Loading...
PRE 2010 DOCS-q5�1 City ®f Fridley, BURDING PERMIT ® 7408 Date: ---— Owner: �" Builder Address Address L CATIO?/,i F BUILDING No. S P of Lot Lot Block _�-ry Addition or Sub -Division � r Corner Lot — Inside Lot r`� Setback Sideyard � ���.--- Sewer Elevation 2 FQundwlion DESCRIPTION OF BUILDING T U� Front Depth Height Sq. Ft Cu. Ft Front " Depth 'Height _ . Sq. Ft Cu. Ft Type o Conairuction Fast =�'to be Completed In consideration of the issuance to me of a permit to construct the building described above, I agree to do the proposed work in accordance with the description above set forth and in pliance with all provisions of ordinances oP the city of Fridley. �� ^ 4�6' In consideration of the payment of a fee of 1- ,permit is hereby granted to to construct the building or addition as described above. This permit is granted upon the eFress condition that the person to whom it is granted asci his agents, employees and workmen, in all work. doneFridl, Minnesota location, construction, alteration, maintenance, repair and moving of buildings �nordi�s►anc�s. city limits and permit may be revoked at any time upon violate of any of the p%visions of said Building Inspector NOTICE: This permit don not corer the construction, hulaWfien for wiring, pluablog, on heating, sewer or water. Be Sure to on the Building Imcpeder for separate permits for these tions. A APPLICATION FOR BUILDING PEMWEET CITY OF FRIDLEY, M"NNESG:'A LOCATION OF BUILDING No. Street Part of .Lot Lot. `Z Block_ a Addition or Subdivision% Corner Lot Inside Lot setback 5!�L side -Yard 1z, SEWER ELEVATION FOUNDATION ELEVATION Applicant attach to this form Two.Certificates of Survey of Lot and proposed build- ing location drawn on these Certificates. To be used as; DESCRIPTION OF BUILDING Front Height Sq. Ft. Cu. Ft. Front Depth ' Height Sq. Ft. Cu. Ft. Type of Construction Estimated Cost To be Completed The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City of Fridley Ordinances and rulings of the Department of Buildings, and hereby declares that all the facto, and representations stated in this applicatioh.aralaue and correct. DATE / SIGNATURE Schedule of Fee Costs can be found on the Reverse Side). S BUILDING PEM91"IT FEE SCHEDULE Section 2. The Inspector of Buildings shall; before issuing any permit for the erection of any building or structure, or for any addition to any e.tist- ing building or structure,_ or for any alterations or repairs to any existing building or structure; upon application therefor, require the payment by the applicant for such permit of fees to the amount herein below set forth and in the.manfier herein provided to -wits 2.1.. For any"such permit for the erection of any fire -proof building, other than a garages warehous-e, factory or grain elevator, or -for the -erection of any fire -proof addition, for similar occupancy, to any existing building shall.be at the rate of $1.40. for each one„thousand cubic feet, or fraction thereof, in such cubical contents. 2.2. For any..such permit. for the erection of any fire -proof garagei-varehouse.,.,. factory or grain elevator, or for the erection of any fire -proof addition, for similar occupancy,_.to any existing building shall be at the rate of $1:25 for each one thousand cubic feet, classified as "fireproof".by Section 502 of the Minneapolis Building Code. HOUSES 2.3. For any such permit `for the erection of any tion -fireproof building other than a garage, warehouse, factory or grain elevator, or any non-fireprec-f addition, for similar occupancy, to any existing building - permit 01.00 for each one thousand cubic feet. GARAGES 2.4. For any such permit for the erecttny oP anv non repro f garage, warehouse, factory or grain elevator, �� rc. �.tia ;section of any non -fireproof addition, for -similar occupancy, to ar t,�.x.:ts b%il d=ing or for each such bui]�ding or addition - ninety cent ^ ;9 =; wt� a Zor ers ;3 one thousand cubic feet or fraction thereof, in the cubleal s:-rtdrd::a .thereof with a minimum of $4:00.. - For the purpose of computing fees for bu-1.1ding permits, the cubical.contents of any building -or addition to a unifcra heLgcnt throughout by multiplying the ground area covered from a point six (6) inches below the floor.line of_he, basement or cellar to the average height of the upper surface or to the average height of the roof surface of the main gable of a pitched.,roof: 2.5. For repairs or alterations to an existing structure, the fee shall be at the rate of $3.00 per each Five Hundred Dollars ($500.00) or fraction thereof in the Cost of all proposed work. 2.6. In no case shall the fee .charged..for-any.permit a$ set forth in.._ .Section 2 be less. than $4.00. SUBJECT PERMIT N City of Fridley 14590 AT THE TOP OF THE TWINS BUILDING PERMIT r RECEIPT NO. COMMUNITY DEVELOPMENT DIV. PROTECTIVE INSPECTION r SEC. �� 1 /'•'.1 CITY HALL FRIDLEY 55432 NUMBER REV. DATE PAGE OF APPROVED BY �•'-'� � ,•J 612-560-3450 910-1715 3/ro/78 JOB ADDRESS 1532 Trollhagen Drive N.E. 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 11 4 1 Innsbruck 5th Addition SHEET 2 PROPERTY OWNER MAILADDRESS ZIP PHONE Tom Campbell 1532 Trollha en Drive N 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Milton L. Johnson Co. 2513 Cpnfral Aypniip N -R 781-9548 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAILADDRESS ZIP PHONE LICENSE NO. 6 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ❑ ADDITION ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Basement paneling and repair 9 CHANGE OF USE FROM TO STIPULATIONS Call for framing inspection. TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT. CU. FT. AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED. WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $1,000 $.50 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. $7.50 11 1. )- �`�� PLAN CHECK FEE TOTAL FEE $8.00 SIGNATURE OF CO RACTOR OR AUTHORIZED AGENT (DATE) N P OPE VALIDATED THIS IS YOUR P MIT SIGNATURE OF OWNER IIF OWNER BUILDER) (DATE) BLDG )NSP OAT CITY OF FRIDLEY APPLICATION FOR RESIDENTIAL BUILDING PERMITS (NEW, ALTERATIONS, ADDITIONS, OR REPAIRS) 1 OWNER:—LOWNER7LO 4,j 62LL,32oj) E L- L BUILDER: J j 0 6 "J �v � t F� n v 5 c -A co Address: 1 #Z-oL L tf Address: A o Tel. No.:- -781- No. /8f -No.: / S� 2 - Street: e 0 L -L f-6 /31 LOT: BLOCK: ADDITION: CORNER LOT: INSIDE LOT: SETBACK: SIDEYARDS: Applicant attach to this form Two Certificates of Survey of Lot and proposed building location drawn on these Certificates. To Be Used As: DESCRIPTION OF BUILDING Front: Depth: Height: Square Feet: Cubic Feet: Front: Depth: Height: Square Feet: Cubic Feet: Type of Construction: A) e- +fie Estimated Cost: $ ® ® ® 0 To Be Completed: Alt. A Alt. B Proposed Driveway Width If New Opening Is Desired $ $ (SEE REVERSE SIDE OF SHEET) The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City of Fridley Ordinances and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. See reverse side for additional information. DATE: -� _6, ` -7/ SIGNATURE: VA LL4--I � Stipulations: �. Ce -d r; 1 BUILDING PERMIT FEE SCHEDULE SECTION 2. The Inspector of Buildings shall, before issuing permits for the erection of any building or structure, or for any addition to any existing building or structure, or for any alteration or repairs to any existing building or structure, upon application therefore, require the payment by the applicant for such permit of fees to the amount herein below set forth and in the manner herein provided to -wit: NEW CONSTRUCTION: Single Family Homes