Loading...
PRE 2010 DOCSV PERTY SUBJECT City of Fridley AT THE TOP OF THE TWINS PERMIT r 46 BUILDING ECEIPT NO. I `L -------COMMUNITY DEVELOPMENT DIV. r PROTECTIVE INSPECTION SEC. 1 1 = CITY HALL FRIDLEY 55432 NUMBER REV. DATE PAGE OF APPROVED BY 812-580-3450 910-F15 4/29/76 JOB ADDRESS 1309 - 53rd Avenue N.E. 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 6 Rut -Berg Addition SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE Roger Vesall 23245 Lafton Court North, Scandia , 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Same 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO. 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO. 6 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE X xf,? G f 'j1 �i . 8 DESCRIBE WORK (Y � ��i 5 M1 Vy L. y Construct a 45' x 26' Dwelling and a 20' x 26' GarageBefefe 04 digging TELEPHONE e ELECTING - GAS Ea FOR 9 CHANGEOFUSEFROM �, REQUIRED By LK HEATING, PLUMBING AND SIG STIPULATIONS provide a hard surface driveway. Provide a verifying survey before capping. Provide sod in the front and side yards. SEWER LOCATION: Manhole in middle of Lot 5 in 53rd Avenue -MUST BE EXTENDED TO PR WYE ELEV: LI TOP OF FOOTING: WATER LOCATION:MUST BE TAPPED, 40' South of Property Line —IMR®RTANT— THE CITY OF ER1®LI=1( ®OG5 NOT GUARANTEE THE ' CCURACY OF UTILITY LOCATIO14S AND ELEVATI0t-', . NOTIFY THE FRIDLEY ENGR. :)ATA IS FOR INFORM710N PUEPOSES 0. LY , I-,. , DIVISION REGARDING CURB .. USING IT :.EIOULD VENFY 11HE REMOVAL AND REPLACEMENT CAN i "�I• E AT DRIVEWAY OPENINGS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, TYPE OF CONST. OCCUPANCY GROUP OCCUPANCY LOAD VENTILATING OR AIR CONDITIONING. Wood Frame THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SQ. FT. CU. FT. AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT R-1 1170 + 520 23,400 + 6240 ANY TIME AFTER WORK IS COMMENCED. NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION Z ISTALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF. WORK WILL BE COMPLIED. $35,550 $17.78 WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- $ 54.83 $350.00 STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. PLAN CHECK FEE TOTAL FEE $422.61 SIGV4UREO CONTRACTOR OR AUTHORIZED AGENT (DATE) WHEN Vr BLDG. WSP I E VA ATED THIS IS YOUR PERMIT DATE •' SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE) V PERTY CERTIFICATE PF SURVEY JAMES L. KIURTM LAND SURVIEYOR 730 -40TH AVENUE N.E. COLUMBIA HEIGHTS 55421 788-9769 1 MUUNY CVtTIFY THAT THIS SURVEY. PLAN. OR REPORT WAS PRIk►ARCD DY MR OR UNDBR MY DIRCCT GU ISION AND THAT I AMDULY RCOISTRRED LAND SURVEYOR U THR LAWS OF THC STATC OF MINNESOTA. DATE 4- ZZ -7-4- "P. SCALE V =03�_ MINNESO A REGISTRATION NO. 5332 O= IRON MONUMENT 80.02 N c� 4131-, , v� a'1 -S -F a I v.s STANbARD OIL_ COMPANY —B-oz M i so.oz °' 153 RoAV E.NU E. . b Lot 6, Block 1, Hut - Berg Addition Anoka County, Minnesota V 2 14 lk 0. �t APPLICATION FOR RESIDENTIAL, ALTERATION, OR ADDITION BUILDING PERMIT • CITY OF FRIDLEY, MINNESOTA OWNER'S NAME • ' j--Qo �UILDER : ADDRESS:ADDRESS: NO • �.� G s STREET • i1 k LOT: BLOCK: J- ADDITION: Z' CORNER LOT: INSIDE LOT :_SETBACK: SIDWARD: Applicant a.ttac'i to this form Two Certificates of Survey of Lot and proposed building location drawn on these Certificates. DESCRIPTION OF BUILDING To Be Used As: ` Front: + 5 Depth: 2 � Height: Square Feet: d 70- Cubic Feet: 3 � Front: '2-6 Depth: Z 0 Height: !�-� g ` Square Feet; SZ Cubic Feet: e.) z -v Type of Construction: Estimated Cost: $ a tj �y To Be Completed: / 6 The undersigned hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with the City of Fridley Ordinances and rulings of the Department of Buildings, and hereby declares that all the facts and representations stated in this application are true and correct. DATE: SIGNATURE: r�. il (See Reverse Side For Additional Information.) F 7-1 S' 7 'SAC,6,0 ® o, ((,, D ttttt4•ION O � YONO mDi �� 1 Irn-m P 10 •S vHuy neN; i G1 mVt•1Ny� O O•i :.]W V• IQ A D W C]• I Z I S n e s P I W A M C X O optmlum• w J n W fi,, V V .cu0 y-rZ• Z I 1 m C c P•Z•INy� 1r••m'' F L L Lwm a -I r> i NP•Iw�d-Iir NF->] N CC.. L • 1•, n \ W g N y W m w V^ z z n i J y 4 H � muI�ro-1 :i Inmvnn L L•1N.I yV Dwwo fw'Ir2 D nxfSuJD.tT V ow^pOpS yi' a P-IP•1NC �ni z i •�iRS 7. L L LNmW.