Loading...
PRE 2010 DOCSMEMO TO: File MEMO FROM: Richard.N. Sobiech, Public Works Director MEMO DATE: June 12, 1979 ✓ j SUBJECT: Effecting Lots 1 through 4, Block 1 - Marian Hills 2nd Addition Please be advised that the referenced properties are adjacent to an existing sanitary sewer line. Due to the topography of the lots in relation to how single family dwellings would•be constructed, the manholes tend to stick out of .the ground quite a distance. It was initially.discussed with the property owners from DeGardner Realty, that the City would have -no objection to lowering the man- holes; -however, at the property.owners' expense. On June 11, 1979, contact with the property owners indicated that they do not intend to lower the manholes. They, instead,will provide landscaping to screen the structures. h t This information is for the file to advise future property owners as to why the manholes are as high as they are.. RNS:ik cc: 1345 - 52nd.Avenue 1335 - 52nd Avenue 1315 - 52nd Avenue 1311 -.52nd Avenue 1307 - 52nd Avenue,/ SUBJECT PERMIT NO. City of Fridley V 550 AT THE TOP OF THE TWINS p B U I L D I N G P E R M I T r I EIPT N COMMUNITY DEVELOPMENT DIV. r r 1 PROTECTIVE INSPECTION SEC. 0 CITY HALL FRIDLEY 55432 NUMBER REV. DATE PAGE OF APPROVED BY L 612-571-3450 910-F15 10/5/79 JOB ADDRESS 1307 - 52nd Avenue N.E. 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 4 1 Marian Hills 2nd Addition SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Darlene Sammarco 211 Sylvan Lane N.E. 571-5984 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Same tip 'j 0 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONCE LICENSE NO. 5 ENGINEER MA156PINATE PERMITSREQUIREMMR WINK LICENSE NO. 6 USE OF BUILDING HEATINOj PLUMM4 AND SIGNS. Re sidentia 1 7 CLASS OF WORK CA NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Construct a 72.3' x 34' House and a 21' x 34' Garage 9 CHANGE OF USE FROM TO STIPULATIONS Provide a hard surface driveway. Provide sod in the front and side yards. Provide a verifying survey before capping. All rooms without openings to outdoors must have mechanical ventilation. Drain field cannot connect to sanitary sewer. Submit waterproofing specifications. Submit roof slab engineering calculations. Guardrail along front and west side may be required. SEWER LOCATION: (Approx. 9' Deep In Street) 78' W. of M.H. (W. Inv. 938.24) WYE ELEV: 937.85 TOP OF FOOTING: 940.85 Minimum WATER LOCATION: 10' E. of Sewer Service DRIVEWAY DEPRESSION COST: N/A THE CITY OF FRIDLEy DOES NOT GUARANTE: Tib& AND EO WAR,... HN6 TNN PURPOSESIONS Y, ID DATA IS FOR 1 ORMATIOANo 'rS Before digging call lock uiilitl!� PERSONS USING IT SHOULD VERIF'i( THE INFORMATI= TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD SEPAVENTILATING NG ORATE T AIRg�OVEQ�1lfiF�I fC )CAL LUMBI G, HEATING, ICR Frame THIS PERMIT BECOMES NULL AND VOID I OR' CONSTRUCTION FT. AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION ZONING SO. FT. CU. OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT 2458 f 714 ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $57,500 $28.75 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. $103.99 $425.00 PLAN CHECK FEE TOT LFEE 26.00 .74 TORORAu ZED AGENT IDATEI SIGNATUREOCONTRACTOR WHEN PR PERLY ALI I IS YpUR PER IT 79� BLDG INSP 1 SATE SIGNATURE OF OWNER IIF OW ER BUILDER) (DATE) CITY OF FRIDLEY APPLICATION FOR RESIDENTIAL BUILDING PERMITS (New, Alterations, Additions; or Repairs) ADDRESS: BUILDER • ADDRESS: TEL NO: � �( � � � � � � �+ TEL NO: Construction Location STREET NO: 07 STREET: 5,z 0"i , A 9 r LOT: BLOCK: �^ ADDITION: Lot: Inside Lot: X� Setback: Sideyards: Applicant attach to this form two Certificates of Survey of lot and proposed building location drawn on certificates to scale. DESCRIPTION OF CONSTRUCTION 0� i 31 �L.L IJ Front: Depth: Height: Squane. Feet: Cubic Feet: 5. 040 Front: p Depth:- Height: Square Feet:­9/x/Cubic Feet: S% Sw, od Type of Construction: C® l� Estimated Cost: $ - - To Be tbmpleted: Alt. A Alt. B Proposed Driveway Width If New Opening Is Desired: $ $ SEE REVERSE SIDE OF SHEET-. The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City of Fridley Ordinances and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and corre DATE: 2115-1% SIGNATURE: l� / Stipulations: 00 P A Pe 26,00 IT a�.�� c� y - g0 � --114TVA* Ur Ai Lf I M q x, 7 4 = A LI I VA 1:r I SII S34, 7L "V "Sit S®D.®y qy qo q 4 7:`f Q DMICAJI. N SMsNtAy - ENGINEERING, INC. nw/ & "IDwfial sit -066 Engineers Surveryors -�--- cer ificate, of ourveT so: 12AayEt 6m , , N R - - I 5Z"d . E, WaR��' a� AVE.-- 'a� °t►Uties , ;E �,I'tY �P PRIDLEY ROES N47 GUAaArIT� *ME di • fo UTILITY LO-ATIONIS AND ELEVATIC: I D 8 A ACCURACY CP �U►TION PURPOSES ONLY A110 RE VIRE TWI$ DATA IS FOS FIFO Tull: INFORMATION PERSONS USING M.MOUW velem - ON THE SIM LOT 4 , BLOCK -1 , MARIAN HILLS 2 -E) ADD1TION ` �- iJEnn+ts t�..�,►+ayt ti'r,+y oseneY+F ,4I.!OKA COUNTY ® —iib n O hw and mrad n�swtahw j�a Sawa) eAr CS rf 1* � a ,4v dy aaal cf"Ifa� Icon rt o,�'al/ hman , sd d/ r kWj veva i vgdi , ifay. fmn ar w said land. As surrerf0d ly 00 ' A.0 1 1 , St BuR AAf ENG/NfERfNa..flV'C;` p S , g fly D� Foe>T,�6'- 0 41.P, l 7� F /,W t11c LC CITY OF FRIDLEY APPLICATION FOR PWMBI*NG AND GAS FITTING PERMIT ' PARTIAL RATE SCHEDULE o� NO. RATE TOTAL m —- x $3.00 U x X d New Fixture, Old Opening Water p L .OI x Ol $ {tea E •.Oi {O� $ ,j m b N a w Water Softener x heater .� O b $5.00 C Electric Water Heater �_ x � J� fJ ►C� .0 C � � � 1st 3 fixtures x $3.00 $ Additional Fixtures x p J O N L m �tOL C mal .[+ y o O O m ai W m U N N C y v a w N 3 wo rA w 8 M 0 aslec 010.00) 1st 2nd + 3rd 4th (R) a Future Connection Opening Connected with Sewer M - New Fixture, Old Opening Water ' PARTIAL RATE SCHEDULE PLMJBING FIXTURE RATES: NO. RATE TOTAL Number Fixtures —- x $3.00 Future Fixture Opening x $2.00 $ New Fixture, Old Opening x $2.00 $ Catch Basin x $5.00 $ Water Heater - to 99,000 BTU v-'7= x $5.00 $ ,j 100,000 BTU to 199,000 BTU x $10.00 $ Water Softener x $7.00 $ New Ground Iain Old Building x $5.00 $ Electric Water Heater �_ x $5.00 $ C12J GAS FITTING FEES: 1st 3 fixtures x $3.00 $ Additional Fixtures x $1.00 $ Gas Range to 199,000 BTU x $1.0.00 $ REPAIRS $ ALTERATIONS First $100.00 Ss.oa $ each add. $100.00 or fraction $2.00 $ State.Surcharge $ .50 TOTAL F=. $ REINSPECTION FEE 010.00) Job Address / �� ✓7 �+ `� J G �' Department of Buildings City of Fridley Tel. #571-3450 The undersigned hereby makes application for a permit for the work herein specified agreeing to do all work in strict accordance with the City Codes and rulings of the Department of Buildings, and hereby declares that all the facts and reprosontations statod in this application aro true and correct Fridley, Mn. OWNER �C jl�j / may/ r' /i ✓i J KIND OF BUILDING / /% 4J" USED AS TO BE COMPLETED ABOUT ESTIMATED COST AW - NEW BUILDING PERMIT NO. PERMIT NO. li J r ROUGH INSP. Date FINAL INSP. Date APPROVAL FOR PERM•.T Company Signed Tel. No. __�/ /,% ✓� MINI1QX FEE FOR ANY PLUMBING PERMIT IS $7.50 PLUS $.50 STATE SURCHARGE 8431 UNIVERSITY AVENUE N.E., FRIDLEY, MINNESOTA 65432. TELEPHONE ( 812)571.3460 June 9, 1980 Ms. Darlene Sammarco 1307 - 52nd Avenue N.E. Fridley, MN 55421 Re: Waterproofing of Below Grade Structure - 1307 - 52nd Avenue N.E. Dear Ms. Sammarco: You called our office to report a problem with your home in that you are experiencing a seepage problem through the wall/ceiling/roof system. A field inspection was conducted on June 5, 1980 following a substantial rain from.the morning of that day. It was noted that in almost every room of the structure there was evidence of moisture leaking into the living areas. It appears that it occurs near the.ceiling in almost all instances. This is a result of the waterproofing failing to seal off water from entering the interior of the structure. This office can not determine the exact cause of fault which is causing the failure. No waterproof design was ever submitted for our review and no inspection was called for or made prior to backfilling. Therefore, you and/or your applicator must correct the problem. Since this process is new, an inspection by a third party may be necessary to determine the correction method. 9his correction must occur as soon as possible; certainly within 30 days. Please let this office know what your intentions are in this matter. Sincerely, DARREL G. CLARK Chief Building Official DGC/mh aao W. BROADWAY. I.O.6OX I". MONTICELLO. MINNESOTA adasE PHONE Is 121 ass -all" PLAT DRAWING ( THIS IS NOf A SURVEY) REQUESTED BY Warranty Title, Inc, FILE NO. 3980 INSPECTION DATE March 18. 