Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PRE 2010 DOCS
City of Fridley, Minn. BUILDING PERMIT Date: ---a- --- Owner: �`� Builder Address _ _ Address 11T° Q54Ok P OF BUILDING Part of .TAptP. Lot ., Block _ _ __ Add"doll or Sub -PV o =- -- Corner Lot _ Inside Lot _ _ _ _ Setback . _ .__ S' Sewer Elevation __ ___ Foundation Elevation DESCRIPTION OF BUILDING To iT Front Depth _ height Sq. Ft. Cu. Ft. ; Nr- l9rox Depth eigk:t Sq. Ft. _ Cu. Ft. Type of Construction Est Cost AATobe Completed �. In consideration of the issuance to me of a permit to construct' the building described above, I agree to do the proposed work in accordance with the description above set forth and in compliance with all provisions of ordinances of the city of Fridley. In consideration of the payment of a fee of $ _ _M , permit is hereby granted to to construct the building or addition as described above. This permit is granted upon the express condition that the person to whom it is granted and his agents, employees and workmen, in all work done in, around and upon said building, or any part thereof, shall conform in all respects to the ordinances of Fridley, Minnesota regarding location, construction, alteration, maintenance, repdii� and moving of buildings within the city limits and this permit may be revoked at any time upon violation of a�y of the provisions of said 'ordinances. - .rs ' a Inspector NOTICE: This permit does not cover the construction, Installation for wiring, plumbing, -gas heating, sewer or water. Be sure to we the Building Inspector for separate permits for these items. APPLICATION FOR BUILDING PERMIT CITY OF FRIDLEY, MINNESOTA 1, d . I o - 00, 91 r. - 0 M, WOO T Address ® LOCATION OF BUILDING J No.��`�_Street ® Part of Lot Lot � � ,� Block 3 Addition"or Subdivision Corner Lot Inside Lot Setback__;Z:�„Side-Yard SEWF,R. ELEVATION FOUNDATION,. ELEVATION Applicant attach to this form Certificate of Survey of Lot and proposed building location. To be used as: DESCRIPTION OF BUIIDING Sq. Ft. Z 7 �; Cu. Ft. 3 17-3 Front epth Fight Sq. Ft. Cu. Ft. Type of Construction Estimated Coat f -)/7C0: To be Completed The undersigned hereby makes application for a permit for the work herein spe6ifiedo agreeing to do all work in strict accordance with the Ci dinances and ruling of the Department of Buildings, and hereby declares that he facts and representations stated in this application are true and correct. DAVE ��Z SIGNATURE (A Schedule of Fee Costs can be found on the Reverse Side.) App �j� y Bu' '"Inspector ----- City of Fridley Application for Plumbing and Gas Fitting Permit Dept. of Bldgs. Phone SU 4-7470 DESCRIPTION OF WORK Number, Kind and Location of Fixtures PARTIAL RATE SCHEDULE PLUMBING FIXTURE RATES: Number Fixtures ......... Future Fixture Opening ................ New Fixture Old Opening .............. NO. RATE x $1.50 x 1.20 x 1.00 Catch Basin ............................ x 3.25 Water Heater (Up to 200,000 BT) ...... Z x 2.00 New Ground Run Old Bldg . ............ x 3.25 City of Fridley: The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City Ordinances and ruling of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. Fridley, Minn. AUG 15 1961 19— Owner `S S Kind of Building Used as To be completed about Estimated Cast, $ Old—New. g Permit No Permit No. Building TOTALLONbON PLUMBING CO' $ 7 p -d Signed $ By $ Business Phone No ROUGH --0_1 L, FINAL GAS FITTING FEES: NO. RATE TOTAL 1st 3 Fixtures .......................... x $1.50 Additional Fixtures .................... x .50 $ Gas Range to 200,000 BTU .............. x 2.00 $ s REPAIRS & ALTERATIONS—Refer to Code Description.................... ...........................$, TOTAL FEE $ �'Sr�S'� as 2M 7-59 x Zz �c Boz 8, IaTjZ °� O , �U' NU' z � 6 N WATER HTR. GAS ELEC. 3 U 7 m VI 3' F- LL ul � U � 6 °d O / Base Ist 2nd 2 _ 3rd _ 4th • Fugue Connection Openings Connected with I Sewer New Fixture, Old Openings Cesspool El PARTIAL RATE SCHEDULE PLUMBING FIXTURE RATES: Number Fixtures ......... Future Fixture Opening ................ New Fixture Old Opening .............. NO. RATE x $1.50 x 1.20 x 1.00 Catch Basin ............................ x 3.25 Water Heater (Up to 200,000 BT) ...... Z x 2.00 New Ground Run Old Bldg . ............ x 3.25 City of Fridley: The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City Ordinances and ruling of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. Fridley, Minn. AUG 15 1961 19— Owner `S S Kind of Building Used as To be completed about Estimated Cast, $ Old—New. g Permit No Permit No. Building TOTALLONbON PLUMBING CO' $ 7 p -d Signed $ By $ Business Phone No ROUGH --0_1 L, FINAL GAS FITTING FEES: NO. RATE TOTAL 1st 3 Fixtures .......................... x $1.50 Additional Fixtures .................... x .50 $ Gas Range to 200,000 BTU .............. x 2.00 $ s REPAIRS & ALTERATIONS—Refer to Code Description.................... ...........................