: Facilities Registration System Total Estimated Cost: $15,000 Funding Priority: 2 Account Number: Project Code: Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $ 15,000 $ 0 $ 0 $ 0 $ 0 Justification: The primary objective is to allow residents to view the availability of park facilities (shelters, ball fields, etc.) online and be able to reserve a facility without having to call or come to city hall. The Recreation office staff processes over 100 shelter reservations each year and numerous facility reservations. This software will provide a convenience to residents and allow the redirection of staff resources. Scheduling and Project Status: The project will be initiated during Q1 2016, so the system can be online for spring and summer registrations. Costs would primarily be incurred at the beginning of the project when software and licenses are purchased. Relationship to General Plan and Other Projects: The reservation software is intended to be integrated into the existing Parks and Recreation activities registration system. Effect on Annual Operations Costs: Annual maintenance fees would be paid by the Parks & Recreation General Fund budget. Description: Purchase and install reservation software to allow for on-line reservations of parks and recreation facilities. 4 - 6 Project Category: Technology Improvements Project Title: Code Enforcement System Total Estimated Cost: $40,600 Funding Priority: 2 Account Number: Project Code: Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $ 40,600 Justification: The City Council has been supportive of aggressive code enforcement. This system will replace the aging, custom-designed system currently in use, enabling our inspectors to input data in the field and take photographs instantly attach them to cases. One of the time saving benefits of this new system is its ability to map necessary re-inspections, enabling the coordination of multiple code enforcement staff, potentially saving both time and fuel. The proposed software is also accessible via the internet, so staff could access the system from home and conduct inspections on their way into work. Scheduling and Project Status: The system is intended to be operational by May 1, 2016 for use during summer systematic code enforcement. Relationship to General Plan and Other Projects: This system is made by Tyler Technologies, so it is designed to be compatible with the new Finance system, making it possible with additional advancements in the future for the two systems to communicate with each other when we need to process special assessments related to public nuisance abatements. Effect on Annual Operations Costs: The annual maintenance fee of $9,200 will be paid from the Planning General Fund budget. Description: Purchase and install software enabling Planning staff to enter code enforcement data in the field and attach photos to cases. 4 - 7 Project Category: Technology Improvements Project Title: Phone System Replacement Total Estimated Cost: $50,000 Funding Priority: 2 Account Number: Project Code: Source of Project Funding 2016 2017 2018 2019 2020 MIS Fund $50,000 $ 0 $ 0 $0 $ 0 Justification: The current phone system and handsets were originally purchased in 1999. The system was upgraded in 2009 to extend its life an additional 5-7 years and will need replacement. When the city decides to replace its phone system, IP phone providers connected to the Anoka County fiber network would be a possibility, though new handsets would still have to be purchased. The city could also investigate cost sharing with another on the fiber network. Scheduling and Project Status: Originally planned for implementation in 2016, but project will remain on hold until the building feasibility study is complete. Relationship to General Plan and Other Projects: This project will leverage the upgrade of the city’s network switching infrastructure scheduled for 2015. Effect on Annual Operations Costs: If the city chooses to purchase its own phone system, operating costs would be similar to existing costs. If the city, instead, chooses to utilize a VoIP vendor, the initial project costs would be lower, but operating costs would rise accordingly based on the number of phones supported. Description: Replacement of phone system and handsets originally purchased in 1999 and upgraded in 2009. 5 - 1 Project Category: B u i l d i n g s C I P Project Title: Municipal Center HVAC Retrofit Total Estimated Cost: $ 130,000 (over five years) Funding Priority: 2 Account Number: 405-3115-702100 2016 Project Number: 405-16-460 Reimbursements: Possible rebates through CenterPoint Energy Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 25,000 $ 25,000 $ 50,000 $ 30,000 (final) Justification: This project consists of multi-year replacement or retrofit of rooftop HVAC units at the Municipal Center. There are 16 units that serve to heat and cool the building housing staff from all City Departments. These are over 20 years old, and are becoming inefficient and maintenance-intensive. The proposed budget includes $25,000 in 2016 for this work. Scheduling and Project Status: This is the sixth year of replacements under this program. The 2018 project includes addition of controls to operate the units installed in 2015 through 2018. Completion of this project is anticipated in 2018, with one additional year to provide retrofits and repairs to other central HVAC systems. Relationship to General Plan and Other Projects: In 2016, the seventh of ten phases of HVAC retrofit is proposed. On a prior year, two phases were completed. Effect on Annual Operations Costs: The project is anticipated to provide an annual savings of approximately $2,500 in reduced power consumption and maintenance. The project will be administered and coordinated by the Engineering Division. Description: This item funds a phase of a multi-year HVAC retrofit at the Fridley Municipal Center. 5 - 2 Project Category: B u i l d i n g s C I P Project Title: Municipal Center Exterior Repairs Total Estimated Cost: $ 200,000 (over five years) Funding Priority: 2 Account Number: 405-3110-xxxxxx 2016 Project Number: 405-16-461 Reimbursements: None Design and Inspection: Contracted, Coordination with Various Departments Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 100,000 $ 100,000 Justification: This project consists of needed repairs to the Fridley Municipal Center to address structural and drainage repairs to extend the service life of the building. Scheduling and Project Status: This project will address the most necessary repair work in 2015, and will be continued in 2018-19. Relationship to General Plan and Other Projects: This project is stand alone, and will allow current service levels of the Municipal Center to be maintained. Effect on Annual Operations Costs: This project will not have an effect on operations costs, but would reduce potential for future costs through repairs. Description: This item funds repairs needed on the exterior of the Municipal Center to address water intrusion and aging. 5 - 3 Project Category: B u i l d i n g s C I P Project Title: Municipal Center Work Station Replacements/Repairs Total Estimated Cost: $ 80,000 Funding Priority: 3 Account Number: 2016 Project Number: T B D Reimbursements: None Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 20,000 $ 20,000 $ 20,000 $ 20,000 Justification: This project consists of replacement of work station fixtures at the Fridley Municipal Center. More efficient and functional work components are available to replace existing office chairs, desks, and storage. The project is planned to be accompanied by in-house work station analysis and definition of storage needs in coordination with proposed cubicle replacements/retrofits. Scheduling and Project Status: This is a five year project, including prior funded years. A shorter timeframe for replacement may be considered if substantial savings would result. Relationship to General Plan and Other Projects: This project is stand alone, and will allow current service levels of the Municipal Center to be maintained. Effect on Annual Operations Costs: There will be a slight reduction in repair costs and increase in efficiencies anticipated through this project. The project will be administered and coordinated by the Engineering Division. Description: This item funds replacement of work station fixtures serving staff located at the Fridley Municipal Center from all Departments. 5 - 4 Project Category: Buildings CIP Project Title: Municipal Center Storage, Cabinets, and Fixtures Total Estimated Cost: $ 24,000 Funding Priority: 3 Account Number: 405-3115-XXXXX 2016 Project Number: 405-16-952 Reimbursements: N o n e Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: Public Works Department Engineering, Streets, and Parks Division Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 6,000 $ 6,000 $ 6,000 $ 6,000 Justification: This project consists of replacement of storage cabinets, appliances, and fixtures in common areas of the Fridley Municipal Center. Most of these elements are over 25 years old and some have been identified are inefficient or in need of repair. Scheduling and Project Status: This is a five year project, including prior funded years. A shorter timeframe for replacement may be considered if substantial savings would result. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: There will be a slight reduction in repair costs and increase in efficiencies anticipated through this project. The project will be administered and coordinated by the Engineering Division. The Streets and Parks Divisions have skilled carpenters that can support the project with construction and installation. Description: This item funds replacement of storage, cabinets, and fixtures serving staff located at the Fridley Municipal Center from all Departments. 5 - 5 Project Category: Buildings CIP Project Title: Municipal Center Site Analysis Total Estimated Cost: $ 75,000 Funding Priority: 2 Account Number: 405-3115-XXXXX 2016 Project Number: 405-16-480 Reimbursements: N o n e Design and Inspection: Various Department Planning Efforts Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 75,000 Justification: This project will include analysis that would provide future cost basis to evaluate the potential of a future relocation of the Fridley Municipal Center Scheduling and Project Status: This project would be initiated upon direction of preferred alternatives analysis of potential Municipal Center sites, if a select site becomes feasible, and may be initiated by 2016. Relationship to General Plan and Other Projects: This project provides valuable insight to provide cost comparisons for the future of city facilities, and therefore has impact on maintenance projects that have been funded but deferred ($1.2 million). Effect on Annual Operations Costs: The project itself will not have an impact on operations costs, but will provide information that will minimize long-term costs for city facilities. Description: This item funds preliminary planning and analysis for a future Municipal Center site, elements include geotechnical testing, surveying and preliminary layouts. 5 - 6 Project Category: B u i l d i n g s C I P Project Title: Gun Range Backstop Total Estimated Cost: $ 96,000 Funding Priority: 2 Account Number: 405-2110-xxxxx 2016 Project Number: 405-16-481 Reimbursements: None Design and Inspection: Contracted Coordinated with Police Dept. Payroll Logged to Project: Police Department Source of Project Funding 2016 2017 2018 2019 2020 Capital Improvement Fund $ 96,000 Justification: The indoor police gun range, constructed during the 1988-89 Municipal Center remodel, allows target shooting out to 21 yards which is short of the 25 yard industry standard for firearms qualification and training purposes. The gun range uses an escalator backstop consisting of angled steel impact plates with a deceleration chamber into which bullets are deflected, losing their inertia before falling into a collection bin. The backstop is not suitable for rifles. The Police Department must rent other gun range facilities in order to conduct required rifle training and qualification shoots as well as to test and sight-in rifles during replacement, repair and maintenance. The backstop allows bullet fragmentation which contributes to lead contamination and exposure. This project upgrade will replace the existing steel escalator backstop with a rubber block backstop consisting of formed rubber blocks into which bullets are fired and captured (see picture). The new backstop will allow target shooting out to 25 yards and will allow use of rifle calibers. The new backstop will also mitigate projectile fragmentation and lead contamination. Scheduling and Project Status: Design and construction will be completed in 2016. Relationship to General Plan and Other Projects: This project is stand alone, and will enhance the functionality and safety of a Municipal Center facility. Effect on Annual Operations Costs: This project will provide a modest decrease in range rental fees in the Police operating budget. The project will be administered and coordinated by the Police Department. Description: This item funds an upgrade of the indoor police gun range to permit required police training and qualification shooting using patrol rifles. 