PLA packet 12/21/2016
CITY OF FRIDLEY
A G E N D A
PLANNING COMMISSION MEETING WEDNESDAY, DECEMBER 21, 2016 7:00 P.M.
======================================================================
LOCATION: COUNCIL CHAMBERS
FRIDLEY MUNICIPAL CENTER, 6431 UNIVERSITY AVENUE NE
CALL TO ORDER:
ROLL CALL:
APPROVE PLANNING COMMISSION MEETING MINUTES: October 19, 2016
PUBLIC HEARING:
1.
Consideration of adopting an updated Water Supply Management Plan for the City of Fridley
for the purpose of meeting state and regional long-range planning requirements for the City’s
water supply.
2. RECEIVE THE MINUTES OF THE OCTOBER 3, 2016, PARKS & RECREATION
COMMISSION MEETING.
3. RECEIVE THE MINUTES OF THE NOVEMBER 7, 2016, PARKS & RECREATION
COMMISSION MEETING.
4. RECEIVE THE MINUTES OF THE OCTOBER 11, 2016, ENVIRONMENTAL QUALITY AND
ENERGY COMMISSION MEETING.
5. RECEIVE THE MINUTES OF THE NOVEMBER 15, 2016, ENVIRONMENTAL QUALITY AND
ENERGY COMMISSION MEETING.
6. RECEIVE THE MINUTES OF THE OCTOBER 6, 2016, HOUSING AND REDEVELOPMENT
AUTHORITY MEETING.
7. RECEIVE THE MINUTES OF THE NOVEMBER 3, 2016, HOUSING AND
REDEVELOPMENT AUTHORITY MEETING.
OTHER BUSINESS:
ADJOURN
PLANNING COMMISSION MEETING
October 19, 2016
Chairperson Kondrick
called the Planning Commission Meeting to order at 7:00 p.m.
MEMBERS PRESENT:
David Kondrick, Brad Sielaff, David Ostwald, Leroy Oquist, and Mark
Hansen
MEMBER ABSENT:
Mark Heintz
OTHERS PRESENT:
Stacy Stromberg, Planner
Scott Hickok, Community Development Director
ThomasGregersen,USAgain
Approval of Minutes:
September 21, 2016
MOTION
by Commissioner Sielaff to approve the minutes as presented. Seconded by Commissioner
Hansen.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY.
1. PUBLIC HEARING:
Consideration of a Special Use Permit, SP #16-06, by USAgain, to allow limited outdoor
storage along the west side of the property, generally located at 191 Osborne Road.
MOTION
by Commissioner Oquist to open the public hearing. Seconded by Commissioner Sielaff.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS OPENED AT 7:01
P.M.
Stacy Stromberg
, City Planner, stated the petitioner, Joseph Labraco, CFO for USAgain, is proposing to
lease building space from Osborne Commerce Center, LLP which is the owner of the property at 191
Osborne Road. As part of that lease the petitioner is seeking a special use permit to allow limited
outdoor storage within one designated area on the west side of the property.
Ms. Stromberg
stated the petitioner would like to store the collection bins used for their business within
a 40-foot by 50-foot area, along the western edge of the existing parking lot.
Ms. Stromberg
stated the property is zoned M-2, Heavy Industrial as are the properties to the west and
south. The property to the north is zoned S-3, Heavy Industrial Onaway Addition; and the two properties
to the east are zoned C-2, General Business and M-1, Light Industrial. It is located on northwest corner
of Main Street and Osborne Road. The property was replatted in 1997, as was the property to the west at
101 Osborne Road. The existing building was constructed in 1996. The shell of the building has
remained the same over the years, though several interior modifications have been made for different
tenant spaces.
Ms. Stromberg
stated City Code allows limited outdoor storage in the industrial districts that is up to 50
percent of the building footprint with a special use permit. This building is 101,600 square feet, so City
Planning Commission Meeting
October 19, 2016
Page 2 of 10
code would allow up to 50,800 square feet of outdoor storage on this site. The petitioner plans to lease
approximately 12,000 square feet of space within the inside of the building. As part of his business, the
petitioner needs the ability to store empty collection bins that are being staged for repair/clean-up and
deployment back into the field. The proposed outdoor storage area for the collection bins will be along
the western edge of the parking lot, where there is existing trailer parking spaces. The size of the area is
40 feet by 50 feet, or 2,000 square feet, which is well below the allowable outdoor storage area for this
property.
Ms. Stromberg
stated before the proposed special use permit can be issued, several additional
requirements need to be met. Those specific requirements relate to height, screening, parking, and the
types of materials allowed to be stored outside.
Ms. Stromberg
stated based on the calculations provided to the City by the property owner on how the
interior space of the building is used, City code would require 103 parking stalls for this site. There are
123 parking stalls on site and 27 trailer parking spots. Of those trailer parking spots, 5 will be used for
the proposed storage area.
Ms. Stromberg
stated the petitioner plans to fence in the outdoor storage area with a chain-link fence that
will have screening slats in it, which will comply with Code requirements. All other Code requirements
to allow a special use permit for limited outdoor storage are being met.
Ms. Stromberg
stated City staff has not heard from any neighboring property owners.
Ms. Stromberg
stated City Staff recommends approval of this special use permit, with stipulations as
limited outdoor storage is a permitted special use in the M-2, Heavy Industrial zoning district, provided
specific Code requirements are met, subject to stipulations.
Ms. Stromberg
stated staff recommends that if the special use permit is granted, the following
stipulations be attached:
1.Outdoor storage area shall be limited to the square footage amount requested as part of
this special use permit request.
2.Screening fence shall be installed within 60 days of tenant occupying the site.
3.The types of materials stored inside of the containers shall be reviewed by the Fire
Marshal.
4.Per Section 205 of the Fridley City Code, this Special Use Permit will become null and
void one year after the City Council approval date if work has not commenced or if the
Petitioner has not petitioned the City Council for an extension.
Chairperson Kondrick
asked whether there could be one to five companies using the storage space as a
place to store things?
Ms. Stromberg
stated it is the intention of the petitioner that this one business uses the area for the
outdoor storage.
Commissioner Oquist
asked Ms. Stromberg whether the City reviews the slat fencing. So often you see
the slats deteriorating or falling apart.
Planning Commission Meeting
October 19, 2016
Page 3 of 10
Ms. Stromberg
replied, yes, they do. Every year staff likes to go through all the special use permits they
have issued to make sure the people are still in compliance with their stipulations. If it gets to a point
where the slats need to be replaced, staff would notify them.
Chairperson Kondrick
stated this is so close to a very important roadway and area and people can see
that. He asked the representative from USAgain if he had anything to add?
Thomas Gregersen,
USAgain, states he lives in Chicago. There is no intent to store anything inside the
storage bins.
Chairperson Kondrick
stated to Mr. Gregersen the City is interested as to what is being stored inside the
containers and that is why one of the stipulations states that. The City would like to ensure there is no
trouble with what is inside the storage containers and that they would not start any fires.
Commissioner Hansen
asked Mr. Gregersen how long would the containers would be stacked/stored in
this location?
Mr. Gregersen
replied, the bins are rotated. They get fixed in the warehouse and then stored before
replacing more bins to be brought in for repair, etc.
Chairperson Kondrick
asked whether they had any problems with the stipulations?
Mr. Gregersen
replied, no, they expected those.
Chairperson Kondrick
asked, and they are in agreement, correct?
Mr. Gregersen
replied, yes.
MOTION
by Commissioner Sielaff to close the public hearing. Seconded by Commissioner Hansen.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS CLOSED AT 7:10
P.M.
MOTION
by Commissioner Oquist approving Special Use Permit, SP #16-06, by USAgain, to allow
limited outdoor storage along the west side of the property, generally located at 191 Osborne Road with
the following stipulations:
1.Outdoor storage area shall be limited to the square footage amount requested as part of this
special use permit request.
2.Screening fence shall be installed within 60 days of tenant occupying the site.
3.The types of materials stored inside of the containers shall be reviewed by the Fire Marshal.
4.Per Section 205 of the Fridley City Code, this Special Use Permit will become null and void
one year after the City Council approval date if work has not commenced or if the Petitioner
has not petitioned the City Council for an extension.
Seconded by Commissioner Sielaff.
Planning Commission Meeting
October 19, 2016
Page 4 of 10
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY
2. PUBLIC HEARING:
Consideration of a Vacation, SAV # 16-01, by Fridley Land LLC, to vacate a portion of
Northern Stacks Drive to adjust the street right-of-way to match the updated development
plan. They are also requesting that some drainage and utility easements be vacated, as new
rd
ones will be re-dedicated upon final plat approval of North Stacks 3 Addition, generally
located at 41 Northern Stacks Drive NE.
MOTION
by Commissioner Oquist to open the public hearing. Seconded by Commissioner Ostwald.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS OPENED AT 7:12
P.M.
Ms. Stromberg
stated Paul Hyde, of Fridley Land LLC is requesting to vacate a portion of Northern
Stacks Drive to adjust the street right-of-way to match the updated development plan for property
generally located at 41 Northern Stacks Drive.
Ms. Stromberg
stated the request will also vacate some drainage and utility easements on Lot 1, Block 1,
nd
Northern Stacks and Lot 3, Block 1, Northern Stacks 2 Addition, as new easements will be re-dedicated
rd
upon final plat of Northern Stacks 3 Addition.
Ms. Stromberg
presented an illustration showing the areas which are to be vacated.
Ms. Stromberg
stated these parcels are part of the larger parcel that was addressed as 4800 East River
Road, which was known as the BAE/FMC/Navy site and is now being called Northern Stacks. This
larger parcel of land was rezoned from M-2, Heavy Industrial to S-2, Redevelopment District in 2013 to
allow redevelopment of the property.
Ms. Stromberg
stated a master plan was approved with the rezoning that establishes guidelines that
dictate what type of development can occur on the site.
Ms. Stromberg
stated the proposed vacation request meets the intent of the master plan that was
approved with the S-2 rezoning for this property.
Ms. Stromberg
stated the Northern Stacks Drive cul-de-sac is being extended further to the east, which
rd
will provide access to the newly created lots that are part of the Northern Stacks 3 Addition. As a
nd
result, the portion of the cul-de-sac that extends into Lot 3 within Northern Stacks 2 Addition needs to
be vacated.
Ms. Stromberg
stated the petitioner is also asking that the existing drainage and utility easements on Lot
nd
1, Block 1, Northern Stacks and Lot 3, Block 1, Northern Stacks 2 Addition, as new easements will be
rd
re-dedicated upon final plat of Northern Stacks 3 Addition.
Ms. Stromberg
stated City staff recommends approval of the street and easement vacations.
Planning Commission Meeting
October 19, 2016
Page 5 of 10
Chairperson Kondrick
stated he drove by the area today and the development process taking place there
is really something. What was and is now is just amazing. He would assume if City staff and the
petitioner are going to go along with this idea, he thinks they should, too. He cannot find any fault with
it.
Commissioner Sielaff
asked whether this will be resolved through the development plan?
Ms. Stromberg
replied, it will be resolved when the third addition is platted. That preliminary plat was
before them earlier this year and approved. It is at the County now for their approval, and then it will
come back to City Council for final plat approval.
Chairperson Kondrick
asked whether the County has had any reservations or said anything about the
plat and what is going on here?
Ms. Stromberg
asked, as far as the platting process?
Chairperson Kondrick
replied, yes.
Ms. Stromberg
stated, no. Everything has gone rather smoothly. The second building is fully leased,
and they are constructing the third building now. Things have been moving right along.
MOTION
by Commissioner Sielaff to close the public hearing. Seconded by Commissioner Oquist.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS CLOSED AT 7:18
P.M.
Chairperson Kondrick
stated he has no problem with this. It is pretty straightforward and pretty simple.
MOTION
by Commissioner Sielaff approving Vacation, SAV # 16-01, by Fridley Land LLC, to vacate a
portion of Northern Stacks Drive to adjust the street right-of-way to match the updated development plan
along with some drainage and utility easements be vacated, as new ones will be re-dedicated upon final
rd
plat approval of North Stacks 3 Addition, generally located at 41 Northern Stacks Drive NE. Seconded
by Commissioner Oquist.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY.
3. PUBLIC HEARING:
Consideration of a Text Amendment, TA #16-04, by the City of Fridley, to Chapter 0-5,
Telecommunications Towers and Facilities, to add language within the Code that defines
and regulates “small cell” communication facilities within the public right-of-way. Other
general housekeeping items will also be addressed in the text amendment.
MOTION
by Commissioner Oquist to open the public hearing. Seconded by Commissioner Hansen.
Planning Commission Meeting
October 19, 2016
Page 6 of 10
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS OPENED AT 7:20
P.M.
Ms. Stromberg
stated technology is continually changing. It requires updates and changes to the City's
telecom code and the facilities and equipment that service it. As of late the City has received a couple of
requests from a company that is interested in installing smaller telecommunications equipment within the
public right-of-way. The City's current Code does not allow this type of equipment in the public right-of-
way. Therefore, it prohibits it and the City has had to explain to the company they cannot allow it at this
time because its Code does not allow it.
Ms. Stromberg
stated in December 2015 City staff asked the Council to establish a moratorium so staff
would have some time to conduct some research and find out what other communities are doing in
relationship to this new technology. City Council did approve and staff has prepared the text amendment
language in the Commission's packet for their review and approval. The new language addresses DAS
(or small cell as it is also called in the industry) in the right-of-way.
Ms. Stromberg
stated the City attorney and staff have consulted with the League of Minnesota Cities and
other cities in the metro regarding this new technology. Through those consultations and discussions with
the City's public works director, staff has drafted this text amendment that will allow this new technology
in the public right-of-way provided specific standards can be met.
Ms. Stromberg
stated one of the standards they have placed within the Code would be that the new
equipment needs to be attached to an existing structure that is already in the public right-of-way. The
new standards will also limit the size or the new equipment; and the DAS user does need to get approval
from the owner of the existing structure, whether it is a pole from Xcel or a light pole the City
owns. They will also need to get approval MnDOT if it is in the MnDOT right-of-way or the City if in
the City's right-of-way or the County if it is in Anoka County's right-of-way. Those are just a couple of
the standards that staff has placed within the Code.
Ms. Stromberg
presented a couple of pictures of what this technology could look like on an existing light
pole. The text amendment will allow this technology through issuance of a right-of-way permit which is
handled through the City's engineering department and/or a building permit if a building permit is
required for the structure.
Ms. Stromberg
stated the illustration shows how the small technology works with the larger tower. They
work together in areas where there is a high coverage need, i.e., a shopping mall, baseball stadium,
hospital, high traffic intersections where people are stopped. Those are where these small cell
technologies want to be located because there is a higher demand for them.
Ms. Stromberg
stated wherever there is poor cell coverage; it is communication between the larger tower
and the smaller tower working together to provide the coverage that the users need.
Commissioner Oquist
stated the small cell enhances the signal from the large one. It is not a stand
alone. It has to work in conjunction with the large one.
Ms. Stromberg
replied, yes.
Planning Commission Meeting
October 19, 2016
Page 7 of 10
Ms. Stromberg
stated she will be going through the code highlighting the changes. There is reference to
small cell technology in the Purpose and Intent section of the Code. That is the first part of the text
amendment. They then modified a couple of the definitions, specifically the applicant definition and the
public utility structure definition. Then they added two definitions, the DAS definition and
telecommunications right-of-way user definition.
Ms. Stromberg
stated as to the meat of the new language is the added DAS performance standards, she is
not going to go through all of them but just picked a few of them she thought maybe would be of interest
to the Commission and the public. Again, in order for them to be located in the right-of-way they need to
be on an existing structure; and that does not include stoplights. The City's engineering department has
stated they do not want them on stoplights. Light poles or any other type of a pole the City has within the
public right-of-way is an option but not the signalized stop light.
Chairperson Kondrick
stated, for example, on Mississippi and University they could not come in and
construct a new pole.
Ms. Stromberg
replied, only if it’s on an existing structure.
Commissioner Hansen
asked, how does it apply to private property?
Ms. Stromberg
replied, they are not addressing private parties with this text amendment. That is
something staff would like to dive into a little bit further. However, the requests they have had have been
specific to the public right-of-way and is why they are addressing that right now. They do allow the large
tower sites on private property, and the City has a list of established sites. However, they have not
developed a small cell criteria for private property yet.
Ms. Stromberg
stated another one of the other performance standards is to ensure it does not interfere
with public safety communications. It will require license from the City if it is a City-owned
structure. The new equipment should match the existing pole or existing equipment as much as
possible. They are also limiting the size of the structure and then how far it can protrude out from the
existing pole. They are requiring that the applicant be a telecom right-of-way user, and that they get all
applicable permits from any government agencies they might need. For example, if they are in the
MnDOT right-of-way, they need to have MnDOT approval.
Chairperson Kondrick
asked whether staff has taken into consideration this may affect the police and
fire communications.
Ms. Stromberg
replied, she is not a technical expert but she does believe there are different frequencies
in which they operate on from the Police and Fire department frequencies.
Scott Hickok,
Community Development Director, stated that is exactly right. There are bandwidths they
travel in. There is an emergency service system of its own that travels at a certain megahertz. That, too,
is a permitted use of the public right-of-way now as an essential public service, much like the horns for
those on the first Wednesday of every month, etc.
Chairperson Kondrick
asked would the county, state, or some agency have the right to tell them that
they cannot broadcast frequency in those bandwidths where the police and fire department are active?
Planning Commission Meeting
October 19, 2016
Page 8 of 10
Mr. Hickok
replied, there are a couple of agencies. At the federal level there is the FCC that issues
licenses for wireless communication. At the local level there is a determination, not just Fridley's law
enforcement agencies, but all law enforcement agencies across the country travel in a certain bandwidth
and have a certain area in the communications spectrum they travel in. It is known and it is saved, it is
preserved for them. You would not be able to get an FCC license to travel inside their bandwidth.
Ms. Stromberg
stated the next part that staff changed in this text amendment is related to the application
process, what the applicant needs to submit with their application. It is kind of the same as the
performance standard, but staff listed things such as they need to submit with their application, like they
need to have a structural engineer determine if the utility structure they are going to be locating on is
strong enough to hold the new equipment. They need to have a geological engineer confirm that the soils
can support this new equipment. They need to submit a site plan. They need to make sure they have their
licenses, the FCC or whoever. They want to make sure they have all their ducks in a row before they
issue the permit.
Ms. Stromberg
stated, staff reworded the abandonment section to include DAS in the regulations. If a
tower or a DAS is abandoned, they can notify the owner they have so long to remove the structure and, if
they don't, then the City does and bills them for it. Staff also added a section on no recourse which the
City has not had in the Code before but the City Attorney feels it is very important to create a clause that
cannot hold the City liable for any damages related to the tower.
Ms. Stromberg
stated lastly, staff added a section on data practice. Sometimes the City gets plans that
are stamped with "Trade Secret" and people don’t want the City sharing this information but we do need
to follow the Minnesota Government Data Practices Act, so they do need to go by that and not necessarily
what the petitioner asks of the City.
Ms. Stromberg
stated staff is asking the Commission to recommend approval to the City Council and, if
they do choose to do that, the Council is scheduled to hold a public hearing on this request on November
14.
Chairperson Kondrick
stated so if he has a permit to put a DAS on a structure that is already around,
can somebody else put a DAS on there, too, does the City regulate that, and does it make any
difference? What about the structural part. How does the City stop or allow it?
Mr. Hickok
replied, that is a very good question. One of the reasons staff wanted to be very particular
about existing facilities in the right-of-way is they do not want, for example, a light pole to be placed on a
100-foot structure that now has that three-station co-locates on it. From an engineering perspective,
typically a light fixture like the goose neck fixture is one that is engineered to hold and manage the wind
loads of that in all. If they are able to add their equipment and do it in a way that the weight, the wind
resistance, etc. does not cause problems with that fixture, that is great. If you start loading a power pole, a
light pole, or anything else like this and it has been engineered for only a certain amount of activity on it,
the likelihood of getting more than one is somewhat controlled by the fact that the City is having them go
on existing facilities; and it needs to be engineered, it needs to have proof that it can meet the
requirements.
Mr. Hickok
stated even as to clearances from the ground, they do not want these things to be a detriment
to someone who might be walking and not notice it because it is hanging too low on the pole.
Chairperson Kondrick
asked does it have to be at least 15 tall?
Planning Commission Meeting
October 19, 2016
Page 9 of 10
Mr. Hickok
replied they had a lot of discussion about clearance. Again, it is in a bit self-policed by
virtue of the fact there is a line of site that they use. They want to be at a certain elevation in order to
communicate with the towers.
Mr. Hickok
stated another part about requiring it being on an existing pole in the right-of-way is that one
of the trends they are seeing is there are groups that, basically he will call them real estate agents, who are
out and they want to put poles in the right-of-way so they can turn around and lease them out to
telecommunications entities. Another element of this, and it is important know, there is another entity
kind of related to Chairperson Kondrick's question as to who governs this and what kind of licenses and
permits, etc. are needed. In order to do this the ordinance will tell you that you need to be registered with
the Public Utilities Commission for the State of Minnesota. If you are that real estate type agency that
wants to drill a new hole and put a new post in the ground so that it can be real estate for telcoms to come
in and put their equipment on, you are not a telecom. You are not listed with the PUC as a telecom, and
the City won’t be able to issue them a permit.
Commissioner Ostwald
asked, do they know how many potential sites they have in the City? Or are we
just preparing for it?
Mr. Hickok
replied, they have had an inquiry as to that real estate company wanting to put a new 120-
foot pole on University and Osborne Road. It is not going to happen. Xcel, for example, has addresses
on all of their power poles throughout the City. Although it is the City's understanding that Xcel has not
said yes to anyone at least here in Fridley, the concept of having equipment on their poles, if they did,
they have specific addresses they use in their system they would reference if they made application
here. The City does have somewhat of an inventory of where Xcel, for example, has the City's
poles. They know where the City has poles that are City-owned uprights here. They do have some sense
about what the potential is out there based on what they see in the City's infrastructure and what they
know is there.
Commissioner Sielaff
stated, staff said they are responsible for taking these devices down? Will the City
have some kind of financial assurance to make sure they have the ability to do that?
Ms. Stromberg
replied, staff did add an escrow fee, No. 9, under Section 205.39, it says an escrow fee as
set forth in Chapter 11 which is the City's fees chapter, shall be held and utilized in the event the DAS is
abandoned without removal by the applicant.
MOTION
by Commissioner Oquist to close the public hearing. Seconded by Commissioner Sielaff.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE PUBLIC HEARING WAS CLOSED AT 7:40
P.M.
Chairperson Kondrick
stated he went through this three times. He cannot find any loops or faults. He
thought the City staff did a magnificent job in making sure the City is covered. Anybody who wants a
DAS is going to be protected. It is okay with him.
MOTION
by Commissioner Oquist approving Text Amendment, TA #16-04, by the City of Fridley, to
Chapter 0-5, Telecommunications Towers and Facilities, to add language within the Code that defines and
Planning Commission Meeting
October 19, 2016
Page 10 of 10
regulates “small cell” communication facilities within the public right-of-way. Other general
housekeeping items will also be addressed in the text amendment. Seconded by Commissioner Hansen.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY.
4. Receive the minutes of the September 12, 2016, Parks & Recreation Commission meeting.
MOTION
by Commissioner Sielaff to receive the minutes. Seconded by Commissioner Oquist.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY.
OTHER BUSINESS:
5. Approve the 2017 Planning Commission meeting dates.
MOTION
by Commissioner Sielaff approving the 2017 Planning Commission meeting dates. Seconded
by Commissioner Oquist.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY.
Ms. Stromberg
stated that the items heard before the Commission at their September meeting will be
th
going before the Council next Monday, October 24. She also stated that the November Planning
Commission meeting has been cancelled.