and Garages: $4.00/1,000 cubic feet. PLAN CHECK: 25 percent of building permit fee. DRIVEWAY DEPRESSION: (Concrete Curb Streets Only) Alternate A: Removal and replacement of concrete curb and gutter only; Driveway width plus 6 feet x $11.75 Alternate B: Removal and replacement of concrete curb and gutter and install a 3 foot wide approach with 6 inch depth; Driveway width plus 6 feet x $15.40 ADDITIONAL INFORMATION For the purpose of computing fees for building permits, the cubical contents of any building or addition, is determined by multiplying the ground area covered from a point six (6) inches below the floor line of the basement or the cellar to the average heights of the upper surface or to the average height of the roof surface of the main gable of a pitched roof. For repairs or alterations to an existing structure, the fee shall be at the rate of $3.00 per each five hundred dollars ($500.00) or fraction thereof in the cost of all proposed work. In -no case shall the fee charged for any permit as set forth in Section 2 be less than $7.50 plus $.50 state surcharge. VERIFICATION OF FOUNDATION NOTE: Permits for construction will be issued a minimum of 24 hours from the time of application to allow for proper review of the proposed structure and of the construction site. A Certificate of Survey of the lot, showing the location of the foundation once it has been constructed will be required before proceeding with the framing. CERTIFICATE OF OCCUPANCY Application for a Certificate of Occupancy shall be made ten (10) days prior to the use or occupancy of any structure for which a building permit has been issued; and said structure shall not be used or occupied until a Certificate of Occupancy has been issued. !tf•PLICATION FOR PUJMB114G ANDD GAS FITTING Pt:lt'iIi 71 Ilea Ccr R M _ctrl a! of aid c Y ia.��° q v z, 43 J 37 t7 C ;i.5 :1 CC kl y I„Late ►dMC,:CiJn G(.cntr3 .._ with Setrec O1J OL:enir3 Hater Ft -IJ T I ,L :ii-' k.-.TCE tiu. Il.u.:,,:c 11wl.,ct0 (LATE TOTAL. x $3.00 NLOL f. 3 I.e• I1At-1Le, Old Gper.(;.� x $2,00 GtL.h baaln x $5.00 WALat Ilaatcc - to 57,000 bl'U , 1u0,000 b1U to 1S QL0 BTU , $5.00 __•_,_,, x $10.00 uatur a..ftencr x 31.00 Hew GtuttnJ Ren Old BJildlc►] _ x 35.00 C1et;tcl.; N,ter IIAALCr 55.00 ros I i I rING FEES; 1st 1 tl4turt! Aldtttrtal Fl�turea 4ts N.t„•La to 199,006 biu PA110 4 AI.Tt KATIGNS � r1:�L stt�u.o�a ea.h aJ.l, yIUJ.00 or tcacuan x 53.00 5 x $1,00 x $10.00 5 $5.00 $ $2.00 5 SLAL4 :ur;l,arg0 TGrt,L t t.L S 8.00 A 97-84-0416051 Job Addruss 1532 Trollhagen Drive DoparLMelit cf baL:1:ta.jy - Cicy C t 1-r:dl,:y Tel, H571-1450 Th4-und0rsl.jn,:J h„reL•y r-:;kea appli;st:ar :tr n ;.�rrr,tt f:.r tha work Lerr le, epeeiEied aireairg La dc'sll work in strict c;_er�sr,ca Witt ttr City Coc:cs and rulings cE Lb;; G,:i:arL:rent of Bji131nli' a -ercty ,le lsre,. teat all tho fat:lit 0 -id r,a,rJs„rtaLlona stacaJ in chio l..s;caue,: aro c,uo and �,,n„c 4-23-80 _, 19 CANER dhomas D. Gampbell KIND OF UUILL.Iti.; 'cane ~ USED AS Res TO BE COMPLLTED i-.L;;UP —2-80 ESTIRATLD CUSP _ 50 100 OLD - NEVI 11U1LG1,'K; FLl,t•1IT NZ. �tJnaa By - VINNEGA.SC5 .al. I.a. ROUGH ItISp. _ Da CJ ' FINAL. Il1Sp. Data. 1h1'1'IIUVAL L Git i Eludi P �� HItIIMU11 !'L'L' It;lt 111'i PLWt ulHu PL:lti:Ir IS 67.50 PLUS 0.50 .Ii_Tr 6UFCIIAw.r ALLIED TEST DRILLING COMPANY 4000 BEAU D'RUE DRIVE EAGAN, MN 55122 Exploration - Evaluation - Foundation Engineering 7 (612) 452-6913 August 22, 1990 Mr Tom Campbell % Mr Artur Paul Burnevik Architext Design Center 3916 West 50th Street Edina, MN 55424 Re: Subsurface Soil Investigation Proposed Single Family Residence Addition 1532 Trollhagen Drive Northeast Fridley, Minnesota Allied Project: 90124 Dear Tom: Enclosed is our findings and recommendations for the above mentioned project. One boring was completed to obtain soil profiles and bearing capacities. The boring indicates a black organic clay loam down to a depth of 3 feet, below a layer of top soil. Basal soil is a brown clay from 3 to 8 feet, and a brown sandy clay loam from 8 to 15 feet at depth. Cone penetrometer reading for the boring are low (e700) down. to 6 feet in depth where they increase to higher values. Ground water was encountered in the borings at 5.4 feet in depth, relative elevation 89.51, as evidenced by standing water level in the bore hole, and the saturated condition of the soils. It is recommenced that the organic soil be removed and a granular fill be ready for immediate placement, due to the high water table, then compacted, up to desired footing elevation. With the native soil, an allowable bearing capacity of approximately 2000 psf is obtained. An invoice for our services is included with our report. If we can be of any help on this or on any other matter, please do not hesitate to contact us or Mr Samstad. Respectfully, Keith Willenbring enclosures Geotechnical services ALLIED TEST DRILLING COMPANYA � Commercial, Residential 4000 Beau D'Rue Drive, Eagan, MN 55122 (612) 452-6913 Municipal, DHUD SUBSURFACE SOIL INVESTIGATION FOR PROPOSED ADDITION TO SINGLE FAMILY RESIDENCE 1532 Trollhagen Drive Northeast Fridley, Anoka County, Minnesota Allied Project: 90124 INTRODUCTION This report summarizes the findings of a subsurface soil investigation completed by Allied Test Drilling Company in the City of Fridley, Minnesota, as per the above title block. The proposed construction is an addition to an existing single family residence, the addition will be similar to a tow story spit entry walkout. The work was performed for Tom & Diane Campbell, care of Artur Paul Burnevik, of Architext Design Center, hereafter referred to as the "Owner". One soil borings was accomplished within the project area to establish soil profiles, water table elevation, inplace soil compaction or firmness, and other information. From this data, recommendations were developed for foundation and slab design. The proposed addition is to be added to the rear portion of existing house. The site slopes down away from the house to a pond in the rear of the property. Vegetation on the site consists of grass, shrubs, and trees. - ALLIED PROJECT 90124 - BORING LOCATIONS AND ELEVATIONS The boring location was chosen by Architext Design Center and modified by Allied Test Drilling Company as required. Factors in locating boring were possible structure location, accessibility, obstacles, terrain patterns, likely offsets required, etc. Insofar as practical, borings were placed in an attempt to obtain soil profiles and data representative of the site. Refer to the drawing attached to this report for a sketch of boring locations. In addition, borings were marked in the field with lath. Ground surface at each boring was determined referenced to the Northwest corner of the garage slab of the house, assumed elevation 100.00. The elevations for the boring hole, pond, and walk in of the house, are given on the boring location sketch and the boring logs. FIELD INVESTIGATION Soil sampling was performed in accordance with ASTM:D3441. Using this procedure, a testing cone of 35.6 mm in diameter with • a 60 degree apex angle. It is driven into the soil and the resistance to penetration is measured as hydraulic pressure at one -foot intervals. Allowable foundation pressure is determined from this penetration together with soil classification. See attached description sheet (color -coded yellow) in appendix. 