5 - 7 Project Category: Buildings CIP Project Title: Municipal Center Lower Level R e m o d e l Total Estimated Cost: $ 480,000 Funding Priority: 1 Account Number: 2017 Project Number: T B D Reimbursements: N o n e Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 80,000 $ 400,000 Justification: This project provides limited upgrades to lower level service counters to avoid conflicts between Police and Recreation users. The project also provides for very limited square footage gain for immediate storage needs in the Fridley PD. Scheduling and Project Status: This project would be initiated upon direction of results of potential Municipal Center site evaluation, if no select site becomes feasible. Relationship to General Plan and Other Projects: This project would be eliminated if direction of the future Fridley Municipal Center is at a new site. Effect on Annual Operations Costs: The project itself will not have an impact on operations costs, but will have limited improvement in a small fraction of overdue needs in the Fridley Municipal Center. Description: This item funds the highest priority entrance and upgrades on the lower level of the Fridley Municipal Center, identified by the 2014 Building Assessment. 5 - 8 Project Category: Buildings CIP Project Title: Municipal Center Electrical and Mechanical Repair/Retrofit Total Estimated Cost: $ 2,100,000 Funding Priority: 1 Account Number: 2020 Project Number: XXXX Reimbursements: N o n e Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $2,100,000 Justification: This project provides for addressing the highest priority electrical and mechanical upgrades at the Fridley Municipal Center, including fire protection, electrical retrofit, generator replacement, plumbing, and exterior repairs for the Municipal Center buildings. Scheduling and Project Status: This project would be initiated upon direction of results of potential Municipal Center site evaluation, if no select site becomes feasible. Relationship to General Plan and Other Projects: This project would be eliminated if direction of the future Fridley Municipal Center is at a new site. Effect on Annual Operations Costs: The project itself will not have an impact on operations costs, but will improve the Municipal Center’s code compliance and safety. Description: This item funds essential electrical and mechanical retrofit and repair at the Fridley Municipal Center, identified by the 2014 Building Assessment. 5 - 9 Project Category: Buildings CIP Project Title: Municipal Center Reconstruction Total Estimated Cost: $ 14,150,000 Funding Priority: 2 Account Number: Finance Project Number: XXXX Reimbursements: N o n e Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: None Source of Project Funding UNFUNDED Capital Building Fund $14,150,000 Justification: This project provides for addressing the long-term space needs at the Fridley Municipal Center so that it can remain functionally viable for the coming decades. Scheduling and Project Status: This project would be initiated upon direction of results of potential Municipal Center site evaluation, if no select site becomes feasible. The project is currently not scheduled as a funding source is not identified. Relationship to General Plan and Other Projects: This project would be eliminated if direction of the future Fridley Municipal Center is at a new site. Effect on Annual Operations Costs: The project would have a substantial impact upon the day-to-day efficiency of the operation of the Fridley Municipal Center, and provide an improved level of service to the city’s constituents. Description: This item funds the reconstruction of the existing Fridley Municipal Center to address the space needs identified by the 2014 Building Assessment. 5 - 10 Project Category: B u i l d i n g s C I P Project Title: Public Works Garage Storage Yard and Drainage Retrofits Total Estimated Cost: $ 85,000 Funding Priority: 2 Account Number: 405-3176-xxxxxx 2017 Project Number: 405-17-489 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering, Streets, and Parks Division Source of Project Funding 2016 2017 2018 2019 2020 Capital Building Fund $ 85,000 Justification: This project consists of improvements to screening and drainage needed at the Public Works Garage yard. An exchange of property with Anoka County Parks is essential to providing these improvements with the greatest economy. Scheduling and Project Status: This project is proposed to be initiated and completed in 2017. Property discussions have been initiated. Relationship to General Plan and Other Projects: This project will be coordinated with conceptual plans for Public Works Garage upgrades at its existing site. Effect on Annual Operations Costs: There will be improved storm water quality and screening of the Public Works Garage with this project. The project will be administered and coordinated by the Engineering Division. The Streets and Parks Divisions have skilled will support the project with construction and installation. Description: This project funds a property exchange with Anoka County Parks, screening and drainage improvements to enable the Public Works staff to function at their current site. 5 - 11 Project Category: Buildings CIP Project Title: Public Works Garage Reconstruction Total Estimated Cost: $ 7,000,000 Funding Priority: 2 Account Number: Finance Project Number: XXXX Reimbursements: N o n e Design and Inspection: Engineering Staff, Coordination with Various Departments Payroll Logged to Project: None Source of Project Funding UNFUNDED Capital Building Fund $7,000,000 Justification: This project provides for addressing the long-term space, safety, and efficiency needs at the Fridley Municipal Garage so that it can remain functionally viable for the coming decades. It includes Phase 1 and 2 projects identified in the 2014 Building Assessment. Phase 3 projects ($6.5 million) are not included in this initial work plan. Scheduling and Project Status: This project would be initiated upon direction of results of potential municipal facilities site evaluation, if no select site becomes feasible for the Public Works Garage. The project is currently not scheduled as a funding source is not identified. Relationship to General Plan and Other Projects: This project would be eliminated if direction of the future Fridley Public Works Garage is at a new site. Effect on Annual Operations Costs: The project would have a substantial impact upon the day-to-day efficiency and safety of the Fridley Public Works Department’s maintenance operations, and provide an improved level of service to the city’s constituents. Description: This item funds the reconstruction of the first two phases of the existing Fridley Public Works Garage to address the space needs identified by the 2014 Building Assessment. 5 - 12 Project Category: Buildings Project Title: Fridley Community Center Furnishings and Fixtures Total Estimated Cost: $ 25,000 Funding Priority: 3 Account Number: 405-4100-xxxxxx 2016 Project Number: 405-16- Reimbursements: None Design and Inspection: Recreation Department Payroll Logged to Project: Recreation Department Source of Project Funding 2016 2017 2018 2019 2020 Capital Improvement Fund $ 5,000 $ 5,000 $ 5,000 Justification: This multi-year project consists of replacement of indoor and outdoor fixtures and furnishings at the Fridley Community Center. Non-serviceable pieces will be selected for replacement. Scheduling and Project Status: 2015 was the first year of a five year project. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: There will be a slight reduction in repair costs anticipated through this project. The project will be administered and coordinated by the Recreation Department. Description: This project funds replacement of indoor and outdoor fixtures and furnishings at the Fridley Community Center. 5 - 13 Project Category: Buildings Project Title: Fire Station Floor Resurfacing Total Estimated Cost: $ 25,000 Funding Priority: 2 Account Number: 405-2510-xxxxxx 2016 Project Number: 405-16-482 Reimbursements: None Design and Inspection: Fire Department Payroll Logged to Project: Fire Department Source of Project Funding 2016 2017 2018 2019 2020 Capital Improvement Fund $ 25,000 Justification: This project consists of resurfacing the apparatus floors at all Fire Stations. Scheduling and Project Status: This project is proposed to be designed and completed in 2016. Relationship to General Plan and Other Projects: This project is stand alone, and will improve maintenance of the fire station floors. Effect on Annual Operations Costs: The project is anticipated to have minimal impact on annual operations costs. Description: This project funds floor resurfacing at Fire Stations 1, 2 & 3. 5 - 14 Project Category: Buildings Project Title: Fire Station 1 Kitchen Improvements Total Estimated Cost: $ 15,000 Funding Priority: 2 Account Number: 405-2510-xxxxxx 2016 Project Number: 405-16-483 Reimbursements: None Design and Inspection: Fire Department Payroll Logged to Project: Fire Department Source of Project Funding 2016 2017 2018 2019 2020 Capital Improvement Fund $ 15,000 Justification: This project consists of replacing damaged flooring, cabinets and appliances. Scheduling and Project Status: This project is proposed to be designed and completed in 2016. Relationship to General Plan and Other Projects: This project is stand alone, and will improve functionality of the Firefighters cooking facilities. Effect on Annual Operations Costs: The project is anticipated to have minimal impact on annual operations costs. Description: This project funds replacing damaged flooring, cabinets and making improvements to the kitchen space. 5 - 15 Project Category: Buildings Project Title: Fire Station 2 & 3 Building Repairs Total Estimated Cost: $ 25,000 Funding Priority: 2 Account Number: 405-2510-xxxxxx 2017 Project Number: 405-17-487 Reimbursements: None Design and Inspection: Fire Department Payroll Logged to Project: Fire Department Source of Project Funding 2016 2017 2018 2019 2020 Capital Improvement Fund $ 25,000 Justification: This project consists of repairing or replacing damaged building components including replacing inefficient lighting in the apparatus bays. Scheduling and Project Status: This project is proposed to be designed and completed in 2017. Relationship to General Plan and Other Projects: This project is stand alone, and will improve functionality of the fire department facilities. Effect on Annual Operations Costs: The project is anticipated to have some impact on annual operations costs as they relate to power consumption. Description: This project funds maintenance of Fire Stations 2 & 3. 5 - 16 Project Category: Buildings Project Title: Propane Fire Simulator Total Estimated Cost: $ 100,000 Funding Priority: 2 Account Number: 405-2510-xxxxxx 2017 Project Number: 405-17-488 Reimbursements: None Design and Inspection: Fire Department Payroll Logged to Project: Fire Department Source of Project Funding 2016 2017 2018 2019 2020 Capital Improvement Fund $ 100,000 Justification: This project consists of installation of a propane fueled fire simulator in the training facility residential building. The ability to train in the live fire environment is limited by the Fire Department’s ability to obtain structures, the cost of permits and meeting strict environmental regulations and the cost of traveling to and renting other facilities. By installing a simulator in the existing training building firefighters will have the opportunity to safely train under live controlled fire conditions that are within the Department’s response area. Fewer structure fires also necessitate the need for experience in live fire training. Scheduling and Project Status: This project is proposed to be designed and completed in 2017. Relationship to General Plan and Other Projects: This project is stand alone, and will improve ability of firefighters to train in an environment otherwise not available. Effect on Annual Operations Costs: Fuel for the operation of the simulator will add additional annual cost. Description: This project funds installation of a propane fire simulator in the training facility residential building. 