Mr. Hickok
wanted to invite the Commission and the viewing audience to a Public Meeting regarding
the potential use of the Columbia Arena site next Tuesday, October 25, 2016 at 6:30 p.m. at City Hall in
meeting room 1 in the lower level. They will be taking a closer look at the needs, findings, options, and
costs involved with the current site plan proposal.
ADJOURN
:
MOTION
by Commissioner Oquist to adjourn. Seconded by Commissioner Ostwald.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON KONDRICK DECLARED THE
MOTION CARRIED UNANIMOUSLY AND THE MEETING ADJOURNED AT 7:46 P.M.
Respectfully submitted,
Denise M. Johnson
Recording Secretary
Public Works Department
Streets ¤ Parks ¤ Water ¤ Sewer ¤ Stormwater ¤ Fleet ¤ Facilities¤ Engineering
MEMORANDUM
TO: Julie Jones, Planning Manager PW 16-072
FROM: James Kosluchar, Public Works Director / City Engineer
DATE: December 19, 2016
SUBJECT: Draft 2016 Drinking Water Plan
Attached you will find the City of Fridley’s Draft 2016 Drinking Water Plan (formerly
known as Emergency and Conservation Plan). This plan is the first component to our
updated 2040 comprehensive plan. The plan includes an evaluation of our drinking
water system, projections for demand, and conservation and planning practices.
It is notable that the City of Fridley is positioned well for sustainability of its drinking
water system with the following circumstances:
1. Demand for water is approximately 50% of that since peaking in the late 1980s.
Capacity therefore remains high relative to demand.
2. Aquifer data indicates long-term increases in recharge.
3. Residential consumption is meeting the goal of below 75 gallons per capita per
day. Industrial consumption is also down over the past 10 years.
4. Peaking factor (maximum daily demand over average daily demand) is
consistently declining, and is very low.
5. Various conservation practices are in place.
There are challenges with maintaining our sustainability, namely that of aging
infrastructure, and increasing rates that have been required to offset declining demand.
I would ask that the Planning Commission focus on Part 3 of the plan, including
conservation measures it would like to see implemented, along with zoning controls that
might be enacted to enhance Wellhead Protection. I will have a presentation that I can
provide at the hearing.
Finally, I have attached the City’s 2030 Comprehensive Plan Water Supply Plan chapter
for reference.
JPK:jpk
Chapter 11, Water Supply Plan Page 167 Final
Chapter 11
Public Water Supply Plan
11.0 Introduction
Purpose
This chapter documents water supply and characteristics of the municipal water system. In addition,
forecasts of future water supply needs have been developed to assist in the planning of system expansions
in an orderly manner and to anticipate future capital expenditures. The public water supply plan has been
developed to:
Provide for the delivery and conservation of water that is of consistent quality that meets drinking
water standards;
Provide for the delivery and conservation of water that is of consistent quantity for fire
protection; and
Provide sustainability of the water utility.
In addition to meeting community needs, this plan has been prepared to fulfill state mandates that are
administered by the Department of Natural Resources (DNR), the Department of Health, the Minnesota
Pollution Control Agency (MPCA) and the
Metropolitan Council.
The Minnesota Department of Health
commissioned Anoka County to complete a
groundwater modeling effort. Anoka County
completed the modeling effort in 2005. In turn, the
City has submitted its Wellhead Protection Plan
with the City Engineer acting as the City’s
Wellhead Protection Manager. This plan will
address prevention of contamination to our
aquifers.
Community Setting
Fridley is a fully developed, first ring suburban
community lying to the north of the central cities of
Minneapolis and St. Paul. The current population is
estimated at approximately 26,459 (2007) and the
number of persons employed by various businesses
is approximately 23,595(2005). Although there
are few areas left for residential development, a
limited amount of vacant land does exist for
commercial and industrial development.
Public Water System Development
The municipal water system within Fridley was established in the early 1950s and designed to replace
individual private wells. The current water system includes 13 wells, three water treatment facilities, two
booster stations, two elevated water towers, and two ground reservoirs. Approximately 115 miles of water
main serves the community.
Chapter 11, Water Supply Plan Page 168 Final
The City contains three pressure zones due to the varied topography in the community. The low level
zone contains 11 wells, two treatment facilities, two elevated water towers, and one ground storage
reservoir. The intermediate pressure zone level contains two wells, one water treatment facility and one
booster station. The high service level contains one booster station, one ground reservoir and one
standpipe.
In August 1989, the City commissioned the preparation of a Water System Study to determine future
water needs based upon the capability of the existing system. Additionally, information was gathered to
evaluate the operation of the water system, analyze potential water conservation methods, develop a
computer model of the distribution system, estimate the costs of future system improvements, and to
preliminarily investigate an identified contamination problem.
As a result of this 1989 Study, an elevated 1.5 million gallon water tower and the third water treatment
facility at 73 ½ Avenue and TH 65 were added to the system; improvements to the booster pump system
were installed, and a well contamination monitoring program was instituted. The Twin Cities Army
Ammunition Plant (TCAAP) water main interconnection to New Brighton was completed in 1994. It
provides maximum flows of 3 million gallons per day from the non-peak months of September through
April and 250,000 gallons per day from April to September.
The City provides an annual Water Quality report, as required by law, to the public by including it in the
City newsletter. The most current report is also posted on the City web site at
www.ci.fridley.mn.us/pubwks/water. Comparable to previous year’s reports, the most recent Water
Quality report, from 2007, shows current testing in certified laboratories demonstrates that no
contaminants in excess of EPA limits were detected in the City of Fridley’s drinking water supply.
11.1Geologic Setting of the Community
The topography of the community is varied and influenced by the waterways. Higher elevations exist in
the eastern and southeast portions of the community with the lowest associated with the Mississippi River
floodplain.
Surficial and Underlying Geology
The surficial deposits of the Fridley area are classified as part of the Anoka Sand Plain, and were
deposited primarily by glacial ice and meltwater during the most recent glaciation. However, the glacial
landscape has been altered by soil formation and erosion during the postglacial periods. All of the glacial
deposits were from the Grantsburg Sublobe and the overall thickness of the surficial deposits range from
50 to 100 feet.
There are five surficial deposits in Fridley. Two of the deposits are of glacial origin: lake sand and
outwash deposits. The other three deposits are of postglacial origin: alluvium, eolian sand, and terrace
deposits. All of the surficial deposits are postglacial.
The lake sand deposits are found along the eastern boundary of Fridley and consist of very fine to
medium sand with minor silt, and include some areas of fluvial sand at or near the surface. The outwash
deposits are located in the northern portion of the City and generally consist of sand and gravel. Alluvium
deposits have been identified along Rice Creek and the Mississippi River. These deposits consist of
primarily silty sand overlaid in places by sandy loam or peat. Eolian deposits, dunes of very fine to
medium sand, are found in the extreme southeastern corner of the City. The terrace deposits are mainly
sand and gravel in nature and are found over most of the western two-thirds of the City.
There are two types of uppermost bedrock immediately beneath the surficial deposits within the Fridley
city limits. The two formations are called the St. Peter Sandstone and the Prairie du Chien Group. Both of
Chapter 11, Water Supply Plan Page 169 Final
these bedrock units were deposited during the Ordovician period. Depth to the uppermost bedrock in
Fridley ranges from 50 to 100 feet.
The St. Peter Sandstone is found as the uppermost bedrock in the southern half of the City and is typically
155 feet thick. The upper half to two-thirds of the formation consists of a fine- to medium-grained, poorly
cemented quartzose sandstone. The lower one-third to half of the formation contains multicolored beds of
mudstone, siltstone, and shale with an interbedded, very course sandstone. Many sand grains in the lower
portion of the formation are dark gray.
The Prairie du Chien Group underlies the St. Peter Sandstone and is located near the Mississippi River
along the western boundary of Fridley, and in the northern one-third of the City. Typically, the Prairie du
Chien Group is 280 feet thick and is comprised of two principal formations, the Shakopee Formation and
the Oneota Dolomite, both of which are predominantly light brownish-gray or buff, sandy, thin- to
thick-bedded dolomite. It is typically varied and fractured and contains some thin layers of interbedded
Figure 11.1
grayish-green shale. Bedrock geology is shown on .
Aquifers and Groundwater Conditions
There are four aquifers in the Fridley area: the watertable system, the Prairie du Chien-Jordan, the
Franconia-Ironton-Galesville, and the Mt. Simon-Hinckley.
The uppermost aquifer, the watertable system, exists in many different types of geologic materials. Some
of these may yield water to wells, such as sands and gravels, but others, such as till, do not. Due to the
heterogeneous nature of the glacial deposits, the watertable system is highly variable in flow direction and
velocity. Groundwater flow direction is generally west or southwest toward the Mississippi River.
The other three aquifers are bedrock aquifers. The uppermost bedrock aquifer, the Prairie du
Chien-Jordan, is present throughout Fridley. The Prairie du Chien Group is up to 140 feet thick in some
areas and groundwater flow is controlled by fractures, joints, and solution cavities within the dolomite.
The Jordan Sandstone consists of fairly uniform quartzose sandstone and is highly permeable. The
groundwater flow through this sandstone is primarily intergranular. Since there is no confining unit
between the Prairie du Chien Group and the Jordan Sandstone, they act as a single aquifer. Groundwater
flow direction is unknown, but is likely west to southwest toward the Mississippi River. The approximate
maximum thickness of the aquifer is 470 feet and typical yields to individual wells range from 500 to
1000 gallons per minute. Total dissolved solids generally are less than 500 parts per million.
The Franconia-Ironton-Galesville bedrock aquifer exists beneath the Prairie du Chien-Jordan aquifer. The
St. Lawrence Formation, a dolomite shale and siltstone ranging in thickness from 30 to 75 feet, acts as the
confining unit between the two aquifers. The Franconia-Ironton-Galesville is comprised of three parts.
The upper 105 to 190 feet consists of the Franconia Formation, glauconitic sandstone with some shale and
dolomite. The next 25 to 30 feet consist of the Ironton Sandstone, and the lower 30 to 35 feet consist of
the Galesville Sandstone. All three units are hydrologically connected. The groundwater flow direction in
this aquifer is also unknown, but it is likely toward the Mississippi River. The approximate maximum
thickness of the aquifer is 330 feet. Typical yields to individual wells range between 250 and 500 gallons
per minute and total dissolved solids are generally less than 500 parts per million.
The deepest bedrock aquifer is the Mt. Simon-Hinckley. It is located beneath the Eau Claire Formation, a
60- to 125-foot thick siltstone, shale, and silty sandstone, which acts as the confining unit between the Mt.
Simon-Hinckley aquifer and the Franconia-Ironton-Galesville aquifer. It consists of the Mt Simon
Sandstone, which ranges from 125 to 270 feet in thickness and the Hinckley Sandstone, which is absent in
many localities. In general, the Mt. Simon-Hinckley is hydraulically isolated from the shallow
Chapter 11, Water Supply Plan Page 170 Final
Figure 11.1 Bedrock Geology
Source: SEH, Inc.
Chapter 11, Water Supply Plan Page 171 Final
groundwater systems and surface waters above it. Therefore, most of its recharge comes from leakage.
The groundwater flow direction and approximate maximum thickness in the Fridley area is unknown.
Typical yields to individual wells range from 400 to 700 gallons per minute; and total dissolved solids
range from 79 to 2400 parts per million.
According to the Regional Hydrogeologic Assessment of the Anoka Sand Plain, the sensitivity rating for
the watertable system to pollution in the Fridley area ranges from very high in the central portion and
eastern half to high in the northeastern, southwestern, and extreme western portions of the City. A
sensitivity rating is a qualitative measure of the susceptibility of the aquifer to become contaminated from
a release at the surface. The ratings correspond to an estimated travel time for waterborne contaminants at
the land surface to reach the uppermost aquifer. A very high rating corresponds to a travel time of hours
to months. A high rating corresponds to a travel time of weeks to years. The wellhead protection plan
being prepared by the County should provide more distinct data for aquifer ratings.
Surface Water Characteristics
There are four lakes within the City of Fridley: Moore Lake, Locke Lake, Harris Pond and Farr Lake.
Moore Lake consists of an east bay and a west bay. The lake is approximately 105 acres and has a
maximum depth of 22 feet. According to the 1994 Minnesota Lake Water Quality Assessment, the mean
total phosphorus, mean chlorophyll-a, and alkalinity values for the east and west bays during the summer
are 58 and 99, 8 and 17, and 55,000 and 59,000 parts per billion, respectively. Water quality information
for the other three lakes was not available.
There is one major creek in Fridley called Rice Creek. It is located in the central portion of the City and
runs east to west toward the Mississippi River. Rice Creek discharges into and out of Locke Lake in the
western portion of the City near where it discharges into the Mississippi River. Water quality information
is available from Rice Creek Watershed District for Rice Creek.
11.2 Existing Water Supply and Water Storage
The following section describes the existing water supply system of Fridley. This system, which began in
1957, has taken approximately 50 years to construct and is nearly complete except for several minor
improvements.
Aquifer and Groundwater Supply
The Fridley municipal water system depends upon the glacial drift, the Prairie du Chien-Jordan formation,
the Franconia–Ironton–Galesville formation, and the Mt. Simon-Hinckley formation. The Prairie du
Chien-Jordan group supplies Wells No. 6-9 and 12-13. The Mt. Simon-Hinckley group supplies Wells
No. 1-5 and Well No. 11 is supplied from the Franconia-Ironton-Galesville group. Well No. 10 is served
from glacial drift material. Wells No. 6, 8, and 9 were
originally drilled to glacial drift but subsequently
deepened to the Prairie du Chien-Jordan group.
Municipal Wells
The 13 municipal wells range in depth from 199 feet to
925 feet and have pumping capacities of 750 to 1,550
gallons per minute (gpm). Combined, the overall
production capability of the city wells is 12,625 gpm or
18.18 million gallons per day (MGD). Therefore, the
effective daily maximum pumping capacity is 15.95
Table 11.1
MGD. depicts the characteristics of the City's
wells.
Chapter 11, Water Supply Plan Page 172 Final
Table 11.1 Ground Water Sources
WellUniqueYearWell & WellCapacity
#Well ID Installed CasingDiameter (GPM) Geologic Unit Status
#Depth (ft) (in)
Franconian,
389 16 Gailesville, Mt.
1206685 1957 156 20 700 Simon-Hinckley Standby
675 16 Mt. Simon-
2206674 1961 131 24 525 HinckleyActive use
720 10 Mt. Simon-
3206670 1961 64 16 700 HinckleyActive use
663 16 Mt. Simon-
4201158 1961 138 24 725 HinckleyActive use
Mt. Simon-
5206675 1961 656 16 725 HinckleyActive use
Prairie du Chien-
6206673 1964 153 24 1400 JordanActive use
Prairie du Chien-
7206671 1966 138 12 800 JordanActive use
138 12 Prairie du Chien-
8206669 1966 64 16 1550 JordanActive use
153 24 Prairie du Chien-
9206672 1966 37 30 1500 JordanActive use
128 16
10 206658 1969 16 24800DriftActive use
344 23 Franconian-
11 206657 1970 225 30 825 GalesvilleActive use
234 24 Prairie du Chien-
12 29207 1970 153 30 1550 JordanActive use
Prairie du Chien-
13 206696 1970 191 24 825 JordanStandby
Total
12,625
*1984 data, remaining data from 1998 as indicated
Note: Does not include water supply from TCAAP in Arden Hills
In review of the original and 1998 static levels, there had been a significant decline in Wells No. 1, 2, 4,
and 5 that are served by the Mt. Simon-Hinckley aquifer and Well No. 11, which draws water from the
Franconia/Galesville Formation. The 1998 static levels of all other wells are similar to the levels when the
wells were originally drilled.
Table 11.2
A comparison of the 1998 and 2007 well drawdowns, illustrated on below, shows the
drawdowns in 2007 are reduced from 1998. A drawdown represents the distance the City must pump the
water in order to reach ground level. In 2007, the water table was higher and, therefore, less energy was
needed to pump water to the surface. Measurements taken by operations from 1982 through present
illustrate that a stabilization, and varying slight recovery, in static and drawdown levels is occurring in
Figure 11.2
Fridley’s wells. See , which shows data collected for Well 4 in chart format.
Chapter 11, Water Supply Plan Page 173 Final
Table 11.2 Water Level Data (Well Drawdown Levels) – 1998 and 2007
Well No.: 12345678910 11 12 13
1998 313’ 281’ 291’ 319’ 316’ 63’ 73’ 86’ 74’ 57’ 179’ 80’ 47’
2007 271’ 241’ 252’ 251’ 255’ 55’ 70’ 69’ 74’ 53’ 162’ 77’ 40’
Difference
between
42’ 40’ 41’ 68’ 61’ 8’3’15’ 0’4’17’ 3’7’
1998 and
2007
Figure 11.2 Well 4 Drawdown Level Data – 1982 through 2008
Public Well Sites
The 13 public well sites are all located on city-owned property. Wells No. 2 through 9 are located within
Commons Park, Well No. 1 off Cheri Lane, Wells No. 10 and 11 in Locke Park, Well No. 12 on property
st
near the intersection of Highway 65 and 73 ½ Avenue, and Well No. 13 on East River Road and 51
Way. Only Wells No. 12 and 13 are near land uses that could have the potential for groundwater
Chapter 11, Water Supply Plan Page 174 Final
Table 11.3
contamination. below presents the characteristics of the ownership and land use of the well
sites.
Table 11.3 Land Use Characteristics of Well Sites
Well No. Ownership Land Use Use of Closest Structure
1Public-fee title Residential Home
2-9Public-fee title ParkPublic
10-11Public-fee title ParkPublic
12Public-fee title IndustrialIndustrial
13Public-fee title IndustrialIndustrial
Source: Fridley Community Development Department
Trunk Water System and Service Areas
The Fridley water system consists of approximately 115 miles of water main which vary from 2 inches to
24 inches in diameter. The majority of the system is constructed of cast iron pipe. Water is distributed into
three service areas in the City that are divided according to topographical conditions.
The low service area serves approximately 66% of the community and encompasses the western half of
Fridley. Due to supply, fire flow, and operation issues raised in the 1989 Water System Study, the City
constructed a 1.5 million gallon elevated tower in Locke Park to serve customers within this zone and to
supply a portion of water to the intermediate and high service areas. Water pressure within this zone
ranges from 45 to 85 pounds per square inch (psi). The low service area contains two booster pumps
located at Commons Park that supplement the capacity of the nearby filtration plant.
In 1993, the City, in conjunction with New Brighton and the United States Army, constructed a water
main to distribute excess water from New Brighton to the City from the (TCAAP) remediation plants.
This system supplies up to three million gallons of water per day during non-peak months and 0.25 MGD
during the summer peak months to augment the City's supply system. The system is connected at 29th
Avenue in New Brighton and extends through the 63rd Avenue booster station to the main service line on
the west side of T.H. 65 at 63rd Avenue. The water from the New Brighton system is tested once a month
for iron and manganese and weekly for chlorine. The City adopted an agreement with New Brighton to
use the water for twenty-five years, subject to change.
The intermediate service area comprises the eastern third of the City and approximately 33% of the total
system demand. Pumps at Well Sites No. 1 and No. 12 transfer water from the low service area to this
zone of the City. A water main loop near the Skywood Mall was completed within this area in 1991 to
increase system reliability and to deliver required fire flows to the mall. The 63rd Avenue booster station
was also reconstructed to receive the TCAAP water and provide better water service to the intermediate
and high service areas.
The extreme southeast portion of the community is included within the high service area. This area
contains only 1% of the community and is entirely residential. The Marion Hills pumping station, which
provides water pressure at 40 to 53 psi, serves this area as does a 1.5 million gallon standpipe ground
reservoir. There is no elevated structure that serves the high service area.
The city storage facilities include two elevated tanks and two ground reservoirs. One of the ground level
reservoirs serves the low service area and the other consists of a standpipe that serves the high service
Table 11.4
area and can serve the intermediate area. below provides characteristics of the existing water
storage facilities.
Chapter 11, Water Supply Plan Page 175 Final
Table 11.4 Water Storage Capacity
Average Day Demand
Total Storage Capacity
(average of last 5 years)
6,500,000 Gallons 3,892,000 Gallons per day
Type of Structure Number of Structures Gallons
Elevated Storage 22,000,000
Ground Storage 24,500,000
Water Supply Interconnections
The City has a major interconnection with the City of New Brighton as described earlier, which
introduces water into the low and/or intermediate water system. The primary purpose of the
interconnection is to deliver flow from New Brighton to Fridley. However, in an emergency situation in
New Brighton, the interconnection could be used in reverse to deliver water from Fridley to New
Brighton. In this mode, the interconnection could deliver in excess of 3 MGD to New Brighton.
The Fridley water system also provides water service to a limited number of residents of Coon Rapids,
Mounds View, and New Brighton. But, the Fridley water system is not interconnected with the water
systems of Coon Rapids and Mounds View. There are two physical interconnects, one with Minneapolis
and one with Mounds View.
As noted in the Introduction, a groundwater model of Anoka County was completed in 2005. Three of
the aquifers underlying Fridley – surficial, Prairie du Chien – Jordan, and Mt. Simon – Hinckley – have
been modeled separately. The Minnesota Department of Health has made the model available to each of
the cities in Anoka County. It is the health department’s intention that each of the cities use the model and
“build on it” to develop their wellhead protection plan. The wellhead protection planning rules have been
established. The City of Fridley’s wellhead protection plan is under review as of the date of this update.
Table 11.5Wholesale Interconnections
Water Supply System Water Purchased (MGD) Capacity (MGD)
1.3 (average) 3.0
New Brighton via TCAAP
Note - Purchase of wholesale water from the City of New Brighton is discretionary and is excluded in
capacity calculations.
11.3 Treatment and Storage Capacity Facilities
There are three water treatment plants – Commons
Park, Locke Park, and Plant No. 3 – that filter most
of the water consumed by residents of the City of
Fridley. Originally the Commons Park and Locke
Park water treatment plants removed only iron. In
1988, the Commons Park plan was upgraded to also
remove manganese. A similar upgrade was
completed at the Locke Park plant in 1994. Plant
No. 3, located at Highway 65 and 73 ½ Avenue, was
constructed as an iron and manganese removal plant
in 1997. Commons Park again received upgrades in
2006 to its filter and backwashing system.
Chapter 11, Water Supply Plan Page 176 Final
The Commons Park water treatment plant has a nominal capacity of 8,400 gpm. However, the plant is not
limited to the combined capacities of Wells No. 2, 3, 4, 5, 6, 7, 8, and 9 (7,925 gpm). The Locke Park
water treatment plant operates at 2,000 gpm. Plant No. 3 only filters water from Well No. 12. Therefore,
Table 11.6
its capacity is identical to that of Well No. 12 - 1,550 gpm. depicts the capacity of the City’s
three water treatment plants.
Table 11.6Capacity of Water Treatment Facilities
Water Treatment Design Capacity – Commons Pk WTP 12.1 Million Gallons per day
Water Treatment Design Capacity – Locke Park 2.9 Million Gallons per day
Water Treatment Design Capacity – WTP No. 3 2.2 Million Gallons per day
17.2
Total Water Treatment Design Capacity*
Million Gallons per day
Treatment Processes: Fe/Mn removal, filtration, fluoridation, chlorination at all WTPs. Radionuclide removal at
Commons Park WTP. Fe/Mn sequestration, fluoridation, and chlorination from unfiltered Wells 1 and 13
(Standby).
*Note: Total Emergency Capacity is 23.2 Million Gallons per day.
