Loading...
COSLand Planning Sif/Crr AAn n 6875 Highway No. 5 N. E. Land Surveying �I • • Minnea olis, Soils Testing (�1rirz�<., ► 32 • Minn. 5 432 Civil Engineering Telephone 784'-6 66 Municipal Engineering Engineers & SurveyorArea Code 612 Mortgage Loan Survey for V1 KGi I Scale: u,ch=yid�u� ,Y `Ee 25 1. 'x p ` N awn Ci { This is a true and correct representation of a survey of the boundaries of the land above described and, of the location of all buildings, if any, thereon, and all visible encroachments, if any, from or on said land.$ This survey is made only in connection with a mortgage loan now being placed on the property and no liabilityis assumed except to the holder of such mortgage or any other interest acquired by the reason of such mortgage. It is understood and agreed no monuments h ve been laced for the purpose of establishing lot lines or boundary corners. Doted this 7 t"• day of A. D. 19, SUBURBAN ENGINEERING, INC. Engineers Surveyors by a. r 175(1