$, TOTAL FEE $ �'Sr�S'� as 2M 7-59 Application for Power Plants and Heating. Cooling. Ventilation, Refrigeration and Air Conditioning Systems and Devices PARTIAL RATE SCHEDULE GRAVITY WARM AIR: RATE TOTAL, Furnace Shell & Duct Work .......................... 8.00 Replacement of Furnace 5.00 $ Repairs & Alterations—up to $500.00 .................. 5.00 $ Repairs & Alterations each add. $500.00 ............... 2.50 $ MECH. WARM AIR Furnace Shell & Duct Work to 120,000 BTU ............ 8.00 $ each add. 60,000 BTU ....................... 2.00 $ _ Replacement of Furnace .............................. 5.00 $ Repairs & Alterations—up to $500.00 5.00 $ in Repairs & Alterations each add. $500.00 ............. 1. 2.50 $ ,STEAM or HOT WATER SYSTEM 0.0 Furnace Shell & Lines—to 400 sq. ft. EDR Steam .... 8.00 $ Furnace Shell & Line—to 640 sq. ft. EDR Hot Water ... 8.00 $ 6 Each add. 200 sq. ft. EDR Steam .................... 2.50 $— - Each add. 320 sq. ft. EDR Hot Water ........ I ......... 2.50 $ , o OIL BURNER—to 3 gal. per hour ........................ 5.00 $ over 3 gal. per hour—See Fee Schedule ,-6-i D D GAS BURNER (up to 400,000 BTU) ....................... 5.00 $ GAS FITTING FEES: NO RATE TOTAL 1st 3 Fixtures x $1.50 $ 1Zr Additional Fixtures x .50 $ Gas Range to 200,000 BTU ........... x 2.00 $ AIR CONDITIONING FAN HEATING SYSTEM VENTILATING SYSTEM ALTERATIONS & REPAIRS ROUGH— OUGH FINAL— FINAL See See Fee Schedule TOTAL FEE l Dept. of Bldgs. Phone SU. 4-7470 Location " Q% ® City of Fridley: The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City Ordinances and ruling of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and co t. Fridley, Allinn / 19 Owner r;'•-- J ,4 � Kind of Building /— �/� Used as To be completed about /�- Estimated Cost, $ © U ®, Old—New. Building Permit No. Permit No. U DESCRIPTION OF WORK HEATING or POWER PLANTS -Steam, Hamot Water, Warm Air—No �q Trade Name ) Size No- /( l >_A "U. Capacity Z l2" L1 b 0 Sq. Ft. E.D.R E6 BTU-/ C e, Q H.P. Total Connected Load -Kind of Fuel BURNER —Trade Name Size No Capacity Sq. Ft. E.D.R BTU H.P. (REMARKS -OVER) Signed�— By g A22 42 2M 7_59 Business Phone No- J C— 7 — -7 Lc 6 EDWARDS ""JOB" ESTIMATING FORM • • _ I =MN COLUMN I If III IV V VI I VII I VIII I IX X XI I XII Xlll I XIV I XV I XVI XVII ROOM BTU HEAT LOSS FEET- FEET- OUTSIDE WALL -SPACE AVAILABLE ELEMENT LENGTH (SEE TABLE ON BACK) • ADJUSTED LINEAL FEET REQUIRED LENGTHS -COVER ASSEMBLY REQUIRED rr 14 FILLERTRI PIECE CORNERS END CAPS WALL DAMPERS (4' OR 8') SPLICERS AV. WATER TEMP. LINEAL Fr. 3 FT. 4 FT. 5 FT. __FT. INSIDE OUTSIDE RIGHT LEFT 124011110 la `� �" dd '1716 2jco 241 , BEDROOM #I BEDROOM #2 BEDROOM] #3 o �- ' a n ,•� _J ends e :1" . TOT L T Z4qgZad `� Total Dumber of B' Lengths -&meat STEP I. Enter in Col. I—the heat loss for each room—using the I -B -R, ASHVE or any accepted calculating method. STEP 2. Enter in Col. 2—fhe total length of out- side wall available for installation of radia- fion. If no outside wall is available (kitchens, Baths, etc.), enter available length of inside wall. STEP 3. Enter in Col. 3—desired "design" water temperature. (180° water temperature is recommended if possible). STEP 4. Enter in Col. 4 the required length of element which equals or slightly exceeds the BTU loss of the individual room, as indicated in Col. I. Refer to Table on back—"Lengths of Element required for various BTU Losses." (Form 54-2). STEP S. Check the length of outside wall space entered in Col. 2 and ascertain if sufficient space is available for the length element required at the designed water temperature. If sufficient wall space is not available— refer to FORM 54-2 again and check footage required at a higher water tem- perature. It is possible that by using .a higher design water temperature — the available space will be enough to accommo- date the length of element required. Note: The higher the design water fem- pera+ure—the shorter the length of element required. i.e.: At 180°—if takes 15 feet of element to cover a heat loss of 8400 BTU— whereas at 140° it takes only 13 feet of element and at 200° it takes only 111/2 feet. CAUTION: If it is necessary to use a HIGHER design temperature for any single room—the figures in Cols. 3 and 4 (for all rooms) should be revised to agree With the new or higher design temperature being used, and the "Adjusted" lineal footage required--entered'in Col. S. STEP 6. Columns 6 thru 17 are used to list the lengths of Cover Assembly and Accessories required per room. Note: See Edwards Baseboard Price List for example of how to'figure lengths of cover assembly needed. No cutting Is necessary when using the standard 3-4-5 or 8 foot lengths in conjunction with the 14" Extension "Filler" Pieces. STEP 7. By totaling the Columns—a complete material