2 - ALLIED PROJECT 90124 - As the samples were obtained in the field, they were visually and manually classified by the crew chief in accordance with ASTM:2487-85 and 2488. Representative portions of the samples were then returned to the laboratory for further examination and for verification of the field classification. Logs of the boring indicating the depth and identification of the various strata, bearing values (cone pen), the laboratory data, water level information and pertinent information regarding the method of maintaining and advancing the drill holes are attached. Charts illustrating the soil classification procedure, the descriptive terminology and symbols used on the boring logs are also attached. SOIL BORING RESULTS Attached is the log for the boring together with a key explaining terms and entries. The depth of individual layers of soil may vary somewhat from those indicated on the logs due to the inexact nature of auger sampling, unsampled intervals, and most importantly, the occurrence of transition between soil layers. The boring indicates a black organic clay loam down to a depth of 3 feet, below a layer of top soil. Basal soil is a brown clay from 3 to 8 feet, and a brown sandy clay loam from 8 to 15 feet at depth. 3 — ALLIED PROJECT 90124 — Cone penetrometer reading for the boring are low (<700) down to b feet in depth where they increase to higher values. Ground water was encountered in the borings at 5.4 feet in depth, relative elevation 89.51, as evidenced by standing water level in the bore hole, and the saturated condition of the soils. There is no mottling of soils at a depth to indicate maximum anticipated water level. Mottling indicates past, and thus possibly future, ground water level. In any event, it is again emphasized, as noted in the attachment, that ground water may vary as a function of many variables, especially changes in the pond elevation, development patterns, undeterminable within the time frame, scope and budget allowed in this investigation. CONCLUSIONS AND RECOMMENDATIONS The following conclusions and recommendations are based upon interpreted results of boring logs and other information. Because the borings represent a small portion of the site in relation to the proposed area of work, ongoing review of construction should be carried out. If additional excavations reveal subsurface soils of a different nature than those observed in the borings, the Soils Engineer should be contacted for possibly revised recommendations (see #b below and the following "Limitations of Investigation"). 4 — ALLIED PROJECT 90124 — 1. General Site Suitability Based upon interpreted results of the borings, it appears that the site has some limitations regarding suitability for construction. These consist of the presence of soft and organic soil unsuitable as support material, and the need to adapt the site to conform to the proposed construction. 2. Initial Site Preparation As a first and general recommendation, the site should be cleared of all vegetation, organic, loose or otherwise unsuitable soil, debris and boulders (3+) prior to structure or fill placement. Based upon boring evidence, this will require excavations to the bottom of soft soils depth 6 feet. Since the proposed construction is a split entry walkout with frost footings this excavation would be still required. Exact definition of excavation requirement throughout the building pad area is difficult to certify as variations may occur at other locations not in the vicinity of the boring. The depths of excavation as given above should not be taken as an absolute guarantee, nor should straight line interpolations be made. Rather, this judgment is tempered by the advisory that the Soils Engineer or his representative inspect the base of excavation. The bottom of the soft layer is usually the indicator of suitability. This zone should be "followed out" until it either disappears, extends beyond building pad oversizing, dissipates, 9 - ALLIED PROJECT -= 90124 - or daylights. Special attention should be given to the "1:1+1" oversizing requirement, note in #5 below. Excavated organic material should be disposed of offsite, or in landscaping areas, where the bearing of weight will not be required. It is possible that excavated soil may have an opportunity for salvage and reuse as fill if it kept free of any organic material and compacted when placed. The base of excavation, being just into groundwater in most instances, may be somewhat prone to destabilization upon excavation or disturbance. Additional construction techniques, such as sumping or dewatering, laying of geotextile fabric, etc, may have to be employed. It is suggested also that the granular fill be ready for placing immediately after excavation. It may be necessary to use Class 5 fill material which can give a more stable base than pit -run granular material. Upon the proper base of excavation fill may be placed if required to bring the building pad up to desired grade. The fill should be placed, compacted, and tested as per the "Fill Placement" section (#5 following). Refer to subsequent sections for more detailed and specific recommendations for each structural component. 3. Foundations For purposes of proposed construction, foundations and fill to support foundations must rest upon and over mineral (non - 6 — ALLIED PROJECT 90124 — organic) soils of adequate bearing value. Normally, an allowable foundation bearing pressure of 2000 pounds per square foot (psf) or more is desirable for a structure of this type. If this cannot be achieved, alternatives may include spread or extending footings deeper using lower compacted (engineered) fill. This analysis of soil for foundation purposes is based on a single splint entry family full basement walkout construction. Given likely footing elevations, topography and soil boring results, it is anticipated that all footings will rest upon virgin soil. The site should be corrected, if necessary, as outlined above. When any footings come near existing basal soil, this soil should be examined closely regarding suitability for the purpose. There should be no roots in otherwise clean foundation soil. If present, the zone of roots should be subcut out or to a depth of a least one foot below footing level. Small roots may then be left inplace. Using the above method, an allowable foundation bearing capacity of 2000 psf may be utilized (normal spread footing at the perimeter). The Cone Pen obtained for footing levels range form 1000 to 2100+. When these values are used with the type of base soil, a clay to a sandy clay loam, and using compacted fill below the footings, an allowable bearing capacity of approximately 2000 psf is obtained. 7 ALLIED PROJECT 90124 Footings should be placed at least 4 feet below grade line for frost protection. After fill placement there should be no excavation outside of the building pad area which intrudes into the "1:1+1" fill zone below footings noted below in #S "Fill Placement" section. Prior to footing installation, any soil loosened in the excavation process should be thoroughly recompacted. Footings should have reinforcing steel placed longitudinally, lapped properly and continuous around all corners for footing continuity and stability. The alternative of filling over existing soils, without correction, is not advisable as the soft soils have a low allowable bearing capacity. Settlement of the structure, possibly differential, with accompanying damage, will likely result. 