Loading...
Res 2017-23 Allowing Assignment to McGough RESOLUTION NO. 2017-23 A RESOLUTION ALLOWING THE ASSIGNMENT TO MCGOUGH CONSTRUCTION COMPANY, LLC, AS PRIME CONTRACTOR AND ASSIGNMENT OF CONTRACTS BETWEEN THE CITY OF FRIDLEYAND SPECIFIC INDIVIDUAL CONTRACTORS TO MCGOUGH AS THE CITY OF FRIDLEY'S CONSTRUCTION MANAGER AT RISK FOR THE CITY OF FRIDLEY'S CIVIC CAMPUS PROJECT WHICH INCLUDES: CITY HALL, POLICE, FIRE AND THE PUBLIC WORKS BUILDINGS t WHEREAS,he CityCouncil has contracted with McGough Construction Company, LLC as its Construction Manager; and WHEREAS, the City Council has accepted the Guaranteed Maximum Price (GMP) from McGough Construction Company, LLC, making McGough its Construction Manager At Risk (CMAR); and WHEREAS, a formal bid process commenced with bid packets available for 31 contacts began with packets available on March 25, 2017; and WHEREAS, respondents to eighteen (18) of the bid categories were evaluated by a lowest responsible bid process according to bid guidelines; and WHEREAS, respondents to thirteen (13) of the bid categories were evaluated by a best value bid process, which included contractor interviews; and WHEREAS, the processes have resulted in twenty eight (28) of the thirty one (31) categories being successfully bid; and WHEREAS, now that those contractors are known and contracts are ready to be signed, it is most appropriate to have the CMAR manage the contracts; and WHEREAS, those contracts that include materials only can be awarded by a letter and the sample letter is attached as Exhibit A; and WHEREAS, those contracts that include materials and labor will require bond and insurance submittals prior to award and be awarded once those items have been provided, through a notification letter attached as Exhibit B; and WHEREAS, those contract award recipients can be identified as follows: 1.Concrete - McGough Construction 2.Masonry - McGough Construction 3.Carpentry - McGough Construction 4.Overhead Doors - Overhead Door Company 5.Flooring Tile - WTG Terrazzo and Tile, Inc. 6.Ceiling Tile - Minnesota Acoustics 7.Carpet/Resilient - Sonus Interiors, Inc. 8.Elevators TO BE RE- BID Resolution No. 2017-23 Page 2 9.Window Treatments - CE LLC BBA CE Contract 10.Aggregate Piers - Foundation Service Corp 11.Bituminous Paving - Bituminous Roadways, Inc. 12.Landscaping - Hoffman & McNamara Co. 13.Painting - Julius B Nelson & Son Inc. 14.Vehicle Wash/Equipment Lube Tech ESI 15.Furnish Millwork TO BE RE-BID 16.Furnish Doors - Wheeler Hardware Company 17.Fire stopping - Superl, Inc. 18.Caulking - Carciofini Company 19.Public Works Precast - Fabcon Precast, LLC 20.City Hall Precast - Well's Concrete 21.Demo Site Work - Park Construction Company 22.Structural Steel/Misc. Metals Install - Dan Sowles Company 23.Drywall/Air Barrier - Custom Drywall, Inc. 24.Metal Panels - Flynn Midwest LP 25.Fire Suppression - Viking Automatic Sprinkler Company 26.HVAC/Plumbing-Schadegg Mechanical 27.Electrical/Low Voltage - Peoples Electric Company 28.Roofing - Central Roofing Company 29.Structural Steel/Misc. Metals Furnish - LeJeune Steel Co. 30.Curtain Wall/ Glazing/Storefront - Top Lite Contract Glazing 31.Waterproofing TO BE RE-BID; and WHEREAS, Items sixteen (16) and twenty eight (28) are materials only and can be notified by use of the letter identified as Exhibit A; and WHEREAS, all other contract award recipients will require bond and insurance information prior to contract assignments to the CMAR: and WHEREAS, signatures by the Mayor and City Manager will be required on the assignment documents and those signature dates may be staggered, and NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Fridley approves the assignment of contracts as stated to McGough Construction Company, its CMAR and authorizes the Mayor and City Manager to sign the Award/assignment documents as appropriate. This resolution hereby adopted by the City Council of the City of Fridley. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 22ND DAY OF MAY, 2017. _________________________________ SCOTT J. LUND – MAYOR ATTEST: ________________________________ DEBRA A. SKOGEN - CITY CLERK EXHIBIT A Assignment of Prime Contract THIS ASSIGNMENT is made and effective this ___ day of ____________, 2017, by the City of Fridley, a municipal corporation (“Owner”) to McGough Construction Co., LLC, a Minnesota corporation (“Construction Manager”). RECITALS A. Owner and Construction Manager have entered into that certain agreement entitled Standard Form of Construction Management Agreement between Owner and Construction Manager as Constructor, A133-2009, dated May 23, 2016, and as amended, March 9, 2017 (“CM Agreement”) regarding the construction project in the City described therein (“Project”). B. Construction of the Project facility has been competitively bid pursuant to Minnesota law and Owner has awarded the bid for the performance of __________________ to ___________________ and entered into a contract with _____________________ describing the documents included in the contract and setting forth the terms and conditions of the Work. Specifically, the contract provisions describing all documents forming the contract between Prime Contractor and Owner hereby assigned include Article 1 and Section 9.1.7 of the AIA A132 – 2009 together with the AIA A232 -2009 General Conditions of Contract, comprising the contract documents (“Prime Contract”). C. Owner has accepted Construction Manager’s Guaranteed Maximum Price (“GMP”), which is conditioned on Owner assignment of certain rights in the Prime Contract to the Construction Manager, as well as assignment of rights in other Prime Contracts between Owner and the Prime Contractors. D. By this Assignment, Owner is assigning and retaining certain rights under the Prime Contract and Construction Manager is accepting and assuming those rights and obligations for the defined Work under the Prime Contract to carry out the Project Work for the GMP. NOW THEREFORE , for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agrees to the following: 1.The Recitals are made a part of this Assignment. 2.Unless expressly retained, reserved or qualified in paragraph 4 below, Owner assigns all its rights, duties, and obligations under the Prime Contract to Construction Manager, which hereby assumes such rights, duties, and obligations. 493296v6 FR655-1 3.By this Assignment, and notwithstanding any language to the apparent contrary in CM Agreement, Construction Manager assumes direct management and control over the Prime Contractor in carrying out the Project Work to accomplish timely completion of the Work in accordance with the Prime Contract. 4.Owner does not hereby assign and expressly reserves the rights, duties and obligations contained in the following provisions of AIA A232–2009, and in those sections in AIA A132–2009 and A232 that are a part of or otherwise relate directly thereto: a.The right to require that all Work performed during the Project under Owner’s assigned rights to Construction Manager be procured pursuant to the requirements of the Uniform Municipal Contracting Law, Minn. Stat. § 471.345, including but not limited to section 2.4 of the A232; b.Rights inuring to the Owner in sections 3.5.1, 3.9.3, 3.11, 3.12.8, 3.16, 3.17, 3.18.1, 4.2.16, 4.13, 4.2.16, Article 9 payment, Article 15 and rights to legal remedies available under the Prime Contract, and final approval of the Work; c.Owner’s rights and obligations under sections 2.1, 2.2, 3.3.1, 3.7.4, 3.7.5, 3.12.10, 3.13.3, 4.1, 4.2, 6.1, 6.2, 7.1, 7.2 when involving Owner, 7.3, 9.3, 10.2.8, 10.3, Article 11, 12.2, 13.5. IN WITNESS WHEREOF, the undersigned parties have executed this Assignment effective the date first above written. CITY OF FRIDLEY MCGOUGH CONSTRUCTION CO., LLC Owner Construction Manager By: ________________________ By: ________________________ Its: ________________________ Its: ________________________ By:________________________ Its:________________________ 2 493296v6 FR655-1 EXHIBIT B Date Mr. Greg Hedin Construction Executive McGough Construction Co., LLC 2737 Fairview Avenue North St. Paul, MN 55113 Re: Assignment Letter Bid Package No. # Bid Scopes – Tax Exempt Materials Fridley Civic Complex Fridley, Minnesota Dear Mr. Hedin: The City of Fridley, MN (“City”) has received competitive bids from various trade contractors for the tax- exempt materials portion of the Project. After reviewing those bids, the City has determined that Purchasing Agent Agreements should be awarded to the successful bidders listed on Exhibit A attached hereto (the “Successful Bidders”) in the amounts of the accepted bids. The City has notified the Successful Bidders of the award. In lieu of entering into direct Purchasing Agent Agreements with the Successful Bidders and then assigning those Purchasing Agent Agreements to McGough Construction Co., LLC (“McGough”), the City desires to assign its right to enter into binding Purchasing Agent Agreements with the Successful Bidders to McGough, whereupon McGough will enter into Purchasing Agent Agreements directly with the Successful Bidders. Therefore, the City hereby assigns its aforementioned right to enter into binding Purchasing Agent Agreements with the Successful Bidders to McGough. By signing below, McGough hereby accepts the assignment and agrees to enter into Purchasing Agent Agreements with the Successful Bidders as provided herein. Sincerely, CITY OF FRIDLEY ______________________________________________________________ Name, Title Date: ______________________________________________________________ nd Name, Title (If 2 Signature is required) Date: Approved: _______________________________________________________________ Greg Hedin Date: McGough Construction Co., LLC EXHIBIT A Fridley Civic Complex Fridley, MN Bid Package No. # Awarded Bidders – Tax-Exempt Materials Bid Scope No. # - Name of Bid Scope Bid Scope No. # - Name of Bid Scope Bid Scope No. # - Name of Bid Scope EXHIBIT C Date Mr. Greg Hedin Construction Executive McGough Construction Co., LLC 2737 Fairview Avenue North St. Paul, MN 55113 Re: Assignment Letter Bid Package No. # Bid Scopes – Tax Exempt Materials Fridley Civic Complex Fridley, Minnesota Dear Mr. Hedin: The City of Fridley, MN (“City”) has received competitive bids from various trade contractors for the tax- exempt materials portion of the Project. After reviewing those bids, the City has determined that Purchasing Agent Agreements should be awarded to the successful bidders listed on Exhibit A attached hereto (the “Successful Bidders”) in the amounts of the accepted bids. The City has notified the Successful Bidders of the award. In lieu of entering into direct Purchasing Agent Agreements with the Successful Bidders and then assigning those Purchasing Agent Agreements to McGough Construction Co., LLC (“McGough”), the City desires to assign its right to enter into binding Purchasing Agent Agreements with the Successful Bidders to McGough, whereupon McGough will enter into Purchasing Agent Agreements directly with the Successful Bidders. Therefore, the City hereby assigns its aforementioned right to enter into binding Purchasing Agent Agreements with the Successful Bidders to McGough. By signing below, McGough hereby accepts the assignment and agrees to enter into Purchasing Agent Agreements with the Successful Bidders as provided herein. Sincerely, CITY OF FRIDLEY ______________________________________________________________ Name, Title Date: ______________________________________________________________ nd Name, Title (If 2 Signature is required) Date: Approved: _______________________________________________________________ Greg Hedin Date: McGough Construction Co., LLC EXHIBIT A Fridley Civic Complex Fridley, MN Bid Package No. # Awarded Bidders – Tax-Exempt Materials Bid Scope No. #16 - Furnish Doors Bid Scope No. # 28 - Structural Steel/ Misc. Metals Furnish Exhibit D - Contracts to Be Assigned in Accordance With Attached Resolution 1.Concrete - McGough Construction 2.Masonry - McGough Construction 3.Carpentry - McGough Construction 4.Overhead Doors - Overhead Door Company 5.Flooring Tile - WTG Terrazzo and Tile, Inc. 6.Ceiling Tile - Minnesota Acoustics 7.Carpet/Resilient - Sonus Interiors, Inc. 8.Elevators - (to be bid Friday, May 26, 2017) 9.Window Treatments - CE LLC BBA CE Contract 10.Aggregate Piers - Foundation Service Corp 11.Bituminous Paving - Bituminous Roadways, Inc. 12.Landscaping - Hoffman & McNamara Co. 13.Painting - Julius B Nelson & Son Inc. 14.Vehicle Wash/Equipment Lube Tech ESI 15.Furnish Doors - Wheeler Hardware Company 16.Firestopping - Superl, Inc. 17.Caulking - Carciofini Company 18.Public Works Precast - Fabcon Precast, LLC 19.City Hall Precast - Well's Concrete 20.Demo Site Work - Park Construction Company 21.Structural Steel/Misc. Metals Install - Dan Sowles Company 22.Drywall/Air Barrier - Custom Drywall, Inc. 23.Metal Panels - Flynn Midwest LP 24.Fire Suppression - Viking Automatic Sprinkler Company 25.HVAC/Plumbing-Schadegg Mechanical 26.Electrical/Low Voltage - Peoples Electric Company 27.Roofing - Central Roofing Company 28.Structural Steel/Misc. Metals Furnish - LeJeune Steel Co. 29.Curtain Wall/ Glazing/Storefront - Top Lite Contract Glazing 30.Waterproofing (to be bid Friday, May 26, 2017)