6 - 1 Project Category: Parks CIP Project Title: Court Surfacing and Overlays Total Estimated Cost: $ 161,000 Funding Priority: 2 Account Number: 407-3172-xxxxxx 2016 Project Number: 407-16-902 Reimbursements: Parks Reserve Fund and/or USTA funds Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Public Works Parks Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Parks Reserve Funding +2014 $30,000 and 2015 $30,000 $ 30,000 $ 32,000 $ 32,000 $ 32,000 $ 35,000 encumbrance Justification: Court resurfacing is needed on the City's basketball and tennis courts with a color coating material. Color coating material needs to be reapplied every 3-4 years in order to keep the courts in acceptable playing condition. Scheduling and Project Status: Courts to be color coated are determined annually by the Park Maintenance Supervisor and the Parks and Recreation Director. Tennis court resurfacing is included. Also, some courts will require asphalt overlays or replacement of the asphalt surface Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project involves resurfacing of tennis and basketball courts. 6 - 2 Project Category: Parks CIP Project Title: Park Furnishings Total Estimated Cost: $ 58,000 Funding Priority: 2 Account Number: 407-3172-xxxxxx 2016 Project Number: 407-16-903 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Public Works Parks Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Parks Reserve Funding $ 10,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000 Justification: This project consists of selective replacement of picnic tables, park benches, signs, fences, and other fixtures throughout City parks to maintain the quality and safety of City parks. Scheduling and Project Status: Fixture replacements are determined annually by the Park Maintenance Supervisor and the Parks and Recreation Director based on regular equipment inspections. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project consists of selective replacement of picnic tables, park benches, signs, fences, and other fixtures throughout the City park system. 6 - 3 Project Category: Parks CIP Project Title: Parking Lot Resurfacing Total Estimated Cost: $ 265,000 Funding Priority: 1 Account Number: 407-3172-xxxxxx 2016 Project Number: 407-16-464 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Recreation Department and Public Works Parks Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Parks Reserve Funding $ 125,000 $ 90,000 $ 0 $ 50,000 $ 0 Justification: Parking lot surfaces at Springbrook Nature Center and Moore Lake Park are in need of repair or replacement. Scheduling and Project Status: Installation of the first phase is to be completed in 2016 at Springbrook Nature Center; the second and third phases would be completed in 2017 and 2019, respectively at Moore Lake Park. Relationship to General Plan and Other Projects: Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project is for the resurfacing of parking lot surfaces at Moore Lake Park. 6 - 4 Project Category: Parks CIP Project Title: SNC Boardwalk Replacement Total Estimated Cost: $ 100,000 Funding Priority: 2 Account Number: 407-3172-xxxxxx 2016 Project Number: 407-16-433 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Recreation Department and Public Works Parks Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Parks Reserve Funding $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 0 Justification: This project includes replacement the existing trails, bridges, and boardwalks at the Springbrook Nature Center. There are repairs and replacement needed to bring the boardwalks into safe condition. Scheduling and Project Status: Construction will be completed over a five year period, with first phase in 2015. Relationship to General Plan and Other Projects: The 2015 project completes the replacement of the 800 foot floating boardwalk segments. Additional shorter segments replaced in 2016 - 2020. Effect on Annual Operations Costs: This project will reduce maintenance costs needed to repair existing trails, bridges and boardwalks. Description: This project constitutes work to repair and replace trails, bridges and boardwalks at Springbrook Nature Center. 6 - 5 Project Category: Parks CIP Project Title: Playground Equipment Replacement Total Estimated Cost: $ 490,000 Funding Priority: 1 Account Number: 407-3172-xxxxxx 2016 Project Number: 407-46-493 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Recreation Department and Public Works Parks Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Parks Reserve Funding $ 30,000 $ 80,000 $ 115,000 $ 115,000 $ 150,000 Justification: Playground equipment in the neighborhood parks will need some upgrading and replacement to keep the parks attractive and as a useful recreation outlet for pre- school and elementary age children. Scheduling and Project Status: Installation of the first equipment in 2015; to be followed by annual installations through 2020 and beyond. Relationship to General Plan and Other Projects: The project adds playground equipment to neighborhood parks as determined by the Parks and Recreation Director and the Parks Maintenance Division Supervisor. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This project includes the replacement installation of children’s playground equipment in the neighborhood parks. 6 - 6 Project Category: Parks CIP Project Title: Security Cameras Total Estimated Cost: $ 60,000 Funding Priority: 1 Account Number: 407-3176-xxxxxx 2013 Project Number: 407-16-476 Reimbursements: Parks Reserve Fund Design and Inspection: Recreation Department and Public Works Parks Maintenance Division Payroll Logged to Project: Recreation Department and Public Works Parks Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Parks Reserve Funding $ 30,000 $ 30,000 $ 0 $ 0 $ 0 Justification: Increasing vandalism and graffiti at larger parks requires improved security measures. Scheduling and Project Status: Installation of the security cameras in 2016 and 2017 Relationship to General Plan and Other Projects: Security cameras for Commons, Community, Moore Lake, Madsen and Flanery Parks. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. May reduce maintenance costs with lower vandalism and graffiti issues. Description: This project is providing security cameras at Commons, Community and Moore Lake Parks. 6 - 7 Project Category: P a r k s C I P Project Title: Springbrook Nature Center Interpretive Building Total Estimated Cost: $ 5,000,000 Funding Priority: 2 Account Number: Project Code: Reimbursements: State Bonding Funds via Met Council Source of Project Funding 2016 2017 2018 2019 2020 State of Minnesota Capital Investment $ 2,000,000 $ 0 $ 0 $ 0 Justification: This project consists of renovating the existing 5,800 square foot Springbrook Nature Center interpretive building and constructing a 8000 square foot addition. The facility will have new and expanded teaching/classroom spaces; new and expanded exhibit spaces; and an inspirational gathering space to accommodate up to 250 for weddings, retreats, lectures, and large program events. The facility will use active and passive “green technology” for energy savings and public exhibit. The facility plans to have extensive views into nature and wildlife. Scheduling and Project Status: Design of the project will start in mid-2014 and continue into early 2015. It is expected that construction will begin in 2015 and be completed in 2016. Relationship to General Plan and Other Projects: This is a new project to make necessary improvements and additions to the Springbrook Nature Center. Effect on Annual Operations Costs: This project will increase operating costs for the Springbrook Nature Center. Additional program and rental revenues will offset the increase in costs. Description: This project is to design, construct, equip and furnish an addition and remodel of the Springbrook Nature Center Interpretive Building. The project will be paid for with a $5M grant from the State of Minnesota. 7 - 1 7 - 2 Project Category: Streets CIP Project Title: Street Rehabilitation Project ST2016-01 Total Estimated Cost: $ 800,000 Funding Priority: 1 Account Number: 406-3174-638180 2016 Project Number: 406-16-01 Reimbursements: Municipal State Aid Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Municipal State Aid $ 800,000* *Special Assessments estimated at $600,000 to reimbursement to the Street Reserve Fund as collected. Justification: This project is included in the City’s long-range pavement management plan. Bi-annual road ratings have identified candidate segments based on condition. Other considerations include age, coordination with other projects, and upgrades needed. Scheduling and Project Status: This project is presently scheduled for 2016 construction. Preliminary design, workshop, and assessment hearing is planned to occur upon preliminary CIP approval in 2015. Relationship to General Plan and Other Projects: This project is consistent with the street pavement preservation program. Sewer, storm sewer, and water system surveys will need to be completed prior to plan development to determine the extent of repairs needed on the city’s utility systems. These costs are approximated in the above estimates. This project will be coordinated with CenterPoint Energy and other private utilities in regard to replacement of their aging systems. A stormwater management component with cost share between the City of Fridley, City of Columbia Heights, and MWMO is being developed in conjunction with this project. Effect on Annual Operations Costs: This project will reduce operating costs relating to street and utility maintenance in the project area. Description: This project involves the reclamation of various street segments and minor repairs to utilities on various streets in the Plymouth neighborhood. 7 - 3 Project Category: Streets CIP Project Title: Street Rehabilitation Project ST2017-01 Total Estimated Cost: $ 770,000 Funding Priority: 1 Account Number: 406-3174-638180 2017 Project Number: 406-17-01 Reimbursements: Municipal State Aid Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Municipal State Aid $ 770,000* *Special Assessments estimated at $560,000 to reimbursement to the Street Reserve Fund as collected. Justification: This project is included in the City’s long-range pavement management plan. Bi-annual road ratings have identified candidate segments based on condition. Other considerations include age, coordination with other projects, and upgrades needed. Scheduling and Project Status: This project is presently scheduled for 2017 construction. Preliminary design, workshop, and assessment hearing is planned to occur upon preliminary CIP approval in 2016. Relationship to General Plan and Other Projects: This project is consistent with the street pavement preservation program. Sewer, storm sewer, and water system surveys will need to be completed prior to plan development to determine the extent of repairs needed on the city’s utility systems. These costs are approximated in the above estimates. This project will be coordinated with CenterPoint Energy and other private utilities in regard to replacement of their aging systems. Effect on Annual Operations Costs: This project will reduce operating costs relating to street and utility maintenance in the project area. Description: This project involves the reclamation of various street segments and minor repairs to utilities on various streets in the Lakeview and Parkview neighborhoods. 7 - 4 Project Category: Streets CIP Project Title: Street Rehabilitation Project ST2018-01 Total Estimated Cost: $ 800,000 Funding Priority: 1 Account Number: 406-3174-638180 2018 Project Number: 406-18-01 Reimbursements: Municipal State Aid Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Municipal State Aid $ 800,000* *Special Assessments estimated at $580,000 to reimbursement to the Street Reserve Fund as collected. Justification: This project is included in the City’s long-range pavement management plan. Bi-annual road ratings have identified candidate segments based on condition. Other considerations include age, coordination with other projects, and upgrades needed. Scheduling and Project Status: This project is presently scheduled for 2018 construction. Preliminary design, workshop, and assessment hearing is planned to occur upon preliminary CIP approval in 2017. Relationship to General Plan and Other Projects: This project is consistent with the street pavement preservation program. Sewer, storm sewer, and water system surveys will need to be completed prior to plan development to determine the extent of repairs needed on the city’s utility systems. These costs are approximated in the above estimates. This project will be coordinated with CenterPoint Energy and other private utilities in regard to replacement of their aging systems. Effect on Annual Operations Costs: This project will reduce operating costs relating to street and utility maintenance in the project area. Description: This project involves the reclamation of various street segments and minor repairs to utilities on 69th Avenue east of Central Avenue (deferred from 2015), and 53rd Avenue from University Avenue to Central Avenue. 