4. Slabs Slabs should also rest upon and over mineral soil of adequate bearing strength. With engineered fill to the level of the lowest floor slab, this strength should be adequate. Slabs should have clearance from maximum anticipated ground water level and be protected from intrusion by surface waters. This clearance should be four feet or more (not a building code requirement, but advisable). - ALLIED PROJECT 90124 - The existing mineral soil upon this site or this soil with fill thereon is capable of adequate slab support provided that excavations are carried out in accordance with the above recommendations including the inherent warnings above. Immediately beneath the slabs, clean granular (free - draining) material with drain tiles should be place and thoroughly compacted. Groundwater in the vicinity will quickly reflect changes in local lake level. Hence, slab elevation would be set accordingly. It is up to the volition of the Owner as to how much to "crowd" this advisory. If the groundwater advisory is crowded at all, then a superior subslab drain tile system will be necessary, placed outside and below footings. Using this method, the existing mineral soil and fill thereon will be capable of adequate slab support. 5. Fill Placement Fill material, as required, should be mineral soil, preferably granular or clayey as required in above sections, free of debris, boulders and organic material. Fill should be placed and compacted in a manner that will allow complete compaction of the total fill layer to 98% of standard maximum density according to ASTM D 69B in the building pad area. Required compaction should be maintained at 98% for fill levels S feet and deeper below grade. 9 [:z — ALLIED PROJECT 90124 — A soil compaction tests should be conducted at the proposed depth of excavation and for every two feet of fill in appropriate portions of the area. The top of fill should extend at least one foot horizontally beyond the structure pad or footing limits. The fill surface may then extend downward and upward on a 1:1 slope to competent soil. If the fill slope is unconfined by other soils, the downward and outward slope should be flattened and stabilized. Also, no unremedied excavations should be carried out within the are delineated by the "1:1+1" rule. When computing fill oversizing, finished grade should be used as fill height. Edges of frost level footings may be used, but only if the footing wall can effectively function as a retaining wall, holding interior subsoils. 6. Inspections The Owner should retain a qualified geotechnical engineering firm to inspect excavations prior to placement of any construction material and to perform density testing and other testing as necessary. This firm should bear full responsibility for understanding this report, correlating data, and making proper interpretations. It is especially important in this case due to inplace soil conditions and the nature of site correction required. We recommend our affiliated, INSTANT TESTING COMPANY for any inspections and tests required in fill placement. 10 - ALLIED PROJECT -_- 90124 - 7. Final Site Topography The final soil surface should be graded to provide adequate drainage from structures and hard surfaces so that as little water as possible infiltrates into soils adjacent to the structure, The areas adjacent to footing walls should be adequately compacted, not loosely placed, to avoid this zone acting as a "sump" and creating nuisance water conditions. LIMITATIONS OF INVESTIGATION The Soils Engineer has prepared this report in accordance with generally accepted soil and foundation engineering practices. Because the borings represent only a small portion of the total site and for other reasons. Allied Test Drilling Company does not warrant that the boring are necessarily representative of the entire site but only of the boring locations at the time of investigation. Because of the influence of various construction procedures on site suitability, methods presented in this report may lead to a successful installation of the foundation, slabs and pavements only if appropriate review of construction is carried out by the Soils Engineer or his representative. Construction review should be considered an integral part of the design. The scope of this report covers only the suitability of soil for foundation and slab support and does not warrant or certify the site as buildable regarding compliance with any other 11 ALLIED PROJECT 90124 requirements such as building codes, local or state ordinances, federal rules and regulations, etc which may or may not be applicable. This report and all supporting information is provided only for the use of the Owner and his consultants for the described purpose. Allied Test Drilling Company has backfilled the boring holes as well as possible under existing conditions with native cuttings. The Owner should periodically check boring hole (frequently at first, then after each change of season) for signs of settlement. Any settling that does occur should be backfield with additional material, preferably a free-flowing granular material. This monitoring should continue for at least one season until no additional settlement is evidenced. Samples of soil from the borings will be retained in the office of Allied Test Drilling Company for a period of 90 days from the date of testing. After 90 days, the samples may be discarded unless a request to retain them for a longer period. 12 — ALLIED PROJECT 90124 — ENGINEER'S CERTIFICATE I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am duly registered Professional Engineer under the Laws of the State of Minnesota. ALLIED TEST DRILLING COMPANY Lawrence E. Samstad, PE Date Acting Chief Consultant Registration No 6220 LS/KW 13 G !r 1 y ' BORING NO.1 ElavatIon -94:91 POND Elevation 91.62 BENCH MARK: Northwest corner of garage slab. Assumed elevation 100.00 LiO �- � ALU IED TEST DRILLING COMPAN''1�' �A n� _/` )nlwl N -au Dliue 1i '2 6 Dnw, mpn, MN 5512121 48$-6918 SCALE: NONE mvm ev D • W PROJECT NO. 90124 RESIDENCE OF: TOM AND DIANE CAMPELL 1532 TROLLHAGEN DR. NE. FRIDLEY MN. A ■ ! ■rm!w& Wr=d%T ■RAE■ ■ !IL111/A 0%0%&Ar%A ILEV rhLLIGV 1 L� 1 I6.R1'UILLIIr� VVIV11�/ylr i PROJECT: 90124: 1532 TROLLHAGEN OR. NE. FRIDLEY LOG OF BORING NO: 1 DEPTH SURFACE ELEVATION: g4 . 91 SAMPLE LAB & OTHER TESTS IN GEOLOGY N WSL CONE PEN FEET DESCRIPTION AND CLASSIFICATION TYPE R W DEN P.L. (psi) BLACK ORGANIC TOP SOIL moist 1 FA 300 BLACK ORGANIC CLAY LOAM, mcis 1 2 300 g 400 BROWN CLAY, moist 3 4 450 '5 Elev. 4 500 BROWN CLAY,moist to wet V 6 89.51 l 600 1000 8 BROWN SANDY CLAY LOAM, J y 5 1200 Trace Gravel, saturated. 