-INS L_LLwmD-1V=.. Ni�ii �].�: � L souo'i Z�Z�`Z�Z.DovD+� D�uM°�.IrosZ�Oe ^ �'y � _• C P~wyH-l-iroa�'lr^_ x PMw-ly y-iyOr N 9 •1 zV z n -1 -1 N J H V •f \ O G W j~.. M m D C H •1 m N L f] -i �I�, y -' L L•i (r'J11 .09i� L L•P.INPtI �' ly} �Ii r, _°' mowo N3 aouo az �L, v ! 2 2 •�wY 'Z Z Obi e.A ,'W„3j N -1V •1 .IL X P-fu•"I%C {Xn •WIN V T L L pza L L wza � OA G S C :� ♦ O W O^_ -1 r 2 N O W O_ •• ss H r Z -I ,i W"� Z a N l•1 2 Y e til C O! �. t 7 Q •i D i D o L L L D min -iW 2 ro Douoao�oP np wP-I W -!ri y-1rf]`rA ((,, P,,i++C��b•im Vl I I n^ P r P J -fG-f Or. N , +1 menu -x~ ((,, mNLaln PO4 Z- -VOr3 P-xw M^i X V D h n W= V y pyw•. yi' Z N O-ajJYP❑ H D s o M L L Lums-fuz Ib>a owo aM�hzna x 1 J O'J V •1 1.1 D N NED•-ID N •' mV hW y~ 999no a�L HN:a V• wo Pz nr: z z- ub P-Iw •17 2 X N P D O P 9 D m o w jo a va 1 u� P•ZiP •11S 9 m c •c �_ _ _ uOw OD ONn Tf_ItA wLfSW�wLj 'v O�n-1 i nTa n=m • 1 I GVWV• 1 1••1 DO^V •+, DfduoDoN.J 1 1 1 .JV •� iN-Ziyr'•,12 7 M•iW-1P.-1•-I C7nr N m Wiu .V N - p• P•IW •i .J •i -Irnr N - W• yy WONOP®DS9-� -N w�Nll u0VO�TDS�y I Z I Zn nN 2 Ey•\ o f nlri] viro•{ --Z1N-Z1n VyN-Zin I m D C- �I W&A y 1 = w -1 V y Nm -Io OW ;a (c�� y .pmro0o ' L L-1 IJd V L Ly #T • *d L LAIN P'^• wOWO Vz W0.0 UOwo O2 xp-IW-IPC O•i U••i .x= X u -IU •-ImC % O nmmNm n PN O O oNm'•Nm O OOTOm• I� 'a u n w n W m n V " 12 WOWO-• -1� uLri4O-_¢ -1rz DOW O -P"'12 z A A m i 2 0 -ID 2 7 -ID v S OiD v O O L L LGDD ti'>4 ro)DOYO D O r.l Jh PO 1 •• JZ 99 .. n a ri• N NL ^!mD .I .z.Iu•aa Niro n mu wNy.' m 9.enn L L y N m V sono ��•z P •ZiG-1 •JC GX �d I•I O OpmDm o u V S T L L aza WOV O�C•i� ^ PHP•iyi �. p o0 L L LGmD-INC aouoDo2�9'Jm P•Z. Z. ZID Zf •• x•1 D rr1 NLw•iND L L O J\ N GOf'>O{nv 9% L -Ci v { rI 1 N ro V 9 V IC•INy•i' ga�nnn DOWy'-xNAZ• n r + z z W D P H W 1 0 O 01M.- 0.— S v + •I r Z Pz ZIMG >� = OyD = p0 L L LwmD HW= L L LNmu-1 _wG D.y V OD.O.PS^ V T �D O •' OD ODSNS •O Z a Z.ZNz • 2 z Zm 2P •1 P^iwti•0-1-�NOrw 9P-iw-1tl-1 •l rNnrP2 NIC1w•iDN ` t� acw-tn� V O:i0 �9PS= uONOD QN 2P2 1 O^ J? P 1 1 J- -11 ZZ nN i y -11N--1 nN • N +l m,UN•1 .-' •I mDn=1N-1v P m P n o w m N n 0 L L-1NNV• 0OW0 .INU zV• D2uj �M� IZIZ nf"� P-iw•iNm X W-Iw-1St X O nNm:Im D O.mwm n u J n W o w W n W m V V J ZZV V V OV.O.D H.r.a jw1wlV -Ir^ PYNiD9 P -ID• Nw x O -I. �•r=i�-�i�+'JI +=i T'�•'f +Ct +Yi ^'�+IT'�+f '=n 9 Trr r��rrr l- rrrr i.Li-Y f.Ai.r Y i.h: i f^W N -V•- N-V•N N-fN N r! s' VWW WWa- NN W!]W� taN Wt: tfWW Z N_t. 'a tJ i.'/1••.�. i• Wil -t• NC V• C7171 4: 4 to :'JN SWC a 1 x s\� a\�1�r7n`►\` x of x x e r i N�```\ ll w ct • I I W fII I A } a I — a Y F r A _ ti 1 w- a � 1 A \ I 1 N A NI (9 L�I�I N ^r� jL � Lt a, i 1 I 11 Nf- O L L LD9N•i 'wQ NDM Vy ao D n a'tpn W P �IV.a•1 IJ •i Hfa'alf W (, P1�-C-t�W•iP D YpNON T.NS\fA] 1 •r 1 in-gi r7'i: J�Y-i cc •N •' m4r14 �~� L Ly�u.nn N:]T• YOWO �ryz o•z•Iu-Z7-fir Iax -I O n N m O m p�WC�r- y?t2 p-ZIJ-1 J5 -X z o~s -o N D N u S N sncs-Im5 t'Jmuo\m 40 N04 mN _V -o 12 1 ZO nIS i JNN-1 N a. •r mPS -1r N w y D O W O~ N w 2 n P-14 ypt 4 % D ooLmxsanm mVV G^ b- "r2 Z 2 O rpt t P y P y W 9 X s o -Is (LDD oC0 D ZOZ Y O D O^ o N C~I P Gl P•i4-ZI .0 y-1 CZ'xr � N rrrr9 .. ``A DWmmtu•fL]itrD YONON9 T 9�fA9 r Z 1 ZZn"nf 7= J•rN-1 N •! m=1mt•Iro yy L, Pnn DO W p'yNy ZV 1 o r 33 Oiu-ZI ldE WX D Cl.f. IImI1 W ffm•11 •V1 nWNVT Y«1.LO.D=-Ni�2 Z 2df7 t P-IN•1 .Im 7C S O -ID i - pp0 L L Lurmw-1WC 'fa Gr Z Z z J>. 7+ tl NCG n VP-Iw-Ira-IHP'fr t� N"!O ' .. n a m pa •c ... L, W i. O �Inm ((,, •ICW yOD GG]il nl ud NUf•Trb.19•\•n a rC 1 1 oH"P S` fn rin•IN "• OrY i• 1 m w C •f w i'' a f> O Pt D 1•ID-1• v m••nn W D-i� WMu�_Iro no 'i• M S! ao1�'tk 1 ori' to z z^ W� .•lames =Z OWb W om nLt ,,77 OGrO--�•y mpD�; yrz�L bADNN/ p -IP •+ym X to •'1m9p S O SII /=•raNA L L L m4-IwLQ rro�no �DOVOD 2-nVS•JO Loco Z0,0 OTN9 wP-IwZ-IN-I-I NC1 .r.PA •ai1�HC•n M D S. PIr 61 PCW•IV� �OAm L Lmx� 3o\a N-1fNnOp- uON0.190T:rOA S<7 ms 1 • O^ OZPS � OSCn p>A y•troy Ow i• S znac M WIw-I C-iw -0 O---0 L xI2 O C L b� Mw V ii hP3`NiG OO 1 7 �•Inw; •j �HN� Pwn1NPmlA frmx -f -i NN � D In�] 'xl N )p I 1 P p� ,gym g„�� x o -Is O N •&.O. 11OD Sw 7•.O ACNE NPIL -2W-Z7'0-ZI•m•1{SfaILZ' •w. OgyW 1'vv -'o rA Iis�l1 P11C�1,D •iPD •-lim 11 .1 •Z -IN ��o ON ' •imid I w 1 N •1 m l IL H N30] N NI`lu y• Lal N m O O n R O m L •1N:J V• i, times '212— nrz s room In ca -I rNL X e! O OPomDmm y=z u D o Z'' p msro .O.b- -rrg^ P-IP-IOm ]C = 0~D /=tl=tto f- 4 � o e O D w 1 N 1 IG. #3 nterior air film 2. Page Two - r VALL sECTi •ONs — Fx,rAFa/O/Z 4401*OMF� G rh1 ASO.