list is obtained as well as a guide for the installer while on the job. Note: Heating elements are furnished in 8 and 12 foot lengths only. •Note — Col. 5 — The most satisfactory operation and best comfort conditions are gained by selecting a design water temperature which most nearly fills the available outer wall area with heating element. FORM M -IA B. T. U. PER HOUR ESTIMATING TABLE ( For use with Form #1 C BASED 'ON 70 TEMPERATURE DIFFERENCE CORRECTION FACTORS FOR OTHER TEMPERATURE DIFFERENCES FOR OTHER TEMPERATURE DIFFERENCES MULTIPLY BTUH BY FACTOR BELOW 35 .50 11 50 .71 11 65 .93 11 80 1.14 95 40 .57 11 55 .79 11 70 1.00 I 1 85 1.21 j 1 100 45 .64 11 60 .86 11 75 1.07 11 90 1.30 11 105 Explanation of Table I This table shows in columns 1 to 9 the BTU per hour, (BTUH) heat loss for from 1 to 9 square feet of area for various types of construction at 700 temperature difference, (0° to 700) as covered in the explan- atorynotes. Columns 10 to 12 show the BTUH heat loss for from I to, 9 CUBIC feet of volume. As this table is set up it can be used, for any area or volume by simply using factors of 10 or 1,000. For example, Column 1 shows the loss for 2 sq. feet of single glass as 160 STUFF, the loss for 20 sq. feet would be 160 x 10 or 1600 BTUHs of for 200 sq. feet - 160 x 100 or 16,000 BTUH. Explanation of Columns Table 1 Column 1 -Single Glass (ordinary window) Column 2 - Double Glass, Glass Block, Thermopone, or solid wood doors. Column 3 - Masonry Walls -plain or plastered, no air space. Column 4 - Masonry Walls -plastered with " I" air space. Brick Veneer --sheathing", lath, and plaster. Frame Walls -lath and ,plaster. Ceilings -Doth and piaster -no Rear above. Ceilings -lath and plaster -part of flat roof. Column 5 - Masonry Walls -Plastered -Air space ---plus t/s" insulation. From Walla --loth and plaster plus composition siding. Ceilings -same as column 4 with 9/s" insulation. Column 6 - Brick Veneer -lath and plaster plus 1/0 insulation. Frame Walls -lath and plaster plus % insulation. Ceilings -lath and plaster with woad floor above or % insulation. Column 7 -Double floor over unheated space. Partitions next to unheated space.. Column 8 -Walls or Celllhgs insulated with 3 t/s" rockwool. Double floors -same as column 7 with • t/2" insulation. Column 9 - Walls below grade. Concrete floors laid an ground. Column 10 -Use with volume of room with one wall only exposed. Column 11 -As above for rooms with two adjoining walls exposed - (NOT walls opposite each other). Column 12 --Entrance halls, vestibules, or rooms with excessive windows. 1.43 1.50 Any area can be easily figured in the some manner, for example: the loss for 38 sq. feet of single glass is found as follows -30 sq. feet is found by using the loss for 3 sq. feet -240 times 10 or 2400 BTUH plus the loss for 8 sq. feet or 640 BTUH loss for 38 sq. feet equals 3040 BTUH. The factors at the bottom are to be used when some other tempera- ture difference is required, i.e. from 0° outside to 75° inside the temper- ature difference is 75. Multiplying the BTUH loss obtained from the table by the proper factor will give the correct BTUH lo.s for the temperature difference desired. Use of Estimating Form #1 1. Fill in information on top of form. 2. Start with living room and 811 in room size in space provided. It will help if the exposed walls are indicated thus: 18 x 12 x 8 -this Indicates that 2 walls are exposed, 1-18' and 1-12', this will help in figuring the Gross Wall Area. 3. Fill in the Gross Wall Area by multiplying the total length of exposed wall by the coiling height: (18 i 12 equals 30 x 8 equals 240 square feet.) 4. Compute the area of exposed glass or doors in the exposed walls -and enter on form. 5. Subtract the Glass Area from the Gross Wall Area to arrive at the net exposed wall area. 6. If ceiling is exposed, (1 story house) compute the ceiling area (18. x 12 equals 216 sq. feet) and enter on form. 7. If slab floor, or floor is over unheated space, compute floor area as in 6 above and enter on form. 8. Compute volume of ►aom for air change by multiplying Bear or ceiling area by ceiling height (216,x 8 eq. 1728 cubic ft.) and enter on form. 9. From BTU loss table, All in column BTUH for each exposure. 10. Add the various BTU losses and enter total at top of total BTUH Columns this is the BTUH loss for the room at 700 temperature dig. 11. If other than 70° temperature dill. is desired, multiply by the correct factor and enter 'this figure in total BTU" Column under CORRECTED. 12. Proceed for each room as outlined. 13. The total of the corrected BTUH total should be shown In the final total BTUH BI®ck.---This is the BTU per hour required at the register or in square feet of radiation. 