HomeMy WebLinkAbout25 44th Ave NECONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR ABOVEGROUND PIPING
PROCEDURE
UPON COMPLETION OF WORK, INSPECTION AND TESTS SHALL BE MADE BY THE CONTRACTOR'S REPRESENTATIVE AND WITNESSED
BY AN OWNER'S REPRESENTATIVE. ALL DEFECTS SHALL BE CORRECTED AND SYSTEM LEFT IN SERVICE BEFORE CONTRACTOR'S
PERSONNEL FINALLY LEAVE THE JOB.
A CERTIFICATE SHALL BE FILLED OUT AND SIGNED BY BOTH REPRESENTATIVES. COPIES SHALL BE PREPARED FOR APPROVING
AUTHORITIES, OWNERS, AND CONTRACTOR. IT IS UNDERSTOOD THE OWNER'S REPRESENTATIVE'S SIGNATURE IN NO WAY
PREJUDICES ANY CLAIM AGAINST CONTRACTOR FOR FAULTY MATERIAL, POOR WORKMANSHIP, OR FAILURE TO COMPLY WITH
APPROVING AUTHORITY'S REQUIREMENTS OR LOCAL ORDINANCES.
PROPERTY NAME
DATE
Genereal Mills
2/01/06
PROPERTY ADDRESS
25 44"' ave NE Fridley, MN
ACCEPTED BY APPROVING AUTHORITY(S) NAMES
Fridley
ADDRESS
PLANS
6431 University ave NE Fridley, MN 55432
INSTALLATION CONFORMS TO ACCEPTED PLANS OYES NO
EQUIPMENT USED IS APPROVED ®YES []NO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF ONO
YES
CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS
IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: j@YES NO
1. SYSTEM COMPONENTS INSTRUCTIONS OYES []NO
2. CARE AND MAINTENANCE INSTRUCTIONS OYES ONO
3. NFPA 25 OYES []NO
LOCATION OF
SUPPLIES BLDGS.
SYSTEM
Dry System
MAKE
MODEL
YEAR OF
ORIFICE SIZE
QUANTITY
TEMPERATURE
MANUFACTURE
RATING
Viking
VK108
2005
1/2"
180
2860
SPRINKLERS
o
0
0
0
TYPE OF PIPE Galvanized Schedule 40
PIPE AND
FITTINGS
TYPE OF FITTINGS Grooved and Screwed
ALARM VALVE
ALARM DEVICE
MAXIMUM TIME TO OPERATE
THROUGH TEST CONNECTION
OR FLOW
enk TYPE
MAKE
MODEL
MIN.
SEC.
INDICATOR
. c
I V
DRY VALVE
Q.O.D.
MAKE
MODEL
SERIAL NO.
MAKE
MODEL
SERIAL NO.
TYCO
DPV -1
:Ls Srs
TIME TO TRIP
WATER
AIR
TRIP POINT
TIME WATER
ALARM
THRU TEST
PRESSURE
PRESSURE
AIR
REACHED
OPERATED
DRY PIPE
CONNECTION
PRESSURE
TEST OUTLET
PROPERLY
OPERATING
MIN.
SEC.
PSI
PSI
PSI
MIN.
SEC.
YES
NO
TEST
WITHOUT
Q.O.D.
► S
�0
40
AS
WITH
Q.O.D.
IF NO, EXPLAIN
GENERAL INFORMATION
AUDI I IONAL LAF'LANA I ION AND NOTES: 1 I
OPERATION OPNEUMATIC ❑ELECTRIC ❑HYDRAULIC
PIPING SUPERVISED OYES ONO
DETECTING MEDIA SUPERVISED ❑YES ❑NO
DOES VALVE OPERATE FROM THE MANUAL TRIP AND /OR REMOTE CONTROL STATIONS OYES ONO
DELUGE &
IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR
IF NO, EXPLAIN
PREACTION
TESTING
❑YES ONO
VALVES
DOES EACH CIRCUIT OPERATE
DOES EACH CIRCUIT
MAXIMUM TIME TO OPERATE
MAKE
MODEL
SUPERVISION LOSS ALARM
OPERATE VALVE RELEASE
RELEASE
YES
NO
YES
NO
MIN.