1500 10- 1800 11- 1000 12- 1500 13- 1500 14- 1900 15 2100 END OF BORING - NO REFUSAL 16 Bore hole backfilled with native 17 cuttings on August 5, 1990. is- 8192021WATER 19- 20- 21- WATERLEVEL MEASUREMENTS DRILLING DATA DATE TIME SAMPLED DEPTH CASING DEPTH CAVE-IN DEPTH DRILLING MUD LEVEL WATER LEVEL D.W. Crew Chief: 12:00 is, 11.01 5.81 6-2 4" Power Flight Auger & method: Cone Penetrometer 8-2 2:00 11.0' 5.41 Boring Completed: 2 AUGUST 1990 8-5 2:00 2.51 NONE Attachment to Sail Investigation Report ALLIED TEST DRILLING COMPANY CLAY 200% O CIU c TEXTURAL CLASSIFICATION OF SOILS from: Mn/DOT Grading 6 Base Manual Figure B 5-692.603 Note: The term "Loam" refers to a particular mixture of sand, silt, and less than 20% clay. Adjectives describe the predominating material(s) in a loam. AASHTO Gradation specifications: Gravel 2.Dmm+ Sand 0.074 -.2.0 mm Silt 0.005 - 0.074 mm Clay less than 0.005 mm ALLIED TEST DRILLING COMPANY PROJECT: Boring Log Key LOG OF BORING NO: DEPTH SURFACE ELEVATION: SAMPLE LAS A OTHER TESTS IN GEOLOGY I N WS FEET DESCRIPTION AND CLASSIFICATION I 1#1TYPEIR W E L+- 1 17 Visual Classification of Soil 4- According to Unified Soil Origin Classification Symbol Shown of Soil 5 in Parentheses 6 Number o f 7 Hammer Blows to Drive $ Split Spoon One Foot 9 1C 11 12 13 14 15, 16 17 16 19 20 21 Indicates By Y = Yes N = No if Soil is Water Bearing Water Level WATER LEVEL MEASUREMENTS DATE nME SAMPUD I CASING I CAVE -IM I DRILLINGWATER DEPTH I DEPTH I DEPTH IMUDLEVELI LEVEL it I Liquid Limit Plastic Limit Dry Density of Soil in Pounds Per Cubic Foot Moisture Content of Soil as a Percent of Dry Soil Weight Length of Soil fin Inches) Recovered in Split Spoon Sample Indicates Type of Sample: SS = Split Spoon FA = Flight Auger N = None DRILLING DATA Crew Chief. Method: ScOng'Complefed• ' ALLIED TEST DRILLING COMPANY Attachment to Soils Report METHOD OF INVESTIGATION CONE•PENETRATION TEST OF SOIL The Cone Penetrometer Test, or "Dutch Cone Test", of inplace soil compaction supplies data on the engineering properties of soil which can be used as a guide in design- ing earthworks and foundations. To perform this test, power flight auger borings are accomplished to establish soil profiles in the vicinity of proposed construction. The augers are advanced into the F ground by mechanical/hydraulic means and withdrawn every five feet. This portion of the test is performed in accord- ance with ASTM 0 1452, "Soil Investigation and Sampling by Auger Borings". Nature of subsurface soil is determined by observing and sampling disturbed material found on the flight auger. Representative samples are retained, sealed and stored for future testing or reference, if necessary. Prior to drilling each five-foot increment, inplace soil compaction is tested by the cone penetrometer in accordance with ASTM 0 3441, "Deep Quasi -Static Cone . . . Penetration Tests of Soil". The basic testing device is a cone, 35:.6 mm in diameter with a,60 a apex angle. It is driven into the soil by means of a rod rigidly attached to the cone. Resistance to penetration is measured as hydraulic pressure at one -foot in- tervals. Allowable foundation pressure is determined from this penetration resistance together with soil classification and other data. Testing by this method is usually performed to fifteen feet of depth unless conditions such as footing depth, un- suitable soils at proposed termination, etc, require addition - testing. Soil Classification Soils were classified by field personnel and verified by the Soils Engineer according to the Unified Soil Classification Method in accordance with ASTM D 2488, "Description of Soils (Visual -Manuel Procedure)". A summary of soil class types is attached to this report. Groundwater To establish possible occurence of groundwater in the region of testing, one or more boring holes were allowed to stand for a period of time, that period depending upon the free -draining nature of soils encountered, and then checked for standing water or cave-in prior to backfilling. In ad= dition, soil samples were checked for mottling (discolloration in streaks due to fluctuation of water level) and saturation. However, because of the nature of soil and various meteo- rological and geological influences which occur over a large area and time span and which can affect the site, an accurate measurement of highest annual groundwater could not be deter- mined in the time frame allowed for the investigation. Indi- cated levels, if any, are for the time of testing only. SUBJECT City ®f Fridley 2 0 10 AT THE TOP OF THE TWINS BUILDING PERMIT f RE COMMUNITY DEVELOPMENT DIV. PROTECTIVE INSPECTION SEC. r e 1 e CITY HALL FRIDLEY 55432 �'"'" NUMBER REV. DATE PAGE OF APPROVED BY 612-571-3450 910-F15 10/2/90 10B ADDRESS 1532 Trollhagen Drive N.E. 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 11 4 Innsbruck 5th Addition SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Tom/Diane Campbell 1532 Trollhagen Drive N.E. 571-506/0 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Architext Inc. 3916 West 50th Street Edina MN 5542 922--1013 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO. B USE OF BUILDING * Residential 7 CLASS OF WORK ❑ NEW k] ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Construct a 2512" x 2019" Addition and a 23''4" x 22"4" Garage Addition 9 CHANGE OF USE FROM TO STIPULATIONS Provide a hard surface:driveway. Owner/Contractor shall obtain the services of a soils testing company to observe and perform soils: testing as indicated in the soils -.investigation report prepared by Allied Test Drilling Co. Construction limits: are at current water's edge. See notations on plan. On all new roofs or tear -offs and replacement roofs, State Code requires that 2 layers of 15 Ib. felt, mopped together, be installed to a point 24 inches " up from exterior wall line, or the use of other Before digging call for approved underlayment membrane. all utility locations SEPARATE PERMITS REQUIRE® FOR 454-0002 WIRING, HEATING, PLUMQING AND SIGNS REQUIRE® BY LAW TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. ZONING SO. FT. CU. FT. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT NO. DWLG. UNITS OFFSTREET PARKING ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION STALLS GARAGES VALUATION SURTAX AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $102,450 $51.25 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT PERMIT FEE SACCHARGE DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $650.00 N/A STRUCTION OR TH PERFORMANCE OF ONSTRUCTION. ��?�a� iv 12 �� `tom �q PLAN CHECK FEE TOTAL FEE SC $102.5b 1$803.75 ASk�R ncrpgl�Ry6TOR ORAUTHORIZED AGENT (DATE) WHAN PROPERL V A E HIS IS Y]O,(UUHPERMIT ® l,9 A 96 SIGNATURE OF OWNER OF OWNER BUILDERI IDATEI BLOC INSP 0ATQ NEW [ ] ADEN 1>4 ALTER [ l R-1 AND R-2 Building Permit Application Effective 8/16/90 Construction Address: L-i�kL e-� `(c� c��� , J CJS AI Iek Legal Description: +.-UT / 1, k) Owner Name & Address: -T-b M l Arvi ig- C-Aim'Q � e"LL_ Tel. Contractor:Tel. Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. DE.SCRIPTIO�T OF IIVII�iP LIVnJG AREA: length Width % Height Sq. Ft. QMM AREA: Length Width ��` A- Height Sq. Ft. DECK AREA: length Width Hgt/Grand Sq. Ft. 07MM: Corner Lot [ ] Inside Lot [ ] Type of Construction: Approx. Completion Date: Ft. Yd Setback Side Yard Setbacks Estimated Cast: $ t J 0Q0 gS-0.06 Proposed Driveway Width If New Opening Is Desired: Ft. $ $ Width + 61 See Back Page DAZES APPLICANT:alwlz��k�,LgtgTel. /3 Permit Fee $ 6-s®R 00 Fine Surcharge $ 9 0 . S-0 State Surcharge SAC Charge $ Driveway Escrow $ Park Fee $ Sewer Main Charge $ TOTAL $ 41. TOTAL r)z, CITY USE OOII,Y l0a, qsb Fee Schedule on Reverse Side 000, C� Z 31.E ag .001 x Permit Valuation (1/10th $.50/$1,000 Valuation ��®® $600 per SAC Unit Alt. "A" or Alt. "B" Above Fee Determined by Engineering Agreement Necessary [ ] Not Necessary [ ] &MMIATIONS : So_", c) a, Solt s I k6 c /-J r AtAL4 ftv-) ? ' D 20 uctic. cc) . ® �' f7/-) `�� cG1 cs � � i m i � �J R'rC' � � 1��,�1,(t,�s (AJ ✓���'" 1-9/21/90 09:08 i A %Y 9223803 ARCHITEXT 02 1 1 92- " 8 Ol 3 12/21/90 09-06 'a 9223803 ARCH ITEXT 03 v 1 0 S S I FA -014 PNCE 0 3144 �-Opnepim Avenue So4ttii - Wri6apolis, MN 55400 X 112) 822-bM FA 12) 022 -SM MCCONKEY AM CIATES INC. pro) By 'gh, NO. v s L. IT 0 S L Ary i t v VP llkirx-g- - --A lck-qpl U FK PIT -15�il VA W MOT ol� 6-AmAlAya r 0 LAO R -4-64- -v Lo U- -TOTA, L , O'AS-P, t IF' T 4 yi5c). f '—&l tiq. In's 0 bit;, q in A -L is 85P, tx A -L is 85P, ;; _ l t; i TE- +:7' 4 ti l �� 3 - & � ® =� 5 €-� - ss ;� �_� ��� �•�.