1986 FOR Darlene C. Sammarco ADDRESS 1307 52nd Avenue N.E., Fridley, Minnesota 55421• LEGAL Direr. CRIPrION; Lot 4, Block 1, MARION S 2Nn AnDIT104, Anoka County, Minnesota. - � -- --- Aos UHAINAGE I UTILITY EASEMENT so' 1 I 3 N_ a I a ^ Me tic iA0 NOTE: ENCROACHMENT ON " EAST DRAINAGE I UTILITY EA5EMENT �O•o 36.5 1 z 7- EiOsT L�t/P O� IfI/6a'V G\ 1 W! i 0 52- AVENUE N.E Ln S. 5`a l� 1''= 30' -'The location of this improvements shown on this drawing an approximate and are bawd on a visual inspection of the premises. The lot dimensions are taken from the recorded plat or county records. This drawing is for informational purposes and should not be used as a survey. It an not constitute a liability of the company# and is intended for mortgage purposes only." BOOK F"27r PAGE 30 86001"195 TO Darrel Clark • ' FROM Sandy Stemig; First Minnesota Mortgage Banking Dept. DATE April 23, 1986 SUBJECT Darlene C. Sammarco Property Please review the plat drawing that I have sent to you. We are having some trouble with the easements. It looks like a part of the house is on a drainage and utility easement, please advise me if this is correct. Thank You, Sandy Stemig, Mortgage Banking )EVPQ0=X 293-5832 �1 RiceCreek 3585 LEXINGTON AVENUE NORTH, SUITE #177 ARDEN HILLS, MINNESOTA 5friiIIiIiiiiiiiiiiii-55126 M3NLUM OF TELEPHONE (612) 483-0634 509/SPECIAL PRWBCTS MEETMG OF THE B929GERs Arden Hills City Hall 1450 W. Highway 96 March 20, 1986 ROLL CALL: Present: Managers Cardinal, Petrangelo, Scott, Sande Engineer Willenbring and Bill Kattner Acdbuntant Hermann Administrative Assistant Torpe Absent: Manager Willcoxen, with prior notice Also Present: Colleen and Peter Greiskalns, Jud Rute, Mike Ball, T. Creager, K. all regarding Long Lake Outlet, Hugc Board of Managers Regular Meetings: 2nd and 4th Wednesdays at Arden Hills City Hall BONITA TORPE, Admin. Ass't. ��a 01a2d �-1'l -?4 Robert and Michelle Hester, Anderson, Juanita Loviagren, CALL TO ORDER: President Cardinal called the 509/Special Projects Meeting to order at 7:30 PM in the Council Chambers of Arden Hills City Hall on March 20, 1986. `iWQ01Time) y.i - Hm' c Sande added one item. Cardinal added 1 item. Willenbring deleted Review of Final. Draft 509 Plan and added Report on Anoka Co. Ditch 22, Memo regarding questions from League of Women Voters and Discussion with P. Mulloy, MPCA. Torpe added 3 items. With these changes, the Agenda eras declared set by the President. READING OF THE M]NUIES AMID THEIR APPROVAL: 1. Scott moved approval of the Minutes of February 20, 1986, 509/Special Projects Meeting in their entirety; seconded by Sande. Carried. 4-0 Ate' ITEM FOR DISCUSSION: REPORT OF THE TREASURER: 1. Accountant distr uted RCM Revised Accounts Payable dated 3-12-86 and revie�d same with the Board. Petrangelo roved approval in amount of $63,144.44. Seconded by Scott. Carried. 4-0 Accountant distributed LL/00L Accounts Payable dated 3-12-86. Petrangelo moved approval in the amount of $941.88. Seconded by Scott. Carried. 4-0 REPORT'OF THE ATTORNEY: none REPORT OF THE ENGINEER: 1. 1986 Rice Creek Pryonitoring Program. Engineer reminded Board it is time to begin Water Quality Monitoring for 1986. This program was developed through the 509 Plan and implemented in 1985. Sampling to begin in April, and will include monitoring lakes one time in July and streams nine times per year for a total of $26,000 already budgeted. After discussion, Petrangelo moved to approve and authorize E.A. Hickok & Assoc. to initiate and conduct throughout 1986 the Rice Creek Monitoring Program, BOARD OF MANAGERS A.J. CARDINAL, SR. G.A. SANDE C.T. KING L.H. SCOTT, SR. E.A. PETRANGELO ANOKA COUNTY RAMSEY COUNTY WASHINGTON CO. RAMSEY COUNTY ANOKA COUNTY E.A. HICKOK & ASSOCIATES Consulting Engineers 473-4224 • FRANK J. MURRAY Attorney 222-5549 ROM 509/SPECIAL PRQTECTS MEETING MINUTES: 3-20-86 Page 2 a duplicate of 1985, at $20,000 for Stream Monitoring and $6,000 for Lake Monitoring, to include a written report. Seconded by Scott. Motion carried. 4-0 It was noted these costs will be paid from 509 Funds. 2. Request for Partial Payment, Estimate #2, Sed Basin Maintenance Project No. 85-1. Engineer distributed and reviewed Partial Payment Estimate #2 from C.S. McCrossan, noting the Change Order No. 1 for 200 CY of common channel excavation at $6.50/CY for a total of $1,300, per Board action 2-20-86. Engineer reported McCrossan has completed excavation of the Sed Basin, and all that remains is restoration. After review and discussion, Petrangelo moved approval of Partial Payment Estimate #2 for the period 2-7-86 through 3-19-86, in the amount of $22,410, based upon recommendation of the Engineer. Seconded by Sande. Carried. 4-0 3. Engineer Willenbring distributed a memorandum of questions/responses to queries of League of Women Voters, Mahtomedi Chapter, compiled at request of Petrangelo who will address this group on 3-25-86. Petrangelo explained his need for technical background information. This item was not reviewed at the Meeting. 4. Discussion with Pat Mulley. Willenbring reported speaking with Pat Mulloy, MPCA, on Managers' questioning possibility of retaining Lake Josephine funds for future use in that Lake, and the negative response. Regarding the possibility of transferring these funds to a Non -point source pollution abatement project in bite Bear lake/Bald Eagle Lake, there were a number of issues to be discussed, and Mulloy offered to attend the next Projects Meeting, if Managers desired. Consensus is to invite Mulloy to the 4-17-86 Projects Meeting for discussion on transferring funds. 5. Anoka County Ditch 22. Engineer displayed a map of subject Ditch and gave back- ground to date, advising there was a meeting 3-19-86 including representatives of County, City and RCM (Cardinal and Willenbring attending) with consensus being that an improvement project would be necessary in order to provide the drainage needed to adequately handle the anticipated runoff. Lino Lakes Council has been seeking a repair up to this point, but if the Ditch is returned to its original configuration at a cost of $40,000, it will still be inadequate for the City's purpose. The City has set up an informational meeting on 3-24-86, 7:35 PM at Lino Lakes City Hall, and requests Rao be present to respond to questions from citizens. There was discussion, with consensus being that 10M will not participate further, having expended considerable funds to date, until a proper petition under Ch. 106 or 112 is received. Anoka Co. Managers Cardinal and Petrangelo will attend the informational meeting. Engineer was directed to convey the Board's decision in writing to the City of Lino Lakes. 6. Update on Long Lake Outlet, Hugo. Engineer reported work began today on the Outlet. The City was previously advised the Board was taking emergency action, and that the City advised property owners downstream of long Lake of the project commencing. Several property owners were present to speak with the Board regarding lack of notice and water quality, as well as rising water level in Round Lake. Engineer noted Long lake is five feet higher than Round Lake, that there will be a temporary rise in Round Take water level and further downstream, but this will equalize. If the rising water level (DNR has set Normal OHW at 966.2 in Round Lake) adversely impacts property owners on Round lake, the outlet will be metered back. Staff gauges have been installed in Round, Mann and Pine Tree Take, and will be inspected daily. Culvert Maintenance will be turned over to Washington County. Juanita Lovegren stated that MPCA informed them last year that Round Lake is already degraded, producing blue-green algae, and advised of her concern that Greiskalns' septic system has probably affected Long Lake waters, which will flaw into Round Lake and further degrade the waters. Engineer Willenbring dis- tributed a memorandum dated 3-20-86: Results of Water Quality Monitoring of Long Lake and Round bake in Hugo, and reviewed this with Managers and citizens who were present. Conclusions reached from test results are that concentration of nutrients, solids and other monitored pollutants in Long Lake were significantly less than those RCWD 509/SPECIAL PIWECTS MEETIM MINUTES: 3-20-86 Page 3 observed in Round Lake, and that there was no indication of contamination from the drainfield system on Greiskalns' property. However, after water recedes, City of Hugo will test the drainfield function and if not proper, will require it be fixed. Managers assured the citizens they gave notice to the City of Hugo immediately after their decision to take emergency action. REPORT CF THE ADMINISTRATIVE ASSISTANT: 1. Letter received from Fletcher Driscoll, declining appointment to the Citizens Advisory Comnittee, dated 3-18-86, although the CAC had recamnended Driscoll for membership. Discussion. The Board will require a letter of intent from candidates in the future. Petrangelo moved to void previous appointment of Fletcher Driscoll to the CAC. Seconded by Scott. Carried. 4-0 Sett queried the length of appointments to the CAC. It was noted the Committee passed a rule that anyone serving 2 three-year terms must take a one-year furlough. 