SEC.
PRESSURE
LOCATION
& FLOOR
MAKE &
MODEL
SETTING
STATIC PRESSURE
RESIDUAL PRESSURE
FLOWING
FLOW RATE
REDUCING
INLET (PSI)
OUTLET (PSI)
INLET (PSI)
OUTLET (PSI)
FLOW GPM
VALVE TEST
HYDROSTATIC: HYDROSTATIC TESTS SHALL BE MADE AT NOT LESS THAN 200 PSI (13.6 BARS) FOR TWO HOURS OR 60
PSI (3.4 BARS) ABOVE STATIC PRESSURE IN EXCESS OF 150 PSI (10.2 BARS) FOR TWO HOURS. DIFFERENTIAL DRY -PIPE
VALVE CLAPPERS SHALL BE LEFT OPEN DURING TEST TO PREVENT DAMAGE. ALL ABOVE GROUND PIPING LEAKAGE
TEST
SHALL BE STOPPED.
DESCRIPTION
PNEUMATIC: ESTABLISH 40 PSI (2.7 BARS) AIR PRESSURE AND MEASURE DROP WHICH SHALL NOT EXCEED 1 -1/2 PSI (0.1
BARS) IN 24 HOURS. TEST PRESSURE TANKS AT NORMAL WATER LEVEL AND AIR PRESSURE AND MEASURE AIR
PRESSURE DROP WHICH SHALL NOTE EXCEED 1 -1/2 PSI 0.1 BARS IN 24 HOURS.
ALL PIPING HYDROSTATICALLY TESTED AT 200 PSI FOR 2 HOURS.
DRY PIPING PNEUMATICALLY TESTED OYES ONO
IF NO, STATE REASON
EQUIPMENT OPERATES PROPERLY OYES ONO
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR
DERIVATIVES OF SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS
OR STOPPING LEAKS?
YES ONO
DRAIN
TEST
READING OF GAGE LOCATED NEAR WATER SUPPLY
TEST CONNECTION: SO PSI I
RESIDUAL PRESSURE WITH VALVE IN TEST
CONNECTION OPEN WIDE R$ PSI
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO
TESTS
SPRINKLER PIPING
VERIFIED BY COPY OF THE U FORM NO.85B DYES ONO OTHER EXPLAIN
FLUSHED BY INSTALLER FOR UNDERGROUND SPRINKLER PIPING OYES ONO
IF POWDER DRIVEN FASTENERS ARE USED IN ®YES ❑NO
IF NO, EXPLAIN
CONCRETE, HAS REPRESENTATIVE SAMPLE
TESTING BEEN SATISFACTORILY COMPLETED?
BLANK
NUMBER USED
LOCATIONS
NUMBER REMOVED
TESTING
NONE
GASKETS
WELDED PIPING OYES ONO
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES ®YES NO
COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS D10.9 LEVEL AR -3?
WELDING
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN OYES ONO
COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9 LEVEL AR -3?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE
RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER
WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING
ARE NOT PENETRATED ? ®YES ONO
CUTOUTS
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
DISCS
CUTOUTS DISCS ARE RETRIEVED? OYES ❑NO
HYDRAULIC
NAMEPLATE PROVIDED ZYES ONO
IF NO, EXPLAIN
DATA
NAMEPLATE
REMARKS
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:ti
NAME OF SPRINKLER CONTRACTOR
NEWMECH COMPANIES, INC. LICENSE #000017
SIGNATURES
TEST WITNESSED BY
NER SI NED) TITL4L DATES Z, Q&
F R SP INKL O (SIGNED) �yTITLE 011 DATE
AUDI I IONAL LAF'LANA I ION AND NOTES: 1 I