-J/—'To. 3'/•iPI NG ) NOTE: Use SM of opaque wall area for 5. • G. erior air film frame construction Construction R -Value u -//R= AWGtW j J GRADE interior air film 0.6$ zo 2. '/Z 1/G K" 8ar�, V .46' 10 3. 9" inc es soft wood moi. 3 5 FIG. #4 Jll '` o 4. Z47 -0g. By/G r01 t ; . OG Q depth and S. MA -50^.1 % Tli ` BASIC 6. Exterior air film = 0.17 6]ATZ Total FIG. #1 TOPVIMI Of FP.AY.E 14ALL 1. Interior air film 0.68 2. Vz o Y✓�' �on�t . 3.�V?,�GLs456 �JPs:z ' 4. 2332 lJwc7�' -,� '• ^.•�� � S. MA •Tr= p,Z�iNG 6. Exterior air film 0.17 FIG. 42 Total y `' • ' 1. Interior air film 0.68 •., .!,r . �_^� 2. AZ1GCs+If r��3Fti 1'J'l1 1NS. II.Oo L 4. ZS/52'0 8u1L•rC111f '•o� ripheral ,•. ; i -� I ----� • 6. Exterior air film 0.17 •.Ails._. -• _ Total- 14.Z4 IG. #3 nterior air film 2. ' 3 . /211 Co" • � �+ • 4. 5. • G. erior air film 0.17 • Total _. u -//R= AWGtW j J GRADE zo 10 ill � = .. ��/ll � �. . • FIG. #4 Jll '` o /� NOTE: Indicate type, "fit" value, depth and placement of insulation. /Z,Ia Page Two ALL SECTIONSJ<,Cos G NOTE: Use► ! of opaque wall area for frame construction Construction *-Value r ' �._.^ 1. Int@rinr air film 0.68 2. Me "4 rI. Arsg= .440 3. 4N inches soft wood ffic 4. Mm's -Poop . r i• t. 40&AAiIC 5. . SG 6. An6ve&w air film f IAororx Ait) V7ALI. Total d.7a 2 FIG. # 1 /L TOPVIETI OF F?.AIM 14ALL 1. Interior air film 0.68 2. o �Aea .X05 i3. �Z" I •Il I oQ • 4. s3 i'7st�r o • . "I ` 5 • �., , 6. ibiteekw air film Aj7,c,c/a f) �:�l+►' , (8 FIG. 42 Total /S•4� r C-77) 4 G) vice •zipheral IRA- .L IG. #3 G 1. 2. 3. 4. S. 6. 1. 2. 3. 4. S. 6. U=%= . 0trW 4th . 04 air film • �J .W.W....r 40 . L.i• SLAB ON GF11DE use SSMz ,SOS. Iz i.• Il /.rte f • 71 FIG. #4 /(l 6 • o /,/ t/ r NOTE: Indicate type, "R" value, denth.and placement of insulation. Page Ti+o 1Mr,%LL SECTIONS it/ AV oVdo gr - OGT' eC'p N C. , NOTE: Use SM of opaque wall area for frame construction Construction R -Value_ interior air film 0.68 3• inches soft wood 4 5. BASIC 6. Exterior air film = 0.17 F HALL Total it FIG. #1 TOPVIEI OP FIRAIM WALL 1. Interior air film 0.68 2. 3. • 4. 6. Exterior air film 0.17 FIG. #2 Total 1. Interior air film �, '• y�i I"'i�1J 2. 3. 4. • `�� 6. Exterior air film 0.17nos r '^r Total O' mo , 1. Interior air film 0.68 AN' =:;IIr;�aTZort '` . �' 3. 4Co N .71 c?r •r',�� 1+ !•i,•'j.• 6. Exterior air film 0.17 �...._i' . •. Total14 �• I ' TF IG. #3 Yv . ' `q _ o 1 GRADE s r L FIG. #4OP lit x tit r NOTE: Indicate type, "R" value, depth and placement of insulation. Page Three ROOT/CEILING • PL,4�✓ ick. Construction R -Values 1: Interior air film 0.61 2• 3. B.2Z Z&pg . ??. 00 4. Exterior. air film (still) 0.61 Total VE i `—U t4D mte,d Meat flow N UP FIG. ;;5 ' Interior air film 0.61 '_M1! .•—f rN..• 7.A�:•i;�'`1: $��/i,C�w_Q.fa{F R..�. ii12�(�/ 2 3. 4. Exterior air film (still) Total Heat flog up ; vented FIG. V 6 4 1. Insa.de air film 0.61 2. 3. 4. •-• 1 5. Outside air film 0 - ' Total • I Z Mote: Use additional sheets if more space is needed for details and calculations. ' Heat ' flow up ' FTG. 47 FrTij SNOW- •ARSON, INC. CONSTRUCTION M A T E R I A L S B612/374-1216 1221 North 2nd Avenue N Mlnneapolle, Minnesota 56408 COST ANALYSIS MASONRY WALL INSULATION Type of Wall No Insulation Korfil Zonolite B -D Fil 8" HWCB 41p/unit Block cost per SF .45 .45 .45 .45 Insulation cost per SF .00 .37 .18 .11 Total material cost per SF .45 .82 .63 .56 U Factor .51 .23 .36 4 8" IWCB 510 unit Block cost per SF .56 .56 .56 .56 Insulation cost per SF .00 .37 .18 .11 Total material cost per SF .56 .93 .74 .67 U Factor .33 .15 .16 .15 12" HWCB 550,/unit Block cost per SF .60 .60 .6060 1`26 Insulation cost per SF .00 .48 44 Total material cost per SF .60 1.08 11.04 86 U Factor .47 .24 "1 .2 .22 12" IWCB 70-01/unit Block cost per SF 77 .77 ,77 .77 Insulation cost per SF .00 .48 .26 Total material cost per SF .77 1.25 ;21 1.03 U Factor .29 .14 .12 .10 Figures based on the following contractor