COSLand Planning N.E.
Land Survec ?y Milwapols 2/,
Soils Testing ENGINEERING, INC. IViinneso}a
Civil & kfuniripal SUnsef 4-6066
EngineeringEn9 ineers Surveyors
certificate o 's uxave7 f ®i� E M DEVELOPMENT CO.
EI-
49
. / Zo
110 .y
j 1
A/
N
Q
rirown4 Ehev, 661.7-,a Nouse C4sv%er S
o Or --NOTES "IRON _ OENO'TES UTILIT`i DR MAGE EASEMENTS
06TE
i- £LEVATIOWS ARE PRoe°OS£m
Z. FIRST FLOOR ELEVATIOW TO HE 2.5 FEET ABOVE GROUND ELEV. SHOWN
LO T ....I - BLOCK .,___ MELODY 1�/L Alit O F�
l hereby certify fhat this is a true and correct representation 00 survey of *e boundorres o�'& obare described /and, and
or& lWhon oPal/ tru;ldin }hereon , and al/ visible mcravrhmenfs , of my, f n or ar said /and. As wrveyed by me fi'as _ do
�Sep><e.r� 6 er a.O /,q La.,SU8 U28AN ENGINEERING, INC.
SCALE A. L 1"- 30� Lne fr Sury ors
� � �y