7 - 5 Project Category: Streets CIP Project Title: Street Rehabilitation Project ST2019-01 Total Estimated Cost: $ 800,000 Funding Priority: 1 Account Number: 406-3174-638180 2019 Project Number: 406-19-01 Reimbursements: Municipal State Aid Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Municipal State Aid $ 800,000* *Special Assessments estimated at $580,000 to reimbursement to the Street Reserve Fund as collected. Justification: This project is included in the City’s long-range pavement management plan. Bi-annual road ratings have identified candidate segments based on condition. Other considerations include age, coordination with other projects, and upgrades needed. Scheduling and Project Status: This project is presently scheduled for 2019 construction. Preliminary design, workshop, and assessment hearing is planned to occur upon preliminary CIP approval in 2018. Relationship to General Plan and Other Projects: This project is consistent with the street pavement preservation program. Sewer, storm sewer, and water system surveys will need to be completed prior to plan development to determine the extent of repairs needed on the city’s utility systems. These costs are approximated in the above estimates. This project will be coordinated with CenterPoint Energy and other private utilities in regard to replacement of their aging systems. Effect on Annual Operations Costs: This project will reduce operating costs relating to street and utility maintenance in the project area. Description: This project involves the reclamation of various street segments and minor repairs to utilities in the Florence Park and Christie neighborhoods. 7 - 6 Project Category: Streets CIP Project Title: Street Rehabilitation Project ST2020-01 Total Estimated Cost: $ 800,000 Funding Priority: 1 Account Number: 406-3174-638180 2020 Project Number: 406-20-01 Reimbursements: Municipal State Aid Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Municipal State Aid $ 800,000* *Special Assessments estimated at $580,000 to reimbursement to the Street Reserve Fund as collected. Justification: This project is included in the City’s long-range pavement management plan. Bi-annual road ratings have identified candidate segments based on condition. Other considerations include age, coordination with other projects, and upgrades needed. Scheduling and Project Status: This project is presently scheduled for 2020 construction. Preliminary design, workshop, and assessment hearing is planned to occur upon preliminary CIP approval in 2019. Relationship to General Plan and Other Projects: This project is consistent with the street pavement preservation program. Sewer, storm sewer, and water system surveys will need to be completed prior to plan development to determine the extent of repairs needed on the city’s utility systems. These costs are approximated in the above estimates. This project will be coordinated with CenterPoint Energy and other private utilities in regard to replacement of their aging systems. Effect on Annual Operations Costs: This project will reduce operating costs relating to street and utility maintenance in the project area. Description: This project involves the rehabilitation of various concrete street segments and minor repairs to utilities in the Black Forest, North Innsbruck, and South Innsbruck neighborhoods. 7 - 7 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2016-10 (Chip Sealing) Total Estimated Cost: $ 235,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2016 Project Number: 406-16-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 235,000 Justification: This project includes chip sealing of City streets on an eight-year rotation for pavement preservation purposes. The project for 2016 includes Area 7, which is generally northeast of Mississippi Street and Trunk Highway 65. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2016. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is coordinated with resurfacing plans to avoid sealing streets that are scheduled for reconstruction in the near term. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves street sealing to extend pavement service life. Chip sealing is included in Area 7, which is generally northeast of Mississippi Street and Trunk Highway 65. 7 - 8 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2017-10 (Chip Sealing) Total Estimated Cost: $ 235,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2017 Project Number: 406-17-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 235,000 Justification: This project includes chip sealing of City streets on an eight-year rotation for pavement preservation purposes. The project for 2017 includes Area 8, south of I-694. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2017. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is coordinated with resurfacing plans to avoid sealing streets that are scheduled for reconstruction in the near term. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves street sealing to extend pavement service life. Chip sealing is included in Area 8, which is generally south of I-694. 7 - 9 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2018-10 (Chip Sealing) Total Estimated Cost: $ 235,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2018 Project Number: 406-18-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 245,000 Justification: This project includes chip sealing of City streets on an eight-year rotation for pavement preservation purposes. The project for 2018 includes Area 1, in the northwest area of Fridley. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2018. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is coordinated with resurfacing plans to avoid sealing streets that are scheduled for reconstruction in the near term. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves street sealing to extend pavement service life. Chip sealing is included in Area 1, in the northwest area of Fridley. 7 - 10 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2019-10 (Chip Sealing) Total Estimated Cost: $ 235,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2019 Project Number: 406-19-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 245,000 Justification: This project includes chip sealing of City streets on an eight-year rotation for pavement preservation purposes. The project for 2019 includes Area 2, generally in the north area of Fridley. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2019. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is coordinated with resurfacing plans to avoid sealing streets that are scheduled for reconstruction in the near term. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves street sealing to extend pavement service life. Chip sealing is included in Area 2, generally in the north area of Fridley. 7 - 11 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2020-10 (Chip Sealing) Total Estimated Cost: $ 235,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2020 Project Number: 406-20-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 250,000 Justification: This project includes chip sealing of City streets on an eight-year rotation for pavement preservation purposes. The project for 2020 includes Area 3, generally in the southeast area of Fridley. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2020. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is coordinated with resurfacing plans to avoid sealing streets that are scheduled for reconstruction in the near term. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves street sealing to extend pavement service life. Chip sealing is included in Area 3, generally in the southeast area of Fridley. 7 - 12 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2016-10 (Crack Sealing) Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2016 Project Number: 406-16-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 35,000 Justification: This project includes crack sealing of City streets in order to prolong the life of newer pavement. With the limitations on staff time and large mileage of street rehabilitation projects in recent years, staff is unable to keep up with all crack sealing. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2016. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is performed on streets that are to be chip sealed (Area 7), and other streets that have been paved within the past five years. This project augments sealing work performed by our maintenance crews, who along cannot seal the optimum mileage in a given season. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves routing and sealing of cracks to extend pavement service life. Rubberized crack sealing will be performed in Area 7, and on other selected streets. 7 - 13 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2017-10 (Crack Sealing) Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2017 Project Number: 406-17-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 35,000 Justification: This project includes crack sealing of City streets in order to prolong the life of newer pavement. With the limitations on staff time and large mileage of street rehabilitation projects in recent years, staff is unable to keep up with all crack sealing. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2017. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is performed on streets that are to be chip sealed (Area 8), and other streets that have been paved within the past five years. This project augments sealing work performed by our maintenance crews, who along cannot seal the optimum mileage in a given season. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves routing and sealing of cracks to extend pavement service life. Rubberized crack sealing will be performed in Area 8, and on other selected streets. 7 - 14 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2018-10 (Crack Sealing) Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2018 Project Number: 406-18-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 35,000 Justification: This project includes crack sealing of City streets in order to prolong the life of newer pavement. With the limitations on staff time and large mileage of street rehabilitation projects in recent years, staff is unable to keep up with all crack sealing. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2018. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is performed on streets that are to be chip sealed (Area 1), and other streets that have been paved within the past five years. This project augments sealing work performed by our maintenance crews, who along cannot seal the optimum mileage in a given season. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves routing and sealing of cracks to extend pavement service life. Rubberized crack sealing will be performed in Area 1, and on other selected streets. 7 - 15 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2019-10 (Crack Sealing) Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2019 Project Number: 406-19-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 35,000 Justification: This project includes crack sealing of City streets in order to prolong the life of newer pavement. With the limitations on staff time and large mileage of street rehabilitation projects in recent years, staff is unable to keep up with all crack sealing. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2019. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is performed on streets that are to be chip sealed (Area 2), and other streets that have been paved within the past five years. This project augments sealing work performed by our maintenance crews, who along cannot seal the optimum mileage in a given season. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves routing and sealing of cracks to extend pavement service life. Rubberized crack sealing will be performed in Area 2, and on other selected streets. 7 - 16 Project Category: Streets CIP Project Title: Street Sealing Program, Project ST2020-10 (Crack Sealing) Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2020 Project Number: 406-20-10 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Consultant through JPA Payroll Logged to Project: Public Works Department Engineering and Street Divisions Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 35,000 Justification: This project includes crack sealing of City streets in order to prolong the life of newer pavement. With the limitations on staff time and large mileage of street rehabilitation projects in recent years, staff is unable to keep up with all crack sealing. Scheduling and Project Status: This project is presently scheduled for bidding and construction in 2020. The project is bid out as part of a nine-city JPA project administered by the City of Coon Rapids. Bids are requested in February of each construction year for the work. Relationship to General Plan and Other Projects: This work is performed on streets that are to be chip sealed (Area 3), and other streets that have been paved within the past five years. This project augments sealing work performed by our maintenance crews, who along cannot seal the optimum mileage in a given season. Effect on Annual Operations Costs: This project reduces operating costs relating to maintaining pavement in this area over the long-term. Description: This project involves routing and sealing of cracks to extend pavement service life. Rubberized crack sealing will be performed in Area 3, and on other selected streets. 