14. Add 15% to the Intal BTUH loss to obtain •boiler or furnace size. EXPOSED EXPOSED `WALLS, CEILINGS OR WALLS AIR CHANGE GLASS I II COI. # II USE ROOM Sq. Ft. for Walls, Floors COL, # VOLUME. or Ceilings. I Cu. R. for Air Change I 1 I 2 3 II 4 I 5 6 I 7 I 8 J 9 II 10 11 I 12 1 1 80 i 31 [_32 Y 1 is 14 11 7 4 1.2 1,9 I 2.5 2 1 160 1 62 64 1 42 _1- 3!f r28 1 21 14 7 2.4 1 3.8 1 5.0 3 1 240 1. 93 11 91 63 53 42 _32 1 21 11 1 3.6 1 5.7 7.5 4 - 320 124 11 129 84 1 70 1 56 1 42 1 28 1 14 II 4.8 1 7.6 1 10.0 5 1 400 1 155 II 161 105 88 70 1 53 35 18 6.0 9.5 12.5 6 480 186 193 1 126 105 84 63 42 21 7.2 11.4 1 15.0 7 1 560 1 217 II 225 1 147 123 98 74 49 1 25 11 8.4 1 13.3 17.5 8 1 640 1 248 I I 258 1 168 140 1 112 1 84 1 56 1 28 I I 9.6 1 15.2 1 20.0 9 -j-201 279 11. 290 189 158 126 95 1 63 J 32 10.8 17.1 22.5 CORRECTION FACTORS FOR OTHER TEMPERATURE DIFFERENCES FOR OTHER TEMPERATURE DIFFERENCES MULTIPLY BTUH BY FACTOR BELOW 35 .50 11 50 .71 11 65 .93 11 80 1.14 95 40 .57 11 55 .79 11 70 1.00 I 1 85 1.21 j 1 100 45 .64 11 60 .86 11 75 1.07 11 90 1.30 11 105 Explanation of Table I This table shows in columns 1 to 9 the BTU per hour, (BTUH) heat loss for from 1 to 9 square feet of area for various types of construction at 700 temperature difference, (0° to 700) as covered in the explan- atorynotes. Columns 10 to 12 show the BTUH heat loss for from I to, 9 CUBIC feet of volume. As this table is set up it can be used, for any area or volume by simply using factors of 10 or 1,000. For example, Column 1 shows the loss for 2 sq. feet of single glass as 160 STUFF, the loss for 20 sq. feet would be 160 x 10 or 1600 BTUHs of for 200 sq. feet - 160 x 100 or 16,000 BTUH. Explanation of Columns Table 1 Column 1 -Single Glass (ordinary window) Column 2 - Double Glass, Glass Block, Thermopone, or solid wood doors. Column 3 - Masonry Walls -plain or plastered, no air space. Column 4 - Masonry Walls -plastered with " I" air space. Brick Veneer --sheathing", lath, and plaster. Frame Walls -lath and ,plaster. Ceilings -Doth and piaster -no Rear above. Ceilings -lath and plaster -part of flat roof. Column 5 - Masonry Walls -Plastered -Air space ---plus t/s" insulation. From Walla --loth and plaster plus composition siding. Ceilings -same as column 4 with 9/s" insulation. Column 6 - Brick Veneer -lath and plaster plus 1/0 insulation. Frame Walls -lath and plaster plus % insulation. Ceilings -lath and plaster with woad floor above or % insulation. Column 7 -Double floor over unheated space. Partitions next to unheated space.. Column 8 -Walls or Celllhgs insulated with 3 t/s" rockwool. Double floors -same as column 7 with • t/2" insulation. Column 9 - Walls below grade. Concrete floors laid an ground. Column 10 -Use with volume of room with one wall only exposed. Column 11 -As above for rooms with two adjoining walls exposed - (NOT walls opposite each other). Column 12 --Entrance halls, vestibules, or rooms with excessive windows. 1.43 1.50 Any area can be easily figured in the some manner, for example: the loss for 38 sq. feet of single glass is found as follows -30 sq. feet is found by using the loss for 3 sq. feet -240 times 10 or 2400 BTUH plus the loss for 8 sq. feet or 640 BTUH loss for 38 sq. feet equals 3040 BTUH. The factors at the bottom are to be used when some other tempera- ture difference is required, i.e. from 0° outside to 75° inside the temper- ature difference is 75. Multiplying the BTUH loss obtained from the table by the proper factor will give the correct BTUH lo.s for the temperature difference desired. Use of Estimating Form #1 1. Fill in information on top of form. 2. Start with living room and 811 in room size in space provided. It will help if the exposed walls are indicated thus: 18 x 12 x 8 -this Indicates that 2 walls are exposed, 1-18' and 1-12', this will help in figuring the Gross Wall Area. 3. Fill in the Gross Wall Area by multiplying the total length of exposed wall by the coiling height: (18 i 12 equals 30 x 8 equals 240 square feet.) 4. Compute the area of exposed glass or doors in the exposed walls -and enter on form. 5. Subtract the Glass Area from the Gross Wall Area to arrive at the net exposed wall area. 6. If ceiling is exposed, (1 story house) compute the ceiling area (18. x 12 equals 216 sq. feet) and enter on form. 7. If slab floor, or floor is over unheated space, compute floor area as in 6 above and enter on form. 8. Compute volume of ►aom for air change by multiplying Bear or ceiling area by ceiling height (216,x 8 eq. 1728 cubic ft.) and enter on form. 9. From BTU loss table, All in column BTUH for each exposure. 10. Add the various BTU losses and enter total at top of total BTUH Columns this is the BTUH loss for the room at 700 temperature dig. 11. If other than 70° temperature dill. is desired, multiply by the correct factor and enter 'this figure in total BTU" Column under CORRECTED. 12. Proceed for each room as outlined. 13. The total of the corrected BTUH total should be shown In the final total BTUH BI®ck.