costs: Zonolite 4 cu. ft. bag $2.90 B -D Fil 6 cu. ft. bag $2.6.0 Korfil & Block based on Freidheim figures Add for labor for filling block cores 1 �V A e CITY OF FRIDLEY FINAL INSP. APPROVAL FOR PERMIT MINIMUM FEE FOR ANY HEATING PERMIT IS $7.50 Company Signed By �—f/v/ - l/ k (� Tel. No. APPLICATION FOR POWER PLANTS AND HEATING, COOLING, VENTILATION, REFRIGERATION AND AIR CONDITIONING SYSTEMS AND DEVICES PARTIAL RATE SCHEDULE GRAVITY WARM AIR: RATE TOTAL Job Address Furnace Shell & Duct Work $12.00 $ Replacement of Furnace 7.00 7.00 $ $ Department of Buildings Repairs & Alterations -up to $500.00 4.00 $ City of Fridley Repairs & Alterations each add. $500.00 Tel. #571-3450 MECHANICAL WARM AIR: The undersigned hereby makes application for a permit for the work herein Furnace Shell & Duct Work to 100,000 BTU $12.00 $ specified agreeing to do all work in strict accordance with the City Codes each add. 50,000 BTU 4.00 $ and rulings of the Department of Buildings, and hereby declares that all the Replacement of Furnace 7.00 $ facts and representations stated in this applica true and correct`.) Repairs & Alterations -up to $500.00 7.00 $ �Iare / �J 19 /K3 Repairs & Alterations each add. $500.00 4.00 $dley, Minn. STEAM OR T WAT SYSTEM: OWNER Boiler & Lines up to 100,000 BTU $12.00 $ KIND OF BUILDING each addn. 50,000 BTU 4.00 $ Boiler only up to 100,000 BTU •7.00 $ USED AS each addn. 50,000 BTU 6.00 $ TO BE COMPLETED ABOUT . /i L7 OIL BURNER- to 3 gal. per hour $10.00 $ T` each add. 3 gal. per hour 10.00 $ ESTIMATED COST GAS BURNER- from 100,000 BTU to 199,999 BTU $10.00 $ OLD - W BUILDING PERMIT NO. PERMIT N0. 1�p1 (over 199,999 BTU see Fee Schedule) $ GAS FITTING FEES: lst 3 Fixtures x $ 3.00 $ DESCRIPTION OF FURNACE/BURNER Additional Fixtures x $ 1.00 $ Gas Range to 199,000 BTU x $10.00 $ HEATING or POWER PLANTS, Steam, Hot Water, Warm Air- No. AIR CONDITIONING $ Trade Name Size No. FAN HEATING SYSTEMS ( See Fee Schedule $ VENTILATING SYSTEMS $ Capacity Sq. Ft. EDR BTU HP ALTERATIONS $ REPAIRS_S $ State Surcharge $ .50 Total Connected Load Kind of Fuel TOTAL FEE $ BURNER - Trade Name Size No. ROUGH INSP. REINSPECTION FEE Capacity Sq. Ft. EDR BTU HP Date (_$10.00) FINAL INSP. APPROVAL FOR PERMIT MINIMUM FEE FOR ANY HEATING PERMIT IS $7.50 Company Signed By �—f/v/ - l/ k (� Tel. No. D•36 j HEAT 42 LOSS CALCULATIONS DEPARTMENT OF BUILDINGS FRIDLEY, MINN. Weatherstrips A.S.H.V.E. Guide Reference 19_ Construction No. Coef.1 Btu Insulation WindowsI Doors Yes—No Yes—No Out. Wall Int. Wall Ceiling Roof Floor Kind How Applied -- o Exp. wall Exp. wall I F1.I D ')_ Room I Length Width Height II Fl.l Room I Length Width Height Windows and Doors—Crackage and Area Width Height No. of Lineal f . Area No. of pane of Dane lights of crack sq. ft. Width Height No. of Lineal ft. Area No. of pane of pane llghte of crack eq. ft. 3 to S Coef.1 Bp Coef.1 Btu Infiltration Infiltration `Z c 14C61 Too Glass Glass -- o Exp. wall Exp. wall Net exp. wall Net exp. wall ® Ll Int. wall Int. wall Ceiling Ceiling Floor Floor 1 otal btu. C/ Required sq. ft. E.D.R. or sq. ins. W.A. Leader area / Fl. Room I Length Width Height Windows and Doors--Crackage and Area Width Height No. of Lineal ft. Area No. of Dane of pane lights of crack sq. ft. Width Height No. of Lineal ft. Area No. of pane of pane llghte of crack eq. ft. 3 to S Coef.1 Bp Coef. Btu Infiltration `Z c o OD Glass �p a Exp. wall Ceiling Net exp. wall ® i Floor , �® Int. wall Ceiling qLA Floor 1 otal Utu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area I 1 F1.I 1.1 l/-1 / MP -Room I Length Width Height Windows and Doors—Crackage and Area Width Height No. of Lineal ft. Area No. of Dane of pane lights of crack sq. ft. 80 Z D Coef.1 Bp Infiltration Glass Exp. wall 8 O Net exp. wall Int. wall Ceiling 10 91 i Floor , I btal litu. Z � Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Windows and Doors—Crackage and Area Width Height No. of Lineal ft. Area No. of pane of pane llghte of crack sq. ft. Coef. Btu Infiltration Glass Exp. wal Net ex . wall Int. Il f JL It Ceil' g a Floor Total t' Required s . . E.D.R. or sq. ins. W der area f -- FV Room I Length Width Height Windows and Doors—Crackage and Area Width Height No. of Lineal