�.$�, 'kap _ - °�a#'. law 4mt 91Lo 1 Nc Ord 4$ Aft a Gate ' r 8, itoo ij Olt Nw- 4,6 n s 0:40 i 7 s AE �`� € W •ate ' . � �t � � j'' in op i d _$ a P' �• s ,14 y y IV gym- +:-' i8 �33A.w x gy L rV —e V �v Pill -,I- qvo C--- tv -z, -o Ink -A SCIPS A. •.�- EXTERIOR ENVELOPE AVERAGE "U" COMPUTATION O W: C R: 2 . j_:D UQ t'^cti rim . Z O rv-� G !cm,►Yv% ca S'bZ L. - SITE ADDRESS: –1515'- -rim oL_.L_"►at.mt1 T) wLua . L►'DL_F–C. t"C11f1S1'Fc.SQ"C/4 CONTRACTOR: _ A_ymc," VrreY.z _ DATE:.O PHONE:.Q22- L o Vti • r DETERMINE WORKING SQUARE FOOTAGE OF EACH: 1. TOTAL 'EXPOSED WALL AREA........ -ZT-�. sq ft.x "U" . p, 2. TOTAL ROOF/CEILING AREA,....... 1.4= 14- sq ft x ".U" j L4i. q tQ 3. TOTAL EXPOSED WALL AREA CALCULATIONS: Total exposed wall area above floor........ :2-4Z, sq ft t a) Total wall window area: VOLL O, L.ouaO. glazed...... _ 6,1.2F sq ft x "U" ®�' ��__ e PIe�.Lw L UM ._ glazed...... _13 O. O 0 sq ft x "U" .,4 . Q 0 ..� b) . -Total door area ......... 2p•.O0 , sq ft x "U" �.m ' .�(o c) Tolal sliding glass door area: ; i ]_l1E!ED lazed...... 4.0 sq ft x "U" _ �3-] • ML -L a Low L_ '��, �R. u►r.azed...... 33. O sq ft x "U" . 3l0 • d) Total flyeplace wall area sq ft x "U" -p-- ®— 1 e) Total wall framing area (Average 10X)........... ,? O. O• sq ft x "U" , I O 4 f) Total net wall area above �- -floor (Insulated)....... $52. "% sq ft x "U" .046 ...�� g) Total rim joist area...... sq ft x "U" _0– —p Total foundation area (Exposed).......... b.C7 sq ft h) Total foundation window area ............. —cam - sq ft x #full 1) Total net foundation area above grade........ alto sq ft x "U" . O 3. TOTAL a) th ru 1) If Item 03 is the same as, or less than Item fl, you have met the Intent of 2 ICU 1.16008 A and 0. Page 1 TOTAL 9XPOSEO ROOF/CEILING CALCULATIONS: Total exposed ' roof/ceiling area........ 1,(ZC> sq ft j) Total skylight area....... 3[0.1 ; sq ft x "U" .2-4(o • ..11. C)I R` Q Total roof/cellinq framing area (Average 1n%) ...... 162. sq f t x "U" . O 2 O - 1) 'Total net insulated . roof/telling area ....... _1� 5_ sq ft x "U" 4. TOTAL j) thru 1)r'� If total of 04 is the same as, or less than f2, you have met the intent of 2 MCAA 1.16008 A and 0. ALTERNATE BUILDING ENVELOPE DESIGN To utilise the total envelope system method, the values established by the sum of items 13 and /4 shall not be greater than the sum of items 11 and #2: -Z -1 . 3 + 2. _ -4 LAV C E R T I F I C A T 1 0 N 1 hereby certify that I have calculated the "U" factors apd "R" values herein and that the buildinq here described meets or exceeds the State. of Minnesota Energy Conservation Act. (Signature) r . ✓' / C> (Date) w:: Page 2 HSTRUCTION AMING SECTION: Interior al it film • WALL SECTION (INSULATED) --(1 Interior air film {2 i 3 iEx�. --®---{6 Ex to r 1 or a 1 r f i l m R VALUE 0.611 U= .10 11.611 11. 1 TOTAL -it - ?y U s ) /R m . • i ' HSTRUCTION AMING SECTION: Interior al it film • WALL SECTION (INSULATED) --(1 Interior air film {2 i 3 iEx�. --®---{6 Ex to r 1 or a 1 r f i l m R VALUE 0.611 U= .10 11.611 11. 1 TOTAL -it - ?y U s ) /R m . SLAB ON GRADE Unheated Slabs: Minimum R = 6.2. Page 3 RIM J01 SECTION: '1 rior air film 11.611 ' ,2 4 6 Exterior air film TOTAL -11.,-,, ' FOUNRATION INSULATION REQUIRED: ' ®� ~ Mi. R-5 On entire wall OR U 1/11 Min. R-10 down to frost Depth 7�FOUNDATION SECTION: 1 2 Interior air film 11.611 , rZ11 3 tltolYJ 1Z« Grr,V IIf�SV�. Ib.l9O 1.2L� 4 n.17 Exterior air film (S *A* (6 TOTAL R • I 7ip=TT U = 1/11 • 05 SLAB ON GRADE Unheated Slabs: Minimum R = 6.2. Page 3 VENTED CONSTRUCTION R VALUC• ' CEILING SECTION (INSULATED: I' Interior air film 2 dD P -t .2 09 3 0 4 Exterior air film still AAI *• TOTAL R • -T U - 1/R • 07-1 CEILING FRAMING SECTION: 1 Interior air film 2 3 4 Interior air film (stilA. 5 JV17—_11 Inches sot wood IuInL a -a U- 1/R���p CEILING SECTION (INSULATED): V Interior air film 0.61 2 _ 1 came 1!6f>. 0. 3 O 4 Exterior air film(stillA. 0 R 46 U• 1/R• .0&1 CEILING FRAMING SECTION: 1• Interior air film 2 '.�/b�� EYP. 80. 3 5 4 Exterior air f I Im 5 I Inches so ide air film side air film A.6 wood TOTAL R a , U• 1/R=.0 05 n.Al U- I/Ra Pa we l 9223803 04/09/91 13:56 it 9223803 Extorlop Envelope Thermal Ttanatrilthince, Worksheet SIVE ADDAP- 9 P(L� NA OF P;RSON COMPLETIM ronm Total@ Avefage U -Value, (A Requited U -Value 0--,m Energy Code) Insulated AFOa Naming Area � Window$ �Pdeg A-7 r -j & t*- vJ N 0 C, Doom nirn Joist Fireplace Wall roundation Wall (above grade) roundation Windows Other D i V ARCHITEXT 121 02 CITY -- wr= U -Value U -Value x cc�tArea . I 4-& wl Arta (94 FO Insulated Area Average U-Valup S) rramin g Area Skylights 7) C O, C., 4O Other if (C7 Ps than or (0-1 Is greater than Gude Qq! mrnplete thEi Wlowlreg In determine the design necessary to mpol Ili envelope criteria of the Energy 'Ve­ An signed Total. + Total@ Avefage U -Value, (A Requited U -Value 0--,m Energy Code) Insulated AFOa Naming Area � Window$ �Pdeg A-7 r -j & t*- vJ N 0 C, Doom nirn Joist Fireplace Wall roundation Wall (above grade) roundation Windows Other D i V ARCHITEXT 121 02 CITY -- wr= U -Value U -Value x cc�tArea . I 4-& wl Average U-Valup S) L) 2- Is greater than zero, adjust 11 -Values or areas and recalculate no. that (1) is less than or equal to (L) Average U-Valup S) L) 2- fli-rjulred O-Vshtp (fYofn Energy t Witte) if (C7 Ps than or (0-1 Is greater than Gude Qq! mrnplete thEi Wlowlreg In determine the design necessary to mpol Ili envelope criteria of the Energy 'Ve­ An signed Total. + (6 Coiling Budget: (0) A I WAH Budget: uj Tolal Envelope Budget: D As Designed - Budget (% Is greater than zero, adjust 11 -Values or areas and recalculate no. that (1) is less than or equal to (L) 9223803 04/09/91 13:57 10 9223803 ARCH I TEXT [a 03 �J Assembly R and t!_ Value Farms j ASSit M131 v ASSEMBLY ATt Mated. (Daserlbe) . Thickness R-Value A aiedaf (Describe) Thickness n-Value - -( est_ tom' N1* �' r5 i _ 14.o Interior Film Coefficient A POO I deiior Filial Coofli;:Reiit Exlerini Filip Coefficlool , ' �i p �,ri1i at'i :D t4i le rlt o lotal Assembly Thermal l;c `. `-3+'-=� � �p� , 6 Total Assen-ibty Thermal Res;isianc€s ` 7.��1� Assembly U-Value , 09 Assembly U-Valua AS ;EhrBt Y - - -- - ASSFPArl1 Y _ Malerlaf (Describe) -- — Thickness R-Value Material (Describe) Thickness R-Value 1iLS 11l 14,x" LA) IJ , �� s L a ° . 6p. i sdr� Interior f=ilm Coefficient iettetiCx Fitlai C:c�eflit:iertt Exterior filth C:oulficieo! t ®( Exteriut Film C. opflic:iorrt fatal Assembly 7fieir*.:; iii si zn9 e ' dotal Assembly Thermal Resistance ASsernbly U-Value �� Assembly U Value AS�kP.RdLY AE:Sa:r�rbt Y 31 (Descflbe) Thickness R-Valua Material (prescribe) Thickness R-Value Iratefiot Filth Coefficient o (� 1 Interior Film Coufflciertl Exteaim Film Coefficient , Exterior Filar Coefficient o (/ t„tat Assembly Thermal farasislance •f-1 Total Asserribly Thermal Re5rAwice %+`5ewbly U-Vatue Assembly IJ V�luc� $ i ( CITY OF FRIDLEY APPLICATION FOR PLUMBING AND GAS FITTING PERMIT RATE SCHEDULE PLUMBING FIXTURE RATES: NO. RATE w New Fixtures - N w Future Fixtures p $ 3.50 u Old Opening, New Fixture K d a S Water d a� w Blow Off Basin $ 5.00 N rz ---i w L7 $ uEE p, is $ Hydraulic Valve Heater $ 5.00 S Sump or Receiving Tank $ 5.00 S Water Treating Appliance $ 7.00 $ Hot Water Heater 4 $ Gas Range $ 10.00 $ Gas Dryer oNit Mc O $ Back Flow Preventer Required. w ( ) w Type 3 8 4u, w O r u 1t of Value of Fixture or v J1 .I N State Surcharge -A Reinspection Fee $ N O .