---This is the BTU per hour required at the register or in square feet of radiation. 14. Add 15% to the Intal BTUH loss to obtain •boiler or furnace size. FORM 54 -IA EDWARDS ""JOB" ESTIMATING FORM NAME =Y- va- ADDRESS JOB. NO. DATE COLUMN 1 11 111 IV V VI I VII I VIII I IX X XI I XII XIII I XIV XV XVI XVII BTU FEET- OUTSIDE ELEMENT LENGTH REQUIRED *ADJUSTED LENGTHS -COVER ASSEMBLY REQUIRED r. 14 CORNERS EN® CAPS WALL DAMPERS ROOM NEAT WALL -SPACE (SEE TABLE ON BACK) LINEAL FEET FILLER (4' OR 8') SPLICERS AV. WATER TEMP. LINEAL FT. 3 FT, " 4 FT. 5 FT. `FT, INSIDE OUTSIDE RIGHT LEFT LOSS AVAILABLE REQUIRED PIECE „TRIRA LIVING Z11 Anx _,. BATH"-ol /:' TOTAL Total Number of 8' Lengths -Element INSTRUCTIONS FOR USING "JOB" ESTIMATING FORM 541 STEP 1. Enter in Col. I—the heat loss for each If sufficient wall space is not available— footage required--antered'in Col. 5. room—using the I -B -R, ASHVE or any refer to FORM 54-2 again and check STEP 6. Columns 6 thru 17 are used to list the'; accepted calculating method. footage required at a higher water +em- lengths of Cover Assembly and Accessories STEP 2. Enter in Col. 2—the total length of ou+- pereture. It is possible that by using. a required per room. side wall available for installation o$ ¢a$ia- higher design water temperature — the Note: See Edwards Baseboard Price tion. If no outside walt_.is-=-available available space will be enough to accommo- List for example of how to figure lengths. (Kitchens, Bes, etc.), enter available date the length of element required. of cover assembly needed. No cutting is length of inside wall. Note: The higher the design water +em- necessary when using the standard 3-4-5 STEP 3. Enter in Col. 3—desired "design" water pare+ure—the shorter the length of element or 8 foot lengths in conjunction with the temperature. (180° water temperature is required. 14" Extension "Filler" Pieces. recommended ifpossible). i,e.: At 180°—if takes 15 feet of element STEP 7. By totaling the Columns-2complete STEP 4. Enter in Col. 4 the required length of to cover a heat loss of 8400 BTU— material list is obtained as well as a guide element which equals or slightly exceeds whereas at 190° it takes only 13 feet for the installer while on the job. the BTU loss of the individual room, as of element and at 200° it takes only Note: Heating elements are furnished in indicated in Col. I, Refer to Table on 111/2 feet- 8 and 12 foot lengths only. back—"Lengths of Element required for CAUTION: If it is necessary to use a eNote—Col. 5—The most satisfactory various BTU Losses." (Form 54-2). HIGHER design temperature for any single operafion and best comfort conditions STEP S. Check the length of outside wall space room—the figures in Cols. 3 and 4 (for are gained by selecting a design water entered in Col. 2 and ascertain if sufficient all rooms) should be revised to agree temperature which most nearly fills the space is available for the length element with the new or higher design temperature available outer wall area with heating required at the designed water temperature. being used, and the "Adjusted" lineal element. FORM 54 -IA D. T. U. PER HOUR ESTIMATING TABLE ( For use with Form #1 C BASED ON 70 TEMPERATURE DIFFERENCE Sq. . for Walls, Floors ft or Ceilings. Cu. ft. for,Air Change EXPOSED GLASS COL. # 1 2 II II EXPOSED WALLS, CEILINGS OR WALLS COI. # I II AIR CHANGE USE ROOM ';VOLUME l I I 3 4 5 I 6 I 7 I 8 I 9 II 10 I 11 I I II 12 1 i 80 31 Jj_32 s i 18 14 11 7 4 1.2 1 1.9 2.5 2 1 160 62 11 64 1 42 1 35 1 28 1 21 1 14 1 7 1 2.4 1 3.8 1 5.0 3 4 1 240 1 93 11 320 124 11 91 1 129 63 84 1 53 70 42 1 56 1 _32 1 42 1 2_1_ 28 1 11 1 14 11 3.6 4.8 1 5.7 1 1 7.6 1 7.5 10.0 5 6 1 400 1 155 11 1 480 1 186 161 193 105 126 88 105 1 70 1 1 84-T-63 53 33 1 42 1 18 21 11, 6.0 7.2 9.S 1 1 1.1.4 .1 12.5 15.0 7 1 560 i 217 it 225 1 147 123 98 1 74 49 1 25 11 8.4, 1 134 i 17.5 8 1-640 1 248 11 258 1 168 ( 140 1 112 1 84 1 56 1 28 11 9.6 1 15.2 20.0 9 1 720 1 279 1. 290 1 189 158 126 1 95 1 63 { 32 11 10.8 17.1 1 22.5 CORRECTION FACTORS FOR OTHER TEMPERATURE DIFFERENCES FOR OTHER TEMPERATURE DIFFERENCES MULTIPLY STUN BY FACTOR BELOW 35 .50 11 50 .71 63 .93 If 80 1.14 11 95 40 .57 I I 55 .79 11 70 1.00 11 85 1.21 11 100 45 .64 II 60 _ _ .86 11 75 . 1,07 11 . 