ft. Area No. of pane of pane lights of crack sq. ft. Coef. Btu Infiltration Glass Exp. wall Net exp. wall Int. wall Ceiling Floor Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Fl.I Room I Length Width Height Windows and Doors—Crackage and Area Width Height No. of Lineal ft. Area No. of pane of pans lights of crack sq. ft. Coef. Btu Infiltration Glass Exp. wall Net exp. wall Int. wall Ceiling Floor i otai rstu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area i Ddb _42 Cb HEAT LOSS CALCULATIONS DEPARTMENT OF BUILDINGS FRIDLEY, MINN. Weatherstrips A.S.H.V.E. Construction No. Insulation Guide WindowsI Doors Reference Out. Wall Int. Wall Ceiling Roof Floor Kind How Applied Yes—No Yes—No 19_ Fl•I I Length Width Height Il 1 FI.I V!tei rOO Room I Length Width Height Windows and Doors—Crackage and Area Width Height No. of Lineal ft. No6 ofp pane of pane lights of crack Width Height No. of Lineal f . Area No. of pane of pane lights of crack sq. ft. l� 2 3 Z Coef. Btu Infiltration Coef. I Bgtr ® A Infiltration Infiltration Coef. p 0 Glass 1 too Glass Exp. wall Glass Exp. wall _ (o e n x-0 Exp. wall Net exp. wall Z Z -h*r wall Int. wall s+g S Ceiling Floor �® l Floor Iota, Utu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area FI.I �. Length Width Windows a Doors--Crackage and Area Width Height No. of Lineal ft. Area No. of pane of Dane ilghts of crack sq. ft. Coef. I Btu Infiltration 1 0 Glass Exp. wall Net exp. wall wall9 2 - Ceiling Floor Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Fl -1 I Length Width Height Windows kind Doors—Crackage and Area Width Height No. of Lineal ft. No6 ofp pane of pane lights of crack Area sq. ft. l� 2 3 Z Coef. Btu Infiltration O 0 Coef. Btu Infiltration Coef. p Infiltration �® 1 too Glass Exp. wall Glass 1.- 40 orb n x-0 Exp. wall Net exp. wall Int. wall Int. wall Ceiling Ceiling �® l Floor Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Windows and Doors—Crackage and Area Width Height No. of Lineal ft. Area No. of pane of pane lights of crack sq. ft. Width Height No. of Lineal ft. Area No. of pane of pane lights of crack sq.ft. ® Nd Coef. Btu Infiltration O 0 Coef. Btu Infiltration Int. wall '90 1 too Glass Exp. wall Floor 1.- 40 orb n x-0 Net exp. wall Z Int. wall Ceiling Floor Total Btu. 1 3 ' I -L., Required sq. ft. E.D.R. or sq. ins. W.A. Leader area I Fl.l AA c? A Room I Length Width Height Windows and Doors—Crackage and Area Width Height No. of Lineal ft. Area No. of pane of pane lights of crack sq. ft. 9 Coef. Btu Infiltration O 0 Glass Exp. wall n) Net exp. wall Int. wall Ceiling ® (� Floor Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Fl.1 /101 P a I Room I Length IWidth Height Windows and Doors--Crackage and Area Width I Height No. of Lineal ft. Area No. of pane of pane lights of crack sq. ft. Coef-I Btu Infiltration 4agoo Glass Exp. wall 90 Net exp. wall Int. wall Ceiling Floor Total Btu. Required sq. ft. E.D.R. or sq. ins. WA. Leader area CIlL', C• �:IGicy e - - - ,�� tit d lttr�'L::..Sg c:•� ,r .ic5 bt.,al'J n c::e:'iS Dogt. of Bldg. Phono 5.J-3450 ' 'C /L DzScPIPT:O:t O:' V: OM. Kid a^.d L--.r_icn of Fixtures v � .. � � N I •� I 10 �� 1 v _ C 0 � . x -S2.0-3.J N GAS Mc. FJtu:e F•xture Oporling ........... . x SI -50 $ , -• -- - By L� '—A S!r New Fix:L:e Olci 0pe'r1rng• • . • • • • • • x S' c4 . _ j.+ d____.__. C ` Cacti Basin .................... _ x 53.25 I 'up 993.004 x S300 S •' ' atcr Heater to BTU).... rt ROUGH " a G: ound Run Old Bldg.:..:. , .. x $3. 2 5 S .. . V.'a:a- I:eIS'..al. :............s S2.00 Z 7 . . • .e O. IZta.0 TOT AL 4TT_�,-_ • Ist 3 Fixtures .................. _ - AddfL�;nal Fixtum ............... e' x ,► .75 S ' Gra Ra to 23.003 B i v ........... x 55.00 a - .50 State SL'=c?'�."ge ALT£QATIOY.s—?e:ez to Codd ~• � `t 1 I � I � 1 � • ..... • . • ....... s Fr.: E SJ � I Old PARTIAL IAL RAT S IHIEDULE Scw�x ;�cr-.fool city of Fridley:. The undersie;r:cd hereby rn2kes SP',Uca::on for a y:r:^it fl-." th–, ssc:l: here specified, t..) do r'1 %vo k in s:::ct 2cco7dZrce wl:h :':e Cit? c -ml : and n:'ing of the T3•:.,)ar rncnt of Buil:''ri^, and hereby declarm t2hat a:I t_*.e fat and rep:ese-. alio^.s s:atm in lhs app:ica.:on s:e tr;e zrd co::eC,' ' Owner Kind of Used as Z To be completed about EsUm,ated Cost. 5� a, c Paz-ito. rMM•� I alJ ^ FIXTUi:E RATES: L.