Wells No. 1 and 13 do not connect to any of the City’s water treatment facilities due to the distance from
Table 11.7
these wells to the nearest treatment facility (Commons Park). below provides a summary of
filtered water versus unfiltered water consumed by residents of the City of Fridley. Filtered water means
that Iron and Manganese are filtered from the system. Water received from New Brighton in the TCAAP
water line has been filtered since 1997.
Table 11.7 Filtered Versus Unfiltered Water
Year Total Filtered Total Unfiltered Total Pumped
Gallons (MGY) Gallons (MGY) Gallons* (MGY)
1999 828.1 72.0 900.1
2000 1338.7 24.0 1362.7
2001 1259.6 337.0 1596.6
2002 1020.8 23.0 1043.8
2003 1299.8 499.7 1799.5
2004 1080.7 78.0 1158.7
2005 1219.3 31.0 12503
2006 1152.7 192.0 1344.7
*Note: Includes Fridley Wells only, excludes TCAAP water.
11.4Historic Water Demand and Supply: 1999-2006
The following section describes the past water use and demand of the City of Fridley. An analysis of this
experience over the past 22 years will assist in ascertaining the needs of the Fridley water system in the
coming years.
Water Demand Records
Fridley is a nearly fully developed community and substantial growth is not expected based upon past
trends and the availability of land for new development. The City has maintained records of water service
connections since 1985. The 1985-1998 water use history is on file at the Municipal Center. The
categories of connection type are general and are defined below:
Residential - Includes all single family, two to four family buildings, townhomes, apartment
buildings, condominium units and mobile homes.
Chapter 11, Water Supply Plan Page 177 Final
Commercial/Industrial - Combines commercial and industrial uses. Each service connection
represents a single business, or group of businesses located in one building. Also includes
nonprofit uses such as schools, churches, city, county, and state buildings.
Table 11.8Table 11.9
depicts the number of water demands from 1998 through 2007. analyses changes
in residential and non-residential connections.
Table 11.8 Water Demand, 1998-2007
ResidentialWholesale
TotalPopulationTotalWater Sold C/I/I Water Deliveries
YearPopulationServedConnections (MG) Sold (MG) (MG)
1998 27,715 27,389 8,185 871 788 -
1999 27,538 27,212 8,181 819 636 -
2000 27,449 27,123 8,195 906 759 -
2001 27,469 27,143 8,209 892 619 -
2002 27,460 27,134 8,254 769 556 -
2003 27,480 27,154 8,279 885 583 -
2004 27,088 26,762 8,288 821 597 -
2005 26,679 26,353 8,232 797 553 -
2006 26,603 26,277 8,235 849 577 -
2007 26,459 26,133 8,230 873 568 -
Total Water Percent AverageMaximum ResidentialTotal
Total Water Pumped* Unmetered/ Demand Demand gallons/gallons/
YearSold (MG) (MG) Unaccounted (MGD) (MGD) capita/day capita/day
1998 1,659 1,872 11.4% 4.545 n/a 87.1166.0
1999 1,455 1,703 14.6% 3.986 n/a 82.5146.5
2000 1,666 1,801 7.5% 4.564 n/a 91.5168.3
2001 1,511 1,768 14.5% 4.140 n/a 90.0152.5
2002 1,325 1,501 11.7% 3.630 n/a 77.6133.8
2003 1,468 1,778 17.4% 4.022 n/a 89.3148.1
2004 1,417 1,429 0.8% 3.882 n/a 84.0145.1
2005 1,350 1,604 15.8% 3.699 n/a 82.9140.3
2006 1,426 1,560 8.6% 3.907 n/a 88.5148.7
2007 1,441 1,615 10.8% 3.948 10.432 91.5151.1
*Note: Includes water via New Brighton from TCAAP.
Table 11.9 Service Connections 1999 2006
ResidentialCommercial
Commercial/
YearResidential PercentPercentTotal
Industrial
ChangeChange
1999 7680 0.26 501 0.66 8181
2000 7690 0.13 505 0.88 8195
2001 7699 0.12 510 1.09 8209
2002 7743 0.57 511 0.22 8254
2003 7769 0.34 510 -0.22 8279
2004 7776 0.09 512 0.43 8288
2005 7726 -0.64 506 -1.09 8232
2006 7733 0.09 502 -0.85 8235
The number of residential service connections increased slightly on an annual basis from 1999 through
2004. After a slight drop in 2005, the connections continued to increase. The largest increase occurred in
2002. However, the annual increase in residential service connections has averaged only 0.12 %
indicating a low level of residential growth.
Chapter 11, Water Supply Plan Page 178 Final
The combined commercial and industrial connections have increased at an average annual rate of 0.33 %
since 1999. Institutional connections are included with the commercial and industrial connection
numbers. Those connections have decreased from 46 in 1999 to 38 in 2006, for a loss of 8 service
connections.
Table 11.10 Top Ten Water Volume Users - 2007
CustomerGallons per year % of total
annual use
Cummins 30,980,0002.15
ELT Mpls 29,035,0002.01
Aramark Uniform 27,287,0001.89
Lofthouse Bakery 21,544,0001.50
ELO16,156,0001.12
Stylmark Inc. 14,956,0001.04
Minco Products 11,883,0000.82
Spec Plating 11,031,0000.77
HB Fuller Comp. 10,080,0000.70
KCS Property Mgmt. 9,455,0000.66
Table 11.8
Records of water use by customer category have only been maintained since 1993. compares
the volume of water use by customer category from 1998 through 2007. (Future water use is projected in
Table 11.12
.)
Water use by residential categories decreased between 1998 and 2007. Typical residential water use
includes indoor household appliances, swimming pools, lawn irrigation, and other similar outdoor use. As
noted later, the time of heaviest residential water use is during the summer months when outdoor use
consumption substantially increases. Much of the residential summer use in Fridley is devoted to lawn
irrigation and garden sprinkling.
Commercial and industrial water use declined significantly between 1998 and 2007. The reason for the
decline of 200 MGD annually is that Webb Printing no longer operates in Fridley and BAE reduced the
size of its operations.
Unmetered water uses include sprinkling of public properties, fires, fire hydrant flushing,
under-registration of meters, leakage within the system and other municipal activities. Although there are
a number of unmetered municipal water uses in the City of Fridley, the Water Department keeps
estimates of the volume of water used for these purposes. Subtracting these estimates from the total
unmetered water use results in unaccounted for water.
Unaccounted water averages less than half of the recommended 10%. Apparent Losses, mainly from
meter inaccuracies, totaled an estimated 20 MG in 2007. This component can be addressed through more
accurate metering. The City plans to study the cost-effectiveness of an aggressive re-metering program.
We have calculated the Unavoidable Real Losses (UARL) for the City of Fridley’s water system
according to the AWWA method. The UARL for the system is 58.3 MG annually, which is in just below
the Real Losses for 2007 (estimated at 60 MG). The City has an aggressive five-year infrastructure
replacement program, and responds rapidly to distribution and service line repairs, as can be illustrated by
the near concurrence of the UARL and actual Real Losses.
Chapter 11, Water Supply Plan Page 179 Final
Table 11.8
depicts the water pumped compared to water sold. The difference has been labeled
“Unaccounted for Water” to reflect the fact that, although the water use is unmetered, it is estimated, and
much of the water is billed for.
Peak Water Demand
As may be expected, the summer months are those that demand the greatest production of water with the
winter months being relatively the lowest. Because outside water use by residential customers does not
occur, the winter months will continue to be lower than the summer months.
Table 11.11
depicts the seasonal and peak demand characteristics of water production for Fridley from
1999 to 2006.
Table 11.11 Peak Water Production: 1999 2006
Winter Production (January) Summer Production (June) Maximum Monthly
MonthlyAverage Daily MonthlyAverage Daily
Year
Production
ProductionProductionProductionProductionMonth
(MG)
(MG) (MGD) (MG) (MG)
1999 44.5 1.5 101.8 3.4 135.4 August
2000 51.9 1.7 148.0 4.9 210.3 August
2001 60.1 2.0 124.7 4.1 235.7 August
2002 54.4 1.8 108.3 3.6 150.2 July
2003 94.5 3.1 129.2 4.3 263.9 August
2004 51.2 1.7 115.1 3.8 149.1 July
2005 56.1 1.9 126.8 4.2 217.6 July
2006 42.1 1.4 224.3 7.5 227.7 July
Maximum monthly demands occurred during the 2006 drought when high temperatures accompanied
little rainfall. The peak demand month occurred in August 2003 during the drought when 263.9 MG were
pumped from the Fridley water system. The higher demand due to the drought was caused by greater
water usage by customers for outdoor sprinkling and indoor cooling.
11.5 Sustainability
As a result of the 1989 Water System Study,
the City has completed several improvements
to its water system. These improvements
include the construction of a 1.5 million gallon
elevated tank facility west of Highway 65, the
63rd Avenue booster station, filter plant No. 3
at 73 ½ Avenue and the Skywood Mall water
main loop.
Additionally, the City completed the TCAAP
water distribution connection in conjunction
with New Brighton and the United States Army
to receive 3 million gallons of treated water per
day during nonpeak months. However, certain
other improvements are required in order to
ensure reliability with the current system.
Chapter 11, Water Supply Plan Page 180 Final
Improvements, such as ongoing repairs and elimination of dead-end lines will assist the City in meeting
supply, efficiency, control, resource sustainability and fire-fighting demands. As mentioned in the
introduction of this chapter, Fridley is in the process of writing a contingency plan that meets the
requirement of the Minnesota Department of Health’s Wellhead Protection Plan.
Capital improvements that will aid
Fridley in achieving sustainability of
water supply, treatment, and distribution
systems include refinement and
implementation of a long-range capital
improvement plan to include proactive
and scheduled replacement of distribution
system piping and components, storage
facilities, and treatment plant elements.
In late 2007, charter-mandated rate
restrictions on the City’s Water Utility
rates were eliminated through passage of
referendum. Future rates need to be
developed to sustain the components
providing water supply and distribution
to the community.
Programs Aimed At Conserving Water
Certain programs are aimed at conserving water and reducing demand. Fridley already tracks
unaccounted water. Detecting and repairing leaks will minimize unaccounted for water use. Recovering
unaccounted water will allow Fridley to establish and meet conservation goals. Fridley seeks to establish
conservation goals that may be implemented during times of high unaccounted water.
In 1999, Fridley began publishing an annual “water quality report” in its newsletters to educate the
community about water regulations and the quality of the water resource. The report relays to what extent
the City meets or exceeds guidelines for a variety of substances, which may occur in the water supply.
The City regularly tests the water to determine if the water from certain wells should be used or blended
with others to continue to meet guidelines. Fridley has considered instituting an odd/even water sprinkling
ban during drought seasons. Although this type of water ban often increases overall water use, the peak
demand would decrease.
11.6 Future Water Demand and Supply
Although the City is nearly fully developed, there are still opportunities for the development of vacant
commercial and industrially zoned land. Future water consumption needs are projected based upon past
consumption and available land for new development.
As of 2006, little vacant land existed for residential development. Increased density obtained through
redevelopment would increase water demand. For example, the Metropolitan Council anticipates that
1,000 more households will be added to Fridley by 2030. Otherwise, the largest factor that will influence
residential water demand will be climatic influences and residents' needs to respond to those influences.
Droughts and heat waves are typical influences that cause an increase in residential demand for water.
Demand Projections
For planning purposes, the 1989 Water System Study (on file with the City) utilized a rate of 65 gallons
per capita per day for residential purposes. This was based upon 1988 winter quarter water usage. The
1994 and 1998 water consumption records indicate an average annual per capita residential water use of
Chapter 11, Water Supply Plan Page 181 Final
87 gallons per day in 1994 and 82 gallons per day in 1998. Therefore, a conservative of 90 gallons per
day is utilized for the projected water supply in this study.
In 2006, only 60 acres of the 1728 acres zoned for commercial/industrial use was undeveloped. For
planning purposes, it is assumed that the remaining vacant acreage will undergo development by 2020
and possibly by 2010. The 1989 Water System Study estimated that water demand per acre per day was
1650 gallons based upon the winter billing rate. Further, this number represents a conservative approach
in that it represents full occupancy of commercial/industrial properties.
Table 11.12 Ten-Year Demand Projections
Year Total Population Average Day Maximum Projected
Community ServedDemand Day Demand Demand
Population (MGD) (MGD) (MGY)
2010 27000 26635 4.33 10.96 1579
2020 26900 26900 4.35 11.03 1588
2030 27500 27500 4.41 11.19 1608
Ultimate 30000 30000 4.64 11.86 1694
Table 11.12
As indicated in , commercial/industrial water demands will slightly increase as additional
property undergoes development. Although approximately 60 acres of commercial/industrial land remains
undeveloped, the potential increase in water use is considered to be negligible compared to the existing
commercial/industrial water use.
The City of Fridley has one private water service within its limits, which serves a private mobile home
park. It is anticipated that the City of Fridley will begin to provide service to these 365 customers
between 2010 and 2020.
The current capacity of the water supply system is sufficient to accommodate projected water demand.
Treatment capacity exceeds pumping capacity. The system firm capacity (Fridley wells only, largest
pump out of service) is currently 5,019 million gallons per year (MGY) and projected water demand in
the year 2030 is 1,608 MGY. Including reasonable downtime for maintenance, capacity far exceeds
projected demands.
11.7 Policies for Water Supply System Operations
Policies
The City has established the policies listed below that are directed towards the operation, improvement,
and conservation of its water supply system. It is not anticipated that major expansions to the system will
occur due to the status of development within the City. Based upon the inventory and analysis of future
demands, the primary focus of the plan is service delivery and sustainability.
1.The City will provide municipal water service to residents and businesses in the community in the
most fiscally responsible manner possible.
2.The municipal water system service will provide high quality water that will not negatively
impact the natural water resources of the community or region.
3.The City will continue to make every effort within its means to provide high quality drinking
water.
4.The emergency preparedness program will allow for the City to supply quality water to
community users in a prioritized manner that protects the water resource to the extent possible.
Chapter 11, Water Supply Plan Page 182 Final
11.8 Goals and Objectives
Goals and objectives have been assembled related to water supply. The term goal is used throughout the
Comprehensive Plan to define the City’s desired outcome relative to key community issues. Three of the
four overriding goals that emerged from the 2007 neighborhood planning meetings can be related to the
City’s water supply.
Goals
1.Maintain Fridley as a desirable place to live
2.Maintain Fridley as a desirable place to invest in business
3.Keep Fridley a safe community for all to enjoy
A sound drinking water supply is an essential part of the quality of life in a community. It is also essential
to many businesses – particularly the many industries – in Fridley. Also, besides clean air, the most
essential public health issue in a community is a clean, safe water supply.
The following objectives were developed as the staff committee analyzed what was necessary to reach the
goals of a sound drinking water supply that greatly affects the quality of life, business, and public health
in Fridley.
Objectives
1.Protect the quality and quantity of the Fridley drinking water supply
2.Provide a plentiful supply of drinking water in Fridley
3.A public informed about the safety of the public water supply
4.Maintain a sustainable water supply into the future
11.9 General Conclusionsand Action Steps
Several conclusions were drawn from the analysis of the existing water supply system. These findings
were discussed and debated and related action steps that could address the needs of the water supply
system were developed. These action steps reflect the City’s general intentions and will guide the
community in the attainment of goals.
1. During this past summer, water demand neared available supply for brief evening periods.
Action Step:
Staff needs to monitor summer hourly peak demands, and consider educational and
legislative options to address these as needed.
2. In 2004, a water supply emergency plan was developed. The plan needs to be maintained to ensure
reliable service to the community.
Action Step:
Update the emergency management plan, at minimum every 5 years, to incorporate the
most recent technological advances.
Chapter 11, Water Supply Plan Page 183 Final
3. Much has been accomplished in the past ten
years to repair leaks in the water system. There
will continue to be a discrepancy between the
amount of water pumped versus the amount of
water sold. In order to be sustainable, the City
needs to monitor unmetered water use as an
indicator of the condition of its distribution
system. The City has a leak survey program in
place.
Action Step:
The City needs to develop
guidelines and anticipate actions if and when
an unacceptable percentage of unmetered water
usage is observed.
4. The removal of the charter amendment service
fee restrictions will now allow the Fridley
water utility to be fully-funded over time.
Certain measures need to be taken to ensure
sustainability of the system.
Action Step:
A rate study needs to be completed to establish the necessary revenue and optimum rate
structure to sustain the long-term needs of the water supply and distribution systems.
5. Most of the City’s water distribution infrastructure is 45-55 years old. This means the City can expect
much of the system to need replacement within a short time frame.
Action Step:
The City needs to develop a plan for systematically replacing water mains over a
scheduled period as a means to distribute costs over time.
6.The integrity of Fridley’s well water supply is dependent upon the quality of water in different
aquifers. As has been experienced in the past, contamination of that water has significant impact to
the costs of running the system. A Wellhead Protection Plan is not only required by law, but it will
help the City protect the City’s drinking water supply.
Action Step:
The City will complete and submit its Wellhead Protection Plan by the end of 2008.
11.10 Summary
The current water supply system is sufficient to accommodate the projected future growth and
redevelopment activities that will occur in Fridley to the year 2030 and beyond.
Now that service fee restrictions have been removed by the recent referendum, the City can now focus on
planning for a sustainable system in terms of rates and rate structures to address its long-range capital
improvement needs and preservation of water resources. As long as the integrity of the existing water
supply system is preserved, Fridley’s water supply system will adequately meet the needs of the
community to 2030.
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
FormerlycalledWaterEmergency&WaterConservationPlan
1
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
INTRODUCTION TO WATER SUPPLY PLANS (WSP).....................................................................5
WhoneedstocompleteaWaterSupplyPlan.................................................................................................5
GroundwaterManagementAreas(GWMA)...................................................................................................5
BenefitsofcompletingaWSP.........................................................................................................................5
PART 1. WATER SUPPLY SYSTEM DESCRIPTION AND EVALUATION.......................................8
A.AnalysisofWaterDemand......................................................................................................................8
B.TreatmentandStorageCapacity.............................................................................................................9
Treatment and storage capacity versus demand.......................................................................10
C.WaterSources.......................................................................................................................................10
Limits on Emergency Interconnections......................................................................................11
D.FutureDemandProjectionsΑ KeyMetropolitanCouncilBenchmark...................................................12
Water Use Trends.....................................................................................................................12
Projection Method......................................................................................................................12
E.ResourceSustainability..........................................................................................................................13
Monitoring..................................................................................................................................13
Water Level Data.......................................................................................................................15
Potential Water Supply Issues & Natural Resource Impacts.....................................................16
Wellhead Protection (WHP) and Surface Water Protection (SWP) Plans.................................18
F.CapitalImprovementPlan(CIP)............................................................................................................19
Adequacy of Water Supply System...........................................................................................19
Proposed Future Water Sources...............................................................................................20
Water Source Alternatives - Key Metropolitan Council Benchmark...........................................20
Part 2. Emergency Preparedness Procedures.................................................................................21
A.FederalEmergencyResponsePlan........................................................................................................21
B.OperationalContingencyPlan...............................................................................................................21
C.EmergencyResponseProcedures.........................................................................................................21
2
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Emergency Telephone List........................................................................................................22
Current Water Sources and Service Area.................................................................................22
Procedure for Augmenting Water Supplies...............................................................................22
Allocation and Demand Reduction Procedures.........................................................................23
Notification Procedures..............................................................................................................24
Enforcement..............................................................................................................................25
PART 3. WATER CONSERVATION PLAN......................................................................................27
Progresssince2006.......................................................................................................................................27
A.TriggersforAllocationandDemandReductionActions.......................................................................28
B.ConservationObjectivesandStrategies................................................................................................29
Objective 1: Reduce Unaccounted (Non-Revenue) Water loss to Less than 10%....................29
Objective 2: Achieve Less than 75 Residential Gallons per Capita Demand (GPCD)..............31
Objective 3: Achieve at least a 1.5% per year water reduction for Institutional, Industrial,
Commercial, and Agricultural GPCD over the next 10 years or a 15% reduction in ten years..32
Objective 4: Achieve a Decreasing Trend in Total Per Capita Demand....................................32
Objective 5: Reduce Peak Day Demand so that the Ratio of Average Maximum day to the
Average Day is less than 2.6.....................................................................................................33
Objective 6: Implement a Conservation Water Rate Structure and/or a Uniform Rate Structure
with a Water Conservation Program..........................................................................................33
Objective 7: Additional strategies to Reduce Water Use and Support Wellhead Protection
Planning.....................................................................................................................................35
Objective 8: Tracking Success: How will you track or measure success through the next ten
years?........................................................................................................................................36
A.Regulation..............................................................................................................................................36
B.RetrofittingPrograms............................................................................................................................37
Retrofitting Programs.................................................................................................................37
C.EducationandInformationPrograms...................................................................................................38
Proposed Education Programs..................................................................................................38
Part 4. ITEMS FOR METROPOLITAN AREA COMMUNITIES........................................................41
3
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
A.WaterDemandProjectionsthrough2040............................................................................................41
B.PotentialWaterSupplyIssues...............................................................................................................41
C.ProposedAlternativeApproachestoMeetExtendedWaterDemandProjections..............................41
D.ValueAddedWaterSupplyPlanningEfforts(Optional).......................................................................42
Source Water Protection Strategies..........................................................................................42
Technical assistance.................................................................................................................42
GLOSSARY......................................................................................................................................43
AcronymsandInitialisms...............................................................................................................................45
APPENDICES TO BE SUBMITTED BY THE WATER SUPPLIER..................................................47
Appendix1:WellrecordsandmaintenancesummariesΑseePart1C........................................................47
Appendix2:WaterlevelmonitoringplanΑseePart1E...............................................................................47
Appendix3:WaterlevelgraphsforeachwatersupplywellseePart1E....................................................47
Appendix4:CapitalImprovementPlanseePart1E....................................................................................47
Appendix5:EmergencyTelephoneListΑseePart2C..................................................................................47
Appendix6:CooperativeAgreementsforEmergencyServicesΑseePart2C.............................................47
Appendix7:MunicipalCriticalWaterDeficiencyOrdinanceΑseePart2C..................................................47
Appendix8:Graphshowingannualpercapitawaterdemandforeachcustomercategoryduringthelast
tenyearsΑseePart3Objective4.................................................................................................................47
Appendix9:WaterRateStructureΑseePart3Objective6........................................................................47
Appendix10:AdoptedorproposedregulationstoreducedemandorimprovewaterefficiencyΑseePart3
Objective7.....................................................................................................................................................47
Appendix11:ImplementationChecklistΑsummaryofalltheactionsthatacommunityisdoing,or
proposestodo,includingestimatedimplementationdatesΑseewww.mndnr.gov/watersupplyplans.....47
4
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
INTRODUCTIONTOWATERSUPPLYPLANS(WSP)
WhoneedstocompleteaWaterSupplyPlan
Publicwatersuppliersservingmorethan1,000people,largeprivatewatersuppliersindesignated
GroundwaterManagementAreas,andallwatersuppliersintheTwinCitiesmetropolitanareaarerequired
toprepareandsubmitawatersupplyplan.
ThegoaloftheWSPistohelpwatersuppliers:1)implementlongtermwatersustainabilityand
conservationmeasures;and2)developcriticalemergencypreparednessmeasures.Yourcommunityneeds
toknowwhatmeasureswillbeimplementedincaseofawatercrisis.Alotofemergenciescanbeavoided
ormitigatediflongtermsustainabilitymeasuresareimplemented.