2. Torpe reported a call from Engineer Panuska that C.Donahvwer has phoned him regarding lack of what he deems proper stipulations on Ellman Permit #85-89, issued 10-29-85. During discussion, Board requested next Manager who attends CAC Meeting inform the CAC that their inquiries regarding Board action are best directed to the President of the Board, and not to the staff. 3. Torpe queried whether Board wanted the 50 -page copy of MLV Stat. 112 and the 509 law copied to each CAC member. Response: make one copy and it can be circulated. 4. Received from TCAAP 3-20-86: copy of DNR Permit Application for Appropriation of Waters, Non -irrigation, keeping the District advised of the Groundwater Extraction/ Treatment Program as C.Oster had indicated. OTHER: 1. Sande indicated a need for clarification of 2-26-86 Minutes, page 2, Item #3 under Report of the Engineer, correction to read (addition underscored): "After dis- cussion, Willcoxen moved, supported by Scott, to authorize payment at $250, to be 21�riated from the Survey & Data Acquisition Fund of the District, as part of a cost -share project to determine water quality in Silver,Lake, St. Anthony." Petrangelo moved, supported by Sande to insert the recomrnnded phrase. Carried. 4-0 2. Cardinal described the need for moving the Application submittal deadline to 13 days prior to 4th Wednesday each month (fr n 12 days prior). Petrangelo moved accordingly, supported by Scott. Motion carried. 4-0 OID BUSINESS: NEW BUSINESS: ADJOUTO24ENI': With all Agenda items addressed, the Meeting was declared adjourned at 9:50 PM by the President. Next 509/Special Projects Meeting will be 4-17-86 at 7:30 PM, Shoreview City Hall. Scott, Sr., -Secretary Rice Creek Watershed District LHS:bt cc: Managers (5) Ramsey Co. Commissioners (2) Wash. Co. Commissioners (2) Attorney Wash. Co. Planner MN Water Res. Bd. Dept. of Natural Resources Engineers (2) Ramco Soil & Water Cons. Dist. WashCo Soil & Water Cons.Dist. Inspector St.Paul Water Utility Ram -Wash Metro Watershed Dist. Valley Branch WSI Citizens Advisory Carmittee (8) Metro Council Municipalities (30) Terry Noonan Ted Suss D.J. Roberts Patrick Mulloy Isabella Wille John J. Waller Anoka Co. Ccamissioners (3) M.R. Christensen Arthur Potts RiceCreek 3585 LEXINGTON AVENUE NORTH, SUITE #177 1 ARDEN HILLS, MINNESOTA �.pnm •65125 TELEPHONE (612) 483-0634 REGULAR MEEETIM OF THE MANAGERS Arden Hills City Hall March 26, 1986 ROIL CALL: Present: Managers Cardinal, Petrangelo, Scott, Sande Attorney Murray (arrived 8:10 PM) Engineers Willenbring and Panuska Inspector Eklin Administrative Assistant Torpe Absent: Manager Willc:oxen, with prior notice Also Present: Betty Moller, CAC Representative Rich Baker, David Putnam, Niel Banta, Bill Frank, Jeff Nielsen re PA#86-21 Leorle Steher, Paul Swenson, Bob Salmen Tony Jambor re PA#86-14 Bruce Bernin re Oneka Lake flooding Board of Managers Regular Meetings: 2nd and 4th Wednesdays at Arden Hills City Hall BONITA TORPE, Admin. Ass't. -a-86 re PA#86-26 CALL TO ORDER: Prlesident Cardinal called the Regular Meeting to order at 7:30 PM in the Council Chambers of Arden Hills City Hall on March 26, 1986. Petrangelo moved to suspend the Rules of Procedure. Seconded by Scott. Carried. 4-0 SETTING OF THE AG MA: Cardinal added Report on meeting at Lino Lakes 3-24-86, and added appearance by Tony Jambor, and TM Conference. Petrangelo added Report on IW meeting 3-25-86. Scott added item on CAC. Engineer Panuska deleted frcan Consent Agenda Applications 86-21, 86-23, 86-25 and added 86-24 to Table portion. He then added 1985 Permit Summary. Willenbring added Long Lake Outlet Project, Hugo, and Report on MPCA Trophic Status Report, and information on total assessed valuation of the District. Torpe added letter from Metro Council and Steenberg appearance. With these changes, President declared the Agenda set. READING OF THE NLLXTM AND THEIR APPROVAL: Scott moved to accept the Mu.nutes of —the -3-12-86 Regular Meeting as written. Second- ed by Petrangelo. Carried. 4-0 MANp.ICERS' ITEMS FOR DISCUSSION: 1. Tony Jambor appeared to request the Board not require him to obtain a Permit since he has decided not to construct mini -storage buildings on his site in MoundsView. Panuska reviewed exhibits Jambor has submitted, reported on conversation with the City and recommended the Board require a Final Site Drainage Plan delineating the floodplain area on the site. After discussion, Petrangelo moved that Application 86-14 be revised to reflect Jambor's need for Final Site Drainage Plan approval (rather than Land Devel- opment Plan). Seconded by Sande. Carried. 4-0 REPORT OF THE TREASURER: none REPORT OF THE ATTORNEY • BOARD OF MANAGERS none A.J. CARDINAL, SR. G.A. SANDE C.T. KING L.H. SCOTT, SR. E.A. PETRANGELO ANOKA COUNTY RAMSEY COUNTY WASHINGTON CO. RAMSEY COUNTY ANOKA COUNTY E.A. HICKOK & ASSOCIATES Consulting Engineers 413-4224 • FRANK J. MURRAY Attorney 222.5549 RCWD Regular Meeting Minutes: 3-26-86 Page 2 REPORT OF THE ENGINEER: 1. Consent Agenda. It was moved by Petrangelo and seconded by Sande to approve/ ratify the following Permit Applications in accordance with the District Engineer's Recourendation, as contained in the Engineer's Report dated March 21, 1986: 85-134, 86-06, 86-07, 86-15, 86-22. Carried. 4-0 It was moved by Petrangelo and seconded by Sande to table the following items as recommended by the District Engineer in the Engineer's Report dated March 21, 1986: 86-05, 86-27, 86-24. Carried. 4-0 2.- Permit Application Background and Recommendations. Engineers Willenbring and Panuska reviewed exhibits and made recommendations on the following Applications: 86-21, 86-25, 86-26, 86-13, 86-20, 86-23. See Attachments 1 through 5 for Board action. 3. Informational Items: (1) Panuska reported that Ramsey County has responded well to FOO comments on Project Review No. 85836: Reconstruction of County Road J from I -35W to Lexington Avenue. (2) Panuska distributed and briefly reviewed the 1985 Year Permit Summary showing 136 Application, 37 Project Reviews and 4 Comprehensive Plans received. (3) Willenbring updated the Board on the Long Lake Outlet Project, Hugo, noting the flow began on 3-24-86 with long Lake down ten inches today, Round Lake two inches above the NOHW. At first Round Lake rose three inches, and the downstream area rose also. Calls from Creager and Ball requesting relief from Round Lake ice banging against their trees resulted in metering back the flow. Engineer noted daily inspec- tions are made. Scott inquired if discussion has progressed with Washington County. Willenbring reported speaking with Tarry Bousquet about giving over maintenance to the County, and Bousquet reminded him that the Permit states RCWD will be responsible. Willenbring said the Contractor has backfilled, and the job is done except for restora- tion. He then distributed Request for Partial Payment from Jedlicki, Estimate No. 1 for Period March 1 through March 24, 1986 and recommended payment of $9,989.00. Pet- rangelo etrangelo moved approval in accordance with Engineer's recommendation, seconded by Sande (to be paid from, Survey & Data Acquisition Fund). Carried. 4-0 (4) Willenbring then reported on his review of MPCA's Trophic Status of Minnesota Lakes Report, involving 1,087 lakes (10% of those in the Stare), noting data froan STORET was used, advising the ranking status of lakes in the RCWD. (5) Willenbring, at Petrangelo's request, then advised the Total Assessed Valuation of RCWD at $1,042,000,000. Petrangelo noted the RM 1985 Tax levy in each of the Counties was 36G per $1,000 assessed value; in 1986 the RCD Tax levy has dropped to 18.8 per $1,000 assessed value per home. The Board then addressed Bruce Bernie, who stated he was present regarding construction of an outlet to Oneka Lake, U t the City of Hugo Council took action to buy or condemn Zaluckyj property in order to construct the outlet, but property owner's attorney has refused to sell, and the City has not made progress in acquiring the property. Bernin asked if RCWD would participate in the project along with the City and the citizens around the Lake. The Board then noted that F00 already borne the expense of investiga- tion of the downstream effects. Bernin asked for those total costs and a breakdown of them. Willenbring will provide these to Bernin, along with the metered outlet figure.: !vNek-4WijW+Ya5 none REPORT OF THE ADMINISTRATIVE ASSISTANT: 1. Billing Report was reviewed with the Managers, and receipt of USEPA Reimbursement noted. RCM Regular Meeting Minutes: 3-26-86 Page 3 2. Sande will attend the CAC Meeting 4-2-86. There was discussion of the orientation session requested by some of the CAC members, with decision that Sande and Petrangelo beipreserrters. Sande suggested he obtain a list of questions the Committee wants answered, and invite the CAC to have all members present on May 7. This would allow Committee members to invite interested persons in their municipality to attend also. It was not deemed necessary for the Accountant and the Attorney to attend. B.Moller was requested to report back at 4-9-86 Regular Meeting on attendance for next CAC Meetinc 3. Torpe distributed copies of Metropolitan Council letter received 3-24-86, regarding proposed NCR Ccmtem project in Blaine (upstream of Golden Lake), and containing a recom- mendation directed both to the City of Blaine and the Rice Creek Watershed asking that evaluation of water quality impacts on Golden Lake be made prior to permit issuance. There was discussion of whether the District can require this of the developer, since the District usually looks at sediments and erosion, and who should rightfully bear the cost of water quality testing. Engineer Willenbring was directed to investigate through discussion with Gardebring at Metro Council and Attorney Murray, and report back. 4. Torpe reported contact with Mr. Ed Steenberg, City of Circle Pines Councilmember, who accepted the invitation to address the Board regarding aerator in Golden Lake at the 4-9-86 Meeting. 