•i�. J NO. RATE TOTAL .� . x -S2.0-3.J •WT r1AT r 1x:u res • R a • • • ... • • • • • • ..R FJtu:e F•xture Oporling ........... . x SI -50 $ , -• -- - By L� '—A Busir.�Ks New Fix:L:e Olci 0pe'r1rng• • . • • • • • • x S' c4 . _ j.+ d____.__. Cacti Basin .................... _ x 53.25 'up 993.004 x S300 S •' ' atcr Heater to BTU).... ROUGH " a G: ound Run Old Bldg.:..:. , .. x $3. 2 5 S .. . V.'a:a- I:eIS'..al. :............s S2.00 Z 7 . . • .e O. IZta.0 TOT AL x $'--.00 v • Ist 3 Fixtures .................. _ - AddfL�;nal Fixtum ............... e' x ,► .75 S ' Gra Ra to 23.003 B i v ........... x 55.00 a - .50 State SL'=c?'�."ge ALT£QATIOY.s—?e:ez to Codd • .S •♦,e A:i�erC:1 • ... • • ......... 4 ..... • ..... • . • ....... s Fr.: E SJ . TOTA.Y . p -- 560.3450 Cit of yrictle 'y ANOKA COUNTY 6431 UNIVERSITY AVENUE NE December 13, 1976 FRIDLEY, MINNESOTA 55432 Mr. Roger Vesall 1309 - 53rd Avenue N.E. Fridley, Mn. 55421 Re: Final Inspection at 1309 - 53rd Avenue N.E. Dear Mr. Vesall: A final inspection was made on December 13, 1976 of 1309 - 53rd Avenue N.E. and the following items were noted which must be completed before the structure can be finaled out; I. rJ 1. Install door closer to garage by January 12, 1977.L~u' 2. Install sod in the front and side yards by June 18, 1977. 3. Provide 3:1 slope in side yard or adequate retaining wall by June 18, 1977. We will expect the above items to be completed by the noted dates when reinspections will be conducted to determine compliance. If you have any questions on these items, please contact me at 571-3450. Sincere , RONALD HOLDEN Building Inspection Officer REH/mh i ?- 6431 UNIVERSITY AVENUE N.E., FRIDLEY., MINNESOTA 55432 W. Roger Vesalle 23245 Lafton Court No. May 3rd, 1976 '000ei Skandia, ivo Lot 6, Block ;, Vesalle: TELEPHONE ( 612)571-3450 Hutberg Addition (1309 -53rd Aveniu) Recently, our department sent out notices requesting the property owners to respond regarding their desires for sewer and water services to prop- erties abutting 1976 street improvement and maintenance projects. Our records indicated that this lot was under the ownership of Mr. Paul Johnson of Minneapolis, Minnesota. On Thursday, April 29th, 1976, you obtained a building permit for the above referenced lot and indicated that you were the owner of said lot. This leads us to believe that our notice was sent to the wrong party. Conse- quently, I am forwarding a copy of the notice sent to Mr. Paul Johnson with the request that you respond to or contact Our Engineering Department by May 7th, 1976 if at all possible. Should you elect to install your own services at this time, we will require that all work within the street right-of-way be completed by the first part of June. Our street overlay project is scheduled for the latter part of June and once this takes place, no construction within the road surface will be al- lowed. Should you prefer to have city forces do the above mentioned work, we will schedule it appropriately. If you have any questions or concerns, please contact me. Sincerely, Thomas A. Colbert ! Assistant City Engineer TAC/grs Enclosure cc:DarresslCf� allark, Community Development Administrator rnantargrL-� rrrcr�.smw� a..o.w.+sn.rA�rrwp.erAs� UBURBAN NOINEERINGi Main Office 57 -6066 6875 Highway No. 65 N. E. Minneapolis, Minnesota 55432 South Office 890-6510 I Li Civil, Municipal & Environmental Engineering 01101 Cliff Road Land Surveying • Land Planning • Soil Testing IF] I Burnsville, Minnesota 55337. L. H. Huot 7723 Groveland Road NE Minneapolis, Minnesota 55432 Dear Mr. Huot: May 10, 1976 Re: Foundation Fill 1309 — 53rd Ave. NE Fridley, Minnesota, At your request we examined the inplace fill on the above lot on May 3, 1976. Two hand auger holes were placed to a depth of 5' below the footing grade which was cut out. No evidence of organic soil was noted. The soil in the northeast corner was a sandy clay which appeared to be natural. The northwest corner was sand fill except the last few inches. The Contractor stated that all old fill and topsoil had been removed 4=5' out- side the footing lines. Two densities were taken, and ranged from 