GroundwaterManagementAreas(GWMA)
TheDNRhasdesignatedthreeareasofthestateasGroundwaterManagementAreas(GWMAs)tofocus
groundwatermanagementeffortsinspecificgeographieswherethereisanaddedriskofoveruseorwater
qualitydegradation.AplandirectingtheDNRsactionswithineachGWMAhasbeenprepared.Although
therearenospecificadditionalrequirementswithrespecttothewatersupplyplanningforcommunities
withindesignatedGWMAs,communitiesshouldbeawareoftheissuesandactionsplannediftheyare
withintheboundaryofoneoftheGWMAs.ThethreeGWMAsaretheNorthandEastMetroGWMA(Twin
CitiesMetro),theBonanzaValleyGWMAandtheStraightRiverGWMA(nearParkRapids).Additional
informationandmapsareincludedintheDNRwebpageathttp://www.dnr.state.mn.us/gwmp/areas.html
BenefitsofcompletingaWSP
CompletingaWSPusingthistemplate,fulfillsawaterƭǒƦƦƌźĻƩƭstatutoryobligationsunderM.S.
tocompleteawatersupplyplan.Forwatersuppliersinthemetropolitanarea,theWSPwill
M.S.103G.291
helplocalgovernmentalunitstofulfilltheirrequirementsunderM.S.473.859tocompletealocal
comprehensiveplan.AdditionalbenefitsofcompletingWSPtemplate:
Thestandardizedformatallowsforquickerandeasierreviewandapproval.
Helpwatersupplierspreparefordroughtsandwateremergencies.
CreateeligibilityforfundingrequeststotheMinnesotaDepartmentofHealth(MDH)forthe
DrinkingWaterRevolvingFund.
Allowwatersupplierstosubmitrequestsfornewwellsorexpandedcapacityofexistingwells.
Simplifythedevelopmentofcountycomprehensivewaterplansandwatershedplans.
FulfillthecontingencyplanprovisionsrequiredintheMDHwellheadprotectionandsurfacewater
protectionplans.
5
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
FulfillthedemandreductionrequirementsofMinnesotaStatutes,section103G.291subd3and4.
Uponimplementation,contributetomaintainingaquiferlevels,reducingpotentialwellinterference
wellsorexpandsystemcapacity.
andwateruseconflicts,andreducingtheneedtodrillnew
EnableDNRtocompileandanalyzewateruseandconservationdatatohelpguidedecisions.
ConserveaźƓƓĻƭƚƷğƭwaterresources
6
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table1.Generalinformationregardingthiswatersupplyplan.
RequestedInformationDescription
DNRWaterAppropriationPermitNumber(s)19756244,756244
Ownership
PublicorPrivate
MetropolitanCouncilArea
YesorNo(andcountyname)
StreetAddress 6431UniversityAvenueNE
City,State,Zip Fridley,MN55432
ContactPersonNameJamesKosluchar
TitleDirectorofPublicWorks/CityEngineer
PhoneNumber7635723550
MDHSupplierClassificationMunicipal
7
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table3showslargestvolumeuserswithmostrecentannualdata.Fridleyhasseverallargeusers,the
toptenusersconsumedoveronesixthofwaterproductionin201516.
Table3.Largevolumeusers
CustomerUseCategory(residential,AmountUsedPercentofTotalImplementingWater
Industrial,Commercial,(GallonsperYear)AnnualWaterConservationMeasures?
Institutional,Wholesale)Delivered(Yes/No/Unknown)
1.ARAMARKUNIFORMSERVICESIndustrial32,345,3602.80%Unknown
2.ECOFINISHINGIndustrial2.63%Unknown
30,387,200
3.CUMMINS,INCIndustrial24,439,6502.11%Unknown
4.CONAGRAFOODS,INCIndustrial2.06%Unknown
23,883,200
5.UNITYHOSPITALInstitutional16,912,2001.46%Unknown
6.MEDTRONIC,INC
Institutional1.29%Unknown
(HEADQUARTERS)14,948,240
7.STYLMARK,INCIndustrial13,713,4001.19%Unknown
8.DUGASBOWERSPLATINGIndustrial13,401,3901.16%Unknown
9.MEDTRONIC,INC(OPERATIONS)Industrial1.10%Unknown
12,713,300
10.KAP5TONECONTAINERCORPIndustrial12,518,9701.08%Unknown
B.TreatmentandStorageCapacity
Table4describeswherewateristreated,treatmentmethods,andcapacities.Treatmentprocessesare
currentlyprovidingwaterthatmeetsalldrinkingwaterqualityrequirements.The/źƷǤƭtreatment
systemhassubstantialcapacityabovepeakdaydemand.
9
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table4.Watertreatmentcapacityandtreatmentprocesses
TreatmentSiteIDYearTreatmentTreatmentMethodTreatmentTypeAnnualDisposalDoYou
(PlantNameorConstructedCapacityAmountProcessReclaim
WellID)(MGD)offorFilter
ResidualsResidualsBackwash
Water?
CommonsPark1960IronRemoval8PressureFilters
12.1SanitaryYes
WTPSewer
1988ManganeseRemoval8PressureFilters
FluoridationLiquidInjection
ChlorinationChloramineAddition
RadionuclideRemoval
LockeParkWTP1968IronRemoval2PressureFilters
2.9StormNo
Sewer
1994ManganeseRemoval2PressureFilters
and
FluoridationLiquidInjection
Sanitary
ChlorinationChloramineAddition
Sewer
WTP#31997IronRemoval2PressureFilters
2.2SanitaryNo
Sewer
ManganeseRemoval2PressureFilters
FluoridationLiquidInjection
ChlorinationChloramineAddition
TotalTreatedCapacity17.2
EmergencyCapacity23.2
Treatmentandstoragecapacityversusdemand
Table5showsstoragefacilitiesandtotalcapacity.Storageexceedscurrentaveragedaydemandbya
factoroftwo,andisequivalentto1.67timespeakforecastedaveragedaydemand.
Table5.Storagecapacity,asoftheendofthelastcalendaryear
StructureNameTypeofStorageYearConstructedPrimaryMaterialStorageCapacity
Structure(Gallons)
1.CommonsParkElevatedstorage1960Steel500,000
2.Highway65Elevatedstorage1993Steel1,500,000
3.CommonsParkGroundstorage1964Concrete3,000,000
4.MarianHillsGroundstorage1988Concrete1,500,000
Total6,500,000
C.WaterSources
AsummaryofwatersourcesisincludedinTable6.Wellrecordsandamaintenancesummaryforeach
wellthathasoccurredsinceourlastapprovedplanisincludedin Appendix1.
10
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table6.Watersourcesandstatus
ResourceTypeResourceMNUniqueYearInstalledCapacityWellStatusofNormalDoesthisSource
(Groundwater,NameWell#or(GallonsDepthandEmergencyhaveaDedicated
Surfacewater,IntakeIDper(Feet)OperationsEmergencyPower
Interconnection)Minute)(active,inactive,Source?(Yesor
emergencyonly,No)
retail/wholesale
interconnection))
GroundwaterWell12066851957700389StandbyNo
GroundwaterWell22066741961525675ActiveYes
GroundwaterWell32066701961700720ActiveYes
GroundwaterWell42011581961725663ActiveYes
GroundwaterWell52066751961725656ActiveYes
GroundwaterWell620667319641400153ActiveYes
GroundwaterWell72066711966800138ActiveYes
GroundwaterWell820666919661550138ActiveYes
GroundwaterWell920667219661500153ActiveYes
GroundwaterWell102066581969800128ActiveYes
GroundwaterWell112066571970825344ActiveYes
GroundwaterWell122920719701550234ActiveYes
GroundwaterWell132066961970825191StandbyNo
GroundwaterCityofNew19942000CurrentlynotYes
augmentationBrightonavailable,
(purchased)onlinein2018
Groundwater
Cityof350EmergencyYes
EmergencyMoundsOnly
SupplyView
SurfaceWaterCityof1500EmergencyYes
EmergencyMinneapolisOnly
Supply
LimitsonEmergencyInterconnections
Wells2through9exceedthecapacityofCommonsParkWaterTreatmentPlant,wheretheyare
located.Typicallyonetofourpumpsareruninaccordancewithdemand.
Wells1and13arecurrentlyoperatedonlyifdemandexceedsavailablesupply;thishasnotbeen
necessarysinceourlastWaterSupplyPlanin2008.Theyaremaintainedasfullyoperable,however.
TheNewBrightonsupplyisnotavailableuntiltreatmentprocessesareinplace,anticipatedintheendof
2018.
TheMinneapolisemergencysupplyissurfacewaterandwouldtaketimetosetuptoprovideproper
drinkingwaterquality;thissupplymayonlybesuitedtobemadeavailableintheeventsof1)a
catastrophicemergency,2)alongtermlossofcapacity.
11
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
D.FutureDemandProjectionsȟ KeyMetropolitanCouncilBenchmark
WaterUseTrends
Thefollowingtrendsarenotedincurrentwateruse,showninTable2:
1)Populationservedisincreasingatamodestrate,andisprojectedtodosothrough2040.
2)Totalpercapitawaterdemand,alongwithresidentialpercapitademand,hasdeclinedinthe
past10years.CommercialandIndustrialdemandtrendsremainmoresteady,althoughthere
areannualfluctuations.
3)Theaveragedailydemandhasdecreasedsubstantially,andisapproximatelyhalfofthepeak
demandsof30yearsago.
4)Themaximumdailydemandhasdecreasedsignificantly,andhasapeakingfactorofbelow2.0
forthepasttwoyears.
Trendsforallcustomercategoriesaredeclining;residentialcustomerclassisthemostobvious.Reasons
includelowflowfixtures,eliminationofdischargesingleusecoolingwater,conservationrates,and
education/efficiency/rebateprogramsandefforts.
ProjectionMethod
Table7showstheprojectedannualdemandforthenexttenyears.Thepopulationestimates,provided
bytheMetropolitanCouncil,areusedasabasisfortheprojection.Employmentprojectionsalso
providedbytheMetropolitanCouncil,areusedtoprojectCommercialandIndustrialdemandatafixed
rateof62gallonsperemployeeperday(consistentwithcurrentusage,andconservative).
Table7.Projectedannualwaterdemand
YearProjectedProjectedProjectedProjectedProjectedProjected
TotalPopulationResidentialTotalPerAverageDailyMaximum
PopulationServedPerCapitaCapitaWaterDemandDailyDemand
WaterDemand(MGD)(MGD)
Demand(GPCD)
(GPCD)
201628,89228,91268.0118.03.476.94
201728,99429,01468.0118.03.486.96
201829,09629,11668.0118.03.496.99
201929,19829,21868.0118.03.517.01
202029,30029,32065.0115.03.527.04
202129,68329,70365.0115.03.567.13
202230,06730,08765.0115.03.617.22
202330,45030,47065.0115.03.667.31
202430,83330,85365.0115.03.707.40
202531,21731,23765.0115.03.757.50
203031,60031,62063.0113.03.797.59
204032,50032,52060.0110.03.907.80
GPCD ΑGallonsperCapitaperDay MGD ΑMillionGallonsperDay
12
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
E.ResourceSustainability
Monitoring
Sourcemonitoringissummarizedinthetablebelow,andincludesmonitoringofbothaquiferimpacts
andsourcewaterqualitymonitoringthattheCityofFridleyperforms.
Table8.Informationaboutsourcewaterqualityandquantitymonitoring
MNUniqueWell#orTypeofmonitoringMonitoringprogramFrequencyofMonitoringMethod
SurfaceWaterIDpointmonitoring
Well1206685productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well2206674productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well3206670productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well4201158productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well5206675productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoir
annually
13
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
MNUniqueWell#orTypeofmonitoringMonitoringprogramFrequencyofMonitoringMethod
SurfaceWaterIDpointmonitoring
Well6206673productionwell
routineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well7206671productionwell
routineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well8206669productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well9206672productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well10206658productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well11206657productionwellroutineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
14
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
MNUniqueWell#orTypeofmonitoringMonitoringprogramFrequencyofMonitoringMethod
SurfaceWaterIDpointmonitoring
Well1229207productionwell
routineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
Well13206696productionwell
routineMDH
continuousSCADA
sampling
observationwell
grabsampling
hourly
routinewater
steeltape
sourcewater
utilitysampling
daily
streamgauge
intake
other
monthly
sourcewater
quarterly
reservoirannually
WaterLevelData
Awaterlevelmonitoringplanisincludedin Appendix2.
Table9summarizeswaterleveldataforeachwellbeingmonitored.Appendix3 haswaterlevelgraphs
showingallavailabledata,andamorerecent10yeartrend.Productionratesmeasuredatthetimeof
drawdownarealsoshownonthesefigures.
Table9.Waterleveldata
UniqueWellAquiferNameSeasonalVariationLongtermTrendinWaterlevel
NumberorWellID(Feet)waterleveldatameasuredduring
well/pumping
maintenance
Well1206685Franconia,
40SeeAppendix3
Falling
Galesville,Mt.
Stable
SimonHinckley
Rising
Well2206674Mt.3060SeeAppendix3
Falling
SimonHinckley
Stable
Rising
Well3206670Mt.40SeeAppendix3
Falling
SimonHinckley
Stable
Rising
Well4201158Mt.70SeeAppendix3
Falling
SimonHinckley
Stable
Rising
Well5206675Mt.3050
SeeAppendix3
Falling
SimonHinckley
Stable
Rising
15
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
UniqueWellAquiferNameSeasonalVariationLongtermTrendinWaterlevel
NumberorWellID(Feet)waterleveldatameasuredduring
well/pumping
maintenance
Well6206673Prairiedu510SeeAppendix3
Falling
ChienJordan
Stable
Rising
Well7206671Prairiedu5SeeAppendix3
Falling
ChienJordan
Stable
Rising
Well8206669Prairiedu5
SeeAppendix3
Falling
ChienJordan
Stable
Rising
Well9206672Prairiedu35SeeAppendix3
Falling
ChienJordan
Stable
Rising
Well10206658Drift5SeeAppendix3
Falling
Stable
Rising
Well11206657Franconia50
SeeAppendix3
Falling
Galesville
Stable
Rising
Well1229207Prairiedu510
SeeAppendix3
Falling
ChienJordan
Stable
Rising
Well13206696Prairiedu2SeeAppendix3
Falling
ChienJordan
Stable
Rising
PotentialWaterSupplyIssues&NaturalResourceImpacts
Table10liststhetypesofnaturalresourcesthatareorcouldbeimpactedbypermittedwater
withdrawals.Surfacewatersarepresumedtobeatlowrisk,ashistoricpumpingrateshavedeclinedby
50%overthepastthreedecades.Monitoringofindicatorresourceswouldbeconductedtoensurethat
therearenoimpacts.
16
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table10.Naturalresourceimpacts
ResourceResourceRiskRiskDescribeMitigationDescribeHow
TypeNameAssessedResourceMeasureorChangesto
ThroughProtectionManagementThresholdsare
Threshold*PlanMonitored
AquiferMt.Flow/waterSustainedMonthly
GISRevise
Simonleveldeclinedeclineovermeasurements
analysispermit
Hinckleyfiveyear
Degrading
Change
Modeling
period
waterqualitygroundwater
Mapping
trendsand/orpumping
Monitoring
MCLsIncrease
exceededconservation
Aquifer
ImpactsonOther
testing
endangered,
Other:___
threatened,or
special
concern
specieshabitat
orother
natural
resource
impacts
Other:
_____
AquiferPrairiedu
Flow/waterSustainedMonthly
GISRevise
Chienleveldeclinedeclineovermeasurements,
analysispermit
JordanDegradingfiveyearquarterly
Change
Modeling
waterqualityperiod,waterwaterquality
groundwater
trendsand/orqualityissuemonitoring
Mapping
pumping
MCLs
Monitoring
Increase
exceeded
conservation
Aquifer
Impactson
Other
testing
endangered,
Other:___
threatened,or
special
concern
specieshabitat
orother
natural
resource
impacts
Other:
_____
LakeMooreFlow/water
DeclineoverLakelevel
GISRevise
Lakeleveldeclinenondroughtreadings,bi
analysispermit
period,weekly
Degrading
Change
Modeling
multiple
waterqualitygroundwater
seasons
Mapping
trendsand/orpumping
Monitoring
MCLsIncrease
17
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
ResourceResourceRiskRiskDescribeMitigationDescribeHow
TypeNameAssessedResourceMeasureorChangesto
ThroughProtectionManagementThresholdsare
Threshold*PlanMonitored
exceededconservation
Aquifer
ImpactsonOther
testing
endangered,
Other:___
threatened,or
special
concern
specieshabitat
orother
natural
resource
impacts
Other:
_____
WetlandVarious
Flow/waterGISSiteBiannual
Revise
stormwaterleveldeclineanalysismonitoring/GISreviewwhen
permit
wetlandsanalysisshowsnewaerial
DegradingModeling
Change
thatdeclineoverphotography
waterqualitygroundwater
Mapping
rechargenondroughtavailable
trendsand/orpumping
Monitoring
aquifersinperiod,
MCLsIncrease
Fridleymultiple
Aquifer
exceededconservation
seasons
testing
ImpactsonOther
Other:___
endangered,
threatened,or
special
concern
specieshabitat
orother
natural
resource
impacts
Other:
_____
*Examplesofthresholds:alowerlimitonacceptableflowinariverorstream;waterqualityoutsideofanacceptedrange;a
lowerlimitonacceptableaquiferleveldeclineatoneormoremonitoringwells;withdrawalsthatexceedsomepercentofthe
totalamountavailablefromasource;oralowerlimitonacceptablechangestoaprotectedhabitat.
WellheadProtection(WHP)andSurfaceWaterProtection(SWP)Plans
Table11providesthestatusinformationabouttheCityofCƩźķƌĻǤƭWellheadProtectionPlan(WHP).
TheCitydoesnothaveaSurfaceWaterProtectionPlan(SWP),assurfacewaterisnotadirectsourceof
itswatersupply.
18
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table11.StatusofWellheadProtectionandSurfaceWaterProtectionPlans
PlanTypeStatusDateAdoptedDateforUpdate
WHP
20092018
InProcess
Completed
NotApplicable
SWP
InProcess
Completed
NotApplicable
F.CapitalImprovementPlan(CIP)
AdequacyofWaterSupplySystem
Table12containsinformationabouttheadequacyofwells,storagefacilities,treatmentfacilities,and
distributionsystemstosustaincurrentandprojecteddemands.Listedarehighlightsofplannedcapital
improvementsforsystemcomponents,inchronologicalorder.
The/źƷǤƭlatestCapitalImprovementPlanisattachedas Appendix4.
Table12.AdequacyofWaterSupplySystem
SystemComponentPlannedactionAnticipatedNotes
Construction
Year
Wells/Intakes
OngoingBiannualproject
Noactionplannedadequate
including23
Repair/replacement
well
Expansion/addition
rehabilitations
WaterStorageFacilities
2023MarianHills
Noactionplannedadequate
2028Highway65#2
Repair/replacement
2030Commons#1
Expansion/addition
andGround
WaterTreatmentFacilities
2017LockeFilterand
Noactionplannedadequate
Backwash
Repair/replacement
2025CommonsFilterI
Expansion/addition
2030CommonsFilter
II
DistributionSystems
OngoingAnnualMain
Noactionplannedadequate
(pipes,valves,etc.)Rehab,Valve
Repair/replacement
andHydrant
Expansion/addition
Replacement
PressureZonesNoactionplannedadequate
Repair/replacement
Expansion/addition
19
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
SystemComponentPlannedactionAnticipatedNotes
Construction
Year
Other:
WellhousesOngoing
Noactionplannedadequate
andPlant
Repair/replacement
Buildings
Expansion/addition
rd
Booster
632018
Station
Rehab
Minnneapolis2018
Interconnect
Rehab
ProposedFutureWaterSources
Table13identifiesnewwatersourceinstallationplannedoverthenexttenyears.
Table13.Proposedfutureinstallations/sources
SourceInstallationResourceProposedPlannedPlanned
LocationNamePumpingInstallationYearPartnerships
(approximate)Capacity(gpm)
GroundwaterNoFutureSourcesPlanned
SurfaceWater
Interconnection
toanother
supplier
WaterSourceAlternatives KeyMetropolitanCouncilBenchmark
Doyouanticipatetheneedforalternativewatersourcesinthenext10years?YesNo
Formetrocommunities,willyouneedalternativewatersourcesbytheyear2040?YesNo
Table14.Alternativewatersources
AlternativeSourceSourceand/orEstimatedTimeframePotentialBenefitsChallenges
ConsideredInstallationAmountoftoPartners
LocationFutureImplement
(approximate)Demand(%)(YYYY)
NoAlternativeSourcesPlanned
Groundwater
SurfaceWater
Reclaimedstormwater
Reclaimedwastewater
Interconnectionto
anothersupplier
20
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Part2.EmergencyPreparednessProcedures
Theemergencypreparednessproceduresoutlinedinthisplanareintendedtocomplywiththe
contingencyplanprovisionsrequiredbyMDHintheWHPandSWP.Wateremergenciescanoccurasa
resultofvandalism,sabotage,accidentalcontamination,mechanicalproblems,powerfailings,drought,
planningistodevelopemergency
flooding,andothernaturaldisasters.Thepurposeofemergency
responseproceduresandtoidentifyactionsneededtoimproveemergencypreparedness.Inthecaseof
amunicipality,theseproceduresshouldbeinsupportof,andpartof,anallhazardemergency
operationsplan.Municipalitiesthatalreadyhavewrittenproceduresdealingwithwateremergencies
shouldreviewthefollowinginformationandupdateexistingprocedurestoaddressthesewatersupply
protectionmeasures.
A.FederalEmergencyResponsePlan
Section1433(b)oftheSafeDrinkingWaterAct,(PublicLaw107188,TitleIVDrinkingWaterSecurity
andSafety)requirescommunitywatersuppliersservingover3,300peopletoprepareanEmergency
ResponsePlan.
No
Doyouhaveafederalemergencyresponseplan?Yes
Ifyes,whatwasthedateitwascertified?1/1/2011
CompleteTable15byinsertingthenotedinformationregardingyourcompletedFederalEmergency
ResponsePlan.
Table15.EmergencyPreparednessPlancontactinformation
EmergencyResponsePlanRoleContactPersonContactPhoneContactEmail
Number
EmergencyResponseLeadBRIANWEIERKEBRIAN.WEIERKE@FRIDLEYMN.GOV
AlternateEmergencyResponseMIKEMONSRUDMIKE.MONSRUD@FRIDLEYMN.GOV
Lead
B.OperationalContingencyPlan
Allutilitiesshouldhaveawrittenoperationalcontingencyplanthatdescribesmeasurestobetakenfor
watersupplymainlinebreaksandothercommonsystemfailuresaswellasroutinemaintenance.
Doyouhaveawrittenoperationalcontingencyplan?YesNo
Ataminimum,awatersuppliershouldprepareandmaintainanemergencycontactlistofcontractors
andsuppliers.
C.EmergencyResponseProcedures
WatersuppliersmustmeettherequirementsofMNRules4720.5280.Accordingly,theMinnesota
DepartmentofNaturalResources(DNR)requirespublicwatersuppliersservingmorethan1,000people
tosubmitEmergencyandConservationPlans.Wateremergencyandconservationplansthathavebeen
21
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
approvedbytheDNR,underprovisionsofMinnesotaStatute186andMinnesotaRules,part6115.0770,
willbeconsideredequivalenttoanapprovedWHPcontingencyplan.
EmergencyTelephoneList
Alistofemergencycontacts,includingtheMNDutyOfficerisprovidedin Appendix5.
CurrentWaterSourcesandServiceArea
Quickaccesstoconciseanddetailedinformationonwatersources,watertreatment,andthe
distributionsystemmaybeneededinanemergency.Systemoperationandmaintenancerecordsshould
bemaintainedinsecuredcentralandbackuplocationssothattherecordsareaccessibleforemergency
purposes.Adetailedmapofthesystemshowingthetreatmentplants,watersources,storagefacilities,
supplylines,interconnections,andotherinformationthatwouldbeusefulinanemergencyshouldalso
bereadilyavailable.Itiscriticalthatpublicwatersupplierrepresentativesandemergencyresponse
personnelcommunicateabouttheresponseproceduresandbeabletoeasilyobtainthiskindof
informationbothinelectronicandhardcopyformats(incaseofapoweroutage).