-4 to 7 M W w w N FA U a o� m ai o w -C m w U a� a s o i� t� o s lec 1st 2nd 3rd 4th (R) - Future Connection Opening Connected with Sewer (•) - New Fixture, Old Opening Water RATE SCHEDULE PLUMBING FIXTURE RATES: NO. RATE TOTAL New Fixtures - $ 5.00 $� Future Fixtures $ 3.50 S Old Opening, New Fixture $ 1.50 S Beer Dispenser $ 4.00 S Blow Off Basin $ 5.00 $ Catch Basin $ 5.00 $ Rain Water Leader $ 5.00 $ Hydraulic Valve $ 5.00 S Sump or Receiving Tank $ 5.00 S Water Treating Appliance $ 7.00 $ Hot Water Heater $ 5.00 $ Gas Range $ 10.00 $ Gas Dryer $ 10.00 $ Back Flow Preventer Required. . . yes ( ) No ( ) Type $ 5.00 $ ALL OTHERS AND/OR REPAIRS AND ALTERATIONS 1t of Value of Fixture or Appliance $ State Surcharge S 50 Reinspection Fee $ 1515,00) TOTAL FEE $� Effective May 1, 1990. Job Address-----,�� �- Department of Buildings City of Fridley Tel. 1571-3450 The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct jFridley, Mn. �� C , 19 7-0 OWNER KIND OF BUILDING USED AS N TO BE COMPLETED ABOUT ESTIMATED COST / 40 ® JJ/ OLD - NEW BUILDING PERMIT NO. PERMIT NO. /6) S Company Signed Tal. No. ROUGH INSP. Date FINAL INSP. Date ROVAL FOR PERMIT !1INIMUM FEE FOR ANY PLUMBING PERMIT IS $15.00 PLUS THE $.50 STATE SURCHARGE CITY OF FRIDLEY Effective Date May 1, 1988 t APPLICATION FOR POWER PLANTS AND HEATING, COOLING, VENTILATION, REFRIGERATION AND AIR CONDITIONING SYSTEMS AND DEVICES RATE SCHEDULE 4ESIDEI`TIAL RATE Furnace Shell and Duct Work, Burner (Also replacement furnace) $ 20.00 Gas Piping $ 10.00 (piping needed with new furnace) Gas Range $ 10.00 Gas Dryer $ 10.00 • Air Conditioning (all sizes) $ 10.00 All Others/Repairs and Alterations 1% of Value of Appliance or Work COMMERCIAL/INDUSTRIAL 1% of Value of Appliance or Work State Surcharge Reinspection Fee ($15.00) Rough Insp. Date Final Insp. Date Approval for Permit �v 1-3 MINIMUM FEE FOR ANY HEATING PERMIT IS $15.00 PLUS $.50 STATE SURCHARGE *Air Conditioners can not be placed in side yard without written permission from adjoining neighbor. TO'T'AL s ' .oa 90 r Job Address A 37-- %�,,,4 C Lr:/0 Department of Buildings, 6431 University Ave. N.E., Fridley, MN 55432 City of Fridley Tel. /571-3450 The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. Fridley, Minn. / _ '1990 OWNER KIND OF BUILDING USED AS /�t�J�J%�✓ `/t� TO BE COMPLETED ABOUT ESTIMATED COST `�G%L7C% coil OLD - NEW BUILDING PERMIT NO. PERMIT NO. DESCRIPTION OF FURNACE/BURNER HEATING or POWER PLANTS, Steam, Hot Water, Warm Air- No. Trade Name ��'i L.! I Size No. �%lC— Capacity SW Sq. Ft. EDR BTU�W HP Total Connected Load 3'L 000 Kind of Fuel 6' BURNER - Trade Name Size No. Capacity Sq. Ft. EDR BTU HP Company lK Signed By Z Tel. No. Cry 7 Fill out back side for stack verification on replacement furnaces CHIMNEY AND STACK VERIFICATION The undersigned hereby verifies that the existing chimney or stack; 1. Has been carefully examined Yes No ( ) 2. Is free from rust or deterioration Yes () No ( ) 3. Has no foreign objects lodged within Yes ( No ( ) 4. Is securely supported Yes ( No ( ) 5. Meets all current Code requirements for size and total BTU connected Yes (xr No ( ) 6. Has Total heating BTU's of All other BTU's TOTAL c � Rema rk s 5 7� &C, c, 1v4 5 an Com P Y Signed By a Z Date / — 3 — % CITY OF FRIDLEY APPLICATION FOR PLUMBING AND GAS FITTING PERMIT RATE SCHEDULE PLUMBING FIXTURE RATES: NO. New Fixtures Future Fixtures Old Opening, New Fixture Beer Dispenser Blow off Basin Catch Basin Rain Water Leader Hydraulic valve Sump or Receiving Tank Water Treating Appliance Mot Water Heater Gas Range Gas Dryer RATE $ 5.00 $ 3.50 S 1.50 S 4.00 $ 5.00 $ 5.00 $ 5.00 $ 5.00 $ 5.00 $ 7.00 $ 5.00 $ 10.00 $ 10.00 Back Flow Preventer Required. . . Yes ( ) No ( ) type $ S. UO ALL OTHERS AND/OR REPAIRS AND ALTERATIONS is of Value of Fixture or Appliance Re►napection Fee $ State Surcharge (515.00) TOTAL FEB TOTAL S Effective Flay 1, 1990 Job Address 16-12 L%®//1/$!Wz:-z Department of Buildings City of Fridley Tel. #571-3450 The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct /J � Fridley, Mn. /l/ .1290 OWNER 6071/0 1�/// KIND OF BUILLDDING USED AS fter-lel � TO BE COMPLETED ABOUT .2-91 ESTIMATED COST OLD - NEW BUILDING PERMIT NO. PERMIT NO. Company Signed By O T.I. No. ROUGH INSP. Date FINAL INSP. Date APPROVAL FOR PERMIT ?11NIHU4 FIX FOR ANY PLUMBING PERMIT IS $15.00 PLUS THE $.50 STATE SURCHARGE WdLer syh m Ni5d c Heater K CN�uqLu� r -RC p'� ~oi 'lac rFay] a4( .0 R �[ v',►omaq�.i U a O :as let / 2nd 3rd 4th (R) - Future Connection Opening Connected with Sewer (') - New Fixture, Old Opening Water RATE SCHEDULE PLUMBING FIXTURE RATES: NO. New Fixtures Future Fixtures Old Opening, New Fixture Beer Dispenser Blow off Basin Catch Basin Rain Water Leader Hydraulic valve Sump or Receiving Tank Water Treating Appliance Mot Water Heater Gas Range Gas Dryer RATE $ 5.00 $ 3.50 S 1.50 S 4.00 $ 5.00 $ 5.00 $ 5.00 $ 5.00 $ 5.00 $ 7.00 $ 5.00 $ 10.00 $ 10.00 Back Flow Preventer Required. . . Yes ( ) No ( ) type $ S. UO ALL OTHERS AND/OR REPAIRS AND ALTERATIONS is of Value of Fixture or Appliance Re►napection Fee $ State Surcharge (515.00) TOTAL FEB TOTAL S Effective Flay 1, 1990 Job Address 16-12 L%®//1/$!Wz:-z Department of Buildings City of Fridley Tel. #571-3450 The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct /J � Fridley, Mn. /l/ .1290 OWNER 6071/0 1�/// KIND OF BUILLDDING USED AS fter-lel � TO BE COMPLETED ABOUT .2-91 ESTIMATED COST OLD - NEW BUILDING PERMIT NO. PERMIT NO. Company Signed By O T.I. No. ROUGH INSP. Date FINAL INSP. Date APPROVAL FOR PERMIT ?11NIHU4 FIX FOR ANY PLUMBING PERMIT IS $15.00 PLUS THE $.50 STATE SURCHARGE CITY OF FRIDLEY Effective Date May 1. 1988 APPLICATION FOR POWER PLANTS AND HEATING, COOLING, VENTILATION, REFRIGERATION AND AIR CONDITIONING SYSTEMS AND DEVICES RATE SCHEDULE y� ®/ Job C� RESIDENTIAL RATE TOTAL AddressC/`�/���vt Furnace Shell and Duct Work, Burner (Also replacement furnace) $ 20.00 $L Department of Buildings, 6431 University Ave. N.E., Fridley MN 55432 City of Fridley Gas Piping $ 10.00 $®�J Tel. #571-3450 (piping needed with new furnace) Gas Range $ 10.00 $ The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes Gas Dryer $ 10.00 $ and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. 3 -7 • Air Conditioning (all sizes) $ 10.00 $ Fridley, Minn. G All Others/Repairs and Alterations OWNER C�iL L It of Value of Appliance or Work S KIND OF BUILDING E E& , COMMERCIAL/INDUSTRIAL {{ �� USED AS 1) w z.L—L-- I Ui3 3---9/- '9/ESTIMATED li of Value of Appliance or Work $ TO BE COMPLETED ABOUT �C--�- o ESTIMATEDCOST State Surcharge S .50 OLD -NEW BUILDING PERMIT NO. PERMIT NO. TOTAL FEE $ Reinspection Fee ($15.00) S DESCRIPTION OF FURNACE/BURNER Rough Insp. G q 5 L I N� Date 6 f4 L. c) QLAC�-, Final Insp. 1 p � m > a Date lJ� 0A-0 ® I �,) Approval for Permit _ � ) to b r51ik, CI'h�}5S `� �a U i✓1r MINIMUM FEE FOR ANY HEATING PERMIT IS $15.00 - PLUS $.50 STATE SURCHARGE *Air Conditioners can not be placed in side yard without written permission from adjoining neighbor. HEATING or POWER PLANTS, Stem, Hots (Water, Warm Air- No. Trade Name 1 hof° I �4 L�L�( r PTP— size No. Capacity/IJM- Sq. Ft. EDR BTU `` up Total Connected Load Kind of Fuel BURNER - Trade Name Size No. Capacity Sq. Ft. EDR BTU I ^� I. - Company MAINE &'RIR WING Signed By AND ftl ' Tel. No. 75 Fill out back side for stack verification; on`replacemeni- ces CHIMNEY AND STACK VERIFICATION The undersigned hereby verifies that the existing chimney or stack; 1. Has been carefully examined Yes (,) No ( ) 2. Is free from rust or deterioration Yes ( ) No ( ) 3. Has no foreign objects