86% to 89% of modified Proctor density. On May 4, we met on the lot, and after reviewing the size of the excavation, and the adjoining property, we recommended that the foundation areas be further compacted with a vibratory type of compactor using 3 or 4 passes prior to pouring the footings. We also recommended using two #4 bars in the footings. Please call if you have any questions. WKM/jp cc: City of Fridley Sincerely, SUBURBAN.ENGINEERING, INC. William K. Meyer, P.E. ft linhrrt dlindrr, lteg. Eng. E. A. Rathbun, Reg. Suru. Wm. E. Price, Reg. Eng. Gary It. Harris, Reg. Sam. Wm. E. 4ensen. Reg. Eng. Wm. K. Meyer, Reg. Eng. H. William Rogers, Reg. Suru. e SUBJECT P City of Fridley 2 3 3595 ' AT THE TOP OF THE TWINS BUILDING PERMIT r RECEIPT NO. • COMMUNITY DEVELOPMENT DIV r � PROTECTIVE INSPECTION SEC � CITY HALL FRIDLEY 55432 NUMBER REV DATE POF AGE APPROVED BY 612-571-3450 910-F15 8/2/95 / / JOB ADDRESS 1309 53 Avenue NE 1 LEGAL LOT NO. BLOCK TRACT OR ADDITION SEE ATTACHED DESCR. 6 1 Hut -Berg Addition SHEET 2 PROPERTY OWNER MAIL ADDRESS ZIP PHONE John Kelzenberg 1309 53 Avenue NE 574-9406 3 CONTRACTOR MAIL ADDRESS ZIP PHONE LICENSE NO. Owner 4 ARCHITECT OR DESIGNER MAIL ADDRESS ZIP PHONE LICENSE NO 5 ENGINEER MAIL ADDRESS ZIP PHONE LICENSE NO 6 USE OF BUILDING Residential 7 CLASS OF WORK ❑ NEW ❑ ADDITION ❑ ALTERATION J] REPAIR ❑ MOVE O REMOVE 8 DESCRIBE WORK Reroof House (23 Sq) Tear -off 9 CHANGE OF USE FROM TO STIPULATIONS Underlayment must comply with the State Building Code. TYPE OF CONST. OCCUPANCY GROUP OCCUPANCYLOAD SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION ZONING SQ. FT. CU. FT. AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED NO. DWLG. UNITS OFFSTREET PARKING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION I ISTALLS GARAGES AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS VALUATION SURTAX AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT $1,840 .92 DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PERMIT FEE SAC CHARGE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR THE PERFORMANCE OF CONSTRUCTION $59.50 Fire SC $1.84 PLAN CHECK FEE TOTAL FEE 62.26 sIG ATUREOFCONTRACTORORAUTHO IZEDAGENT IDATEI WHEN PROPERLY ALIDATED THIS IS YOUR PERMIT y - a - -K L, �� - BLDG NSP BATE SIGNATURE( IF N RBUILD I IDATEI e NEW (] ADDN [] ALTER [] Construction Address: Legal Description: CITY OF FRIDLEY SINGLE FAMILY AND DUPLEXES R-1 AND R-2 Building Permit Application Owner Name & Address: �o Contractor: -1P_T' Z-e- Effective 8/1/95 Tel. # 1 _9 q U o MN LICENSE # Address: i- C Q1- 3 2A �Tel. # Attach to this application, a Certificate of Survey of the lot, with the proposed construction drawn on it to scale. LIVING AREA: GARAGE AREA: DECK AREA: OTHER: DESCRIPTION OF IMPROVEMENT Length Length Length i- -e - r-c.)b Width Height Sq. Ft. Width Height Sq. Ft. _ Width Hgt/Ground Sq. Ft. Corner Lot [ ] Inside Lot %1 Ft. Yd Setback Side Yard Setbacks Type of Construction: G` C�� Estimated Cost: $ i �� 0 � , l� q® _ Approx. Completion Date: _ G� (Cost on Back) Driveway Curb Cut Width Needed: Ft. + 6 Ft = Ft x $ _ $ DATE: �S _a Sf APPLICANT: Tel. # CITY USE ONLY Permit Fee $ 9, Fee Schedule on Reverse Side Fire Surcharge $ �c� 1 .001 of Permit Valuation (1/10th%) State Surcharge $ a $.50/$1,000 Valuation SAC Charge $ — $850 per SAC Unit License Surcharge $ $5.00 (State Licensed Residential Contractors) Driveway Escrow. $ Alt. "A" or Alt. "B" Above Erosion Control $ $450.00 Conservation Plan Review Park Fee $ Fee Determined by Engineering Sewer Main Charge $ Agreement Necessary [) Not Necessary TOTAL STIPULATIONS: Building BUILDING Permit No.:a- Inspections RESIDENTIAL APPLICATION R 763-572-3604 V'd: CITY OF FRIDLEY Date ec 763-502-4977 FAX EFFECTIVE 1-1-09 - 7 c, DATE / - ��r d 1 YOUR E-MAIL ADDRESS SITE ADDRESS 136q Sal ✓ ` C . THIS APPLICANT IS: ❑ OWNER )!(CONTRACTOR PROPERTY OWNER/ NAME: 0 N YU Z ?-6"-VS x,26 TENANT ADDRESS: / 3 017 S 3 1401, Al' i- CITY /; pit L" STATEJ"l °J ZIP PHONE: 763- 5W-71/06 CONTRACTOR NAME: NOYC S'k 0--c. C. —rT . SUBMIT A COPY OF YOUR STATE LICENSE STATE LICENSE # `7 33 3 EXP DATE AND CERTIFICATE OF �p ADDRESS: 3 6 Z �l Z L r.