0THER: 1. Cardinal noted a Conference for Water Management Organizations on 4-16-86 in Brooklyn Park, designed to assist in preparation of 509 Plans. No Manager will attend. 2. Scott read an excerpt from CAC Minutes of 7-13-76 which state that Committee members should be appointed for not more than 2 consecutive 3 -year terms, and that a one-year furlough is taken after 6 years of service on the Committee. 3. Cardinal reported on the 3-24-86 meeting at Lino Lakes regarding Anoka County Ditch 22 He noted those present: Anoka County Engineer Ruud, Commissioner Tangfeld, Engineer Willenbring, Petrangelo and himself, along with Lino Lakes Council and the citizens interested in the project. PLMD representatives made it clear that the City of Lino Lakes has not yet petitioned RCM for a project according to the Statute, and that RCWD does not intend to pay for the entire project because of limited funds which will most desirably be spread equitably throughout the 201 square miles of the District. They further noted the considerable funds expended for engineering review up to this point. 4. Scott requested the Board look briefly at TGAF'AA's on the log, and discussed sev- eral which remain tabled since January. The Board directed Eklin to watch these sites closely for activity which is not authorized. 5. Petrangelo reported on his 3-25-86 meeting with the Mahtcmedi League of Women Voters who invited an RCWD representative to acquaint them with the District, its background, powers, and queries on water quality, and concerns for White Bear Lake. With all Agenda items addressed, the meeting was declared adjourned at 10:35 PM. The next Regular Meeting will be at Arden Hills City Hall, 7:30 PM on 4-9-86. �?- 1Z4a!tA-' HY Scott, Sr-. I- Secretary LHS:bt Attachments: 5 cc: Managers (5) Attorney Engineers (2) Inspector Citizens Advisory CmTn. (8 ) Ted Suss Anoka Co. Comm. (3) Ramsey Co. Cam. (2) Wash. Co. Comm. (2) Wash. Co. Planner MN Water Res. Board Dept. of Natural Resources Arthur Potts RamCo Soil & Water Cons. Dist. Wash Co. Soil & Water Cons. Dist. St.Paul Water Util. Ram -Wash. Metro Watershed Dist. Valley Branch Watershed Dist. Metro Council Municipalities (30) Donald J. Roberts, EPA Region V Patrick J. Mulley, MPCA Isabella Wille Terry Noonan M.R. Christensen,PE John J.Waller Attachment 1 of 5 RCPO Regular Meeting: 3-26-86 PERMIT # APPLICANT DESCRIPTION ACTION 85-134 Robert Kranz Land Development Plan for construction of single- Consent Agenda Petrangelo/Sande 4-0 cc: Grant Township family home on 3+ acre site adjacent Protected Ratification of administrative ap- Wetland No. 131W at NE quadrant of the intersection proval granted in a letter dated of Jamaca Road and the Burlington Northern Railroad March 14, 1986. tracks, Grant Township. 86-05 Dennis Gonyea Land Development Plan for commercial development: cc: City of Spring Gonyea's Addition, 16 lots, 21+ acres located NE Lake Park of intersection of 81st Avenue NE and Central Ave- nue, Spring Lake Park. 86-06 Greg Knack Final Site Drainage Plan, shoreline setback and cc: Forest Lake Floodplain alteration which would allow for the Township placement of fill on the west end of the Appli- cant's lot for construction of a single-family home West of Forest Road N between 11th Ave. SW and 216th Street N (NE shoreline of Clear Lake), Forest Lake Township. Consent Agenda Petrangelo/Sande 4-0 Tabled pending receipt of revised Stornwater Management Plan that pro- vides adequate rate control for the 100 -year return frequency rainfall event on-site. NOTE: If the Ap- plicant wishes to use the existing wetland for stonimater storage, the following additional information will be required: 1. A hydrologic analy- sis of the entire drainage area tribu- tary to the wetland and determination of the 100 -year flood elevation for the wetland. 2. Determination of the peak discharge rate for the tribu- tary watershed in its undeveloped condition and information indicating that the peak discharge rate for the tributary watershed in its fully de- veloped condition as zoned will not increase. 3. Statement of Non -Ob- jection from the DNR regarding the use of Protected Wetland 2-681W as a storrT- water storage area. 4. Easements over all areas inundated up to the 100 -year high water elevation for the wetland. Consent Agenda Petrangelo/Sande 4-0 Ratification of administrative approval granted in a letter dated March 3, 1986. Attachment 2 of 5 RCWD Regular Meeting: 3-26-86 PERMIT # APPLICANT 86-07 Allan D. Hauge cc: Forest Lake Township DESCRIPTION Final Site Drainage Plan and Shoreline Setback to allow grading activities on western portion of lot and construction of single-family home west of Forest Road N between 11th Ave. SW and 216th St. N (northeastern shoreline of Clear Lake), Forest Lake Township. ACTION Consent Agenda Petrangelo/Sande 4-0 Ratification of administrative approval granted in a letter dated March 3, 1986. 86-13 Kenneth Grist Rough Grading Plan for construction of duplex on MSP Scott/Petrangelo 4-0 cc: 4bite Bear Twp. 0.5+ acre site adjacent to Ramsey -Washington Ju- Approval. dicial Ditch No. 1 at Lot 1, Block 1, Buffalo Creek Addition (east of Northwest Avenue between Buffalo Street and Fourth Street) , Vki.te Bear Township. 86-15 Jerome Perron Rough Grading Plan which would allow for the place - cc: White Bear Trap. ment of fill on applicant's lot. Proposed filling will encroach into the floodplain of Washington - Ramsey Judicial Ditch No. 1 one-half mile south of the intersection of Portland Avenue and County Line Road, White Bear Township. 86-20 Jim Mostek and Rough Grading Plan which would allow for the place - Greg Schmidt of ment of fill on the eastern portion of the Appli- Castle Design & De- cant3' lots at Lots 5 and 6, Block 1, Royal Haven velopment Co. Estates (western shoreline of Sunset Lake), Hugo. cc: City of Hugo Harry Rudisill 86-21 Everest Investment IV Final Site Drainage Plan for commercial development: cc: City of Roseville Rosedale Corporate Plaza, 12+ acres located NW of intersection of County Road C and Long Lake Road, Roseville. Consent Agenda Petrangelo/Sande 4-0 Ratification of administrative approval granted in a letter dated March 11, 1986. MSP Scott/Sande 4-0 Approval. MSP Soott/Petrangelo 4-0 Tabled with authorization for admini- strative action pending receipt of: 1. Cash surety in the amount of $5,000 to assure compliance with erosion control measures. 2. Informa- tion indicating that the drainage crossing under Long lake Road will be improved or information indicating the City of Roseville has no objection to the flooding which will occur on Long lake Road resulting fran a 100 - year return frequency storm. 3. A revised Stormwater Management Plan indicating the District's requirements for rate control and treatment can be CONTINUED NEXT PAGE -- Attachment 3 of 5 RCWD Regular Meeting: 3-26-86 PERMIT # APPLICANT 86-21 CONTINUED: logweinsugg"'I ACTION met on-site. This Plan must also show no development on those areas designated for 100 -year ponding. When given, this approval will stipu- late that failure by the City of Rose- ville to gain approval of a Comprehen- sive Stormwater Management Plan by May 28, 1986 will result in the devel- oper meeting the District's require- ments for rate control and treatment on-site. 86-22 Gerald H. Pfeffer Renew Permit 84-135: Land Development Plan for Consent Agenda. Petrangelo/Sande 4-0 cc: City of Mahhtomedi construction of single-family residential sub- Approval of renewal. division: Pfeffer Rustic Addition located SE of intersection of Eleanor Avenue and Charles St. (southwest of Lake Washington), Mahtomedi. 