7 - 17 Project Category: Streets CIP Project Title: Trail/Walk Upgrades Total Estimated Cost: $ 500,000 (over 5 years) Funding Priority: 2 Account Number: 406-3174-635100 Not Capitalized 2016 Project Number: 406-16-20 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Streets Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 Justification: Trail and walk resurfacing is needed on the City's trail and walk system in order to keep preserve the condition of these systems. In addition, connections will be made where most cost-effective. Upgrades to current use standards, including ADA will be made where applicable. Scheduling and Project Status: Trails and walks to be color coated are determined annually by the Street Operations Manager and the Public Works Director. Also, some trails will require asphalt overlays or replacement of the asphalt surface. Candidate projects are as follows: 2016: Trail connection to 43rd Avenue on Main Street (in conjunction with overpass) 2017: University Avenue north of Mississippi Street 2018: West Moore Lake Trail match funding 2019: 53rd Avenue Connection University to Central 2020: 7th Street Extension, 57th Avenue and East Moore Lake Trail Relationship to General Plan and Other Projects: This project is stand-alone, and restoration will maintain current service levels. Service levels will be improved where system connections are made. The project is consistent with the City’s Active Transportation Plan. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Minor improvements to connectivity increase maintenance slightly, but these costs are offset by more efficient maintenance. Description: This project involves resurfacing and minor connectivity improvements for the City’s walk and trail systems. 7 - 18 Project Category: Streets CIP Project Title: West Moore Lake Ped. and Bike Improvements Total Estimated Cost: $ 500,000 Funding Priority: 2 Account Number: 406-3174-702100 2018 Project Number: 406-18-21 Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Streets Maintenance Division Source of Project Funding 2016 2017 2018 2019 2020 Federal Highway Funds $ 500,000 Justification: This project will provide additional network connectivity for pedestrians and cyclists from 57th Avenue to 61st Avenue and on West Moore Lake to Trunk Highway 65. This will provide improved access to the Fridley Middle School and High School, and provide for a circuit around Moore Lake. Scheduling and Project Status: The project has Federal Highway funds designated for 2018. Relationship to General Plan and Other Projects: This project is stand-alone, will substantially improve service levels, including improved access to transit and livability improvements. The project is consistent with the City’s Active Transportation Plan. A match of the Federal Funding is provided from our annual Trail/Walk Upgrades CIP item. Effect on Annual Operations Costs: Minor improvements to connectivity and added trail mileage will increase maintenance requirements slightly. Description: This project involves providing connected shared use trail and bicycle lanes on West Moore Lake from 57th Avenue to Trunk Highway 65. 7 - 19 Project Category: Streets CIP Project Title: Street Lighting Upgrades/ Retrofit Total Estimated Cost: $ 200,000 (over 3 years including 2015) Funding Priority: 2 Account Number: Finance Project Number: XXXX Reimbursements: Street Reserve Fund Design and Inspection: Consultant and Engineering Staff Payroll Logged to Project: Public Works Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 90,000 $ 90,000 Justification: Decorative lighting systems, particularly on Mississippi Street, are beyond their useful life and have become extremely maintenance intensive. Long-term energy savings can be obtained through retrofit of these systems. Scheduling and Project Status: Analysis for cost-effective retrofits and design will be completed in 2015, with construction in the two subsequent years. Special assessments within benefiting districts will be considered to augment funding of this project. Relationship to General Plan and Other Projects: This project is stand-alone, and the project will maintain current service levels. Effect on Annual Operations Costs: This project will reduce annual operation costs of maintenance and energy for these street lighting systems. Description: This project involves replacement and upgrades to the City’s decorative lighting systems. 7 - 20 Project Category: Streets CIP Project Title: Traffic Signal Maintenance/ Retrofits Total Estimated Cost: $ 420,000 (over 5 years) Funding Priority: 2 Account Number: Finance Project Number: XXXX Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff, Anoka County Highway Department, MNDOT Payroll Logged to Project: Public Works Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 20,000 $ 20,000 $ 180,000 $ 180,000 $ 20,000 Justification: Traffic signal systems require maintenance of coatings to extend their service lift. The City of Fridley is generally required to maintain these coatings. This item includes anticipated traffic signal replacement projects in 2018 and 2019, which are cost shared with Anoka County and/or MNDOT. Scheduling and Project Status: Signal repainting at 3-4 traffic signal intersections per year is contemplated, along with signal replacements in 2018 and 2019. Relationship to General Plan and Other Projects: This project is stand-alone, and the project will maintain current service levels. Effect on Annual Operations Costs: This project will reduce long-term costs by extending the service life of traffic signal systems. Description: This project involves replacement and upgrades to traffic signals in the City of Fridley. 7 - 21 Project Category: Streets CIP Project Title: Capital Signage Replacements Total Estimated Cost: $ 45,000 (over 5 years) Funding Priority: 3 Account Number: Finance Project Number: XXXX Reimbursements: Street Reserve Fund Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Street Reserve Funding $ 15,000 $ 15,000 $ 15,000 Justification: While the City of Fridley’s traffic signage system has recently been retrofit, guide and neighborhood signage is in need of replacement. Guide signage includes destination signage on state and county roads (typically large brown signs). The City is responsible for replacement of these signs. Scheduling and Project Status: Signs to be replaced are determined annually by the Street Maintenance Supervisor and the Public Works Director. Relationship to General Plan and Other Projects: This project is stand-alone, and restoration will maintain current service levels. Service levels will be improved where neighborhood sign upgrades are made. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Minor improvements in efficiency will result from removal of some redundant signage. Description: This project involves replacement of roadway signage, including those located on state and county highways. 7 - 22 Project Category: Streets CIP Project Title: Traffic Safety Improvement Projects Total Estimated Cost: $ 1,840,000 (over 5 years) Funding Priority: 3 Account Number: Finance Project Number: XXXX Reimbursements: Federal Highway Funds and Street Reserve Fund Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Federal Highway Funds Street Reserve Funding $ 30,000 $ 30,000 $ 1,500,000 $ 220,000 $ 30,000 $ 30,000 Justification: The City will be initiating both minor annual traffic safety improvements, and will seek funding for larger safety improvement projects to be specified in the coming year by staff in conjunction with Anoka County and MNDOT. Scheduling and Project Status: Projects are determined annually by the Public Safety Director and the Public Works Director. Staff will be working with Anoka County and MNDOT to identify major improvements that are eligible for federal funding through HSIP and other programs. The 2018 project is for a roundabout at Osborne Road and West University Service Drive, for which an HSIP Federal funding solicitation was completed in early 2015. Relationship to General Plan and Other Projects: This project is stand-alone, and restoration will maintain current service levels. Service and safety levels will be improved where upgrades are made. Effect on Annual Operations Costs: This project maintains operating costs at a consistent level. Description: This item involves improvements to traffic safety in cooperation with county and state agencies. 7 - 23 Project Category: Streets CIP Project Title: Main Street Pedestrian Bridge Project ST2015-21 Total Estimated Cost: $ 1,470,000 (over 3 years starting in 2014) Funding Priority: 1 Account Number: Finance Project Number: XXXX Reimbursements: Federal Highway Funds and Street Reserve Fund Design and Inspection: Consultant and Engineering Staff Payroll Logged to Project: Public Works Department Engineering Division Source of Project Funding 2016 2017 2018 2019 2020 Federal Highway Funds Street Reserve Funding $ 150,000 Justification: This project will provide an accessible crossing of I-694 for pedestrians and bicyclists between 7th Street and the Mississippi River Regional Trail. While these users cross the bridge at Main Street, this Anoka County bridge does not accommodate pedestrians and cyclists. Scheduling and Project Status: This project is presently scheduled in the 2016 Statewide Transportation Investment Plan (STIP). The City will be requesting advancing of this funding to coordinate with the 2016-17 street resurfacing projects. Design work is being initiated in 2014. Relationship to General Plan and Other Projects: The project meets goals of the City’s Comprehensive Plan and is consistent with the City’s Transit Oriented District Plan. Effect on Annual Operations Costs: This project will add future maintenance obligations to the City of Fridley. Description: This project involves construction of a shared use path from 43rd Avenue to 57th Avenue along the west side of Main Street (Anoka CR 102). This will include a trail bridge spanning Interstate 694. 8 - 1 Project Category: Storm Water CIP Project Title: Water Quality Testing Total Estimated Cost: $ 20,000 (over 5 years) Funding Priority: 3 Account Number: 603-6310-xxxxx 2016 Project Number: 603-16-474 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 10,000 $ 5,000 $ 5,000 Justification: This project is to provide baseline data that is currently not under collection by watershed organizations in Fridley on surface water and storm water discharges in association with a newly issued MS4 permit. Scheduling and Project Status: The project began in 2014, and baseline data will be collected by the end of 2016. Additional follow-up data is intended to be collected beginning in 2019. Relationship to General Plan and Other Projects: This project is needed to advance planning activities for future projects. It is important to plan for data collection over at least two seasons due to annual fluctuations in conditions. The City may partner with its watershed organizations in conducting sampling. Effect on Annual Operations Costs: This project will not impact operations costs. Description: This project involves collection and analysis of water quality samples from surface water and storm water discharges. 8 - 2 Project Category: Storm Water CIP Project Title: Pond Maintenance Total Estimated Cost: $ 130,000 (over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxx 2016 Project Number: 603-16-472 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 30,000 Justification: This work is needed annually to provide maintenance and repairs needed to the existing storm sewer pond systems. Scheduling and Project Status: This work is conducted annually and specific repairs will be identified by staff annually. The 2016 allocation includes maintenance work for the North Danube Pond. Relationship to General Plan and Other Projects: This project is stand-alone, and allows for effective performance of the City’s stormwater management systems. This work is also mandated under the City’s storm sewer permit. Effect on Annual Operations Costs: This project will maintain existing operation costs at current levels. Description: This project includes maintenance on City storm sewer ponds. 