Dorecordsandmapsexist?YesNo
Canstaffaccessrecordsandmapsfromacentralsecuredlocationintheeventofanemergency?
YesNo
Doestheappropriatestaffknowwherethematerialsarelocated?
YesNo
ProcedureforAugmentingWaterSupplies
Tables16and17bylistallavailablesourcesofwaterthatcanbeusedtoaugmentorreplaceexisting
sourcesinanemergency.
Table16.Interconnectionswithotherwatersupplysystemstosupplywaterinanemergency
OtherWaterCapacity(GPMNoteAnyLimitationsOnListofservices,equipment,supplies
SupplySystem&MGD)Useavailabletorespond
Owner
CITYOFNEW3MGDCURRENTLYOFFLINE
BRIGHTONUNTIL2018FOR
TREATMENTUPGRADE
CITYOFMOUNDS0.5MGD
VIEW
CITYOF2.19MGDSURFACEWATERSOURCE
MINNEAPOLISWOULDNEEDTO
EVALUATEWATER
QUALITYPRIORTO
OPERATING
22
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
GPMΑGallonsperminuteMGDΑmilliongallonsperday
Table17.Utilizingsurfacewaterasanalternativesource
SurfaceWaterCapacityCapacityTreatmentNeedsNoteAnyLimitations
SourceName(GPM)(MGD)OnUse
TheNewBrightonsupplyisnotavailableuntiltreatmentprocessesareinplace,anticipatedintheendof
2018.
TheMinneapolisemergencysupplyissurfacewaterandwouldtaketimetosetuptoprovideproper
drinkingwaterquality;thissupplymayonlybesuitedtobemadeavailableintheeventsof1)a
catastrophicemergency,2)alongtermlossofcapacity.
AllocationandDemandReductionProcedures
Table18prioritizesallocationofwaterandreductionindemandduringanemergency.
WaterusecategorieshasbeenprioritizedinawaythatisconsistentwithMinnesotaStatutes103G.261
priority)asfollows:
(#1ishighest
1.Wateruseforhumanneedssuchascooking,cleaning,drinking,washingandwastedisposal;use
foronfarmlivestockwatering;anduseforpowerproductionthatmeetscontingency
requirements.
2.Wateruseinvolvingconsumptionoflessthan10,000gallonsperday(usuallyfromprivatewells
orsurfacewaterintakes)
3.Wateruseforagriculturalirrigationandprocessingofagriculturalproductsinvolving
consumptionofmorethan10,000gallonsperday(usuallyfromprivatehighcapacitywellsor
surfacewaterintakes)
4.Wateruseforpowerproductionabovetheuseprovidedforinthecontingencyplan.
5.Allotherwateruseinvolvingconsumptionofmorethan10,000gallonsperday.
6.NonessentialusesΑcarwashes,golfcourses,etc.
Waterusedforhumanneedsathospitals,nursinghomesandsimilartypesoffacilitiesshouldbe
designatedasahighprioritytobemaintainedinanemergency.Lowerpriorityuseswillneedtoaddress
waterusedforhumanneedsatothertypesoffacilitiessuchashotels,officebuildings,and
manufacturingplants.Thevolumeofwaterandothertypesofwaterusesatthesefacilitiesmustbe
carefullyconsidered.Afterreviewingthedata,commonsenseshoulddictatelocalallocationprioritiesto
23
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
protectdomesticrequirementsovercertaintypesofeconomicneeds.Wateruseforlawnsprinkling,
vehiclewashing,golfcourses,andrecreationarelegislativelyconsiderednonessential.
Table18.Waterusepriorities
CustomerCategoryAllocationPriorityAverageDailyDemandShortTermEmergency
(MGD)DemandReduction
Potential(MGD)
Institutional10.240.00
Residential21.980.20
Commercial30.150.05
Industrial40.700.40
Irrigation50.150.15
NonEssential60.040.04
Wholesale70.000.00
TOTAL3.260.84
MGD ΑMillionGallonsperDay
Table19indicatesthepossibletriggersandactionsduringwatersupplydisruptionconditions.
Table19.Emergencydemandreductionconditions,triggersandactions
EmergencyTriggersShorttermActionsLongtermActions
Supplyaugmentationthrough
Contamination Supplyaugmentationthrough
NewBrighton,MoundsView
NewBrighton,MoundsView,
Lossofproduction
Adopt(ifnotalready)andMinneapolis
Infrastructurefailure
enforceacriticalwaterAdopt(ifnotalready)and
Executiveorderby
deficiencyordinancetopenalizeenforceacriticalwater
Governor
lawnwatering,vehiclewashing,deficiencyordinancetopenalize
Other:_____________
golfcourseandparkirrigation&lawnwatering,vehiclewashing,
othernonessentialuses.golfcourseandparkirrigation&
othernonessentialuses.
Waterallocationthrough____
Waterallocationthrough____
Meetwithlargewaterusersto
discusstheircontingencyplan.Meetwithlargewaterusersto
discusstheircontingencyplan.
NotificationProcedures
Table20showsselectedtriggersforinformingcustomersregardingconservationrequests,wateruse
restrictions,andsuspensions;notificationfrequencies;andpartnersthatmayassistinthenotification
process.
24
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table20.Plantoinformcustomersregardingconservationrequests,wateruserestrictions,and
suspensions
NotificationMethods(selectallthatapply)UpdatePartners
Trigger(s)Frequency
Shortterm
Website
Daily
demandreduction
Emaillistserve
Weekly
declared(<1
Socialmedia(e.g.Twitter,Monthly
year)
Facebook)
Annually
Directcustomermailing,
Pressrelease(TV,radio,
newspaper),
Meetingwithlargewaterusers
(>10%oftotalcityuse)
Other:________
Longterm
Website
Daily
Ongoingdemand
Emaillistserve
Weekly
reduction
Socialmedia(e.g.Twitter,
Monthly
declared
Facebook)
Annually
Directcustomermailing,
Pressrelease(TV,radio,
newspaper),
Meetingwithlargewaterusers
(>10%oftotalcityuse)
Other:________
DƚǝĻƩƓƚƩƭcritical
Website
Daily
waterdeficiency
Emaillistserve
Weekly
declared
Socialmedia(e.g.Twitter,Monthly
Facebook)
Annually
Directcustomermailing,
Pressrelease(TV,radio,
newspaper),
Meetingwithlargewaterusers
(>10%oftotalcityuse)
Other:________
Enforcement
Doesthecityhaveacriticalwaterdeficiencyrestriction/officialcontrolinplacethatincludes
provisionstorestrictwateruseandenforcetherestrictions?(Thisrestrictionmaybeanordinance,
No
rule,regulation,policyunderacouncildirective,orotherofficialcontrol)Yes
TheofficialcontroldocumentisattachedtothisWSPas Appendix7.
Irrespectiveofwhetheracriticalwaterdeficiencycontrolisinplace,doesthepublicwatersupply
utility,citymanager,mayor,oremergencymanagerhavestandingauthoritytoimplementwater
restrictions?YesNo
25
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Ifyes,citetheregulatoryauthorityreference:________________________.
26
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
PART3.WATERCONSERVATIONPLAN
MinnesotanshavehistoricallybenefitedfromtheƭƷğƷĻƭabundant
watersupplies,reducingtheneedforconservation.Thereare
however,limitstotheavailablesuppliesofwaterandincreasing
threatstothequalityofourdrinkingwater.Causesofwatersupply
limitationmayinclude:populationincreases,economictrends,
unevenstatewideavailabilityofgroundwater,climaticchanges,
anddegradedwaterquality.Examplesofthreatstodrinkingwater
qualityinclude:thepresenceofcontaminantplumesfrompastland
useactivities,exceedancesofwaterqualitystandardsfromnatural
andhumansources,contaminantsofemergingconcern,and
increasingpollutanttrendsfromnonpointsources.
Therearemanyincentivesforconservingwater;conservation:
reducesthepotentialforpumpinginducedtransferofcontaminantsintothedeeperaquifers,
whichcanaddtreatmentcosts
reducestheneedforcapitalprojectstoexpandsystemcapacity
reducesthelikelihoodofwateruseconflicts,likewellinterference,aquatichabitatloss,and
declininglakelevels
conservesenergy,becauselessenergyisneededtoextract,treatanddistributewater(andless
energyproductionalsoconserveswatersincewaterisusetoproduceenergy)
maintainswatersuppliesthatcanthenbeavailableduringtimesofdrought
Itisthereforeimperativethatwatersuppliersimplementwaterconservationplans.Thefirststepin
waterconservationisidentifyingopportunitiesforbehavioralorengineeringchangesthatcouldbe
madetoreducewaterusebyconductingathoroughanalysisof:
Waterusebycustomer
Extraction,treatment,distributionandirrigationsystemefficiencies
Industrialprocessingsystemefficiencies
Regulatoryandbarrierstoconservation
Culturalbarrierstoconservation
Waterreuseopportunities
Onceaccuratedataiscompiled,watersupplierscansetachievablegoalsforreducingwateruse.A
successfulwaterconservationplanfollowsalogicalsequenceofevents.Theplanshouldaddressboth
conservationonthesupplyside(leakdetectionandrepairs,metering),aswellasonthedemandside
(reductionsinusage).Implementationshouldbeconductedinphases,startingwiththemostobvious
andlowestcostoptions.Insomecasesoneoftheearlystepswillbereviewingregulatoryconstraintsto
waterconservation,suchaslawnirrigationrequirements.Outsidefundingandgrantsmaybeavailable
forimplementationofprojects.Engagewatersystemoperatorsandmaintenancestaffandcustomers
inbrainstormingopportunitiestoreducewateruse.Askthequestion:ͻIƚǞcanIhelpsaveǞğƷĻƩͪͼ
Progresssince2006
IsthisyourĭƚƒƒǒƓźƷǤƭfirstWaterSupplyPlan?YesNo
27
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table21tosummarizesconservationactionstakensincetheadoptionofthe2006watersupplyplan.
Table21.ImplementationofprevioustenyearConservationPlan
2006PlanCommitmentsActionTaken?
CompletearatestudyandchangewaterratesstructuretoprovideconservationpricingYes
No
DevelopaplanforsystematicallyreplacingwatermainsoverascheduledperiodYes
No
UpdateEmergencyManagementPlanYes
No
MonitorPeakHourlyDemandsandConsiderLegislationandEducationasNeededYes
No
DevelopGuidelinesforUnmeteredWaterUsageYes
No
CompleteaRateStudyandIncorporateConservationRatesYes
No
CompleteWellheadProtectionPlan
TheCityofFridleyhasseenthefollowingfromtheactionsinTable21:Steadydemandreduction,
particularlywithresidentialcustomers.Resultsareshowninannualusagedata.TheCitymonitors
theimpactsoftheseactionsannuallyduringreportingperiods.
A.TriggersforAllocationandDemandReductionActions
Table22checkseachtriggerthatmaybeutilizedbelow,asappropriate,andtheactionstobetakenat
variouslevelsorstagesofseverity.
Table22.Shortandlongtermdemandreductionconditions,triggersandactions
ObjectiveTriggersActions
ProtectsurfacewaterflowsLowstreamflowconditionsIncreasepromotionofconservation
measures
Reportsofdecliningwetland
Other:____________
andlakelevels
Other:______________
ShorttermdemandreductionAdopt(ifnotalready)andenforcethe
Extremelyhighseasonal
(lessthan1yearcriticalwaterdeficiencyordinanceto
waterdemand(morethan
watering,vehicle
restrictorprohibitlawn
doublewinterdemand)
washing,golfcourseandparkirrigation
Lossoftreatmentcapacity
&othernonessentialuses.
Lackofwaterinstorage
SupplyaugmentationthroughNew
Statedroughtplan
28
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
ObjectiveTriggersActions
WellinterferenceBrighton
Other:
Waterallocationthrough____
Demandexceeding80%of
Meetwithlargewateruserstodiscuss
adjustedfirmcapacity
ǒƭĻƩƭcontingencyplan.
Longtermdemandreduction
PercapitademandDevelopacriticalwaterdeficiency
(>1year)
increasingordinancethatisorcanbequickly
Totaldemandincreaseadoptedtopenalizelawnwatering,
(higherpopulationormorevehiclewashing,golfcourseandpark
industry)irrigation&othernonessentialuses.
Waterlevelinwell(s)belowEnactawaterwasteordinancethat
elevationof_____targetsoverwatering(causingwaterto
flowoffthelandscapeintostreets,
Other:_____________
parkinglots,orsimilar),watering
impervioussurfaces(streets,driveways
orotherhardscapeareas),and
negligenceofknownleaks,breaks,or
malfunctions.
Meetwithlargewateruserstodiscuss
ǒƭĻƩƭcontingencyplan.
Enhancedmonitoringandreporting:
audits,meters,billing,etc.
DƚǝĻƩƓƚƩƭͻ/ƩźƷźĭğƌWaterDescribeRespondinconformancewithorder
DeficiencyhƩķĻƩͼdeclared
B.ConservationObjectivesandStrategies
Thissectionestablisheswaterconservationobjectivesandstrategiesforeightmajorareasofwateruse.
Objective1:ReduceUnaccounted(NonRevenue)WaterlosstoLessthan10%
TheMinnesotaRuralWatersAssociation,theMetropolitanCouncilandtheDepartmentofNatural
Resourcesrecommendthatallwaterusesbemetered.Meteringcanhelpidentifyhighuselocations
andtimes,alongwithleakswithinbuildingsthathavemultiplemeters.
Itisdifficulttoquantifyspecificunmeteredwaterusesuchasthatassociatedwithfirefightingand
systemflushingorsystemleaks.Typically,watersupplierssubtractmeteredwaterusefromtotalwater
pumpedtocalculateunaccountedornonrevenuewaterloss.
Isyourfiveyearaverage(20052014)unaccountedWaterUseinTable2higherthan10%?
YesNo
TheCityofCƩźķƌĻǤƭleakdetectionmonitoringscheduleisbiannuallyinspringandfallfortheentire
system.
areintendedtoidentify,quantifyandverifywaterandrevenuelosses.Thevolumeof
WaterAudits
unaccountedforwatershouldbeevaluatedeachbillingcycle.TheAmericanWaterWorksAssociation
(AWWA)recommendsthattenpercentorlessofpumpedwaterisunaccountedforwater.Wateraudit
29
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
proceduresareavailablefromtheAWWAandMNRuralWaterAssociationwww.mrwa.com.Drinking
WaterRevolvingLoanFundsareavailableforpurchaseofnewmeterswhennewplantsarebuilt.
Whatisthedateofyourmostrecentwateraudit?2016
Frequencyofwateraudits:yearlyother(specifyfrequency)________
Leakdetectionandsurvey:everyyeareveryotheryearperiodicasneeded
Yearlastleakdetectionsurveycompleted:2016
AWWArecommendsthateverywatersupplierinstallmeterstoaccountforallwatertaken
Metering
intoitssystem,alongwithallwaterdistributedfromitssystemateachĭǒƭƷƚƒĻƩƭpointofservice.An
effectivemeteringprogramreliesuponperiodicperformancetesting,repair,maintenanceor
replacementofallmeters.AWWAalsorecommendsthatwatersuppliersconductregularwateraudits
toensureaccountability.Somecitiesinstallseparatemetersforinteriorandexteriorwateruse,but
someresearchsuggeststhatthismaynotresultinwaterconservation.
Table23showsinformationregardingthenumber,types,testingandmaintenanceofcustomermeters.
Table23.Informationaboutcustomermeters
CustomerNumberofNumberofNumberofMetertestingAverage
CategoryCustomersMeteredAutomatedintervalsage/meter
ConnectionsMeter(years)replacement
Readersschedule(years
Residential77457745350020___/___
Irrigationmeters___/___
Institutional/38383820___/___
PublicFacilities
Commercial/44544544520___/___
Industrial
TOTALS822882283983NANA
Nounmeteredcustomersatthistime.AMRmetersbeinginstalledforallresidentialcustomersbythe
endof2018.
Table24.Watersourcemeters
NumberofMetertestingNumberofAutomatedAverageage/meter
MetersscheduleMeterReadersreplacementschedule(years
(years)
Watersource
(wells/intakes)135134/20
Treatmentplant6564/20
30
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Objective2:AchieveLessthan75ResidentialGallonsperCapitaDemand(GPCD)
The2002averageresidentialpercapitademandintheTwinCitiesMetropolitanareawas75gallonsper
capitaperday.
Isyouraverage20102015residentialpercapitawaterdemandinTable2morethan75?YesNo
g/person/day
Whatwasyour2010Α2015fiveyearaverageresidentialpercapitawaterdemand?71.4
Residentialpercapitausehasdeclinedbynearly20%.
Table25indicatesstrategiesyoumayusetocontinuereducingresidentialpercapitademandand
projectslikelytimeframesforcompletingeachcheckedstrategy
Table25.Strategiesandtimeframetoreduceresidentialpercapitademand
StrategytoreduceresidentialpercapitademandTimeframeforcompletingwork
Revisecityordinances/codestoencourageorrequirewater2020
efficientlandscaping.
Revisecityordinance/codestopermitwaterreuseoptions,2022
especiallyfornonpotablepurposeslikeirrigation,
groundwaterrecharge,andindustrialuse.Checkwith
plumbingauthoritytoseeifinternalbuildingsreuseis
permitted
Reviseordinancestolimitirrigation.Describetherestricted
irrigationplan:
Reviseoutdoorirrigationinstallationscodestorequirehigh
efficiencysystems(e.g.thosewithsoilmoisturesensorsor
programmablewateringareas)innewinstallationsorsystem
replacements.
MakewatersysteminfrastructureimprovementsOngoing
Offerfreeorreducedcostwateruseaudits)forresidentialOngoing
customers.
Implementanotificationsystemtoinformcustomerswhen
wateravailabilityconditionschange.
ProviderebatesorincentivesforinstallingwaterefficientOngoing
appliancesand/orfixturesindoors(e.g.,lowflowtoilets,high
efficiencydishwashersandwashingmachines,showerhead
andfaucetaerators,watersofteners,etc.)
Providerebatesorincentivestoreduceoutdoorwateruse2020
(e.g.,turfreplacement/reduction,raingardens,rainbarrels,
smartirrigation,outdoorwaterusemeters,etc.)
IdentifysupplementalWaterResources
ConductaudienceappropriatewaterconservationeducationOngoing
andoutreach.
Describeotherplans
31
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Objective3:Achieveatleasta1.5%peryearwaterreductionforInstitutional,Industrial,
Commercial,andAgriculturalGPCDoverthenext10yearsora15%reductionintenyears.
tocontinuereducingnonresidentialcustomeruse
Table26indicatesproposedstrategiesmaybeused
demandandprojectsalikelytimeframeforcompletingeachcheckedstrategy(addrowsforadditional
strategies).
Table26.Strategiesandtimeframetoreduceinstitutional,commercialindustrial,andagriculturaland
nonrevenueusedemand
Strategytoreducetotalbusiness,industry,agriculturaldemandTimeframeforcompletingwork
ConductafacilitywateruseauditforbothindoorandoutdoorOngoingprogramsoffered
use,includingsystemcomponents
Installenhancedmeterscapableofautomatedreadingsto2025
detectspikesinconsumption
Comparefacilitywaterusetorelatedindustrybenchmarks,if
available(e.g.,meatprocessing,dairy,fruitandvegetable,
beverage,textiles,paper/pulp,metals,technology,petroleum
refiningetc.)
Installwaterconservationfixturesandappliancesorchange2018
processestoconservewater
Repairleakingsystemcomponents(e.g.,pipes,valves)Ongoing
Investigatethereuseofreclaimedwater(e.g.,stormwater,2018
wastewatereffluent,processwastewater,etc.)
Reduceoutdoorwateruse(e.g.,turfreplacement/reduction,Ongoing
raingardens,rainbarrels,smartirrigation,outdoorwateruse
meters,etc.)
TrainemployeeshowtoconservewaterOngoing
Implementanotificationsystemtoinformnonresidential
customerswhenwateravailabilityconditionschange.
Rainwatercatchmentsystemsintendedtosupplyusessuchas
waterclosets,urinals,trapprimersforfloordrainsandfloor
sinks,industrialprocesses,waterfeatures,vehiclewashing
facilities,coolingtowermakeup,andsimilarusesshallbe
Proposedplumbingcode
approvedbythecommissioner.
4714.1702.1http://www.dli.mn.gov/PDF/docket/4714rule.pdf
Describeotherplans:
Objective4:AchieveaDecreasingTrendinTotalPerCapitaDemand
Includedas Appendix8 onegraphshowingtotalpercapitawaterdemandforeachcustomercategory
(i.e.,residential,institutional,commercial,industrial)from20052014andaddthecalculated/estimated
lineartrendforthenext10years.
Trendsforallcustomercategoriesaredeclining;residentialcustomerclassisthemostobvious.Reasons
includelowflowfixtures,eliminationofdischargesingleusecoolingwater,conservationrates,and
education/efficiency/rebateprogramsandefforts.
32
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Objective5:ReducePeakDayDemandsothattheRatioofAverageMaximumdaytothe
AverageDayislessthan2.6
demand
Istheratioofaverage20052014maximumdaydemandtoaverage20052014averageday
reportedinTable2morethan2.6?YesNo
Calculateatenyearaverage(2005Α2014)oftheratioofmaximumdaydemandtoaverageday
.
demand:2.17fortheperiod,noyearsexceeding2.6fortheperiod,andbelow2.0for2014and2015
ThepositionoftheDNRhasbeenthatapeakday/averagedayratiothatisabove2.6forinsummer
indicatesthatthewaterbeingusedforirrigationbytheresidentsinacommunityistoolargeandthat
effortsshouldbemadetoreducethepeakdayusebythecommunity.
Itshouldbenotedthatbyreducingthepeakdayuse,communitiescanalsoreducetheamountof
infrastructurethatisrequiredtomeetthepeakdayuse.Thisinfrastructureincludesnewwells,new
watertowerswhichcanbecostlyitems.
Objective6:ImplementaConservationWaterRateStructureand/oraUniformRate
StructurewithaWaterConservationProgram
WaterConservationProgram
Municipalwatersuppliersservingover1,000peoplearerequiredtoadoptdemandreductionmeasures
thatincludeaconservationratestructure,orauniformratestructurewithaconservationprogramthat
achievesdemandreduction.Thesemeasuresmustachievedemandreductioninwaysthatreduce
waterdemand,waterlosses,peakwaterdemands,andnonessentialwateruses.Thesemeasuresmust
beapprovedbeforeacommunitymayrequestwellconstructionapprovalfromtheDepartmentof
Healthorbeforerequestinganincreaseinwaterappropriationspermitvolume(MinnesotaStatutes,
subd.3and4).Ratesshouldbeadjustedonaregularbasistoensurethatrevenueof
section103G.291,
thesystemisadequateunderreduceddemandscenarios.Ifamunicipalwatersupplierintendstousea
UniformRateStructure,acommunitywideWaterConservationProgramthatwillachievedemand
provided.
reductionmustbe
CurrentWaterRates
Includeacopyoftheactualratestructurein Appendix9 orlistcurrentwaterratesincluding
base/servicefeesandvolumechargesbelow.