86-23 Harland C. Walbon Final Site Drainage Plan for construction of garage cc: Ti+Ate Bear Twp. on 0.5+ acre site. Applicant requests 20 -foot variance which results in a 30 -foot setback fran centerline of County Ditch 11 Northwest of the intersection of Eagle Street and the Soo Line Railroad tracks, White Bear Township. MSP Scott/Petrangelo 4-0 Tabled pending receipt of: 1. Plans showing that Applicant will return County Ditch 11 to its original align- ment and profile. 2. Information showing the elevation of the proposed garage floor. 3. Information indica- ting that the existing bridge presently meets or will meet the District's requirements for ditch crossings. 4. A Quit Claim Deed showing easements for ponding and flowage 50 feet south and 30 feet north of the centerline of County Ditch 11. 5. A Cash Surety in the amount of $1,000 to assure compliance with erosion control measures. 86-24 Ulmer Construction Land Development Plan for construction of a Consent Agenda Petrangelc/Sande 4-0 cc: City of Lino Lakes single-family residential subdivision: Ulmer's Tabled pending receipt of: 1. Ponding Rice Lake 4th Addition, 107 lots, 42+ acres SW and Flowage Easements over the entire of the intersection of Elm Street (Co.Rd. 12) and stormwater storage area up to the Lake Drive, Lino Lakes. 100 -year high water elevation. Attachment 4 of 5 RCWD Regular Meeting: 3-26-86 PERUT # APPLICANT DFSCRIPTICN 86-25 Northwestern College Final Site Drainage Plan for construction of 2 cc: City of Roseville buildings and 4 parking lots on NW College caws site North of Lydia Avenue between Lake Johanna Boulevard and Snelling Avenue, Roseville. 86-26 Edward P. Sitarz Trust Land Development Plan for construction of an cc: City of Blaine office/warehouse complex on 30+ acre site NW of intersection of 85th Avenue and I -35W, Blaine. 86-2 Woodbridge Properties, Land Development Plan for a commercial develop - Inc. meat to be known as Lakepointe Corporate Center, cc: City of Fridley 22+ acres located NW of intersection of I-694 and Highway 65, Fridley. (NOTE: This site is located outside the legal boundaries of the RCWD; however, a portion of the site drains into the District.) ACTION MSP Scott/Petrangelo 470 Tabled pending receipt of: 1. Signed Easement Do=cents for easements 50 feet either side of centerline of County Ditch No. 4 on the Applicant's property. 2. Notes defining the elevation of the emergency overflow routes from Pond 3 and Pond 1. 3. A Hold Harmless Agreement and design details for any storage which will take place on the rooftops of the proposed buildings. 4. Desig- nation of a responsible contact person for erosion control and a cash surety in the amount of $5,000 to assure compliance with erosion control measures. MSP Scott/Sande 4-0 Tabled with authorization for admini- strative action pending receipt of: 1. A $3,000 cash surety to assure compliance with erosion control measures. 2. A Preliminary Plat showing easements over the entire ponding area along the frontage road. Consent Agenda Petrangelo/Sande 4-0 Tabled pending receipt of: 1. Prelim- inary Plat showing easements over designated stonrwater storage areas. 2. Sediment/Erosion Control Plan which will retain all sediment on-site, including an implementation schedule for sediment and erosion control measures and notes addressing the establishment of temporary or permanent vegetative cover after the completion of grading activities. 3. Additional stabilization where stormsewer outfalls discharge to the ponding areas. 4. A defined emergency overflow route from each ponding area and its corresponding rrTTTTMTM NFIXT PAC.F.------- Attachment 5 of 5 PERMIT # APPLICANT 86-27 CONTIK FOO Regular Meeting: 11) D. 61 "a l!t0 • kAI 3-26-86 ACTION elevation. 5. Additional detailed information for the skimrer structures, including the 1 -year and 100 -year pond elevations to be shown on the Grading and Drainage Plan. April 25, 1986 First Minnesota - Mortgage Banking 222 East Plato Blvd. St. Paul, MN. 55107 On Wednesday, April 23, 1986, I phoned Taylor Land Surveyors to advise them that their plat survey was in error. I asked to have someone come out to the house by April 25, 1986 to make the necessary corrections so that the refinancing loan would take place as scheduled that day. Mr. Rogers of that company advised me that they would not be able to get the survey corrected by that time and that if I was not satisfied with their survey that I could get someone else. The survey done by ''aylor, was based on locating the front two irons that mark the outer edge of the property bounded on the south side. No attempt was ma.de.to locate the back two irons (markers) of the north side of the property. (The dirt in the area of the NW corner was not disturbed and the wood stake from Sept. 1979 remained in the ground. The metal marker was down over a foot in the ground And was unearthed by the,lSuburban Engineering Surveyors on their extensive survey made on April 25, in the A.M. The NE. corner of the property falls on a seuer cover. No mark appeared on the cover till Suburban placed a mark on it.) The structure v as drawn on the Taylor surey was made on the imagination of the surveyors. Since the building is in the_ground for the most �part, �it was necessary for pictures of the construction process (before the house was covered up)and also for the surveyors to enter and measure the inside of the structure for an accurate drawing. The survey as was done by Suburban is the correct drawing based on the above info. The drawing as shown by Taylor shows a -rectangular square structure, which is not a true image of the building. This would indicate a Utility/ofc. building of 7 ft. 4 in. by approx. 35 ft. The depth of the ofc. is approx. 12 ft. and the "true" width is 6 ft. 8". The width as shown on the plan was chan wed per the engineering dept. of Fridley, before the structure construction was begun, as the plan blue prints size of the room would have beers an intrusion into the easement and would have had to had a variance from Fridley and I believe they did not want to give a variance. On this basis, please do not pay Taylor for the survey as it was not a correct picture o the survey. Either deduct the $90.00 from the closing fees or issue a check to me for reimbursement. If this is not done and TAylor is paid for their incomplete, inaccurate work, then steps will be taken to collect the mondy from them. Thank you,,. Darlene Sammarco cc TAylor Land Surveyors, 230 W Broadway, Monticello (295-3388) G,a'd-' Fridley Engineering Dept. - attn: Mike Birch and Daryl Clark (571-3450) Taylor Land Surveyors - NOTE: Your services are no longer required in the above matter, since an accurate survey has now been dome by Suburban. SuBjECT MIT NO. City of Fridley 2 3 9 A7 AT THE TOP OF THE TWINS BUILDING PERMIT RECEIPT NO. __ COMMUNITY DEVELOPMENT DIV. fr PROTECTIVE INSPECTION SEC. I r ; NUMBER REV DATE PAGE OF APPROVED BY /"'S CITY HALL FRIDLEV 55432 � 612-571-3450 910-F15 1/9/96 JOB ADDRESS 1307 52 Avenue NE 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 4 1 Marian Hills 2nd SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Darlene Sammarco 1307 52 Avenue NE 571-5984 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO Home Solutions Inc 13895 Industrial r553-9369 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 20007157 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO. 6 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ❑ ADDITION O ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE X 8 DESCRIBE WORK Repair roof over porch 4 S Tear-off 9 CHANGE OF USE FROM TO STIPULATIONS Underlayment must comply with the State Building Code. TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT. CU. FT AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $320 $.50 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $20.98 Fire SC 0 STRUCTI NOR THE PERFORMANCE OF CONSTRUCTION PLAN CHECK FEET TAL FEE az,/ % �i Licens SC $ .00 $26.48 SIGNATURE OF CONTRACTOR TMORI D AGEAT f (KATE) PRO YVALI�j� TED THIS IS YOUR PERMIT LDG INS DA7E SIGNATURE OF OWNER))F OWNER BUILDER) IDATEI Effective 8/1/95 ADDN (j CITY OF FRIDLEY ALTER �® SINGLE FAMILY AND DUPLEXES R-1 AND R-2� Building Permit Application nn _ Construction Address: 1 ?J (1-I nZ-►�c� t'v� \ � �� 1 Legal Description: Owner Name & Address:! ; Ylmo'�i Q Tel. #_ Contractor: ��1 1►�� , MN LICENSE #1�f iI'� 11 �� Address:_ Z�'C�ll�S�V i 0� �U }e.1� �`l l Tel. # �J- Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. DESCRIPTION OF IMPROVEMENT LIVING AREA: Length Width Height Sq. Ft. GARAGE AREA: Length Width. Height Sq. Ft. DECK AREA: Length Width Hgt/Ground Sq. Ft. OTHER:\��tx`P� r oa� ®s �r s-•,, Corner Lot [ ] Inside Lot [ ] k' , tje of Construction: Approx. Completion Date: _ (Cost on Back) Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $ DATE: 1 q � APPLICANT: Tel. # 5,5-3 - 9 3 � 5 S Ft. Yd Setback Side Yard Setbacks Estimated Cost: $ — TOTAL STIPULATIONS: e , { CITY USE ONLY Permit Fee $ �-� �.