8 - 3 Project Category: Storm Water CIP Project Title: Storm Sewer System System Upgrades Total Estimated Cost: $ 310,000 (over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2016 Project Number: 603-16-484 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 60,000 $ 60,000 $ 60,000 $ 65,000 $ 65,000 Justification: This work is needed annually to provide maintenance and repairs needed to the existing storm sewer collection system. Scheduling and Project Status: This work is conducted annually and specific repairs will be identified by staff annually. Relationship to General Plan and Other Projects: 2016 work will center on improvements along the Plymouth neighborhood in conjunction with the annual street rehabilitation project. The project will allow continuation of existing service levels. Effect on Annual Operations Costs: This project will reduce operating costs relating to preserving failures in the storm sewer collection system. Description: This project includes repairs to storm sewer conveyance system in conjunction with annual street rehabilitation projects. 8 - 4 Project Category: Storm Water CIP Project Title: Storm Sewer System Upgrades Total Estimated Cost: $ 380,000 (over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2016 Project Number: 603-16-485 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 60,000 $ 60,000 $ 60,000 $ 100,000 $ 100,000 Justification: This work is needed annually to mitigate flood prone areas and to maintain the integrity of the overall conveyance system and other infrastructure. A detailed work plan is typically identified through surveys conducted for outfall inspections, other rehabilitation projects, or as problem areas arise or are identified. The project will ensure resources are available to address immediate concerns or failures in a timely fashion, and to mitigate future issues. Scheduling and Project Status: This work is conducted annually and specific repairs will be identified by staff annually. 2016 work will center on improvements along the Stoneybrook conveyance system. Relationship to General Plan and Other Projects: The project allows the City to address problem areas in a timely fashion, particularly when other project work needs a coordinated improvement. Effect on Annual Operations Costs: This project will reduce operating costs relating to preserving existing infrastructure and mitigation of future flood damage. Description: This project includes upgrades and repairs to storm sewer conveyance system Citywide. 8 - 5 Project Category: Storm Water CIP Project Title: Watershed BMP Implementation Total Estimated Cost: $ 100,000 Funding Priority: 2 Account Number: 603-6310-xxxxxx 2016 Project Number: 603-16-445 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 Justification: This project will apply stormwater BMPs citywide on a targeted basis. Installation of raingardens, water quality structures, and biofilters are the types of projects funded. Scheduling and Project Status: This project can be used to leverage additional support for BMP projects from our watershed organizations, property owners, and other sources. In 2016, the project work will focus on the Plymouth, Lakeview, and Parkview neighborhoods. Relationship to General Plan and Other Projects: The project is scheduled in these subwatershed in 2016 to coincide with the street rehabilitation project in 2016 and 2017. Effect on Annual Operations Costs: This project will provide minor reductions in operating costs relating to sediment control. Maintenance will typically be performed by owners of adjacent properties. Description: This project includes water quality improvements through application of Best Management Practices (BMPs) for stormwater. 8 - 6 Project Category: Storm Water CIP Project Title: Watershed District Water Quality Projects Total Estimated Cost: $ 200,000 (over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2016 Project Number: 603-16-486 Reimbursements: None Design and Inspection: Engineering Staff supported by Anoka Conservation District and Watershed District partners Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 70,000 $ 50,000 $ 100,000 $ 60,000 $ 80,000 Justification: These projects are used to leverage additional outside funding sources for water quality projects in the MWMO area. The 2016 project would expand water quality treatment capacity in the MWMO in the Plymouth neighborhood in conjunction with our street rehabilitation project. This project will provide measurable improvements to outflows to the Mississippi River. Scheduling and Project Status: A 2015 project allocation of $70,000 is anticipated to provide roughly $350,000 in matching funding from the MWMO ($150,000 committed to date). MWMO and the City of Fridley are working on identifying the project at this time. Staff anticipates funding participation of the various watershed agencies for enhancements to water quality. Relationship to General Plan and Other Projects: This project will be coordinated with the annual Street Rehabilitation projects. Effect on Annual Operations Costs: This project will provide a measurable reduction in sediment loading to the City’s storm sewer system and Mississippi River. Reductions in pollutants will be allocated to current and future TMDL requirements. Added maintenance will be minimal with this project, as it is considered during design. Description: This project includes a stormwater pond expansion serving our watersheds, and improving stormwater quality. 8 - 7 Project Category: Storm Water CIP Project Title: Sediment Removal Projects Total Estimated Cost: $ 190,000 (Over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx Finance Project Number: 603-16-478 Reimbursements: None Design and Inspection: Engineering Staff supported by Watershed District Partners Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 90,000 $ 100,000 Justification: This project would provide funding for large sediment removal projects. The 2016 project includes sediment removal at the Springbrook Nature Center above Weir B. The 2020 allocation is a partial allocation that is for Locke Lake dredging, if needed as determined by an updated sediment survey to take place in 2017. Scheduling and Project Status: The City of Fridley is working on permitting of the 2016 project at this time, and it is recommended to complete prior to the new parking lot construction at SNC. Relationship to General Plan and Other Projects: These project is stand-alone, and will be coordinated with associated projects. It will provide for improved downstream water quality. Effect on Annual Operations Costs: This project will reduce maintenance of affected boardwalks and shorelines. Description: This item includes projects to remove sedimentation from large flow ways. 8 - 8 Project Category: Storm Water CIP Project Title: Moore Lake Subwatershed Flood Control Upgrades Total Estimated Cost: $ 55,000 (Over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2017 Project Number: 603-17-490 Reimbursements: None Design and Inspection: Engineering Staff supported by Watershed District(s) Payroll Logged to Project: Public Works Department Storm Water Division Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 55,000 Justification: The project addresses second-priority flooding issues that currently occur north of Moore Lake along Central Avenue. Scheduling and Project Status: The project is dependent on securing additional funding, through state grant programs and/or Rice Creek Watershed District funding programs. Relationship to General Plan and Other Projects: This project is stand-alone. Note that top-priority flood control projects are currently in the CIP for prior years. Effect on Annual Operations Costs: This project will have a limited reduction in operations costs in regard to emergency response and storm sewer system maintenance. Our level of service to area property owners will be increased. Description: This project includes upgrades to the storm sewer system capacity in the Moore Lake Subwatershed between Rice Creek Road and Mississippi Street east of Central Avenue. 8 - 9 Project Category: Storm Water CIP Project Title: TMDL Water Quality Projects Total Estimated Cost: $ 570,000 (over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx Finance Project Number: 603-16-467 Reimbursements: None Design and Inspection: Engineering Staff supported by Watershed District(s) Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 220,000 $ 50,000 $ 50,000 $ 150,000 $ 100,000 Justification: This series of project is intended on achieving total maximum daily load (TMDL) requirements mandated by the Minnesota Pollution Control Agency through the City’s stormwater permit. Scheduling and Project Status: The initial project in 2015-16 is focused on phosphorus reduction in the Moore Lake subwatershed. Relationship to General Plan and Other Projects: The 2015-16 project is stand-alone, and should have a long-term impact on the water quality of Moore Lake. Effect on Annual Operations Costs: This project will increase staff time via maintenance of water quality improvements implemented. It does, however, address a mandated outcome. Description: This project includes addressing water quality TMDL requirements mandated by MPCA. 8 - 10 Project Category: Storm Water CIP Project Title: Storm Sewer Capital Equipment Total Estimated Cost: $ 190,000 (Over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2016 Project Number: 603-16-491 Reimbursements: None Design and Inspection: None Payroll Logged to Project: Public Works Department Storm Water Division Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 190,000 Justification: This equipment is used year-round by the Storm Water Maintenance Division for work throughout the City of Fridley. Scheduling and Project Status: Unit 733, a 2000 Elgin Pelican mechanical sweeper, is planned for 2016 replacement. Replacement of the City’s regenerative air sweeper is planned for 2021. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This project includes replacement of capital equipment associated with service provided by the storm water utility. 8 - 11 Project Category: Storm Water CIP Project Title: Locke Lake Dam Upgrades Total Estimated Cost: $ 35,000 (Over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2018 Project Number: 603-18-466 Reimbursements: None Design and Inspection: Engineering Staff supported by Watershed District(s) Payroll Logged to Project: Public Works Department Storm Water Division Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 35,000 Justification: The project allow for automated adjustment of dam levels at Locke Lake. Scheduling and Project Status: The project is dependent on securing additional funding, through potential state grant programs and/or Rice Creek Watershed District funding programs. Relationship to General Plan and Other Projects: This project is stand-alone. Note that a 2015 project is planned to include a remote monitoring system. Effect on Annual Operations Costs: This project will provide for a slight reduction in staff time to adjust gates, which is performed roughly two dozen times throughout an average season. The project will also enhance response in severe events, as controls will be able to be adjusted remotely. Description: This project includes upgrades to Locke Lake Dam to enable remote adjustment of lake levels. 8 - 12 Project Category: Storm Water CIP Project Title: Riverview Heights Flood Control Upgrades Total Estimated Cost: $ 175,000 (Over 5 years) Funding Priority: 2 Account Number: 603-6310-xxxxxx 2018 Project Number: 603-18-492 Reimbursements: None Design and Inspection: Engineering Staff supported by Watershed District(s) Payroll Logged to Project: Public Works Department Storm Water Division Source of Project Funding 2016 2017 2018 2019 2020 Storm Water Utility Fund $ 175,000 Justification: The project addresses second-priority flooding issues that have potential for high damage levels along the Mississippi in the Riverview Heights area. Scheduling and Project Status: The project is dependent on securing additional funding, through state grant programs and/or Coon Creek Watershed District funding programs. A special assessment component may be considered as well. The project would increase the flood protection elevation, and provide for a system that could be readily installed if severe spring flooding of the Mississippi is imminent. Fridley Public Safety and Anoka County Emergency Management have also indicated their desire/support for this project. Relationship to General Plan and Other Projects: This project is stand-alone. Note that top-priority flood control projects are currently in the CIP for prior years. However, the potential impact to this area is greater than other current projects included in the CIP. Effect on Annual Operations Costs: This project will have a limited reduction in operations costs in regard to emergency response. Our level of service to area property owners will be increased. Description: This project includes upgrades to levee along Riverview Heights to provide an additional level of flood protection to several dozen homes in the neighborhood. 