✓ £ ` CITY � UAi'wF STATL"1- ,L/ S�� INSURANCE PHONE 3-9 96 (rf fO FAX PROPERTY TYPE ❑ SINGLE FAMILY/NEW CONSTRUCTION SIZE ❑ TWO FAMILY/NEW CONSTRUCTION STORIES PERMIT TYPE ❑ ADDITION ❑ GARAGE/SHED ❑ WINDOWS ❑ BASEMENT FINISH ❑ ROOF ❑ DRAIN TILE ❑ DECK ❑ SIDING OTHER ❑ SWIMMING POOL TYPE OF WORK: ❑ NEW HOME CONSTRUCTION ❑ ADDITION ❑ MAINTENANCE/REPAIR 17 REMODELING DESCRIBE WORK BEING DONE: F2 011-1 f� SIZE OF IMPROVEMENT LENGTH WIDTH HEIGHT S/� SQ FT Z S ROOFING ❑ HOUSE ONLY BASEMENT REMODELING SUBMIT: NUMBER OF SQUARES ❑ HOUSE & GARAGE 1. Existing Floor Plan GARAGES ❑ ATTACHED GARAGE 2. Proposed floor plan PROPOSED SIZE: ❑ DETACHED GARAGE 3. List of structural members to be used PROPOSED HEIGHT: SIDING FOR NEW CONSTRUCTION INCLUDING DECKS, ❑ Vinyl []Soffit ADDITIONS. & PORCHES SUBMIT: ❑ Aluminum ❑ Trim I . Site Plan/Survey showing the existing structures ❑ Other ❑ Fascia and proposed project. 2. Two sets of construction plans WINDOWS 3. Energy Calculations IN EXISTING OPENINGS ❑Yes []No LOCATION OF WINDOWS OR FOR NEW OPENINGS -DESCRIBE SIZE OF OPENING CHANGES & . TYPE OF. WINDOW TO BE INSTALLED NUMBER OF WINDOWS ALL FEES ARE BASED ON VALUATION, INCLUDING THE COST OF LABOR AND MATERIALS: (USING THE 1997 U.B.0 FEE SCHEDULE) TOTAL JOB VALUATION $ /,RC�6 CEJ OCCUPANCY TYPE Permit Fee $ ` 4, 5 See Back Page for Fee Schedule Plan Review $ 1,2,0 65% of Building Permit Fee Fire Surcharge $ `� .001 times the total job valuation Surcharge $ .0005 x Permit Valuation Minimum $.50 License Surcharge $ $5.00 (State Licensed Residential Contractors) SAC Charge $ $2000 per SAC Unit (Plans to MWCC for determination) Curb Cut Escrow $ ft + 6 ft = ft x $22 = $ Erosion Control $ $450 Conservation Plan Review Park Fee $ Fee Determined by Engineering Sewer Main Charge $ Agreement necessary ( ) Non Necessary ( ) Total Due $ 14 to, 5 Make checks savable to: Citv of Fridlev Attach Stipulations THIS IS AN APPLICATION FOR A PERMIT -NOT VALID UNTIL PROCESSED I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Fridley and with the Minnesota Construction Codes; that I understand this is not a permit but only an application for a permit and work is not to start without a pe �t on si , that the work will be in accordance with the approved plan in the case of a ork which^r�equires review and approval of SIGNATURE OF APPLICANT ��`� !/ a{�i -yak PRINT NAM DATE Page 2 - Building Residential Application BUILDING PERMIT FEE SCHEDULE The Chief Building Official shall, before issuing permits for the erection of any building or structure, or for any addition to any existing building or structure, or for any alteration or repair to any existing building or structure, upon application therefore, require the payment by the applicant for such permit of fees to the amount herein below set forth and in the manner herein provided to -wit: TOTAL VALUE FEES $1 to $500 $23.50 (Minimum Fee is $23.50 plus surcharge) $501 to $2,000 $23,50 for 1' $500 plus $3.05 for each additional $100 or fraction, to and including $2,000 $2,001 to $25,000 $69.25 for 1" $2,000 plus $14 for each additional $1,000 or fraction, to and including $$25,000 $25,001 to $50,000 $391.25 for ls` $25,000 plus $10.10 for each additional $1,000 or fraction, to and including $50,000 $50,001 to $100,000 $643.75 for 1" $50,000 plus $7 for each additional $1,000 or fraction to and including $100,000 $100,001 to $500,000 $993.75 for ls` $100,000 plus $5.60 for each additional $1,000 or fraction to and including $500,000 $500,001 to $1,000,000 $3,233.75 for the ls` $500,000 plus $4.75 for each additional $1,000 or fraction to and including $1,000,000 $1,000,001 and up $5,608.75 for the I" $1,000,000 plus $3.15 for each additional $1,000 or fraction VERIFICATION OF FOUNDATION Permits for construction will be issued a minimum of 24 hours from the time of application to allow for proper review of proposed structure and of the construction site. A Certificate of Survey of the lot, showing the location of the existing foundation will be required before proceeding with the framing. New Houses Only City of Fridley Building Inspections Department 6431 University Avenue NE Fridley, MN 55432 763-572-3604 Fax: 763-502-4977 THIS JOB COPY SHALL BE AVAILABLE ON THE JOB SITE FOR THE FRAMING AND FINAL INSPECTIONS C44(( --�oa