Volumeincludedinbaserateorservicecharge:_____gallonsor____cubicfeetother(varies)
Frequencyofbilling:MonthlyBimonthlyQuarterlyOther:_________________
WaterRateEvaluationFrequency:everyyearevery___yearsnoschedule
Dateoflastratechange:December2015
33
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Table27.Ratestructuresforeachcustomercategory
CustomerConservationBillingStrategiesConservationNeutralNonConservingBilling
CategoryinUse*BillingStrategiesinUse**StrategiesinUse***
Residential
UniformServicechargebasedonwater
Monthlybilling
Increasingblockratesvolume
Odd/evendaywatering
(volumetieredrates)
Decliningblock
Seasonalrates
Flat
Timeofuserates
Other(describe)
Waterbillsreportedin
gallons
Individualizedgoalrates
Excessuserates
Droughtsurcharge
Usewaterbilltoprovide
comparisons
Servicechargenotbasedon
watervolume
Other(describe)
Commercial/
MonthlybillingUniformServicechargebasedonwater
Industrial/
Increasingblockratesvolume
Institutional
(volumetieredrates)
Decliningblock
Seasonalrates
Flat
Timeofuserates
Other(describe)
Waterbillsreportedin
gallons
Individualizedgoalrates
Excessuserates
Droughtsurcharge
Usewaterbilltoprovide
comparisons
Servicechargenotbasedon
watervolume
Other(describe)
Other
*RateStructurescomponentsthatmaypromotewaterconservation:
Monthlybilling:isencouragedtohelppeopleseetheirwaterusagesotheycanconsiderchanging
behavior.
Increasingblockrates(alsoknownasatieredresidentialratestructure):Typically,thesehaveatleast
threetiers:shouldhaveatleastthreetiers.
Thefirsttierisforthewinteraveragewateruse.
o
Thesecondtieristheyearroundaverageuse,whichislowerthantypicalsummeruse.Thisrate
o
shouldbesettocoverthefullcostofservice.
34
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Thethirdtiershouldbeabovetheaverageannualuseandshouldbepricedhighenoughto
o
encourageconservation,asshouldanyhighertiers.Forthistobeeffective,thedifferencein
blockratesshouldbesignificant.
Seasonalrate:higherratesinsummertoreducepeakdemands
TimeofUserates:lowerratesforoffpeakwateruse
Billwateruseingallons:thisallowscustomerstocomparetheirusetoaveragerates
Individualizedgoalrates:typicallyusedforindustry,businessorotherlargewateruserstopromote
waterconservationiftheykeepwithinagreedupongoals.ExcessUserates:ifwaterusegoesabovean
agreeduponamountthishigherrateischarged
Droughtsurcharge:anextrafeeischargedforguaranteedwateruseduringdrought
Usewaterbilltoprovidecomparisons:simplegraphicscomparingindividualuseovertimeorcompare
toothers.
individualuse
Servicechargeorbasefeethatdoesnotincludeawatervolume Αabasechargeorfeetocoveruniversal
cityexpensesthatarenotcustomerdependentand/ortoprovideminimalwateratalowerrate(e.g.,an
amountlessthantheaverageresidentialpercapitademandforthewatersupplierforthelast5years)
Emergencyrates Acommunitymayhaveaseparateconservationratethatonlygoesintoeffectwhen
thecommunityorgovernordeclaresadroughtemergency.Thesehigherratescanhelptoprotectthecity
budgetsduringtimesofsignificantlylesswaterusage.
**ConservationNeutral**
Uniformrate:rateperunitusedisthesameregardlessofthevolumeused
Odd/evendaywatering Αŷźƭapproachreducespeakdemandonadailybasisforsystemoperation,but
itdoesnotreduceoverallwateruse.
***NonConserving***
basefeewithwatervolume:anamountofwaterlargerthantheaverageresidential
Servicechargeor
percapitademandforthewatersupplierforthelast5years
Decliningblockrate:therateperunituseddecreasesaswateruseincreases.
used(usuallyunmetered).
Flatrate:onefeeregardlessofhowmuchwateris
TheCityhasnoconservationneutralornonconservingratestructures.
Objective7:AdditionalstrategiestoReduceWaterUseandSupportWellheadProtection
Planning
Developmentandredevelopmentprojectscanprovideadditionalwaterconservationopportunities,
the
suchastheactionslistedbelow.Indicatedarethoseactionsthatweintendtoimplementwithin
next10years.
Table28.AdditionalstrategiestoReduceWaterUse&SupportWellheadProtection
ParticipateintheGreenStepCitiesProgram,includingimplementationofatleastoneofthe20
ͻ.ĻƭƷtƩğĭƷźĭĻƭͼforwater
Prepareamasterplanforsmartgrowth(compacturbangrowththatavoidssprawl)
Prepareacomprehensiveopenspaceplan(areasforparks,greenspaces,naturalareas)
Adoptawateruserestrictionordinance(lawnirrigation,carwashing,pools,etc.)
Adoptanoutdoorlawnirrigationordinance
Adoptaprivatewellordinance(privatewellsinacitymustcomplywithwaterrestrictions)
Implementastormwatermanagementprogram
35
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Adoptnonzoningwetlandsordinance(canfurtherprotectwetlandsbeyondstate/federallaws
forvernalpools,bufferareas,restrictionsonfillingoralterations)
Adoptawateroffsetprogram(primarilyfornewdevelopmentorexpansion)
Implementawaterconservationoutreachprogram
Hireawaterconservationcoordinator(parttime)
Implementarebateprogramforwaterefficientappliances,fixtures,oroutdoorwater
management
Other
Objective8:TrackingSuccess:Howwillyoutrackormeasuresuccessthroughthenextten
years?
Monitorannualconsumptiondata.
A.Regulation
Table29byselectswhichregulationsareusedtoreducedemandandimprovewaterefficiencies.Copies
ofadoptedregulationsorproposedrestrictionsareincludedin Appendix10.
Table29.Regulationsforshorttermreductionsindemandandlongtermimprovementsinwater
efficiencies
RegulationsUtilizedWhenisitapplied(ineffect)?
RainfallsensorsrequiredonlandscapeirrigationsystemsOngoing
Seasonal
OnlyduringdeclaredEmergencies
WaterefficientplumbingfixturesrequiredNewdevelopment
Replacement
RebatePrograms
Critical/EmergencyWaterDeficiencyordinanceOnlyduringdeclaredEmergencies
Wateringrestrictionrequirements(timeofday,allowabledays,etc.)
Odd/even
2days/week
OnlyduringdeclaredEmergencies
Waterwasteprohibited(forexample,havingafineforirrigatorsOngoing
sprayingonthestreet)
Seasonal
OnlyduringdeclaredEmergencies
Limitationsonturfareas(requiringlotstohave10%25%oftheNewdevelopment
spaceinnaturalareas)
Shoreland/zoning
Other
Soilpreparationrequirements(afterconstruction,requiringtopsoilNewDevelopment
tobeappliedtopromotegoodrootgrowth)ConstructionProjects
Other
Treeratios(requiringacertainnumberoftreespersquarefootofNewdevelopment
lawn)
Shoreland/zoning
Other
36
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
RegulationsUtilizedWhenisitapplied(ineffect)?
Permittofillswimmingpooland/orrequiringpoolstobecovered(toOngoing
preventevaporation)
Seasonal
OnlyduringdeclaredEmergencies
Ordinancesthatpermitstormwaterirrigation,reuseofwater,orDescribe
otheralternativewateruse(Note:besuretocheckcurrentplumbing
codesforupdates)
B.RetrofittingPrograms
Educationandincentiveprogramsaimedatreplacinginefficientplumbingfixturesandappliancescan
helpreducepercapitawateruse,aswellasenergycosts.Itisrecommendedthatmunicipalwater
suppliersdevelopalongtermplantoretrofitpublicbuildingswithwaterefficientplumbingfixturesand
developedpartnershipswithorganizationshavingsimilar
appliances.Somewatersuppliershave
conservationgoals,suchaselectricorgassuppliers,todevelopcooperativerebateandretrofit
programs.
AstudybytheAWWAResearchFoundation(ResidentialEndUsesofWater,1999)foundthatthe
averageindoorwateruseforanonconservinghomeis69.3gallonspercapitaperday(gpcd).The
averageindoorwateruseinaconservinghomeis45.2gpcdandmostofthedecreaseinwateruseis
relatedtowaterefficientplumbingfixturesandappliancesthatcanreducewater,sewerandenergy
costs.InMinnesota,certainelectricandgasprovidersarerequired(MinnesotaStatute216B.241)to
fundprogramsthatwillconserveenergyresourcesandsomeutilitieshavedistributedwaterefficient
showerheadstocustomerstohelpreduceenergydemandsrequiredtosupplyhotwater.
RetrofittingPrograms
Table30indicateswhichwaterusesaretargeted,theoutreachmethodsused,themeasuresusedto
identifysuccess,andanyparticipatingpartnersfortheCityofCƩźķƌĻǤƭretrofitprogram.
Table30.Retrofittingprograms(Selectallthatapply)
WaterUseTargetsOutreachMethodsPartners
Lowflushtoilets,
EducationaboutGascompany
Toiletleaktablets,
FreedistributionofElectriccompany
Lowflowshowerheads,
Rebatefor
Watershedorganization
Faucetaerators;Other
Waterconservingwashingmachines,
EducationaboutGascompany
Dishwashers,
FreedistributionofElectriccompany
Watersofteners;
Rebatefor
Watershedorganization
Other
Raingardens,Educationabout
Gascompany
Rainbarrels,
Freedistributionof
Electriccompany
Native/droughttolerantlandscaping,etc.
Rebatefor
Watershedorganization
OtherΑCostshare
37
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Resultsoftheprogramaresomewhatinconclusive,astheprogramwasbegunapproximatelysixmonths
ago,anddataisnotavailabletofullymeasureimpactsoftheprogram.
C.EducationandInformationPrograms
Customereducationshouldtakeplaceinthreedifferentcircumstances.First,customersshouldbe
providedinformationonhowtoconservewaterandimprovewateruseefficiencies.Second,
informationshouldbeprovidedatappropriatetimestoaddresspeakdemands.Third,emergency
noticesandeducationalmaterialsabouthowtoreducewateruseshouldbeavailableforquick
distributionduringanemergency.
ProposedEducationPrograms
Table31selectsmethodstobeusedtoprovidewaterconservationandinformation,includingthe
frequencyofprogramcomponents.
Table31.CurrentandProposedEducationPrograms
EducationMethodsGeneralsummaryof#/YearFrequency
topics
Billinginsertsortipsprintedontheactualbill
Ongoing
Seasonal
Onlyduring
declaredemergencies
ConsumerConfidenceReportsConservation,water1
Ongoing
quality,wellhead
Seasonal
protection
Onlyduring
declaredemergencies
Pressreleasestotraditionallocalnews
Ongoing
outlets(e.g.,newspapers,radioandTV)
Seasonal
Onlyduring
declaredemergencies
Socialmediadistribution(e.g.,emails,Advertiseevents,6Ongoing
Facebook,Twitter)education,bestpractices
Seasonal
Onlyduring
declaredemergencies
Paidadvertisements(e.g.,billboards,print
Ongoing
media,TV,radio,websites,etc.)
Seasonal
Onlyduring
declaredemergencies
PresentationstocommunitygroupsRaingarden,lawn4
Ongoing
practices,conservation,
Seasonal
wellheadprotection
Onlyduring
declaredemergencies
StafftrainingPublicworksMS4staff1
Ongoing
38
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
EducationMethodsGeneralsummaryof#/YearFrequency
topics
trainingincludesrelevantSeasonal
material
Onlyduring
declaredemergencies
Selectpersonnelseminars15
FacilitytoursMiddleschooltoursof2
Ongoing
watertreatmentfacilities
Seasonal
Onlyduring
declaredemergencies
DisplaysandexhibitsSubjectmattervaries,2
Ongoing
stormwater,BMPs,
Seasonal
conservation,wellhead
Onlyduring
protection
declaredemergencies
Marketingrebateprograms(e.g.,indoorWashingmachines,100Ongoing
fixtures&appliancesandoutdoorpractices)irrigationsystems,toilets
Seasonal
Onlyduring
declaredemergencies
CommunitynewslettersSubjectmattervaries,6Ongoing
stormwater,BMPs,
Seasonal
conservation
Onlyduring
declaredemergencies
Directmailings(wateraudit/retrofitkits,
Ongoing
showerheads,brochures)
Seasonal
Onlyduring
declaredemergencies
InformationkioskatutilityandpublicBrochures200Ongoing
buildings
Seasonal
Onlyduring
declaredemergencies
Publicserviceannouncements
Ongoing
Seasonal
Onlyduring
declaredemergencies
CableTVProgramsSubjectmattervaries,4
Ongoing
stormwater,BMPs,
Seasonal
conservation,rebate
Onlyduring
programs
declaredemergencies
Demonstrationprojects(landscapingor
Ongoing
plumbing)
Seasonal
Onlyduring
declaredemergencies
K12educationprograms(ProjectWet,
Ongoing
39
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
EducationMethodsGeneralsummaryof#/YearFrequency
topics
DrinkingWaterInstitute,presentations)
Seasonal
Onlyduring
declaredemergencies
CommunityeventsΛĭŷźƌķƩĻƓƭwaterfestivals,
Ongoing
environmentalfairs)
Seasonal
Onlyduring
declaredemergencies
CommunityeducationclassesBMPs,conservation2
Ongoing
Seasonal
Onlyduring
declaredemergencies
Waterweekpromotions
Ongoing
Seasonal
Onlyduring
declaredemergencies
Website(includeaddress:)Stormwater,BMPs,20Ongoing
conservation,wellheadpages
Seasonal
protection,drinkingwater
Onlyduring
quality
declaredemergencies
Targetedefforts(largevolumeusers,users
Ongoing
withlargeincreases)
Seasonal
Onlyduring
declaredemergencies
Noticesofordinances
Ongoing
Seasonal
Onlyduring
declaredemergencies
Emergencyconservationnotices
Ongoing
Seasonal
Onlyduring
declaredemergencies
Other:
Ongoing
Seasonal
Onlyduring
declaredemergencies
TheCityisevaluatingoptionsforeducationandinformationactivitiestoconsiderimplementinginthe
future:
40
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
Part4.ITEMSFORMETROPOLITANAREACOMMUNITIES
MinnesotaStatute473.859requiresWSPstobecompletedforalllocalunitsofgovernmentinthe
sevencountyMetropolitanAreaaspartofthelocalcomprehensiveplanningprocess.
MuchoftheinformationinParts13addresseswaterdemandforthenext10years.However,
additionalinformationisneededtoaddresswaterdemandthrough2040,whichwillmaketheWSP
consistentwiththeMetropolitanLandUsePlanningAct,uponwhichthelocalcomprehensiveplansare
based.
ThisPart4providesguidancetocompletetheWSPinawaythataddressesplansforwatersupply
through2040.
A.WaterDemandProjectionsthrough2040
Table7inPart1Dprovidesinformationaboutlongtermwaterdemandprojectionsthrough2040.Total
CommunityPopulationprojectionsareconsistentwiththeĭƚƒƒǒƓźƷǤƭsystemstatement,foundonthe
Metropolitan/ƚǒƓĭźƌƭwebsiteandwhichwassenttothecommunityinSeptember2015.
ProjectedAverageDay,MaximumDay,andAnnualWaterDemandsarecalculatedbythemethod
described.
B.PotentialWaterSupplyIssues
Table10inPart1Eprovidesinformationaboutthepotentialwatersupplyissuesinourcommunity,
includingthosethatmightoccurdueto2040projectedwateruse.
The MasterWaterSupplyPlan providesinformationaboutpotentialissuesforyourcommunityin
Appendix1(WaterSupplyProfiles).
C.ProposedAlternativeApproachestoMeetExtendedWaterDemand
Projections
Table12inPart1Fprovidesinformationaboutpotentialwatersupplyinfrastructureimpacts(suchas
replacements,expansionsoradditionstowells,waterstorageandtreatmentcapacity,distribution
systems,andemergencyinterconnections)ofextendedplansfordevelopmentandredevelopment,in
10yearincrementsthrough2040.
Table14inPart1FindicatesapproachestheCityofFridelyisconsideringtomeetfuturedemand,and
provides,informationabouttheamountoffuturewaterdemandtobemetusingthatapproach,the
timeframetoimplementtheapproach,potentialpartners,andcurrentunderstandingofthekey
benefitsandchallengesoftheapproach.Thissectionoftheplanconsiderstheneedfor:evaluationof
geologicconditions(mapping,aquifertests,modeling),identificationofareaswheredomesticwells
couldbeimpacted,measurementandanalysisofwaterlevels&pumpingrates,triggers&associated
actionstoprotectwaterlevels,etc.
41
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
D.ValueAddedWaterSupplyPlanningEfforts(Optional)
Thefollowinginformationisnotrequiredtobecompletedaspartofthelocalwatersupplyplan,butis
completedtohelpstrengthensourcewaterprotectionthroughouttheregionandhelpMetropolitan
Councilandpartnersintheregiontobettersupportlocalefforts.
SourceWaterProtectionStrategies
DoesaDrinkingWaterSupplyManagementAreaforaneighboringpublicwatersupplieroverlapyour
community?YesNo
Table32includesinformationaboutnewwaterdemandorlanduseplanningrelatedlocalcontrolsthat
arebeingconsideredtoprovideadditionalprotectioninthisarea.
Table32.LocalcontrolsandscheduletoprotectDrinkingWaterSupplyManagementAreas
LocalControlScheduletoPotentialPartners
Implement
Noneatthistime
ComprehensiveplanningthatguidesdevelopmentinCitiesofNewBrighton,
vulnerabledrinkingwatersupplymanagementareasSpringLakePark,and
BrooklynCenter
ZoningoverlayCitiesofNewBrighton,
SpringLakePark,and
BrooklynCenter
Other:
Technicalassistance
FromyourĭƚƒƒǒƓźƷǤƭperspective,whatarethemostimportanttopicsfortheMetropolitanCouncilto
address,guidedbytheƩĻŭźƚƓƭMetropolitanAreaWaterSupplyAdvisoryCommitteeandTechnical
AdvisoryCommittee,aspartofitsongoingwatersupplyplanningrole?
Coordinationofstate,regionalandlocalwatersupplyplanningroles
Regionalwaterusegoals
Waterusereportingstandards
Regionalandsubregionalpartnershipopportunities
Identifyingandprioritizingdatagapsandinputforregionalandsubregionalanalyses
Others:___________________________________________________________________
42
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
GLOSSARY
Agricultural/IrrigationWaterUse Waterusedforcropandnoncropirrigation,livestockwatering,
chemigation,golfcourseirrigation,landscapeandathleticfieldirrigation.
AverageDailyDemand Thetotalwaterpumpedduringtheyeardividedby365days.
CalcareousFen Calcareousfensarerareanddistinctivewetlandsdependentonaconstantsupplyof
coldgroundwater.Becausetheyaredependentongroundwaterandareoneoftherarestnatural
communitiesintheUnitedStates,theyareaprotectedresourceinMN.Approximately200havebeen
locatedinMinnesota.Theymaynotbefilled,drainedorotherwisedegraded.
Commercial/InstitutionalWaterUse Waterusedbymotels,hotels,restaurants,officebuildings,
commercialfacilitiesandinstitutions(bothcivilianandmilitary).Considermaintainingseparate
institutionalwateruserecordsforemergencyplanningandallocationpurposes.Waterusedbymulti
familydwellings,apartmentbuildings,seniorhousingcomplexes,andmobilehomeparksshouldbe
reportedasResidentialWaterUse.
Commercial/Institutional/Industrial(C/I/I)WaterSold Thesumofwaterdeliveredfor
commercial/institutionalorindustrialpurposes.
ConservationRateStructure Aratestructurethatencouragesconservationandmayincludeincreasing
blockrates,seasonalrates,timeofuserates,individualizedgoalrates,orexcessuserates.Ifa
conservationrateisappliedtomultifamilydwellings,theratestructuremustconsidereachresidential
unitasanindividualuser.Acommunitymayhaveaseparateconservationratethatonlygoesinto
effectwhenthecommunityorgovernordeclaresadroughtemergency.Thesehigherratescanhelpto
protectthecitybudgetsduringtimesofsignificantlylesswaterusage.
DateofMaximumDailyDemand Thedateofthemaximum(highest)waterdemand.Typicallythisisa
dayinJulyorAugust.
DecliningRateStructure Underadecliningblockratestructure,aconsumerpayslessperadditional
unitofwaterasusageincreases.Thisratestructuredoesnotpromotewaterconservation.
DistributionSystem Waterdistributionsystemsconsistofaninterconnectedseriesofpipes,valves,
storagefacilities(watertanks,watertowers,reservoirs),waterpurificationfacilities,pumpingstations,
flushinghydrants,andcomponentsthatconveydrinkingwaterandmeetingfireprotectionneedsfor
cities,homes,schools,hospitals,businesses,industriesandotherfacilities.
FlatRateStructure Flatfeeratesdonotvarybycustomercharacteristicsorwaterusage.Thisrate
structuredoesnotpromotewaterconservation.
43
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
IndustrialWaterUse Waterusedforthermonuclearpower(electricutilitygeneration)andother
industrialusesuchassteel,chemicalandalliedproducts,paperandalliedproducts,mining,and
petroleumrefining.
LowFlowFixtures/Appliances Plumbingfixturesandappliancesthatsignificantlyreducetheamount
ofwaterreleasedperusearelabeledͻƌƚǞŅƌƚǞͼ͵Thesefixturesandappliancesusejustenoughwaterto
beeffective,savingexcess,cleandrinkingwaterthatusuallygoesdownthedrain.
MaximumDailyDemand Themaximum(highest)amountofwaterusedinoneday.
MeteredResidentialConnections Thenumberofresidentialconnectionstothewatersystemthat
havemeters.Formultifamilydwellings,reporteachresidentialunitasanindividualuser.
PercentUnmetered/UnaccountedFor Unaccountedforwateruseisthevolumeofwaterwithdrawn
fromallsourcesminusthevolumeofwaterdelivered.ThisvaluerepresentswaterͻƌƚƭƷͼby
miscalculatedwateruseduetoinaccuratemeters,waterlostthroughleaks,orwaterthatisusedbut
unmeteredorotherwiseundocumented.Waterusedforpublicservicessuchashydrantflushing,ice
skatingrinks,andpublicswimmingpoolsshouldbereportedunderthecategoryͻğƷĻƩSupplier
{ĻƩǝźĭĻƭͼ͵
PopulationServed ThenumberofpeoplewhoareservedbytheĭƚƒƒǒƓźƷǤƭpublicwatersupply
system.Thisincludesthenumberofpeopleinthecommunitywhoareconnectedtothepublicwater
supplysystem,aswellaspeopleinneighboringcommunitieswhousewatersuppliedbythe
ĭƚƒƒǒƓźƷǤƭpublicwatersupplysystem.Itshouldnotincluderesidentsinthecommunitywhohave
privatewellsorgettheirwaterfromneighboringwatersupply.
ResidentialConnections Thetotalnumberofresidentialconnectionstothewatersystem.For
multifamilydwellings,reporteachresidentialunitasanindividualuser.
ResidentialPerCapitaDemand Thetotalresidentialwaterdeliveredduringtheyeardividedbythe
populationserveddividedby365days.
ResidentialWaterUse Waterusedfornormalhouseholdpurposessuchasdrinking,foodpreparation,
bathing,washingclothesanddishes,flushingtoilets,andwateringlawnsandgardens.Shouldincludeall
waterdeliveredtosinglefamilyprivateresidences,multifamilydwellings,apartmentbuildings,senior
housingcomplexes,mobilehomeparks,etc.
SmartMeter Smartmeterscanbeusedbymunicipalitiesorbyindividualhomeowners.Smart
meteringgenerallyindicatesthepresenceofoneormoreofthefollowing:
Smartirrigationwatermetersarecontrollersthatlookatfactorssuchasweather,soil,slope,
etc.andadjustwateringtimeupordownbasedondata.Smartcontrollersinatypicalsummer
willreducewateruseby30%50%.Justchangingthespraynozzletonewefficientmodelscan
reducewateruseby40%.