9 - 1 Project Category: Water CIP Project Title: Distribution System Reconstruction Total Estimated Cost: $ 2,200,000 (over 5 years) Funding Priority: 1 Account Number: (1) 406-3174-xxxxxx Street Project ( 2 ) 6 0 1 - 6 3 1 0 -xxxxxx T o J E ’ d a t Y e a r E n d t o 2 0 1 6 - 0 1 2016 Project Number: 601-16-01 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 500,000 $ 500,000 $ 300,000 $ 400,000 $ 500,000 Justification: This project is to provide preservation of the water distribution system. Annual funding is targeted to extend the life of existing infrastructure. The proposed 2016 project repair mains in the 2016 street project area. Scheduling and Project Status: The 2016 project will be in design in the fall of 2015. Relationship to General Plan and Other Projects: The project is part of a an effort by the City of Fridley to upgrade 50% of its water distribution system by the time it reaches 100 years of age. Effect on Annual Operations Costs: This project will reduce operations costs by providing new mains that are subject to reduced breakage, and provide for a more reliable service delivery. Description: This project involves reconstruction, rehabilitation, and interconnection of the existing water distribution system. 9 - 2 Project Category: Water CIP Project Title: Hydrant Repairs Total Estimated Cost: $ 100,000 (over 5 years) Funding Priority: 2 Account Number: 601-6310-xxxxxx 2016 Project Number: 601-16-494 Reimbursements: None Design and Inspection: Public Works Department Engineering Division Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 Justification: This project is to provide preservation of the fire hydrants, a critical element in our water distribution system. Annual funding is targeted to extend the life of existing infrastructure. The work includes sandblasting and painting of hydrants, and materials for mechanical repairs as identified. Scheduling and Project Status: The project is stand-alone, and will be part of a five-year program to be completed system wide. Relationship to General Plan and Other Projects: The project is part of an effort by the City of Fridley to maintain and repair its hydrants within five years. Effect on Annual Operations Costs: This project will reduce operations costs by providing scheduled hydrant repairs and coatings that will reduce long-term maintenance. Description: This project involves accelerated rehabilitation and repair of existing fire hydrants. 9 - 3 Project Category: Water CIP Project Title: Well Updates Total Estimated Cost: $ 610,000 (over 5 years) Funding Priority: 1 Account Number: 601-6310-xxxxxx Finance Project Number: 601-16-448 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 180,000 $ 40,000 $ 190,000 $ 200,000 Justification: The project consists of removing and inspecting the column pipe, shafts, pumps, and motors, and repairing these components as required. This semi-annual project ensures that the City water system continues to have a constant water supply with a minimum amount of repairs. 63rd Booster Station pump reconditioning is included in 2017. Scheduling and Project Status: The work will be completed in the year budgeted. Relationship to General Plan and Other Projects: This is a project formerly programmed annually, but now modified in schedule to be completed semi-annually. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs of well equipment, and maintains service reliability. Description: This project involves reconstruction, rehabilitation, and interconnection of the existing water distribution system. 9 - 4 Project Category: Water CIP Project Title: Water Meter Replacement and Testing Total Estimated Cost: $ 1,350,000 (over 5 years) Funding Priority: 1 Account Number: 601-6310-xxxxxx 2016 Project Number: 601-16-412 Reimbursements: None Design and Inspection: None Payroll Logged to Project: Finance Department and Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 600,000 $ 720,000 $ 10,000 $ 10,000 $ 10,000 Justification: The City’s water meters are typically beyond their expected life span for accurate reading. The City has also relied on voluntary meter reading for residential properties, which adds data entry and coordination time to collect readings. The project includes installation of water meters Citywide in a multi-year project with upgrades to an automatic meter reading system. City staff has coordinated and performs installations of approximately 500 meters annually. Scheduling and Project Status: Under a revised accelerated schedule, AMR installations in residential properties are to be completed in 2016 and 2017 under this program, with a total of roughly 4,000 installations via contracted staff. Relationship to General Plan and Other Projects: This is a project that is accelerated to be completed in 2017, revised from a project originally programmed annually which would have otherwise reached completion in 2022. Fixed antennas are planned to be installed in 2017 for data collection of areas that have been installed. Testing of commercial meters would begin in 2018, and would take approximately five years to complete. Effect on Annual Operations Costs: This project provides for accurate and timely water billing and collection, and reduces staff time in meter reading collection, data entry, and collection of readings. Description: The project includes installation of water meters with upgrades to an automatic meter reading system, construction of fixed antenna readers, and testing of meters. 9 - 5 Project Category: Water CIP Project Title: Building Maintenance Total Estimated Cost: $ 160,000 Funding Priority: 2 Account Number: 601-6310-xxxxxx 2016 Project Number: 601-16-495 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 40,000 $ 20,000 $ 40,000 $ 20,000 $ 40,000 Justification: The project includes minor preventative maintenance updates and repairs to well house buildings and plant buildings. This annual project ensures that the City water facilities are managed with a minimum amount of repairs. Well power supply, ventilation and cooling will be upgraded with this project to reduce maintenance on equipment. Scheduling and Project Status: The work will be completed in the year budgeted. Relationship to General Plan and Other Projects: This is a project is stand-alone and to be completed annually. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs. It also provides upgrades to buildings that are needed to keep equipment in good operating condition. Description: The item is for minor maintenance of plant and well house buildings. 9 - 6 Project Category: Water CIP Project Title: Distribution System Interconnection Total Estimated Cost: $ 500,000 (over 5 years) Funding Priority: 1 Account Number: 601-6310-xxxxxx 2018 Project Number: 601-18-496 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 500,000 Justification: This project is to provide redundancy of the water distribution system. Annual funding is targeted to provide interconnection where potential for emergency fire flow could be affected by out of service water mains. The proposed 2018 project will provide connection of dead-end systems on Highway 65 between 68th Avenue and Norton Avenue. Scheduling and Project Status: The 2018 project will be in designed in 2017. Relationship to General Plan and Other Projects: The project will be coordinated with MNDOT, for work along Trunk Highway right-of-way in conjunction with their plans for a storm sewer replacement. Effect on Annual Operations Costs: This project will not have appreciable changes to operations costs, but it will provide for a more reliable service delivery. Description: This project involves reconstruction, rehabilitation, and interconnection of the existing water distribution system. 9 - 7 Project Category: Water CIP Project Title: Water Capital Equipment Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 601-6310-xxxxxx 2017 Project Number: 601-17-601 Reimbursements: None Design and Inspection: None Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 35,000 Justification: This item is for replacement of vehicles/equipment used by the Water Division. Scheduling and Project Status: Truck replacement has been consolidated and moved up to 2017 due to need (Unit 605). Relationship to General Plan and Other Projects: This project is stand alone, and will enable us to maintain current service levels. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 10 year service life (Unit 605), respectively. Unit 605 will be passed to the Engineering Division who will use this for an additional 5-10 years. Description: The item is for replacement of Water Division fleet vehicles. 9 - 8 Project Category: Water CIP Project Title: Water Capital Equipment Total Estimated Cost: $ 60,000 Funding Priority: 2 Account Number: 601-6310-xxxxxx 2018 Project Number: 601-18-601 Reimbursements: None Design and Inspection: None Payroll Logged to Project: None Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 60,000 Justification: This item is for replacement of vehicles/equipment used by the Water Division. Scheduling and Project Status: A valve vacuum trailer is planned to be replaced in 2018 (Unit 627). Relationship to General Plan and Other Projects: This project is stand alone, and will enable us to maintain current service levels. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 20 year service life (Unit 627), respectively. Description: The item is for replacement of Water Division fleet vehicles. 9 - 9 Project Category: Water CIP Project Title: Variable Frequency Drives Total Estimated Cost: $ 105,000 (over 5 years) Funding Priority: 2 Account Number: 601-6310-xxxxxx 2016 Project Number: 601-16-477 Reimbursements: None Design and Inspection: Public Works Department Engineering and Water Divisions Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 35,000 $ 35,000 $ 35,000 Justification: This item is for replacement of Variable Frequency Drive (VFD) pump motors and equipment for Water Division treatment plant and transmission systems. Scheduling and Project Status: VFD replacements are planned for 2016, 2018, and 2020. (Those at 63rd Booster Station and Treatment Plant 3 were budgeted for 2015). Relationship to General Plan and Other Projects: This project is coordinated with future well rehabilitation work, and will enable us to maintain current service levels with additional reliability. Effect on Annual Operations Costs: The project will improve performance and provide power savings through increased motor efficiency. There is potential for efficiency rebates through Xcel Energy to assist with funding these projects. Description: The item is for replacement of pump Variable Frequency Drive motors in the Water Division. 9 - 10 Project Category: Water CIP Project Title: Chemical Feed & Storage System Upgrade at Commons Total Estimated Cost: $ 165,000 (over 5 years) Funding Priority: 2 Account Number: 601-6310-xxxxxx 2016 Project Number: 601-16-497 Reimbursements: None Design and Inspection: Public Works Department Engineering Division Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 165,000 Justification: This item is for refurbishing chemical feed and storage equipment at Commons Park Filtration Plant. The equipment needs occasional retrofit to maintain its mechanical reliability and efficiency. Scheduling and Project Status: This project is scheduled to be completed in 2016. Relationship to General Plan and Other Projects: This project is stand alone, and will enable us to maintain current service levels. Effect on Annual Operations Costs: This project may reduce power consumption and will reduce staff maintenance over the life of the equipment (ranging from 10 to 20 years). Description: The item is for refurbishment of Commons Park Plant chemical feed equipment. 9 - 11 Project Category: Water CIP Project Title: Treatment Plant Retrofits Total Estimated Cost: $ 870,000 (over 5 years) Funding Priority: 2 Account Number: 601-6310-xxxxxx 2017 Project Number: 601-17-498 Reimbursements: None Design and Inspection: Public Works Department Engineering and Water Divisions Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 370,000 $ 500,000 Justification: This item is for replacement and retrofit of water treatment equipment. In 2017, filter control valves at Commons WTP will be changed out and chemical feed equipment and storage will be upgraded. In 2019, a filter rehabilitation project is planned. Scheduling and Project Status: The projects will be designed and implemented in the year budgeted. Relationship to General Plan and Other Projects: These projects are stand-alone, but schedules are coordinated with other treatment plant upgrade work. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs. It also provides for reliable water treatment at our treatment plants. Description: This item is for replacement and retrofit of water treatment equipment in Water Treatment Plants. 