lodged within Yes ( ) No ( ) 4. Is securely supported Yes ( ) No ( ) 5. Meets all current Code requirements for size and total BTU connected Yes ( ) No ( ) 6. Has Total heating BTU's of All other BTU's TOTAL Rema rk s Company _ Signed By Date 01 _SUBJECT P City of Fridley 30840 AT THE TOP OF THE TWINS PERMIT CRAIT BUILDINGt RECEIPT N COMMUNITY DEVELOPMENT DIV. st � I r e PROTECTIVE INSPECTION SEC. U"(� � e NUMBER REV GATE PAGE OF APPROVED BY i e "1 CITY HALL FRIDLEY 55432 612-571-3450 9t0 -F15 4/18/00 JOB ADDRESS 1532 Trollhagen Drive NE 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 11 4 Innsbruck 5th Addition SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Tom Campbell 1532 Trollhagen Drive NE 571-5060 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO New Haven Construction 4208 83 Ave N, Brooklyn Park, MN 55443 566-5225 20077950 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 8 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ❑ ADDITION ❑ ALTERATION Cj REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Reroof House & Garage (54 Sq) Tear -off 9 CHANGE OF USE FROM TO STIPULATIONS Underlayment must comply with the State Building Code. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL. PLUMBING, HEATING, TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT CU FT. AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS. OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $2.36 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $4,719 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- F SC $4.72 STRUCTION OR THE PERFORMA OF ONSTRUCTION $,111.25 e PLAN CHECK F E Lice e C $5. T AL FEE $123.33 SIG NATURI OF CON 'R TO Rau HORiZEO AGENT iDATE. HE PRO VALI A D THIS IS toug P IT QA TE S-GNATURE OF OW NER,iF OWNER BUILOER1 IDATEi 01 NEW[ ] Effective 5/10/99 ADDN [ ] CITY OF FRIDLEY ALTER [ ] SINGLE FAMILY AND DUPLEXES R-1 AND R-2 BUILDING PERMIT APPLICATION Construction Address: 16.32 �►,�� Legal Description: Owner Name & Address: Tel. # Contractor: MN LICENSE Address: �Z.(j� 93 e'4e*1EA/ Tel. # Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. DESCRIPTION OF EMPROVEMENT LIVING AREA: Length Width Height Sq. Ft. GARAGE AREA: Length Width Height Sq. Ft. DECK AREA: Length Width Hgt/Ground Sq. Ft. OTHER: Construction Type: eA^- Estimated Cost: $ Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $� DATE: (4— l 6 "WAPPLICANT: e4tTel. # ✓ �CQ (� f STIPULATIONS: CITY USE ONLY Permit Fee $ f/l. �Si' Fee Schedule on Reverse Side Fire Surcharge $ 'l '% .001 of Permit Valuation (1/10th%) State Surcharge $ $.50/$1,000 Valuation SAC Charge $ $1050 per SAC Unit License Surcharge $ $5.00 (State Licensed Residential Contractors) Driveway Escrow $ Alt. "A" or Alt. "B" Above Erosion Control $ $450.00 Conservation Plan Review Park Fee $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [ ] Not Necessary [ ] TOTAL $ STIPULATIONS: CITY -01% �RIDLEY INSPECTION DIViSION >a®✓®D Effective On January 1, 2000 6431 "boiversity Ave NE Fridley, MN 55432 APPLICATION FOR POWER PLANTS AND HEATING, COOLING, VENTILATION, 572-3604 REFRIGERATION AND AIR CONDITIONING SYSTEMS AND DEVICES RATE SCHEDULE Residential Furnace Shell and Duct Work, Burner - Also Replacement Furnace (Side Vent - Fill Out Back) Gas Piping (Needed with new furnace, but not replacement) Gas Range Gas Dryer *Air Conditioning - All Sizes All Others/Repairs & Alterations (LIST ON BACK) 1% of Value of Appliance or Work Commercial/Industrial 1.25% of Value of Appliance or Work Rate $ 30.00 $ 10.00 $ 10.00 $ 10.00 $ 25.00 State Surcharge TOTAL FEE MINIMUM FEE FOR ANY HEATING/COOLING/VENTILATION REFRIGERATION/AIR CONDITIONING PERMIT IS $25.00 PLUS THE $.50 STATE SURCHARGE REINSPECTION FEE $47.00/Hr *Air Conditioners can not be placed in a side yard without written permission from adjoining property owner. TOTAL $ $ .50 JOB AD BUILDING USED AS ESTIMATED COST PERMIT PERMIT N0J q l `� DESCRIPTION OF FURNACE AND OR BURNER No. of Heating Units._ Circle One (Steam) (Hot Water) Air) Trade Name Size No. BTU ILR7),C)QU HP EDR Fuel Total Connected Load Burner Trade Name Size No. BTU HP EDR The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes an rulings of the Building Divisidn, and hereby declares that all the facts and representations stated in this application are true and correct. DATE Ino— If) -05 Approved By4y Rough -In Date Final Date '."/y , / _"L D-1 COMMON VENT, VENT CONNECTOR AND COMBUSTION AIR VERIFICATION When replacing an existina furance, the undersigned hereby verifies that the venting has been examined and is free from rust, deterioration, obstructions, and is securely supported and firestopped where required. Yes (-I No ( ) The venting system is plastic/PVC and meets all current codes and manufacturer specifications including sizing, length, number of elbows and termination. Yes (I No ( ) The undersigned also verifies that the replacement unit is a listed assembly and meets the current codes and manufacturer's specifications. This does include AGA-GAMA Category I Central Furnace Venting Tables for fan assisted and natural draft appliances. Yes (-,y No ( ) The existing combustion air is sized and installed to meet the current codes and manufacturer's specifications. Yes (-f No ( ) When required to install a new combustion air. it will be sized and installed To meet the current codes and manufacturer's specifications. Yes (4 No ( ) When installing a new venting system, the undersigned hereby verifies that it is a listed assembly and meets the current codes and manufacturer's specifications. This does include AGA-GAMA Category I Central Furnace Venting Tables for fan assisted and natural draft appliances. Yes (-T No ( ) Is the common vent and vent connectors sized and installed correctly after an appliance has been removed from the common vent and vented separately as per current codes. Yes (-j No ( ) Appliance Type and Size/Common Vent and Vent Connector Information Appliance #1 Type I'l jY) BTU Input 1y-Mi�b Fan Assisted or Nat Appliance #2 Type BTU Input Fan Assisted or Nat Appliance #3 Type BTU Input Fan Assisted or Nat Total Appliances Total Btu Input Common Vent Type Vent Height Diameter inches Appliance #1 Vent Connector Height ft Length ft Diad in Type Appliance #2 Vent Connector Height ft Length ft Diameter in Type Appliance #3 Vent Connector Height ft Length ft Diameter in Type ALTERATIONS: (Describe) HEATING CO: Signed By: -mop Date CIIYOF FRIDLEY FRIDLEY MUNICIPAL CENTER - 6431 UNIVERSITY AVE. N.E. FRIDLEY, MN 55432 - (612) 571-3450 - FAX (612) 571-1287 June 29, 2001 Mr. Tom Campbell 1532 Trollhagen Drive NE Fridley, MN 55421 Re: Final Inspection at 1532 Trollhagen Drive NE Contractor: Dave's Appliance Heating & Air Dear Mr. Campbell: A mechanical permit was issued on June 20, 2000 to install a furnace and air conditioner at your address. According to section 305 (a) of the 1991 Uniform Mechanical Code, a final inspection shall be conducted on the mechanical work authorized by this permit. As of this date, no inspection has been called for. The permit fee that was paid covers the inspections to make sure the work was completed according to the Mechanical Code. We will keep your permit open for another 30 days and if we do not hear from you within this time to set up the inspection, we will expire the permit and no further action will be taken. To set up the inspection or to have any questions answered, please contact the Building Inspection Division at (763) 572-3604. Sincerely, 17A4 A DA N N Buil g Inspector DJ/mh