-�^' Fee Schedule on Reverse Side Fire Surcharge --� Z7 •001 of Permit Valuation (1/10th%) State Surcharge $ ' 1 �+ $.50/$1,000 Valuation SAC Charge $ $850 per SAC Unit License Surcharge $ $5.00 (State Licensed Residential Contractors) Driveway Escrow $ Alt. "A" or Alt. "B" Above Erosion Control $ $450.00 Conservation Plan Review Park Fee $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [ ] Not Necessary [ ] TOTAL STIPULATIONS: suedEcr PE City of Fridley AT THE TOP OF THE TWINS BUILDING PERMIT t RECEIPT NO. COMMUNITY DEVELOPMENT DIV. r PROTECTIVE INSPECTION SEC. CITY HALL FRIDLEY 55432 NUMBER REV DATE PAGE OF APPROVED BY L 612-571-3460 910-F15 11/7/97 JOB ADDRESS 1307 52 Avenue NE 1 LEGAL LOT NO.BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 4 1 Marian Hills 2nd SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Darlene Sammarco 1307 52 Avenue NE 571-5984 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Same 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO. 8 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ADDITION ❑ ALTERATION 0 REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Construct a 48' x 35' Upper level on earth home 9 CHANGE OF USE FROM TO STIPULATIONS See notations on plan. kfitj r lam= ! r� % s�.-� WARNING Before digging call for SEPARATE, PERMITS REQUIRED FOR all utility locations 454.0002 WIRING, HEATING, PLUMBING ANO CNg •";: 1..WREQUIREU SEPARATE PERMITS ARE REOUIRED FOR ELECTRICAL, PLUMBING, HEATING, TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SO. FT. CU. FT. AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $97,306 $48.65 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $874.75 Fire SC $97.31 STRUCTION OR THE PERFORMANCE OF CONSTRUCTION PLAN CHECK FEE TOTA EE 1,020.71 SIGNATURE OF CONTRACTOR R AUTHORIZED AGENT IDATEI EN O A Y ALIDATHIS IS YOUR PERMIT 76, /If - - BL INSP r )AiE { SIGNATURE OF OWNER,iF OWNER BUILDERi IDATEI NEW [ ] Effective 1/1/97 ADDN [ ] CITY OF FRIDLEY 1� ALTER [ ] SINGLE FAMILY AND DUPLEXES R-1 AND R-2 BUILDING PERMIT APPLICATION ConstructionAddress: 13 0 7 — 5 Re d Legal Description: Owner Name & Address: Sa c to Tel. # 6- 7/ —5-F9 �4 Contractor: G e.l e r -a 1 MN LICENSE # Address: ,S',�z,w e, Tel. # Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. % 31 3, Gd fy DESCRIPTION OF ENIPROVEMENT -7l%'y lc v " 4Y i LIVING AREA: Length Width 35- Height Sq. Ft. GARAGE AREA: Iffier- Length Width Height Sq. Ft. DECK AREA: Length Width Hgt/Ground Sq. Ft. OTHER: g0C, s7 Construction Type: 44) o o Estimated Cost: $ 6� o�7, Soto (Fee Schedule on Back) Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $ DATE: // S —M APPLICANT: Tel. # S77/ STIPULATIONS: CITY USE ONLY Permit Fee $ , 7) Fee Schedule on Reverse Side Fire Surcharge $ %, .001 of Permit Valuation (1/10th%) State Surcharge $ zt, $.50/$1,000 Valuation SAC Charge $ $950 per SAC Unit License Surcharge $ $5.00 (State Licensed Residential Contractors) Driveway Escrow $ Alt. "A" or Alt. "B" Above Erosion Control $ $450.00 Conservation Plan Review Park Fee $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [ ] Not Necessary [ ] TOTAL $ (0O 7l STIPULATIONS: * Construct 4 course of cement block walls over North and East sides of house, 6 ft. wide (back) patio door at the middle of North wall and 36" wide door exiting onto deck over the room at the Southeast corner (attached to garage.) * Remove South, West, and East (partial block) perimeter wood/exterior covering and "seal' the top of 4 course blocks. * Remove upper court-yard room & cover with plastic or tarp * Waterproof outer cement block walls and area attaching original wall * Attach floor trusses to cement block perimeter walls * Exterior perimeter wall framing over 4 course block walls * Remove asphalt (by dump truck) through large window opening at South wall over garage * Berm North wall (back of house) and East wall with any left over dirt * Interior wall framing, insultation, ceilings, windows, and doors (included) * Plywood floor decking over floor trusses * Bathroom walls, wall with doorway, separating room over garage * Large room over lower East bedrooms with closet enclosing exhaust pipes * Roof Trusses (Gable roof over East and West ends of structure) * Plywood roof panels, weathershield lower 6 ft. of roof all around, tar paper and 30 year shingles and rain gutters around roof perimeter * Extend plumbing vents through roof and add dryer vent from lower level existing laundry room * Route electric wiring from 300 amp boxes (small room) across garage ceiling (furnace room), into upper level * Electrical wiring (code) entire upper structure, with 210 amp outlet for (future) Electric Stove * Furnace and ducts - upper level * Full bath - upper level * Rough in for (future) kitchen sink * finished exterior siding * Sheetrock and tape interior walls Darlene Sammarco, General Contractor r)m f-4 r ii- -e v, ,o - VA - e- wot I (s �.Zt6 11,e i JPWa- ,v.if eed 5 z ,ftd 4#1,e N.E..- — � Xfo � re'"�ed ire uG� j4 All 3v'.5.` c. 6w- --i- z ilk (9e�c� ad — �^.%Of>Cyt . 1 �j t Oise ofd% �!1 ���� ��,�+ ;,,,� it Lz 9/q" LP 1 d� T� � /Vo s�aI s fi 8C over i R f LP! a T4n/ - $� a � / y Lie Y•S��`�. ctire� i%'GLC�S�� j+ia. ig ��� 'l'(�c��C ��Q� �3'r+ir7 CIiYOF FRIDLEY CIVIC CI:NTI:R • 6431 UNIVERSITY AVE. N.E. FRIDLEY, MINNESOTA 55132 • PHONE (612) 571-3450 April 24, 1986 TO WHOM IT MAY CONCERN: Please be advised that I inspected the residence at 1307 - 52nd Avenue N. E. on April 23, 19 86 It was determined that the termination of the easterly wall of the structure, which includes a single family house, an attached garage, and a storage/ mechanical room on the most easterly edge, is 11 feet east of the overhead garage door. Please contact me if you have any further questions on this matter. Sincerely, I AnLkk DARREL G. CLARK Chief Building Official DG C/mh August 30 1996 TO: Steve Yaeger Home Solutions 13895 Industrial Blvd. Plymouth, MN. 55441 cc: Ron Julkowski Building Inspector Fridley Municipal Ctr. 6431 University Avenue N.E. Fridley, MN. 55432 On several occasions, I have spoken to you about correcting problems that developed from your employee's reroofing the front portion of our home. Various minimal attempts by your employees to resolve the situation merely worsened the situation. The-Velux windows that were supposed to "open" were even sealed shut. For $JA QQ, City Wide Home Improvements agreed to re -roof the front of the house according to instructions that were also provided to your employee, but which he did not follow. The shingles and tar paper roofing by your employee were torn off and "water shield" over the entire roof area, the appropriate velux kit flashings were used, and 25 year shingles were applied with excellent results. There was also considerable water damage to the interior wood of the porch which didn't previously exist. This additional problem must be dealt with. Since dormers were removed by your employee, I will agreeo resolve the interior water damage if the $14,_V6 re -roofing cost is dealt with without having to involve the courts and the Better Business Bureau. I will expect payment in the next 3 weeks. S'ncerely, Darlene Sammarco 1307 52nd Avenue N.E. Fridley, MN. 55421 (612) 571-5984 Contract # 1005 west Broadway Mrs.Wk. Minneapolis, MN 55411 ,q MN Lkense 013 %� p� Sold To �%� tB�+".s:... ' S A -m �i%i� IZ` - Address Date n, nn..,— �,rwnwn, ccs n,+nn�w.ar,hr r',rn ,mc .,:w7 0uh hwa rhW OB IaDla IOr 61B 006[ an10 eXperae Or rralOilB IIBrti388any rBp81re Ot OBIIIa�Ba fBaraDnQ ►n0fm are 6thBriBlt defetX h prams on whldh ' k Is to be dans, nor act of (loci, dW conarrhoWn, titre, strikes, accidents, storms, Selma weather condfiana of from causes beyond do reannabb control of the w0aetor. RRANM: Materials and eVp nerd fumishati as a part d Of Canfrest which are u4ect to a msrwlachxel'a %amarty are warrented to to andarh'of #at nundnohxses womanly. We shell famish yhu aim Ise of the matadecturWe wanandes upon racpxM Enforcement of the naradac4xels wertantles are yew responstbAityr end we are not Aeby for eryr damages or costs Incurred by you N the emfacenard of is wanar04 AA wgdr pedomred oder this Contract shall be subsand* compieW In a world im rnanner In scoodence with standard practices within the Irhdustry. Wpectoh and approval of the work by the ropdate gororanerq Inspeaw seal be aanduaive evlderae that the work has been completed In a worWo manner. AA labor and materials provide herein are warranted to be free from daaets for the period of year. Said War" shall be enforceable and we shal perform al repairs ado said wanany o* afar you have pakf us the ful Contract Mhout. NOTIC€ TO OWNER REGARDING LIEN RIGMTS: Any Person Or'Company Suppiying Lali�or Or-Moterials'f lfilw) ilprovement To #our property May File A Lien Against Your Property If That Person Or Company Is Not paid F& The Contributions. . Under Minnesota Law, You Have The Right To Pay Persons Who Supplied Labor Or Materials For This Improvement Directly And Deduct This Amount From Your Contract Price, Or Withhold The Amounts Due Them From Us Until 120 Days After Completion Of The Improvement Unless We Give You A Lien Waiver Signed By Persons Who Supplied Any Labor Or Material For The Improvement And Who Gave You Timely Notice. . CASH PRICE ` rT-) C. UNPAID BALANCE OF CASH PRICE DUE UPON COMPLETION a CAS)i PRICE DOWN PAYMENT ............................................. s 0. FINANCE TERMS .................................................... 