9 - 12 Project Category: Water CIP Project Title: Transmission System Reconstruction Total Estimated Cost: $ 800,000 Funding Priority: 1 Account Number: 601-6310-xxxxxx 2018 Project Number: 601-18-499 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 800,000 Justification: This project is to provide preservation of the water transmission piping system. Annual funding is targeted to extend the life of existing infrastructure. The proposed 2018 project will replace an 8,000 foot segment of 20” transmission main repair from Commons Water Treatment Plant to Tower 2 on Highway 65. Scheduling and Project Status: The 2018 project will be in design in 2016. Relationship to General Plan and Other Projects: The project will be coordinated with MNDOT, for work along Trunk Highway right-of-way in conjunction with their plans for a storm sewer replacement. Effect on Annual Operations Costs: This project will reduce operations costs by providing new mains that are subject to reduced breakage, and provide for a more reliable service delivery. Description: This project involves reconstruction, rehabilitation, and interconnection of the existing water transmission system. 9 - 13 Project Category: Water CIP Project Title: Well 13 Analysis and Availability Total Estimated Cost: $ 40,000 (over 2015-2016) Funding Priority: 2 Account Number: 601-6310-xxxxxx 2016 Project Number: 601-16-470 Reimbursements: None Design and Inspection: Public Works Department Engineering Division Payroll Logged to Project: Public Works Department Engineering and Water Divisions Source of Project Funding 2016 2017 2018 2019 2020 Water Utility Fund $ 20,000 Justification: This item includes testing and analysis of the City of Fridley Well 13 to determine whether this source of water will be available with reasonable assurance that water quality will be satisfactory. Scheduling and Project Status: The project was started in 2014. Additional work continues through 2016. Relationship to General Plan and Other Projects: This project is stand alone, and will enable us to determine future service levels. Effect on Annual Operations Costs: The project will have no impact on operations costs, although it may have long-term value in determination of the most effective method to provide for future source water needs. Description: The item is for testing and analysis of Well 13 to determine whether its capacity will be available to the City of Fridley in the future. 10 - 1 Project Category: Sewer CIP Project Title: Sanitary Sewer Collection System Reconstruction Total Estimated Cost: $ 300,000 (over 5 years) Funding Priority: 1 Account Number: (1) 406-3174-xxxxxx Street Project ( 2 ) 6 0 2 - 6 3 1 0 -xxxxxx T o J E ’ d a t Y e a r E n d t o 2 0 1 6 - 0 1 2016 Project Number: 602-16-01 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 80,000 $ 40,000 $ 85,000 $ 45,000 $ 50,000 Justification: This project is to provide preservation of the existing sanitary sewer collection system. Annual funding is targeted to extend the life of existing infrastructure. Scheduling and Project Status: The 2016 project will be surveyed in 2015 and incorporated into the street rehabilitation project. Relationship to General Plan and Other Projects: The proposed 2016 project will include repairs in coordination with the pavement rehabilitation work in the Plymouth neighborhood and 69th Avenue Projects. Effect on Annual Operations Costs: This project will reduce operations costs by providing replacement and repair of sanitary sewer infrastructure. Description: This project involves repairs of the existing sanitary sewer collection system. 10 - 2 Project Category: Sewer CIP Project Title: Sanitary Sewer Collection System Lining Total Estimated Cost: $ 1,300,000 (over 5 years) Funding Priority: 1 Account Number: 602-6310-xxxxxx 2017 Project Number: 602-17-500 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 520,000 $ 520,000 $ 260,000 Justification: The project consists of relining of clay and concrete sanitary sewer collection piping to prolong its useful life. The project was previously conducted annually, but we are now recommending moving to a semi-annual basis to complete work at more cost-effective pricing. Scheduling and Project Status: The work will be completed next in 2017, and candidate work areas are under review in 2015. Relationship to General Plan and Other Projects: The project is part of a an effort by the City of Fridley to upgrade 50% of its sanitary sewer collection system by the time it reaches 100 years of age. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs and potential failures. Description: This project involves lining of the existing sanitary sewer collection system. 10 - 3 Project Category: Sewer CIP Project Title: Sanitary Sewer Force Main Reconstruction Total Estimated Cost: $ 90,000 (over 5 years) Funding Priority: 1 Account Number: 602-6310-xxxxxx 2018 Project Number: 602-18-501 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 90,000 Justification: This project is to provide preservation of the existing sanitary sewer force main piping system. Regular funding is targeted to extend the life of existing infrastructure. Scheduling and Project Status: The 2018 project will be developed in 2016, and designed in 2017. Relationship to General Plan and Other Projects: The proposed 2018 project will include rehabilitation of the 64th Avenue Lift Station force main. Effect on Annual Operations Costs: This project will reduce operations costs by providing replacement and repair of sanitary sewer infrastructure. Description: This project involves repairs of existing sanitary sewer force mains. 10 - 4 Project Category: Sewer CIP Project Title: Sanitary Sewer Lift Station Rehabilitation Total Estimated Cost: $ 80,000 (over 5 years) Funding Priority: 2 Account Number: 602-6310-xxxxxx 2016 Project Number: 602-16-502 Reimbursements: None Design and Inspection: Engineering Staff Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 20,000 $ 0 $ 20,000 $ 20,000 $ 20,000 Justification: The project consists of replacement and repairs to sanitary lift station components to avoid failures that can lead to sewer backups. Scheduling and Project Status: Work on the Vets Lift Station will be completed in 2016. Relationship to General Plan and Other Projects: The project is part of an effort by the City of Fridley to avoid costly emergency repairs and provide for long- term service life of its sanitary sewer infrastructure. The City is nearing completion of its first round of rehabilitation on its 13 lift stations. Effect on Annual Operations Costs: This project keeps excessive operations costs limited through reduction in need for emergency repairs and potential failures. Description: This project involves rehabilitation of sanitary sewer lift stations on a regular and ongoing basis. 10 - 5 Project Category: Sewer CIP Project Title: Sewer Capital Equipment Total Estimated Cost: $ 55,000 Funding Priority: 2 Account Number: 602-6310-xxxxxx 2017 Project Number: 602-17-602 Reimbursements: None Design and Inspection: None Payroll Logged to Project: Public Works Department Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 55,000 Justification: This equipment is used year-round by the Sewer Maintenance Division for work throughout the City of Fridley. Scheduling and Project Status: Unit 661, a utility tool truck is planned for 2017. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment includes vehicle replacements in the Sewer Maintenance Division. . 10 - 6 Project Category: Sewer CIP Project Title: Sewer Capital Equipment Total Estimated Cost: $ 35,000 Funding Priority: 2 Account Number: 602-6310-xxxxxx 2020 Project Number: 602-20-602 Reimbursements: None Design and Inspection: None Payroll Logged to Project: Public Works Department Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 35,000 Justification: This equipment is used year-round by the Sewer Maintenance Division for work throughout the City of Fridley. Scheduling and Project Status: A general use pickup truck replacement is planned for 2020. Relationship to General Plan and Other Projects: This equipment purchase will allow the Public Works Department to continue providing its current level of service. Effect on Annual Operations Costs: This equipment will not change our operations costs supported by Public Works Department budgets. The equipment is anticipated to have a 15 year service life. Description: This equipment includes vehicle replacements in the Sewer Maintenance Division. . 10 - 7 Project Category: Sewer CIP Project Title: MCES Overflow Connection Total Estimated Cost: $ 150,000 Funding Priority: 2 Account Number: 602-6310-xxxxxx 2019 Project Number: 602-19-451 Reimbursements: None Design and Inspection: Contracted through MCES Payroll Logged to Project: Public Works Department Engineering and Sewer Divisions Source of Project Funding 2016 2017 2018 2019 2020 Sewer Utility Fund $ 150,000 Justification: The project consists of providing an overflow connection between the City’s main sanitary sewer interceptor with an interceptor owned and operated by the Metropolitan Council Environmental Services (MCES). During the severe rainfall event in 2011, the main sanitary sewer interceptor reached capacity and resulted in backing up our system. The overflow would help by providing additional capacity in such a future event. Scheduling and Project Status: The City is currently working out the scope and funding for this project with MCES consultants and staff. Relationship to General Plan and Other Projects: MCES coordination and participation in this project will be required. Effect on Annual Operations Costs: This project would provide capacity to the City’s main trunk system during severe rainfall events, to avoid backups due to stormwater inflows into the sanitary sewer system. Description: This project involves cost-sharing of a project to provide an overflow connection between the City’s main sanitary sewer interceptor with the MCES interceptor. 11 - 1 Project Category: Liquor Store Operations Project Title: Highway 65 Liquor Store Remodel Total Estimated Cost: $ 450,000 (over 2 years including 2015) Funding Priority: 2 Account Number: Finance Project Number: XXXX Reimbursements: Possible rebates through Xcel Energy and CenterPoint Energy Design and Inspection: C o n s u l t a n t Payroll Logged to Project: Finance Department Source of Project Funding 2016 2017 2018 2019 2020 Liquor Enterprise Fund $ 400,000 Justification: The Highway 65 Liquor Store is in need of major maintenance and updating. The interior has not been upgraded in three decades. Exterior elements are also in need of repair and replacement. The store is dated well beyond what is customary for other retail stores in the area, which affects its ability to compete with other upgraded establishments. The store is also not compliant with ADA. This project consists of design and construction to remodel the store. The work would include repair of building elements and retrofit of the entire interior of the facility. Equipment would be replaced and upgraded for energy efficiency. Scheduling and Project Status: This project funds design in 2015 with construction in 2015-16. Relationship to General Plan and Other Projects: This project is stand-alone. Effect on Annual Operations Costs: There will be a significant reduction in repair costs anticipated through this project. There are also anticipated revenue increases through improvements of this retail space. The project will be administered and coordinated by the Finance Department. Description: This project funds remodeling of the Highway 65 Liquor Store. 11 - 2 Project Category: Liquor Store Operations Project Title: Break Room Addition to Fridley Market Location Total Estimated Cost: $ 25,000 Funding Priority: 3 Account Number: Finance Project Number: XXXX Reimbursements: N A Source of Project Funding 2016 2017 2018 2019 2020 Liquor Enterprise Fund $ 25,000 Justification: Over the last year we have made a concerted effort to increase our service levels. Part of that increased service level is hiring additional staff to ensure appropriate coverage during peak operational times. One aspect our employees have communicated to us is that they would appreciate a dedicated space to take a break during their shifts. Currently, there is a table or two set up in the warehouse that suffices as a “space” to this point in time. Often this space is needed for warehousing of product and subsequently is not very suitable for an employee break area. There is sales floor space adjacent to the tasting area that if enclosed with an entrance from the warehouse would provide a small, but suitable space for an employee break area. This is currently sales floor space that is not crucial to the overall sales floor layout. Scheduling and Project Status: This project would be instituted in the winter of 2017. Relationship to General Plan and Other Projects: This is stand-alone project. Effect on Annual Operations Costs: No additional operating costs. Description: Build out of an employee break room at the Fridley Market location.