90 1.30 it 105 Explanation of Table 1 This table shows in columns 1 to 9 the BTU per hour, (BTUH) heat loss for from 1 to 9 square feet of area for various types of construction at 700 temperature difference, (00 to 700) as covered in the explan- atory notes. Columns 10 to 12 show the STUN heat loss for from 1 to 9 CUBIC feet of volume. As this table is set up it can be used for any area .or volume by simply using factors of 10 or 1,000. For example, Column i shows the loss for 3 sq. feet of single glass as 160 STUN, the loss for 20 sq. feet would be 160 x 10 or 1600 BTUHs of for 200 sq. feet - 160 x 100 or 16,000 STUN. Explanation of Columns Table 1 Column 1 -Single Glass (ordinary window) Column 2 - Double Glass, Glass Block, Thermopone, or solid wood doors. Column 3 -. Masonry Walls -plain or plastered, no air space. Column 4- Masonry Walls -plastered with 1" air space. Brick Veneer -sheathing, lath, and plaster. Frame Walls -lath and plaster. Ceilings -loth and plaster -no floor above. Ceilings -lath and plaster -part of flat roof. Column 5 -Masonry Walls -Plastered -Air space -plus 1/s" insulation. Frame Walls -lath and plaster plus composition siding. Ceilings -same as column 4 with 1/2" insulation. Column 6 -Brick Veneer -lath and plaster plus 1/�" insulation. Frame Walls -lath and plaster plus 1/y insulation. Ceilings -lath and plaster with wood Boor above or 'Am Insulation. Column 7 -Double floor over unheated space. Partitions next to unheated space. Column 8 -Walls or Ceilings insulated with 31y" rockwooi. Double floors -same as column 7 with %" insulation. Column 9 -Walls below grade. Concrete floors laid an ground. Column 10 -Use with volume of room with one wall only exposed. Column 11 -As above for rooms with two adjoining walls exposed - (NOT walls opposite each other). Column 12 -Entrance halls, vestibules, or rooms with excessive windows. 1.43 Any area can be easily figured In, the samo; manner, for examples the loss for 38 sq. feet of single glass .is found as follows -30_ sq. feet Is found by using the loss for 3 sq. feet -L240 times 10 or 2400 STUN plus the loss for 8 sq. feet or 640 STUN loss for 38 sq. feet equals 3040 STUN. The factors at the bottom are to be used when some .ether tempera - lure difference is required, i.e. from 0° outside to 750'inside the temper. ature, difference is 75. Multiplying the STUN loss obtained from the table by the proper factor will give the correct STUN lo.s for the temperature difference desired. Use. of Estimating Form ;l 1 1. Fill in information on top of form. 2. Start with living room. and fill in room size in space provided. It will help if the exposed walls • are indicated thuss 18 x 12 x 8 -this Indicates that 2 walls :are exposed, 1-18'. and 1-12', this will help in figuring the Gross Wall Area. 3. Fill in the Gross Wall Area by multiplying the ;total length of exposed wall by the ceiling heights (18 & 12 equals 30 x 8 equals 240 square feet.) 4. Compute the area of exposed glass or doors in the exposed walls ---and enter' on form. S. Subtract the Glass Area from the Gross Wall Area to arrive at the net exposed wall area. 6. If ceiling is exposed, (i story house) compute the coiling area (18 x 12 equals 216 sq. foot) and enter on form. 7. If slab floor, or floor is over unheated space, compute floor area as in 6 above and enter on form. 8. Compute volume of raom for air change by multiplying floor or ceiling area by ceiling height (216 x 8 eq. 1728 cubic ft.) and enter on form. 9. From BTU less table, fill in column STUN for each exposure. 10. Add the various BTU losses and enter total at top of total STUN Columns this is the STUN loss for the room at 70° temperature diff. i1. If other than 70° temperature diff. is desired, multiply by the correct factor and enter this figure in total STUN Column under CORRECTED. 12. Proceed for each room as outlined. 13. The total of the corrected STUN total should be shown in the final total STUN Block. -This is the BTU per hour required at the register or In square feet of radiation. 14. Add 15% to the Intal STUN loss to obtain boiler or furnace size. I = B _ R -CALCULATION SHEET 1501 OWNER a t.g _'® r� ���+� ADDRESS DATE :.DEALER. ZIL3y f" F -KIND OF BUILDING CHIMNEY SIZE CONSTRUCTION: WALL WINDOWS ROOF OR CEILING BASEMENT HEIGHT: ABOVE GRADE BELOW' GRADE DESIGN WATER TEMPERATURE DESIGN TEMP. DIFF-- COL. 1 2 3 4 5 6 7 a , - 9 10 11 12 ,,- 13 14 15 16 17 18 ROOM ROOM. SIZE WtNDOWs AND DOORS AREA - SQ. FT. FLOOR VOLUME (SEE NOTE) - FT. GLASS NET WALL CEILING GROSS WALL o a p� ri • +Gr' -{,p TOTAL AT 70 F TEMP, DIFF*—F TOTAL CORRECTED TO o PM RADIA- TOR SQ.FT. BASEBOARDS RADIATOR, coNvecroR. OR LENGTOHF TYPE : BASEBOARD L W H _ HUNKER OR SIVE AREA LENGTH OF AVAILABLELINEAR WALL FT. BTU PER FT. OF WALL TE DIFF. VA 2vd v 4,rii.%^uq 4 ff �C :� 1 oL [jpp^y �ge46 ,g4 Wiz/ ye} n36o eor �sdM�= i:R_I,.,3 ZIP K- eve •�.;,. ®,.+e SbF . ,_,-. 2'.