3 we will fu#&'VV waivers upon request alter full payment NOTICE TO THE BUYER HE RECEIVED Buye/a swab e 1 — Accepted BY ABuyer's gypneture Ycu to Buyer, may cancel Bda puchase at any time to rNdnlght of the third busfress day after to dao of tits purchase. See ateclhed nolice of cancellation form for an eglenailon of tris tit. Receo of two copies of Notre of CancelMAoh Is hereby aclumWIged by Buyers. THIS AGREEMENT SUBJECT TO ACCEPTANCE BY OFFICER OF CITY WIDE HOME IMPROVEMENT, INC. (SEE OVER) 1 rl' O Roofs ❑ Windows FAX 612-529.8839 O Siding ❑ Doors PHONE 529 -CITY ElTrim O Gutters i (2489) O Other bsk Id- .11 aL—wu Mr. Wk. HOME IMPROVEMENTS Contract # 1005 west Broadway Mrs.Wk. Minneapolis, MN 55411 ,q MN Lkense 013 %� p� Sold To �%� tB�+".s:... ' S A -m �i%i� IZ` - Address Date n, nn..,— �,rwnwn, ccs n,+nn�w.ar,hr r',rn ,mc .,:w7 0uh hwa rhW OB IaDla IOr 61B 006[ an10 eXperae Or rralOilB IIBrti388any rBp81re Ot OBIIIa�Ba fBaraDnQ ►n0fm are 6thBriBlt defetX h prams on whldh ' k Is to be dans, nor act of (loci, dW conarrhoWn, titre, strikes, accidents, storms, Selma weather condfiana of from causes beyond do reannabb control of the w0aetor. RRANM: Materials and eVp nerd fumishati as a part d Of Canfrest which are u4ect to a msrwlachxel'a %amarty are warrented to to andarh'of #at nundnohxses womanly. We shell famish yhu aim Ise of the matadecturWe wanandes upon racpxM Enforcement of the naradac4xels wertantles are yew responstbAityr end we are not Aeby for eryr damages or costs Incurred by you N the emfacenard of is wanar04 AA wgdr pedomred oder this Contract shall be subsand* compieW In a world im rnanner In scoodence with standard practices within the Irhdustry. Wpectoh and approval of the work by the ropdate gororanerq Inspeaw seal be aanduaive evlderae that the work has been completed In a worWo manner. AA labor and materials provide herein are warranted to be free from daaets for the period of year. Said War" shall be enforceable and we shal perform al repairs ado said wanany o* afar you have pakf us the ful Contract Mhout. NOTIC€ TO OWNER REGARDING LIEN RIGMTS: Any Person Or'Company Suppiying Lali�or Or-Moterials'f lfilw) ilprovement To #our property May File A Lien Against Your Property If That Person Or Company Is Not paid F& The Contributions. . Under Minnesota Law, You Have The Right To Pay Persons Who Supplied Labor Or Materials For This Improvement Directly And Deduct This Amount From Your Contract Price, Or Withhold The Amounts Due Them From Us Until 120 Days After Completion Of The Improvement Unless We Give You A Lien Waiver Signed By Persons Who Supplied Any Labor Or Material For The Improvement And Who Gave You Timely Notice. . CASH PRICE ` rT-) C. UNPAID BALANCE OF CASH PRICE DUE UPON COMPLETION a CAS)i PRICE DOWN PAYMENT ............................................. s 0. FINANCE TERMS .................................................... 3 we will fu#&'VV waivers upon request alter full payment NOTICE TO THE BUYER HE RECEIVED Buye/a swab e 1 — Accepted BY ABuyer's gypneture Ycu to Buyer, may cancel Bda puchase at any time to rNdnlght of the third busfress day after to dao of tits purchase. See ateclhed nolice of cancellation form for an eglenailon of tris tit. Receo of two copies of Notre of CancelMAoh Is hereby aclumWIged by Buyers. THIS AGREEMENT SUBJECT TO ACCEPTANCE BY OFFICER OF CITY WIDE HOME IMPROVEMENT, INC. (SEE OVER) CHANGE ORDER HOME IMP 1005 West Broadway minneapous. MN 55411 AN Lk% #3013 IV "Onall Z-4 Qrl � r R ARMi -1 �_�-:: i✓!_ _ _moi WA1 _ i .�_ /4 �2 � _ il r+ *•�_WE AGREE hereby to make changes as speciffes above, at thls price $ ACCEPTED: The above prices and specifications of this Change Order are satisfactory and hereby accepted. All work to be performed under same terms and conditions as specified In original contract unle therwi sti to Data (2 `- Signature• kJ -1, .CITY OF FRIDLEY INSPECTION DIV. oil 6431 University Ave NE l 1 �t Fridley, MN 55432 APPLICATION FOR PLUMBING AND GAS FITTING PERMIT 572-3604 MARK NUMBER OF FIXTURES TO BF' INSTAI I Fn nN PAr.W m nna Effective On January 1, 1997 PLUMBING FIXTURE RATES: New Fixtures Old Opening, New Fixture Beer Dispenser Blow Off Basin Catch Basin Rain Water Leader Sump/Receiving Tank Water Treating Appliance Water Heater -Electric NO. RATE TOTAL /7 $ 7.00 $ 4.00 $ 5.00 $ 7.00 $ 7.00 $ 7.00 Water Heater Gas** Gas Range** Gas Dryer** Back Flow Preventer Required ( )Yes () No Type $ 7.00 $10.00 $ 7.00 $10.00 Als _0 $10.00 $10.00 $15.00 Reinspection Fee $42.00/Hr ALL OTHERS AND/OR REPAIRS AND ALTERATIONS 1.5% of Value of Fixture or Appliance 3�, 0V State Surcharge $ .50 TOTAL FEE $ �� SU JOB ADDRESS 1 J � 7 �� ,-, -41— The undersigned hereby makes application for a perm it for the work herein specified agreeing to do all work in strict accordance with the city codes and rulings of the Building Division, and hereby declares that all the facts and representations stated in this application are true and correct. Id 114 _'1997 Owner Building Used As Estimated Cost �, 000, OD PERMIT NO. �J PLUMBING COMPANY_IVoO+Ltan 0I0 -t -I h/V1 SIGNED BY/ice' ����9 TEL N0. Approved B Rough -In Date ` Final Date_ MINIMUM FE FOR ANY PLUMBING/GAS PERMIT IS $20.00 PLUS THE $.50 STATE SURCHARGE **COMBUSTION AIR SHALL BE PROVIDED PER UMC SECTION 504(A) AND TABLE 6-A. MINIMUM SIZE 9 SQ INCHES. CITY OF FRDLEY INSPECTION ON.�,� 6431 University Ave NE Fridley, MN 55432 APPUCKRZI [-on P01,,VEFi P! -ANTI 3 AND HEATING, COOLING, VENTILATION, 7r C�i� 9 � ' '� `7 ' SY�-,TE-MSANP, DEVICES n 572—W4 4z 1 -- .4'1 4 - Effective On January 2A E kirthe work herein -CC':)fda t)c-ewilh the GItv Codes and Fury !ac,-� Al, C'P-dares that all the facts and 30.00 W'"'lu -1:'d rouect. December-- '97 10.00 S& S Construction 71- 5 1% 4 Li, r r 6,000-00 25.00 comfortmaker 75000 Nat gas 65.50 East Bethel Heating & Air 434-1 190 IT 3 nEj',1SPE0-6GN *Air Co nditioners can n : be IDE FO 'N' O'l written permission from adjoinirv- 7 N REPU�LE URA E OCT -19-98 10:05 AM SRMRR CO 612 571 5984 P.02 CALGARY STOVE & CHIMNEY 551 ANDALL STREET LINO LAKES, MN. 55014 (610785.9677 (0a 1 Submitted To: PROPOSAL Name DA r `Q $q r Street v/ .3b '7— �� � 4ve N. k- , city r'r:d 1tv state S3' �1 �•1 Phone SI"'71 SISY weTo ge Performed At., r r No. q -SheDote jo 1q - Sheet et No. , D 4 Street city state Date of Plans Architect We hereby propose to furnish the materials end perform the labor necessary for the completion of r J J y� - el L.r sz 1 r�.•. t�l�QTi'ax OP 4 Si k Zae /'•4L lei C —rVC, 0 r tilf, , eAPNe `'heal hook CP►r'aw.t'Ir < j ee % i�s.J?a�l+tw T.e 1.t� I 4 Lai 0 r9 �vyLai"is jIqI -to Pr I-00- F,Ke ���e5 /a 9c JKAfs0Vi's I.s 41,t .t4It, s pyx at< 1) De.✓wt' � 3r�' e* - All material Is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and spe locations submitted or above work and completed In a substantial workmanlike manner for the sum of Dollars [S. -S I with payments to,be made as f (lows; Xllgrj 7We- Any alteratlon or deviation from above specification Involving swa eons. will be executed only upon written orders, and will become an extra charge over and above the estimate. All eareements contingent upon strike&, accidents or delays beyond our control Owner to carry fire, tornado and other necessary Insurance upon above work Workmen's Compensaattiioon and Public Llebllhy IInnfsurance on above/wwoo�r/k to be taken .,, " , i ,, 4, mz_v Respectfully submitted Per Note— This proposal may be withdrawn by us If not accepted within 80 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment wilt be made as outlined above. Signature Date Signature 0 OCT -19-98 10:06 AM SAMAR CO Calgary Stove & Chimney 551 Andall Strect Lino Lakes, MN 55014 (612)785-9677 Customer�-C,�- ,1 ,�'�, rAddress f � ay,P City / state zip s• u.Q Phone ? 1 Date /,Q — ! e4 — q R Time CONDITION REPORT 7. Moisture Resistance S. Smoke Chamber 10. Firebox / Grate 11. Ash Container 12. Spark Screen / Doors 13. Tools / Gloves C= 14. Hearth Protection WOODSTOVE OR FIREPLAc= I ecnr ,n. Move Pipe Condition lwenric�r,„et 17. NFPA Approved Flue Connaefinn 1 6. Installation / Thimble / Clearancas WMER SAFETY CONSInFoeTlnm0 19. Fire Extinguisher / 8mokN nets,....... 