44
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
SmartMetersoncustomerpremisesthatmeasureconsumptionduringspecifictimeperiodsand
communicateittotheutility,oftenonadailybasis.
Acommunicationchannelthatpermitstheutility,ataminimum,toobtainmeterreadson
demand,toascertainwhetherwaterhasrecentlybeenflowingthroughthemeterandontothe
premises,andtoissuecommandstothemetertoperformspecifictaskssuchasdisconnecting
orrestrictingwaterflow.
TotalConnections Thenumberofconnectionstothepublicwatersupplysystem.
TotalPerCapitaDemand Thetotalamountofwaterwithdrawnfromallwatersupplysourcesduring
theyeardividedbythepopulationserveddividedby365days.
TotalWaterPumped Thecumulativeamountofwaterwithdrawnfromallwatersupplysourcesduring
theyear.
TotalWaterDelivered Thesumofresidential,commercial,industrial,institutional,watersupplier
services,wholesaleandotherwaterdelivered.
Ultimate(FullBuildOut)TimeperiodrepresentingtheĭƚƒƒǒƓźƷǤƭestimatedtotalamountand
locationofpotentialdevelopment,orwhenthecommunityisfullybuiltoutatthefinalplanneddensity.
Unaccounted(Nonrevenue)Loss SeedefinitionsforͻƦĻƩĭĻƓƷunmetered/unaccountedforƌƚƭƭͼ͵
UniformRateStructure Auniformratestructurechargesthesamepriceperunitforwaterusage
beyondthefixedcustomercharge,whichcoverssomefixedcosts.Theratesendsapricesignaltothe
per
customerbecausethewaterbillwillvarybyusage.Uniformratesbyclasschargethesameprice
unitforallcustomerswithinacustomerclass(e.g.residentialornonresidential).Thispricestructureis
generallyconsideredlesseffectiveinencouragingwaterconservation.
WaterSupplierServices Waterusedforpublicservicessuchashydrantflushing,iceskatingrinks,
publicswimmingpools,cityparkirrigation,backflushingatwatertreatmentfacilities,and/orother
uses.
WaterUsedforNonessentialPurposes Waterusedforlawnirrigation,golfcourseandparkirrigation,
carwashes,ornamentalfountains,andothernonessentialuses.
WholesaleDeliveries Theamountofwaterdeliveredinbulktootherpublicwatersuppliers.
AcronymsandInitialisms
AWWA
ΑAmericanWaterWorksAssociation
C/I/I
ΑCommercial/Institutional/Industrial
CIP Α
CapitalImprovementPlan
45
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
GIS
ΑGeographicInformationSystem
GPCD
ΑGallonspercapitaperday
GWMA
ΑGroundwaterManagementAreaΑNorthandEastMetro,StraightRiver,Bonanza,
MDH Α
MinnesotaDepartmentofHealth
MGD
ΑMilliongallonsperday
MG Α
Milliongallons
MGL
ΑMaximumContaminantLevel
MnTAP
ΑMinnesotaTechnicalAssistanceProgram(UniversityofMinnesota)
MPARS
ΑMN/DNRPermittingandReportingSystem(newelectronicpermittingsystem)
MRWA
ΑMinnesotaRuralWatersAssociation
SWP
ΑSourceWaterProtection
WHP
ΑWellheadProtection
46
CityofFridleyDRAFTLocalWaterSupplyPlanDecember12,2016
APPENDICESTOBESUBMITTEDBYTHEWATERSUPPLIER
Appendix1:Wellrecordsandmaintenancesummaries
Appendix2:Waterlevelmonitoringplan
Appendix3:Waterlevelgraphsforeachwatersupplywell
Appendix4:CapitalImprovementPlan
Appendix5:EmergencyTelephoneList
Appendix6:CooperativeAgreementsforEmergencyServices
Appendix7:MunicipalCriticalWaterDeficiencyOrdinance
Appendix8:Graphshowingannualpercapitawaterdemandforeach
customercategoryduringthelasttenyears
Appendix9:WaterRateStructure
Appendix10:Adoptedorproposedregulationstoreducedemandorimprove
waterefficiency
Appendix11:ImplementationChecklistȟsummaryofalltheactionsthata
communityisdoing,orproposestodo,includingestimatedimplementation
datesȟ
47
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
1/1/80
1/1/78
1/1/76
1/1/74
1/1/72
1/1/70
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
Depth \[ft\]
Output \[gpm\]
1/1/16
1/1/14
1/1/12
1/1/10
1/1/08
1/1/06
1/1/04
1/1/02
1/1/00
1/1/98
1/1/96
1/1/94
1/1/92
1/1/90
1/1/88
1/1/86
1/1/84
1/1/82
1/1/80
1/1/78
1/1/76
1/1/74
1/1/72
1/1/70
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
Output \[gpm\]
8/1/16
8/1/15
8/1/14
8/1/13
8/1/12
8/1/11
8/1/10
8/1/09
8/1/08
8/1/07
8/1/06
Depth \[ft\]
ENVIRONMENTALQUALITYANDENERGYCOMMISSION
FridleyMunicipalCenter,6431UniversityAveNe
hĭƷƚĬĻƩЊЊͲЋЉЊЏͲАʹЉЉƦ͵ƒ͵
Location: City Hall, Conference Room A
Call to Order:
Chairman Mark Hansen called the meeting to order at 7:00 p.m. at Springbrook Nature Center
In attendance: Commissioners Hansen (Chair), Foell (Vice Chair), Mulrooney, Westby, Velin and Stoxen.
There was one guest, Heidi Ferris.
Approve Environmental Quality and Energy Commission Minutes
th
Review September 13, 2016 minutes.
MOTION TO APPROVE MINUTES
Commissioner Westby made the motion to approve the minutes, which was seconded by Commissioner
Mulrooney, and the minutes passed on a unanimous vote.
New Business
GreenStep Cities priorities, next projects. A review of the spreadsheet prepared by Chairman Hansen took
place. Commissioner Stoxen stated that reducing old style turfgrass and using techniques for No-Mow, Low-
Mow and lawn alternatives is an important priority for him. He has seen some Chicago demonstration gardens
and great examples of this principle put into practice. A general discussion about how to break some of the
projects down by neighborhood commenced. Getting the block captains involved or neighborhood champions
could be useful.
Old Business
Legislative-Citizen Commission on Minnesota Resources (LCCMR) Department of Natural Resources
municipal tree grant update: plans for tree planting events with the Tree Trust for Oct. 20 and Oct. 22 are
coming together slowly for planting of the 80 gravel bed nursery trees. The most likely locations are Riverview
Heights Park and Craig Park. All of the gravel bed trees of various species did well, with the exception of the
Bur Oaks, which do not look good. Staff will take a closer look to see if a cause for the problem can be
identified. Medtronic has stated that they will be unavailable in October but could be available for planting
around Nov. 4 with a large group, which would work if the weather continues mild. Medtronic had planted 35
trees in Commons Park in May and are interested in continuing to partner with the City. Karen Zumach from
Tree Trust will create the planting plans and the Conservation Corps will pre-drill the holes which will greatly
speed the planting. These two groups, along with the University of Minnesota and Hands-On Twin Cities, are
all partners with the LCCMR-DNR grant projects through May of 2018.
The other major planting site, the Mississippi River Trail at 694 location (Minnesota Department of
Transportation landscaping grant), needs more help spreading bark and pulling weeds, plus tree wrapping is
th
needed. The group agreed to meet on Sunday, Oct. 15 at this location to do some of the work from 11-4 p.m.
Staff will be present to help identify plants vs. weeds and to help direct the workflow if needed. Families and
friends are welcome, since there is a lot of maintenance to do and bark mulch to move!
Also, a brief discussion about how opt-in Organics collection is working in Minneapolis too place.
Other
Next Meetings/Announcements
th
The next EQEC meeting will be held on Tuesday, November 15, 2016 at 7:00 p.m., at the usual location,
Conference Room A (Main Level, City Hall).
Adjourn:
MOTION TO ADJOURN
The motion was made to adjourn by Commissioner Foell and seconded by Commissioner Westby. The motion
passed and the meeting was adjourned at 8:08 p.m.
ENVIRONMENTALQUALITYANDENERGYCOMMISSION
FridleyMunicipalCenter,6431UniversityAveNe
Minutes
bƚǝĻƒĬĻƩЊЎͲЋЉЊЏͲАʹЉЉƦ͵ƒ͵
Location: City Hall, Conference Room A
Call to Order:
Chairman Mark Hansen called the meeting to order at 7:18 p.m.
In attendance: Commissioners Hansen (Chair), Westby, Velin and Stoxen.
Approve Environmental Quality and Energy Commission Minutes
th
Review October 11, 2016 minutes.
MOTION TO APPROVE MINUTES
Commissioner Westby made the motion to approve the minutes, which was seconded by Commissioner Velin,
and the minutes passed on a unanimous vote.
New Business
Municipal tree planting: planning, funding and prioritization of locations. Summary of accomplishments,
challenges and what was learned was discussed by staff and the Commissioners.
Although it was a sprint
to plant nearly 200 trees with volunteers in one growing season, working with a variety of groups to get it done
was, for the most part, a big success! Corporate partners like General Mills, Cummins and Medtronic preferred
to volunteer during the week. This enabled public works and planning staff to avoid overtime or extra travel
time. These volunteers, with minimal training, produced well-planted trees, amazingly quickly. Medtronic
groups could have planted at least 20-40 more trees during their May plantings session (one of two tree
plantings in which Medtronic participated) during the time allotted. Staff loaded and unloaded trucks,
supervised and provided advice and these plantings ran very smoothly without a disproportionate amount of
labor.
Working with youth groups for tree planting requires at least a two student to one adult volunteer ratio, which
was not always possible. The 2016 Arbor Day event was fortunate to have ten University of Minnesota
students volunteer along with a couple of Fridley School and Anoka County Master Gardeners volunteers—all
were needed! Parents tended to drop off their children and leave, rather than participate in the Arbor Day event
or help with the plantings. In working with the Minnesota Pollution Control Agency and the Youth
Conservation Corps, site conditions like heat during the end of June made the East River Road and Mississippi
River Trail location difficult. One reason was that many of the trees were not small containers because, in order
to meet Minnesota Department of Transportation grant specifications, 20 gallon-sized container trees and some
of the large balled and burlapped trees needed to be used and there was no way that junior high and early high
school kids could handle the weight.So Public Works staff had to pre-drilled holes, help get them into the
holes and in some cases, trees are too deep in the holes and cannot be corrected. Winterizing and guided tree
pruning for structure, though, might work very well with this age group and have a nice educational component.
There is an upcoming opportunity to test that idea with an educator named Kirby Rautio.
Staff and volunteer planting groups from Commissioner Foel’s firm, EQE Commissioners Foell, Mulrooney
and Westby as well as EQEC Chair Mark Hansen and other volunteers from local business Cummins, worked
on pollinator planting, wildflower seeding and protecting plants against rodents and more. This was a very
successful activity for volunteers.
What else was learned? Watering takes longer than was estimated. The Gator-bags for shade trees, which hold
around 20 gallons of water, were often empty in one day and the only practical way to fill lots of them is with a
watering truck operated by two to three employees working during the week and on overtime on weekends.
This is costly but until we can come up with a mobile stock tank that can be safely left on a park or planting site
and then used by volunteers to fill the bags, lots of staff time is involved with the watering of trees, pollinators,
raingardens and seeded areas.
Arbor Day 2017.
The last day in April is Arbor Day in Minnesota, however, the Commissioners discussed
continuing to have the tree plantings on a Saturday. The group decided that Earth Day, 2017, which is on April
22, would be the date for Arbor Day plantings and to launch a City cleanup and environmental awareness week.
2017 Fridley Bike & Hike.
Regarding the date for the Fridley Bike and Hike, Trails Day Celebration,
Commissioners determined that the American Hiking Society designated Saturday, June 3 as the National date,
so that seemed logical. It sort of launches the month of festivities in Fridley which includes Fridley Forty-niner
Days. The object of the day is to emphasize the great trails in Fridley’s local and regional parks and to get
families and kids out on these trails for fun and exercise and maybe introduce them to a new walking or biking
location in the City. Chairman Hansen asked that the date be finalized after Commissioner Foell (excused)
could weigh in on it, and determine his availability that day.
Comprehensive Planning for Metropolitan Council requirements.
A very brief discussion about what is
involved with Comprehensive Planning along with some dates ensued.
Meeting dates for 2017 were distributed.
MOTION TO APPROVE 2017 Meeting Dates (attached)
Commissioner Westby made the motion to approve the minutes, which was seconded by Commissioner Stoxen,
and the 2017 EQEC Meeting Dates passed as presented, with a unanimous vote.
Old Business
th
LCCMR Grant update: Tree Trust, Medtronic and Conservation Corps park planting work on Nov. 4.
Winterization plan for volunteer mobilization to protect new trees in Commons, Community and Summit
Square Parks: Commissioners Mulrooney, Westby and Foell have been very active in winterizing for the grant
trees, shrubs, pollinators and in park cleanup. They brought friends, colleagues and family members to join in
the work to place tree wrap and caging on the trees and shrubs to prevent rodent damage and sunscald. The
Mulrooney clan cleaned up Community Park’s raingarden, winterized trees, did trash removal and identified a
code enforcement issue with medical waste dumping. Thanks to all for the extra volunteerism!
University testing new hybrid tree variety.
Because flat-headed borers were found in all of the bare-root oak
trees planted in the new gravel beds and in Commons and Summit Square Parks, those trees were all dead and a
credit applied for with the supplying nursery. In order to make up the numbers for the Tree Trust/Medtronic
plantings at Craig and Riverview Heights Parks, the University of Minnesota Urban Forestry Dept. professor
Gary Johnson arranged for the City to obtain 12-Prairie Stature Oak trees (Quercus x bimundorum 'Midwest'),
which is a cross between a native White Oak and an English Oak. The idea is to see if the best qualities of both
parents come through to increase disease-resistance and vigor. Use of a greater variety of tree types, helps to
also increase the resiliency of the City’s urban tree canopy. It became apparent this was necessary after the
2015-2016 tree inventory which showed very little species variation. That leaves the City municipal tree
population at risk by increasing susceptibility to insect outbreaks, like the current Emerald Ash Borer epidemic.
The Prairie Stature Oak trees were planted, along with about 60 other trees, at Craig and Riverview Heights
Parks by Medtronic volunteers. Thanks to Medtronic, Gary Johnson, Tree Trust and the Conservation Corps!
Other
Changes in Chapter 113 (Solid Waste & Recycling) have been reviewed atPublic Hearing in front of the
Planning Commission and at the Council meeting of October 24, 2016. The first reading was yesterday evening
thth
at the November 14, 2016 City Council meeting and the second reading will be on November 28, 2016.
Subsequent publication of a summary of the changes in this chapter of City Code will take place in early
December in the Sun Focus newspaper.
Next Meetings/Announcements
The next EQEC meeting will be held on December 13, 2016 at 7:00 p.m., at the usual location, Conference
Room A (Main Level, City Hall).
Adjourn:
The meeting was adjourned at 8:20 p.m.
CITY OF FRIDLEY
HOUSING AND REDEVELOPMENT AUTHORITY MEETING
OCTOBER 6, 2016
Chairperson Commers
called the Housing and Redevelopment Authority meeting to order at
7:01 p.m.
MEMBERS PRESENT:
Larry Commers
William Holm
Pat Gabel
Stephen Eggert
Gordon Backlund
OTHERS PRESENT:
Paul Bolin, HRA Assistant Executive Director
Wally Wysopal, City Manager
Jim Casserly, Development Consultant
Paul Hyde, Hyde Development
ACTION ITEMS:
1. Approval of Expenditure.
MOTION
by Commissioner Holm to approve the expenditures as presented. Seconded by
Commission Eggert.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON COMMERS DECLARED
THE MOTION CARRIED UNANIMOUSLY.
2. Approval of September 1, 2016 Meeting Minutes.
Commissioner Gabel
asked for the following changes to be made:
(1) Page 6, third paragraph, second sentence, "To avoid that really what staff" she
believed it should read "To avoid that what staff. . . ."
(2) Page 6, fourth paragraph, should be corrected to read, "Mr. Bolin referred to
Request for Proposals (RFP) in the memorandum. Attorney Casserly and he have
had some discussions, and it may end up being referred to a Request for
Qualifications. . . ."
(3) Page 6, fifth paragraph, second sentence, eliminate the second sentence and then
complete the paragraph stating, "Staff has a lot of soil reports and different
environmental reports done. They can get out into the market place and share that
Housing and Redevelopment Authority Meeting of October 6, 2016 2
information along with the other site constraints with the development
community."
(4) Page 7, fifth sentence, should read, "Then ideally, staff. . .maybe recommend a
couple of developers the HRA. . . ."
(5) Page 9, second paragraph, last sentence, should read "He encourages staff to
consider taking a look at that."
(6) Page 9, fifth paragraph, should read, "because one of the concerns at those
meetings was if the parking garages would be difficult to put in there."
Commissioner Backlund
said page 2, paragraph 5, should read, "He is curious of what the
process is as one goes into the seven-county pool and the rest of the money comes back here for
fiscal disparities."
Commissioner Eggert
referred to page 2, paragraph 3. He asked if the dollar amount should be
$408,000.
Paul Bolin, HRA Assistant Executive Director,
repliedthe amount should be $408,000 and not
$480,000.
Chairperson Commers
asked the minutes be approved subject to corrections at their next
meeting.
3. Approval of Administrative Contract - Home & Garden Show.
Paul Bolin
, Assistant Executive HRA Director, said for the last 19 years, the HRA has been the
fiscal agent on behalf of the cities of Blaine, Mounds View, and Columbia Heights for the Home
& Garden Show. The revenues from the booth rentals cover the expenses for the show. Since
2005, they have worked with Castle Visions to perform the administrative tasks. The Home &
Garden Show members would like to work with Castle Visions for the 2017 Home & Garden
Show which is going to be held on Saturday, February 4, at the National Sports Expo Center.
Staff recommends approval of the contract authorizing the HRA to work with Castle Visions.
MOTION
by Commissioner Holm to approve the Administrative Contract - Home & Garden
Show. Seconded by Commissioner Gabel.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON COMMERS DECLARED
THE MOTION CARRIED UNANIMOUSLY.
4. Approval of Resolution Supporting Grant Application - DEED Redevelopment
Paul Bolin,
Assistant Executive HRA Director, stated Hyde Development is getting ready to do
the clean-up needed to build Phase 4, the final phase of the Northern Stacks project. Mr. Hyde
has identified the need for approximately $3 million in grants to complete this work. These
Housing and Redevelopment Authority Meeting of October 6, 2016 3
grants would come from Met Council and from the State's Department of Employment and
Economic Development. The grants require that the funds go through the HRA, which happened
with the previous three phases of this project.
Mr. Bolin
stated the first grant program is DEED's Contamination Cleanup Program. This
provides money for investigating and developing a Response Action Plan and then doing
contamination clean-up that would go along with that plan. Mr. Hyde is seeking about
$2 million from DEED for this particular program.
Mr. Bolin
stated the other program is the Met Council's Tax Base Revitalization Account
(TBRA) Program. This is additional money for investigation and cleanup of contamination on
the site. They are looking at approximately $950,000 from this program.
Mr. Bolin
stated the HRA has helped Mr. Hyde with these applications during the previous three
phases and they have obtained nearly $6 million. This is Phase 4.
Mr. Bolin
stated staff recommends the HRA adopt two resolutions, one resolution for DEED's
Contamination Cleanup Grant, and the other resolution under a separate motion approving the
application to Met Council's TBRA Program.
Paul Hyde,
Hyde Development, stated they have started and now completed two buildings in
Phase I which are on the south side of the park. The second building which is a 135,000 square
foot office warehouse building was just completed last week. It is 100 percent occupied. In fact,
they leased the building right as they were starting it. That is how much demand they are
seeing. They did not have enough clean-up work done to be able to start another building any
sooner than what they are doing now. They are starting their fourth building, in the Phase 3 site,
which is what they call Northern Stacks 3. That started construction last week.
Mr. Hyde
stated hey have completed three buildings. All are 100 percent occupied. They are
starting their fourth building which is the Northern Stacks 3 building. They will finish the clean-
up of the Phase 3 site this fall. They have another few weeks to wrap that up. Now they are
focusing on getting the clean-up grant applications in on November 1 for the Phase 4 portion of
the site.
Mr. Hyde
stated in terms of their environmental clean-up, they have had Certificates of
Completion issued for the Northern Stacks 1 building which was the first project. They have a
request for the Certificate of Completion for the BAE Building and expect it by the end of the
year. Shortly, they will submit their request for the third Certificate for the Stacks 2 building
with Trio and MV2. They expect that Certificate to be issued in the first quarter of next year.
Mr. Hyde
stated so far everything is moving along, probably faster than what they told the HRA
it would when they first started. It all seems to be going well. They are seeing really good
activity from the leasing market. It may have started a little slower than what they hoped with
the first building. That is typical of it being the first project on a much larger park. The old BAE
building was still out there. It did not look great. They were talking about a vision that was
harder for people to see--especially tenants. Once they got the BAE project done, people really
Housing and Redevelopment Authority Meeting of October 6, 2016 4
could see what it would look like. They started Stacks 2 and filled that up immediately. They
have not had another site ready to offer another building until the Stacks 3 project.
Mr. Hyde
stated they continue to do work marketing the boiler room for tap rooms. He thanked
the HRA for their legislation as it helps out a great deal. That is the first thing any potential
tenant asks when they walk in. They think the space is amazing and ask if the City has passed
the ordinance. Now they are now able to reply, yes. People are interested in the very tall
ceilings in the boiler room. It is very open and bright with a lot of windows which they are
going to add. It has enormous history, not only with the site but with the stacks. They have had
a showing with a different brewing company every other week. They have a lot of activity, and
he hopes to have somebody in there next summer.
Mr. Hyde
said to wrap up, they have had three buildings built in full and all are open. They are
starting their fourth project which will be ready in the spring of 2017. They will continue
working through Phase 3 this winter and spring, trying to get those buildings filled up. Now
their focus is on cleaning up the Phase 4 site, and that is the reason for their grant application. .
Last summer they did the environmental investigation of the Phase 4 site, and they are preparing
their grant application. They have already submitted their clean-up plan to the Pollution Control
Agency. Staff at the Pollution Control Agency has indicated they will approve it in time for their
November 1 application deadline.
Commissioner Commers
stated to Mr. Hyde he certainly deserves a lot of credit for developing
this project. It is a little bit surprising, as it has come faster than they originally thought. There
must be a great demand out there.
Mr. Hyde
replied it is really interesting. Their primary competition is in Rogers and Otsego.
There has been an enormous amount of new product put up out there. He thinks it is a result of a
lot of Wall Street capital that is interested in making some development returns and not just
mortgage returns. Here they have won for people who want to be close to downtown, close to
the employment base, close to transit, and close to their customers. If you have two employees
and want the cheapest place to store boxes, this is not their project. If you want to have an in-
field site location, they are the only game in town. They have been fortunate enough to launch
their project with a good economic cycle. That along with getting the BAE project underway,
has shown some momentum, and people who are tenants now see other people who are there.
They have buildings to show them. They can see what it will look like.
Commissioner Commers
stated they look forward to them being able to get it finished. He
asked if that would be next year.
Mr. Hyde
replied, depending on the economy, he thought it would be two to three years unless
something happened and they slow down. They are really in good shape and they would not
have been able to do any of this without the HRA getting that first development agreement put
together which launched this whole project.
Commissioner Gabel
asked how it went when they got into the plating shop.