�� �7ZB �rr�� 6+$ fy fy E- Lly - r �" c C.ry/ Jnr* e—) CoR " �ad l d l �. - W..r� '- NOTE: FOR CONCRETE FLOOR ON GROUND OR FILL AT GRADE LEVEL, USE LINEAR FEET. OF EXPOSED EDGE. TOTALS FOR ALL OTHER FLOORS USE 89UARE FEET OF AREA. - topyright.1935, by the institute of Boiler and Radiator Manufacturers,,08 Fifth Ave., Now York 20, N. Y. FORM f8Ot Copyright 1955, by the Institute of Boiler and Radiator Manufacturers. Form 150 E ESTIMATE QUANTITY I ITEM AMOUNT Boiler No. Net 1=B=R Rating* Oil or Gas Burner or Stoker, with Controls Oil Tank, Pipe and Fittings Combustion Chamber or Stoker Hearth Pump Thermostat Low Limit Control Reverse Control Extra Controls Draff Regulator Flow Control Valve Pressure Reducing Valve Relief Volvo Air Cushion Tank Domestic Water Heater and Tank Mixing Valve Pipe, Valves, Fittings, Hangers Pipe Covering Heating Units (Radiators, Baseboards, Convectors) Radiator Enclosures Sets = Radiator Brackets Radiator Valves Radiator Union Elbows Radiator Air Valves Main Air Vents Floor and Ceiling Plates Smoke Pipe Foundation Electric Wiring Pounds -- Asbestos Cement Poirrt Freight and Cartage Labor Incidentals Total Cost Overhead Profit Bid *Net 1=6=R Rating of Boiler should equal or exceed the total heat loss of the house plus proper allowance for domestic hot water a 0 M SUBJECT P IT NO City of Fridley ® 46.8'7 AT THE TOP OF THE TWINS PERMIT r BUILDING R CEIPT NO. •r COMMUNITY DEVELOPMENT DIV. ------,,., PROTECTIVE INSPECTION SEC. NUMBER REV. DATE PAGE OF APPROVED BY CITY HALL FRIDLEY 55432 If ,�� `---- 612-560-3450 910-F15 15/10/78 JOB ADDRESS 55800 - 211 Street N.E. 1 LEGAL LOT NO. BLOCK TRACTOR ADDITION SEE ATTACHED DESCR. 14,15 23 Hyde Park SHEET 2 PROPERTYOWNER MAIL ADDRESS R.R. #1, BOX 59 ZIP PHONE Albin Johnson Cushing, WIS 54006 715-488-2496 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Same 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO. 6 USE OF BUILDING Multiple Dwelling 7 CLASS OF WORK ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 6 DESCRIBE WORK Constructt 9 CHANGE OF USE FROM TO STIPULATIONS Provide a hard surface driveway.�/® 44 OiA , W Before dig 0119 U11' 6a -'il Utilities SEPL�tAT� PERMITS TELEPHONE - E�.��►�'i?3c - GAS E� REQUIRED FOR �I RI�G� HEATING, PLUMBING REuI 9Y LAW AND SIGNS SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. Wood Frame THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT. CU. FT. AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT 960 9600 ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED. WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $6,950 $3.46 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. $38.40 PLAN CHECK FEE TOTALFEE $41.86 SIG RE OFC TRACT ORAUTHORIZEDAGENT (DATE) EN PROPERLY VAL ATED THIS IS YOUR PERMIT n E 10 BLDG INSPP DATE BUILDRISI NATURED OW ERIIF OWNER E(DATE) SsW JECT A V-4. City of Fridley Permit No. AT THE TOP OF THE TWINS BUILDING PERf.IT APPLICATION � ' � Receipt No. �-_-"_ --� COMMUNITY DEVELOPMENT WY. tt PROTECTIVE INSPECTION DEPT. CITY HALL FRIDLEY 96432 �.J 6t2—Sm0'3450 YSUD4HER REV. pATE PAGE OF APPROVED BY 910 -FIS 1 738/76 1800 Job Address: �Dv a��'�� Legal Lot No. Block Trac o Ad ti See Attached Descr. R' Sheet P o rt Ow er r Addr s t Z hon %= Vl k7, r h / Ilet En ractor Address V Zip Phone License No.' Architect or Designer Address Zip Phone License No Engineer Address Zip Phone License No. Us f Building emove CI -ass of rk Rove New1:�� Describe Work o2 -f 1x a' . Change of Use From To Signature, ;SPECIAL ASSESSI^ENTS: . If lateral assessments have not been placed on this property, an agreement must be signed, agreeing to assume such lateral assessments before a permit will be issued'! Agreement Necessary: Agreement Unnecessary: Finance Director OUTSIDE UTILITIES: z Sewer Elevation: Water Elevation: 0 Stub Location: Stub Location: uu (n BUILDING INSPECTION I— Plumbing H.y.A.C. Electrical Fire Insp. L) Signature & Date Approved 0 U Registered Engn. Stamp. Legal Description Check Exterior Devel. Check Performance Bond Check Easements, R/W, Special Agreements Final Approval Date Certificate of Occupancy Date 2 96 DIM- NS IONS : / . Length:_ : g 7-G/ Height: J�' Cu. Ft. Width: Sq. Ft. Accessory Buildings• iia %0 Q Length: Height: Cu. Ft. Width: Sq. Ft. 30 6C> VALUATION: rt Sq. Ft. X Cost = Valuation ) �� c$ otal Valuation�0 lm � Basement X Cost = Valuation ) Permit Fee )gp r- PERMIT FEE: Commercial and Industrial Total Cubic Ft. X $2.15/1,000 Cu. Ft. X ALTERATIONS and ADDITIONS or REPAIRS $3.00/$500.00 or fraction up to $50,000 Valuation $1.50/$500.00 for each addition $500.00 over $50,000 SMER AVATIABILITY' CHARGE (SACJ PLAN CHECK 65 percent of permit fee = STATE SURCHARGE: Valuation IX $.50/$1,000.00 PERFORMANCE BOND VALUATION TOTAL FEE Blacktop 4.50/Sc . yd. Curbing 3.50 lin, ft. Sod `o.sow yd. Fencing 5.00_1in. ft. Bushes and Trees nn- t .00 50% Of Total value = $ Bond Fee P'IV /D i -- i f , 3ZI 1/1/1i1t•.x 3 SUBJECT 'I•�IVOCity of Fridley 48 8EAT THE TOP OF THE TWINS BUIL®ING PERMIT (f3 r o I COMMUNITY DEVELOPMENT DIV. r PROTECTIVE INSPECTION SEC- E S NUMBER REVDATE PAGE OF APPROVED BY CITY HALL FRIDLEY 55432 L j\ 763-571-3450 910-F15 5 / 2 / 03 JOB ADDRESS 5800 2 1/2 Street NE 1 LEGAL LOT NO. BLOCK TRACTOR ADDITION SEE ATTACHED DESCR. 