20. Gas Furnace Flue Limer '1. Fire Escape Plan d9: 7ti Sheol tided u a oill m ee"dluvns of lion of any apeq, ie the le9uU of a visual inspec"1611tion done time the e of cleaning. It It use are beyond our to our customer, not as onrlifi�allen al lire worthiness ar salary. use central. we mato no warranty of the 241e1y or, Ince and none is to be implied. 612 571 5984 P.03 • Type of Fireplace: ❑ Pre -fab Aasonry ❑ Modular • No. of Stories: 1 l2 3 4 • No. of Fireplaces; 0 2 3 4 • Woodstove: ❑ Insert - ❑ Free Standing ❑ Pellet • Type of Wood Used: [loft C&? and IHKftt 76ry • Last Cleaned:� Year(s) Ago ❑ Never • Number of cords burned per sefson: • Flue Size: p 8” x 8" �" z 3�3" ❑ 13" x 13" ❑ 8"x 17" ❑ 13" x 17" C3 8" Round p 6" Round ❑ • Outside Chimney Dimensions. "x " • Fireplace Opening Size x„ • How did you hear about us? ❑ Referral ❑ Yellow Pages ❑ Media—TV, Newspaper ❑ Direct Mail Cl Other COMMENTS: ' -�-� _ �. �n1.�alIPJ ....d.irPc?�/ ,....i.++ ..�'!��_�.I�..+rl�•ra CUSTOMER VERIFICATION I have read this form and now understand which a.►eas of my woodburning system appear to be satisfactory and which areas are not satisfactory. Signed Date NEST SFRVICINSG RECOMMENDED In- g r r bf- hvi vs C Saasan ' year Fireplace and chimney should be I petted r an structural faults. y Sweep's or Mason's Signature RECEIPT / INVOICE DESCRIPTION PRICE V. jpi r o I U/) SUBTOTAL DATE COMPLETED TOTAL 7 60 7 f CRYOF FRIDLEY FRIDLEY MUNICIPAL CENTER • 6431 UNIVERSITY AVE. N.E. FRIDLEY, MN 55432 • (612) 571-3450 • FAX (612) 571-1287 TO: COVER SHEET FROM: Inspection Division, City of Fridley, 572-3604 Ron Julkowski, Building Official Mary Hintz, Secretary Barry Riesch, Residential Building Inspector CONTRACT INSPECTOR: Bob Clauson, Electrical Inspector DATE: PAGES (Including Cover Sheet) . "? — f1\— NOTE: If all pages have not been properly received, please call. WPM f j• ,t,- A-e-ol flfl,� 20 ' T F S CITY OF FRIDLEY 6431 UNIVERSITY AVENUE N.E., FRIDLEY, MINNESOTA 65432. TELEPHONE ( 612)571-3450 June 9, 1980 Ms. Darlene Sammarco 1307 - 52nd Avenue N.E. Fridley, MN 55421 Re: Waterproofing of Below Grade Structure - 1307 - 52nd Avenue N.E. Dear Ms. Sammarco: You called our office to report a problem with your home in that you are experiencing a seepage problem through the wall/ceiling/roof system. A field inspection was conducted on June 5, 1980 following a substantial rain from.the morning of that day. It was noted that in almost every room of the structure there was evidence of moisture leaking into the living areas. It appears that it occurs near the ceiling in almost all instances. This is a result of the waterproofing failing to seal off water frcgd entering the interior of the structure. This office can not determine the exact cause of fault which is causing the failure. No waterproof design was ever submitted for' our review and no inspection was called for or made prior to backfilling. Therefore, you and/or your applicator must correct the problem. Since this process is new, an inspection by a third party may be necessary to determine the correction method. This correction must occur as soon as possible; certainly within 30 days. Please let this office know what your intentions are in this matter. Sincerely, DARREL G. CLARK Chief Building Official DGC/mh SuBJECT ERMIT NO. City of Fridley 239-i 7) AT THE TOP OF THE TWINS BUILDING PERMIT i RECEIPT NO. i �• _______ COMMUNITY DEVELOPMENT DIV ti' 3� 1 PROTECTIVE INSPECTION SEC r � , CITY HALL FRIDLEY 55432 NUMBER REV DATE PAGE Of APPROVED BY 612-571-3450 910415 1/9/96 / JOB ADDRESS 1307 52 Avenue NE 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 4 1 Marian Hills 2nd SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Darlene Sammarco 1307 52 Avenue NE 571-5984 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO Home Solutions Inc 13895 Industrial - 9369 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO 20007157 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 6 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ❑ ADDITION ❑ ALTERATION REPAIR ❑ MOVE ❑ REMOVE X❑ 8 DESCRIBE WORK Repair roof over porch 4 S Tear-off 9 CHANGE OF USE FROM TO STIPULATIONS . Underlayment must comply with the State Building Code. TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL. PLUMBING. HEATING, VENTILATING OR AIR CONDITIONING ZONING SO. FT. CU. FT. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT NO. DWLG. UNITS OFFSTREET PARKING ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES VALUATION SURTAX AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $320 $'50 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT PERMIT FEE SAC CHARGE DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $20.98 Fire SC 0 STRUCTI N OR THE PERFORMANCE OF CONSTRUCTION PLAN CHECK FEETAL FEE / I2IV 4 Licens SC $,.00/J7$26.48 SIGNATURE OF CON'RACTOR TMOR 0 AGE T I ATEI PRO Y VAL)/PK TED THIS IS YOUR PERMIT LOG INS w DATE SIGNATURE OFOWNEQ(IF OWNER BUILDERI IOATEI 0 SuBjECT PE City of Fridley 2 5 tj AT THE TOP OF THE TWINS BUILDING PERMIT RECEIPT NO. COMMUNITY DEVELOPMENT DIV. ______ PROTECTIVE INSPECTION SEC. �� CITY HALL FRIDLEY 55432 NUMBER REV DATE PAGE OF APPROVED By 612-571-3450 910-F15 11/7/97 JOB ADDRESS 1307 52 Avenue NE LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED 1 LEGAL 4 1 Marian Hills 2nd SHEET DESCR. 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Darlene Sammarco 1307 52 Avenue NE 571-5984 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Same 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 8 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW [R ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 8 DESCRIBE WORK Construct a 48' x 35' Upper level on earth home 9 CHANGE OF USE FROM TO STIPULATIONS See notations on plan. PblA) Irl WARNING Before digging call for all utility locations SEPARATE PERMITS R WRED, FOR x.0002 WIRING, HEATING, PLUMBING AND C_:-'149• REQUI�1- �1' � AW TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. ZONING SO. FT. CU. FT. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 80 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT NO. DWLG. UNITS OFFSTREET PARKING ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION 1 STALLS GARAGES VALUATION SURTAX AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED $97,306 $48.65 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT PERMIT FEE SAC CHARGE DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $874.75 Fire SC $97.31 STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. PLAN CHECK FEE TOTA FEE 1,020.71 SIGNATURE OF CONTRACTOR RAUTMORIZED AGENT IDATEI -7-1 )(-I. EN Q �Y� HIS IS YOUR PERMIT ll -.7-97- BL INSP ryATE Of OWNERiiFOWNERBUILDERI IDATEI 0 REM ® E ' 1 20 To: David E. Jensen, Fridley Inspections December 19, 2008 Cc: Fridley Police Officer Steven Monsrud Cc: Fridley City Manager William Burns Fm: Darlene Sammarco, 1307 52,d Ave. N.E., Fridley, MN. 55421 David Jensen, RE: Inspection report on my property at 1307 52nd Ave. N.E., Fridley, MN. According to Julie Jones you are the person that inspected my property. As you recall, on December 4, 2008, you did an "inspection" of my property. You laid a wooden stake on the property line between my neighbor Townsley on the West side, then you laid a wooden stake on the East side of my property. On December 12, 2008,1 asked for a copy of the inspection and I was told that the inspection was not written down yet. December 13, 2008, Ralph Mallowitz, who requested you inspect my property was given a copy of the inspection instead of the inspection of my property being given to me. Ralph Mallowitz then advise me that I would have to pay him $700.00 for the "free" inspection you did of my property. That's extortion. That inspection should be placed in my file in Fridley Department of Building Inspections, instead of being given to Mr. Mallwitz. Somehow, Ralph managed to convince the Fridley Police that your inspection is a Land Survey. A real land survey has to be done by a licensed Land Surveyor, not an unlicensed Fridley Inspector. I have proof that your December 4, 2008 Inspection is not correct. [Minnesota Statute 326.11 -Unauthorized practice, disciplinary action, subd. 3: Cease and desist order against a person that is unauthorized to practice land surveying. M.S. 326.11 subd. 6(a)- The board of land surveyors may impose a civil penalty not to exceed $10,000.00 for each violation by a person who commits an act or practice constituting the unauthorized practice of land surveying. (b) The Board may impose a fee to reimburse the board for all or part of the cost of the proceedings resulting in disciplinary action, and the imposition of civil penalties. The Board may include the costs, not limited to, the amount paid by the board for services from the office of administrative hearings, attorney fees, court reporters, witnesses, reproduction of records, board members' per diem compensation, board staff time, and expense incurred by board members and staff.] In addition, there are forged documents in the Bldg. Inspections files.