Housing and Redevelopment Authority Meeting of October 6, 2016 5
Mr. Hyde
replied two different things happened on Phase 3. There really have been almost four
completely different sites environmentally which has been interesting. Phase 3 had two areas
that had been historic concerns. One was called the paint shop which was just south of the boiler
room and something BAE was focused on cleaning up. The other was the plating shop which
was the Navy's issue. Neither party had ever had a chance to do anything about it because the
building covered it. Once the building came up, they warned people they were going to have a
summer to go in and solve the problem or else they were going to cover it with something else,
BAE and the Navy spent their own money and addressed the paint shop and the plating shop.
They excavated the soils and they met the cleanup standards. The cleanups are done, and the
project is underway.
Mr. Hyde
said they have cleaned it up and treated it to the standards required by the agencies.
Now they are looking to de-list another portion of that site. They have de-listed the soils. They
have not de-listed the middle part. They are looking at working on that now that those two areas
have been cleaned up. That may take a year, but now that the cleanup work has been done, that
is a possibility.
Commissioner Gabel
asked if they have moved any of the soil.
Mr. Hyde
replied, absolutely. He cannot tell her the volumes but both in the paint shop and the
plating shop, somewhere between 10,000 yards or so was excavated and treated. Some was
taken off-site. Some treated soil met industrial standards, and he believed they used it under
their parking lots.
Commissioner Backlund
asked if that would relieve any contingent liability that may exist after
the project is completed.
Mr. Hyde
replied he cannot speak for those companies or those parties. The motivation was to
spend some dollars to cut off future liability. He thought the motivation was that this was the
only time in the next 50 years when there was going to be a hole in the ground.
Commissioner Backlund
stated he would assume the Navy would be anxious to do that to limit
their liability.
Mr. Hyde
replied, again, he cannot speak for the Navy. His suspicion is they saw an
opportunity to address the plating shop soils.
Commissioner Gabel
stated according to the MPCA they still have liability even if they have
agreed to some extensive liability of the soil under one of those rooms. She forgot which one it
was. That has been their baby for a long time.
Commissioner Backlund
stated that would be a risk assessment that they would be assuming,
and they probably decided it was the least risky.
Chairperson Commers
stated he would think so and it is clean.
Housing and Redevelopment Authority Meeting of October 6, 2016 6
Commissioner Backlund
stated it is a great idea.
Commissioner Gabel
stated it is a very good deal for this community to have that cleaned up.
MOTION
by Commissioner Holm to approve the Resolution Supporting Grant Application -
DEED Redevelopment. Seconded by Commissioner Gabel.
UPON A VOICE VOTE, ALL VOTING AYE, COMMISSIONER COMMERS
DELCARED THE MOTION CARRIED UNANIMOUSLY.
5. Approval of Resolution Supporting Grant Application - Met Council TBRA
MOTION
by Commissioner Holm to approve the Resolution Supporting Grant Application –
Met Council TBRA. Seconded by Commissioner Gabel.
UPON A VOICE VOTE, ALL VOTING AYE, COMMISSIONER COMMERS
DECLARED THE MOTION CARRIED UNANIMOUSLY.
Informational Items
1. CEE Housing Programs Update.
Paul Bolin,
Assistant Executive HRA Director, stated the numbers for loan programs and the
Remodeling Advisor were much better than they have been for the past few years. They would
like to see that continue. They are already at 16 loans for the year to date. Last year they only
had 11. Remodeling Advisors had 5 last year, and they are already at 11 this year. They are
starting to see positive impacts from those few changes they made last year to the loan program.
The Home Energy Squad visits continue to be popular. They did 20 of those in September, and
those numbers will go up over the next couple of months as well. They continue to get good
feedback from the residents about the program.
Chairperson Commers
asked if there is still a $50 charge for the Home Energy Squad.
Mr. Bolin
replied the program is the same as it has been for the past few years.
2. Locke Park Pointe RFQ.
Paul Bolin,
Assistant Executive HRA Director,the Request for Qualifications was made
available on September 16. They had 17 different development groups ask for copies. They had
a mandatory pre-submittal meeting yesterday, and there were 8 developers represented at that
meeting. They had local developers but also had a development group from Indianapolis, one
from New York, and one from Kansas City.
Mr. Bolin
stated out of those 8 developers, there was a real nice mix of specialties. They all
seemed to have done some different mixed use developments, but they did have one group that
specialized in senior buildings. There were some that have been doing condos in the north loop
Housing and Redevelopment Authority Meeting of October 6, 2016 7
and are now looking at this area. They had other groups there that had done office projects,
residential projects, and retail projects. They were not sure how this would be received in the
marketplace, but there are some people who are pretty excited about it.
Mr. Bolin
stated the real test will be at 12:00 p.m. on October 19 to see how many of these 8
have responded to the questions the City has asked. At yesterday's meeting, the developers had
an opportunity to ask questions of the City's environmental consultant and soils person they have
been working with. The developers have had a lot of access to all the different studies the City
has done on this site over the past 1 ½ years. They have made everything available to the
developers, and they are available for questions from them through next Wednesday.
Chairperson Commers
stated he noticed in the minutes Commissioner Backlund had raised the
issue of every unit being the same and asking for some diversity. Was there any discussion or
did he get any sense from the developers what they are talking about? Is it going to be a uniform
type of patio home all the way through?
Mr. Bolin
said they did not get any of that feedback from those groups yesterday. He did not
think anybody wanted to share their vision. When they refer to patio homes, they are really
talking about the single-level homes such as what those in Blaine. These are nice owner-
occupied homes where you have everything you need on one level. One of the groups they were
talking to stated their homes start at $310,000. They are very nice homes, and they would be a
buffer between the denser development to the north and the single-family neighborhood to the
south.
Chairperson Commers
stated there are a bunch of patio homes on County Road I and I-35,
right off the freeway in Shoreview.
Mr. Bolin
stated Fridley has some across the street in the Christenson Crossing neighborhood.
Most of the homes there are two stories, but within the two stories, you have everything you
need to live on the main floor. Patio homes are not a new product. They are just smaller single-
family homes on smaller lots. Since staff does not know the market. They are looking to find
the right development partner or partners and work with them to come up with a project that
works for everybody.
Mr. Bolin
stated after they get the proposals back on October 19, staff will go through and see if
there are one, two or three of them that seem to be better than the others. Then they would like
those groups to have an opportunity to meet with the HRA Commission in November. Staff
would ask the HRA to make a decision at their December meeting.
3. Existing City Hall Update
Mr. Bolin
stated there was a memo regarding the current City Hall and some ownership maps in
the packet. The purpose was to let the HRA know of some of the challenges they will have in
disposing of this site. If a new City Hall is constructed on another site, it will likely not be until
late 2018 or some time in 2019 before City staff would be moved out of the current building.
Housing and Redevelopment Authority Meeting of October 6, 2016 8
Mr. Bolin
stated it is important they start working on this now. The City proper owns the
building and the plaza in front, but the HRA owns the rest of the land around City Hall. The
HRA owns land around the building immediately south of City Hall. They also own almost half
of Fairview's parking lot on the other side of Fourmies Avenue. There are agreements with these
different bodies on all those parcels. Jim Casserly and Vicki Loher-Johnson's office is working
on this so when the time is right, they can dispose of the property either to their neighbors or to
some other interested party.
Mr. Bolin
stated the next step is going to be having appraisals done for the parcels. They will do
an appraisal of the City Hall property, the Fire Department parking lot, and the City's parking
deck. They will look separately at the parking lot that surrounds the building just to the south
and the parking lot on the other side of Fourmies Avenue. Once they have those values, they can
sit down with the City Manager and discuss how to dispose of this between the City and HRA.
Attorney Casserly pointed out it would take a lot of fill to get this site back up to grade with the
neighboring properties. There are a lot of things they need to figure out over the next several
months; however, they are months away from making any sort of recommendation to the HRA.
Chairperson Commers
asked if the City had any title insurance on this property.
Mr. Bolin
replied they just had a lot of work done.
Chairperson Commers
stated it would go way back to when it was initially acquired or built.
Jim Casserly,
Development Consultant, said at one time he was on a school board, and they had
an issue with the county and city as to who owned what. It took many years of effort to readjust
all the property values. It is not a foregone conclusion that is going to happen quickly.
Chairperson Commers
stated the agreements they have entered into may or may not cause
some kind of permanent disability to being able to sell free and clear. He would think there
would have been along with the initial title opinions, some kind of protection.
Attorney Casserly
replied he does not know if there is title insurance. There may have been,
but the issues that have been raised are really not title insurance problems. These are all
encumbrances and leases they have entered into as an Authority and have encumbered property
that it owns.
Chairperson Commers
asked if there were boundary issues or other issues.
Attorney Casserly
replied, there is one little one and has to do with the property that is to the
north. It is a question of ownership of the retaining wall and subterranean rights. It is all in
agreements. A number of these things are where the adjacent property has the right to exercise
the option to purchase. It may be prudent for the HRA at some point to talk to them about
exercising their option. They have rights for the next 50-60 years. There are all kinds of
obligations the HRA has to clean up the parking area and there are a number of things they are
supposed to do for some years. They may want to see if there is some way they can try and
resolve those issues.
Housing and Redevelopment Authority Meeting of October 6, 2016 9
Attorney Casserly
stated most of the issues that have arisen are ones they have entered into to
facilitate either the developers to the north and south of them to provide adequate parking that
they do not have exclusive rights to. If the HRA is going to sell its property, the appraiser has to
know how much property is available to park and how much or what kind of other encumbrances
there are on some of this ownership. With respect to the survey now, there was a fourth
supplemental opinion which was just a little touch up on one of the issues. The survey is now in
excellent shape.
Attorney Casserly
stated with the current survey and with the title opinion commitment that
exists now, the appraiser will have all the information they need. He referenced a notebook he
had which contained all the documents impacting the property the City and HRA owns. It is
about 500 pages. They just have to sort these out.
Chairperson Commers
replied they have talked about some of these issues before. For
example, the office building next door, the maintenance of that parking lot, the plowing of that
parking lot has come up many times as has the strip of land by the clinic. That would be the
most recent agreement. There should be records related to each one of these events and how
they got resolved at the time.
Attorney Casserly
replied they have all of the documents. They certainly have the time to sort
these out. They had recommended having an appraisal done. They really do not know what kind
of values they are talking about in today's market.
Chairperson Commers
stated he also noticed that on the First American Title insurance
Company commitment, they do talk about the issuance of an ALTA Owner's Policy. As they say
a lot of these issues are not covered by the policy. That should be analyzed completely because
now that he looks at it closer, it looks like there was a policy issued.
Attorney Casserly
said this appears to be a commitment to issue a policy.
Chairperson Commers
stated this would be the first upfront document. The policy would then
follow, along with the commitment itself which is continued with schedules.
Attorney Casserly
stated they spent a lot of time with the surveyor when they knew this needed
to be addressed. Paul Bolin and the City Manager strongly suggested they start identifying these
issues and start addressing this so that when the appropriate time comes, and that may be a year
from now, they will be in a position to do something.
Commissioner Backlund
asked Attorney Casserly, if the 500 pages of document are akin to an
abstract.
Attorney Casserly
replied, not exactly. These are leases, development agreements, cross
easements; all of which the HRA or the City have entered into as it impacts all the different
parcels.
Housing and Redevelopment Authority Meeting of October 6, 2016 10
Commissioner Backlund
asked Attorney Casserly if there has ever been an abstract for this
property.
Attorney Casserly
said he is sure there has been.
Commissioner Commers
replied, Anoka County usually keeps the abstracts. If there is one, it
might be in the County's office.
Commissioner Backlund
stated at least they could tie it back to some fixed point in time.
Attorney Casserly
stated any time you have redevelopment, you are going to have all these
kinds of issues. There are access roads in here. At some point you are going to have to either
dedicate those or make sure the access works for whoever purchases it as well as for the adjacent
properties.
Commissioner Backlund
stated it seems as though at some point in time some of the County
revenue was somewhat loose in the way they issued some of these properties.
Attorney Casserly
replied with the development that occurred just to the south of City Hall,
there was a real emphasis to try and get that developed, and that led to working out all kinds of
parking issues.
Adjournment:
MOTION
by Commissioner Eckert to adjourn the meeting. Seconded by Commissioner
Backlund.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON COMMERS DECLARED
THE MOTION CARRIED UNANIMOUSLY AND THE MEETING WAS ADJOURNED
AT 7:56 P.M.
Respectfully submitted,
Denise M. Johnson
Recording Secretary
CITY OF FRIDLEY
HOUSING AND REDEVELOPMENT AUTHORITY COMMISSION
NOVEMBER 3, 2016
Chairperson Pro Tem Gabel
called the Housing and Redevelopment Authority Meeting to
order at 7:00 p.m.
MEMBERS PRESENT:
Pat Gabel
Stephen Eggert
Gordon Backlund
MEMEBERS ABSENT:
Larry Commers
William Holm
OTHERS PRESENT:
Wally Wysopal, City Manager
Paul Bolin, HRA Assistant Executive Director
Shelly Peterson, Finance Director
Jim Casserly, Development Consultant
Action Items:
1.Approval of Expenditures
MOTION
by Commissioner Backlund to approve the expenditures. Seconded by Commissioner
Eggert.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED UNANIMOUSLY
2.Approval of September 1, 2016 Meeting Minutes
MOTION
by Commissioner Backlund to approve the minutes as presented. Seconded by
Commissioner Eggert.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED UNANIMOUSLY
3.Approval of October 6, 2016 Meeting Minutes
MOTION
by Commissioner Backlund to approve the minutes as presented. Seconded by
Commissioner Eggert.
Chairperson Pro Tem Gabel
requested the following changes:
th
Page 3, 7 paragraph, “Mr. Hyde stated hey they …”
thth
Page 4, 4 paragraph, 4 sentence, “Here they have won one for people”
HousingandRedevelopmentAuthorityMeetingofNovember3,20162
th
Page 5, 9 paragraph, “Commissioner Gabel stated according to the MPCA they may still
haveliability even if they have agreed to some they may still have extensive liability …?
rdrd
Page 7, 3 paragraph, 3 sentence, “..talking about the single-level homes such as what
those in Blaine.”
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED AND THE MINUTES APPROVED AS
AMENDED
4.Approval of 2017 HRA Regular Meeting Dates
MOTION
by Commissioner Eggert to approve the 2017 HRA Regular Meeting Dates.
Seconded by Commissioner Backlund.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED UNANIMOUSLY
5.Approval of Preliminary 2017 HRA Budget
Shelly Peterson
, Finance Director, stated that the Draft Budget is divided into 2 categories. The
General Fund – administrative and overhead costs and Housing Loan Fund Program – housing
related programs and services. The Capital Outlay Funds were removed from budget as TIF
funds have little flexibility and annual cash projections better anticipate balances. Ms. Peterson
presented the following:
Proposed Revenue Budget 2015 Actual 2016 Budget 2016 Revised 2017 Proposed
Taxes 357,968 397,022 397,000 408,400
Interest on Investments 46,021 20,000 20,000 20,000
Lot lease for Fairview 10,400 9,600 9,600 9,600
Medtronic Land Re-pymt 123,983 124,000 124,000 124,000
Inter-fund Loan Interest 164,500 206,800
Admin Fees 90,417 62,100 100,000 120,000
Development Grants 999,973 1,500,000 1,500,000 2,000,000
1,270,794 1,715,700 1,918,100 2,480,400
2017 General Revenue Highlights include:
•Property tax levy increase of 2.87% or $11,400
•2016 Revised budget and 2017 Proposed budget include interest received from the
Gateway NE & BAE TIF inter-fund loans
•The 2017 Proposed budget includes $2 million in pass-through Grants from DEED and
Met Council related to the BAE project
HousingandRedevelopmentAuthorityMeetingofNovember3,20163
General Proposed Budget 2015 Actual 2016 Budget 2016 Revised 2017 Proposed
Salaries & Benefits 152,289 155,200 142,200 156,900
Supplies 200 2,500 2,500 200
Professional Services 861,606 315,000 315,000 321,300
Developer Assistance 999,973 1,500,000 1,500,000 2,000,000
Debt Service 52,653 54,300 54,300 56,400
Other 82,027 21,700 21,700 2,500
2,148,748 2,048,700 2,035,700 2,537,300
Net Income (loss) (519,986) 64,022 279,400 351,500
Expenditure Highlights include:
•A 2% cost of living adjustment for 2017
•A 10% increase in professional services (primarily due to anticipated legal expenses)
•The 2017 Proposed budget includes $2 million in pass-through Grants from DEED and
Met Council related to the BAE project
Housing Loan Program
Proposed Budget 2015 Actual 2016 Budget 2016 Revised 2017 Proposed
Interest on investments 18,606 18,000 18,000 18,000
Interest on loans 37,748 50,000 33,300 33,300
Miscellaneous revenues 21,631 12,000 20,000 21,400
Total Revenues 77,985 80,000 71,300 72,700
Supplies 155 0 0 200
Professional Services 23,097 60,500 67,500 71,000
Total Expenditures 23,252 60,500 67,500 71,200
Net Income (loss) 54,734 19,500 3,800 1,500
Highlights include:
•Anticipated revenue for 2017 reflect a reduction in anticipated mortgage revenue
•Expenditure budget includes additional expenses related to the Home Show.
•Staff is also projecting similar expenditures in 2017 for Home Energy Squad Visits and
Remodeling Advisor Visits
Ms. Peterson
said that staff recommends approval of the preliminary budget. Your questions
and suggestions will be incorporated into a final budget to be presented December 1.
HousingandRedevelopmentAuthorityMeetingofNovember3,20164
Commissioner Eggert
was concerned about taking money out of the loan programs for other
things but it is building up again.
Ms. Peterson
replied that the Authority does have nice reserves in the housing loan program and
reserves in the receivables.
Chairperson Pro Tem Gabel
would like to see the different amounts in the TIF districts.
Ms. Peterson
replied that those are best looked at through the reports Mr. Casserly works with
Greg Johnson to put together for cash flow planning.
Commissioner Eggert
asked for explanation of the last page that summarizes everything.
Ms. Peterson
replied that it shows where the anticipated fund balance will be for all the funds.
We are anticipating $10m in fund balance from cash or any receivables owed to the HRA.
$6.293m total fund balance ending 2017.
Jim Casserly
, Development Consultant, added that the amounts of the cash balances can be used
for other programs. There are some cash balances that are restricted where the cash in those
districts can be used like only for specific activities. Unrestricted cash balances are about $6.5m.
Ms. Peterson
added that is primarily in the housing loan program and the general fund.
Chairperson Pro Tem Gabel
was looking for money for the Columbia Arena project because
we will need money for that.
Mr. Casserly
replied yes, the policy is that you make advances to projects through internal
financing, therefore there are the interfund loans. That is why the general fund is what it is
because that is where the funds were borrowed from in the first place. Once TIF districts begin
to make money the funds go back to the general fund. The general fund will have revenue
coming in for several years because of the loans that were given from that fund. We want to
finance investments as inexpensively as possible and we will have time to look at ways to do
that.
Chairperson Pro Tem Gabel
said that the Authority is in a decent position to go forward with
those things because of the revenue. I like seeing the different districts because sometimes the
money can be pooled and sometimes it can be moved.
Mr. Casserly
replied that as districts reach their end, whatever revenues that can be used for
legitimate expenses will be spent or the funds will go back to the general fund.
MOTION
by Commissioner Eggert to approve the Preliminary 2017 HRA Budget. Seconded
by Commissioner Backlund.
HousingandRedevelopmentAuthorityMeetingofNovember3,20165
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED UNANIMOUSLY
6.Locke Park Pointe / City Hall / Columbia Arena Update
Paul Bolin
, HRA Assistant Executive Director, stated that on September 16, staff released a
request for qualifications (RFQ) to begin the process of selecting a developer/partner for private
development around the proposed municipal campus. In total, 17 developers requested copies of
the RFQ and supporting documents. Eight different developers were represented in a mandatory,
pre-submittal meeting on October 5.
Mr. Bolin
said that in the days leading up to the RFQ submittal deadline, what we heard from a
few developers, is that they are/were too busy to get responses to us and that the uncertainty
surrounding the construction of City Hall causes some concern.
Mr. Bolin
said at noon on Wednesday, October 19, we had RFQ responses from one developer,
Dominium. While they are class leaders in senior buildings, their vision for the site did not
extend beyond them building a 200 unit senior building. They did not bring any partners
forward to develop the rest of the site.
Mr. Bolin
stated that the RFQ response from Dominium did not address the entire site. To
proceed with Dominium as a development partner, at this time, would require the Authority to go
out and find other developers to construct patio homes and other multi-family units. With the
RFQ, we were really looking for a developer or team of developers to take on the development
of the entire site. We are recommending that the Authority adopt a motion rejecting the response
to the RFQ received.
Mr. Bolin
said that staff is also recommending waiting until, at least, early January to go out
with a new RFQ. This timeframe will work better for the developers that are scrambling to
finish projects this fall, but more importantly we will know with much more certainty that City
Hall is a go or not. The Council is authorizing the bond sale for construction of City Hall on
November 14 and residents will have 30 days to gather enough signatures to put the issue up for
special vote. If there is not a successful petition, we can issue the RFQ in January. If the
signatures are gathered, and a special election forced, we would delay issuing the FRQ until the
issue is decided, likely in March. Staff recommends the Authority approve a motion to reject the
October 19 RFQ Response received from Dominium, for the Locke Park Pointe redevelopment.
Chairperson Pro Tem Gabel
agreed that one developer is not enough and understands how
other developers may be cautious about a development that may or may not go forward.
Commissioner Backlund
asked if staff would debrief with the non-responsive people.
Mr. Bolin
replied that staff has talked to several of them that showed up for the meeting on
th
October 5. The reasons they didn’t respond were timing, they are too busy, and the uncertainty
if city hall will be built or not.
HousingandRedevelopmentAuthorityMeetingofNovember3,20166
Commissioner Backlund
asked what would give us a better feeling for responsiveness. He
doesn’t want to repeat the same process and expect a different result.
Wally Wysopal,
City Manager, replied that the timing of it was an issue and greater certainty of
the city hall portion. Once it is confirmed city hall would be built that would grant more
certainty that the rest of the development will be doable.
Commissioner Backlund
confirmed that until we tie down the certainty of city hall, people
won’t respond.
Mr. Bolin
replied that we don’t plan to go out with an RFQ until that is known.
Commissioner Eggert
asked what is the site plan for the developer without the city project? It
can change tremendously.
Chairperson Pro Tem Gabel
agreed that once they have something they can count on then it’s
worth the effort to put the time and energy into it. That will be avoided once they know the
development will be going forward. Right now, that is unknown.
Mr. Bolin
thought staff would get a better response on bids if they wait until after January; or
March if this goes to special election.
MOTION
by Commissioner Eggert to reject the response from Dominium. Seconded by
Commissioner Backlund.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED UNANIOUSLY
Informational Items:
1.CEE Housing Programs Update
Paul Bolin,
HRA Assistant Executive Director, reported that there was one loan last month
making 17 total for year-to-date. Last year this time we only had 6 loans. The changes that the
Authority made to its loan eligibility are paying off. Remodeling Advisor visits had zero last
month making 11 year-to-date. Last year at this time only 3 had been completed. Home Energy
Squad visits had 4 in October making 54 year-to-date. This program continues to be successful.
An insert is going out in the utility bills and the first batch went out Monday. People should start
seeing those in their mailbox in the next few days.
Adjournment:
MOTION
by Commissioner Eggert to adjourn. Seconded by Commissioner Backlund.
HousingandRedevelopmentAuthorityMeetingofNovember3,20167
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON PRO TEM GABEL
DECLARED THE MOTION CARRIED UNANIMOUSLY AND THE MEETING
ADJOURNED AT 7:45 P.M.