14,15 23 Hyde Park SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Trung Duong 661 116 Lane NE, Blaine, MN 55434 612-730-7713 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO Trung Duong Contractor Same 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 8 USE OF BUILDING 4 Plex 7 CLASS OF WORK 0. REPAIR ❑ NEW ❑ ADDITION ❑ ALTERATION REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Reroof 4 Plex (20 Sq) Tear-off 9 CHANGE OF USE FROM TO STIPULATIONS Underlayment must comply with the State Building Code. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT CU FT AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS. OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION 4 STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $2,315 $1.16 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SACCHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $83.25 -I- $83.25 1F STRUCTION OR THE PERFORMANCE OF CONSTRUCTION jFire SC $2.32 PLAN CHECK FEE ZOTALFEE $169.98 SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT IDATEI RLY VALID TED THIS IS Y U�PE IT S,GNATURE OF OWNER,,F OWNER BUILDER. IDATEI k!!�W vdiL OAtE CITY OF FRIDLEY Effective 1/1/2003 6431 University Ave NE R-3, COMMERCIAL & INDUSTRIAL Fridley, MN 55432 BUILDING PERMIT APPLICATION (763) 572-3604 FAX (763) 571-1287 CONSTRUCTION ADDRESS 2 Zoning Legal Owner & Address c' Dab i%, el# ( !Z) 7_:1sD 77( CONTRACTOR & ADDRESS VaAIG D-e6�e _a (��0� �AI& Tel# (�) `7a `771 Architect Reg.# Engineer Reg.# BUILDING CONSTRUCTION TYPE OF WORK C] New [J Addition CJ Alteration -Describe 0 . OFC. AREA: Length Width Height Sq. Ft. WHSE AREA: Length Width Height Sq. Ft. OTHER AREA: Length Width Height Sq. Ft. APPLICANT Tel # �f2 77/3 Date ®� VALUATION Sq. Ft. x $ Cost/Sq. Ft. = Valuation $ Sq. Ft. x $ Cost/Sq. Ft. = Valuation $ Sq. Ft. x $ Cost/Sq. Ft. = Valuation $ ) TOTAL VALUE Building Use Air Conditioning []Yes []No Performance Bond Amount $_ Construction Type Occupancy Group Fire Protection Provided []Yes []No See Reverse for Schedule Received []Yes Permit Fee$ W_C Sc Plan Check /F$ 53, Fire Surcharge $ Z3.2 State Surcharge $ A /60 SAC Charge $ Erosion Control $ Park Fee $ Spec. Assessments $ Curb Cut Escrow $ TOTAL $ []No PERMIT FEES See Fee Schedule on Reverse Side In Excess of Prepaid Amount - See Reverse Side .001 x Permit Valuation (1/10th %) $.50/$1,000 Valuation (See Sched. for > $1 Million) $1275per SAC Unit (Plans to MWCC for determination) $450.00 Conservation Plan Review Fee Determined By Engineering Agreement Necessary [] Not Necessary C] feet x $17.00/foot 6e_i1-)XL ATTACH STIPULATIONS •' CITY OF FRIDLEY PERW NO.: 2004-01151 6431 UNIVERSITY AVENUE NE FRIDLEY, MN 55432 DATE ISSUED: 07/20/2004 (763) 572-3604 FAX: (763) 571-1287 ADDRESS 5800 2 1/2 ST NE PIN 233024230082 LEGAL DESC HYDE PARK LOT 14 BLOCK 23 PERMIT TYPE BUILDING PROPERTY TYPE : MULTI DWELL CONSTRUCTION TYPE : ROOFING VALUATION : $ 1,389.00 NOTE: INSTALL PER MANUFACTURERS SPECIFICATIONS. REROOF GARAGE (12 SQ) TEAR -OFF APPLICANT BUILDING PERMIT FEE FIRE SURCHARGE 50.95 1.39 TRUNG DUONG 661 116 LANE NE STATE SURCHARGE, VALUE 0.69 BLAINE, MN 55434 TOTAL 53.03 OWNER TRUNG DUONG 661 116 LANE NE BLAINE, MN 55434 AGREEMENT AND SWORN STATEMENT This permit becomes null and void if work or construction authorized is not commenced witin 60 days or if construction or work is suspended or abandoned for a period of 120 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regal ns .tion or the performance ofconstrucri n. Applibant Date D7 Bldg Insp� Dat SEPARATE PERMITS REQitJIRED FOR WORK OfIMR THAN DESCRIBED ABOVE. NEW [ ] CITY OF FRIDLEY '� Effective 4/1/2004 ADDN [ ] 6431 University Ave NE, Fridley, MN 55432 (763) 572-3604 Bldg Insp ALTER [ ] SINGLE FAMILY AND DUPLEXES R-1 AND R-2 (763) 571-1287 Fax BUILDING PERMIT APPLICATION 't�` /`�� ty l Construction Address:U Legal Description: Owner Name & Address: ��u l � C Tel. # l� 730-7713 Contractor: MN LICENSE # Address: Tel. # Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. DESCRIPTION OF IMPROVEMENT LIVING AREA: Length Width Height Sq. Ft. GARAGE AREA: Length Width fR Height Sq. Ft. DECK AREA: Length Wi h HaUGround Sq. Ft. OTHER: F Construction Type: Estimated Cost: $ Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ —=$ DATE: AVAAPPLICANT: Tel. # b! 0 17 l Call (763) 572-3604 for Permit Fees if mailing In application. Fax to 763-571-1287 if using credit card and we will call you for card number. Permit Fee Plan Review Fire Surcharge State Surcharge SAC Charge License Surcharge Curb Cut Escrow Erosion Control Park Fee Sewer Main Charge CITY USE ONLY - $ $ L39 $ 6 $ Fee Schedule on Reverse Side 65% of Permit Fee .001 of Permit Valuation (1/10th%) $.50/$1,000 Valuation $1350 per SAC Unit $5.00 (State Licensed Residential Contractors) Alt. "A" or Alt. "B" Above $450.00 Conservation Plan Review Fee Determined by Engineering Agreement Necessary [ ] Not Necessary [ ] TOTAL $ -53,03 STIPULATIONS: