CONTRACTOR DOCSR. MILLER CONSTRUCTION, INC. ,09og
953 MISSISSIPPI STREET NE.
FRIDLEY, MN. 55432
612-571-3514
Lic. #6354
November 12, 1997
Attn: Curtis and Anna Pribula
6880 East River Rd.
Fridley, Mn. 55432
Phone: 571-6433
RE: Final billing for contract dated 10-3-96
Dear Curtis and Anna,
I have reviewed your list of concerns (attached). We have
discussed all of the issues listed. As I have told you I do not
feel that the balance of items listed are part of my contract.
I am requesting final payment. I have attached a final statement.
The attached final statement has been difficult to prepare
because for months I have asked you for a written list and
receipts for your expected deductions, but you have refused to
provide me with any written list, amounts or receipts. In our
meeting on 10-16-97 I asked you again what items you expected to
be credited for. You would not give me any dollar amounts, but
you did say that you were expecting credit for...
- Locksets.
- A motion detector light fixture (I agreed to a credit for a
light fixture, but not a motion detector light fixture).
-- Class 5 in the driveway.
A bill from the phone company.
Duct cleaning as per our earlier agreement.
The two of you have in the past stated that before final payment
you would require...
1) Updates to the vendor list previously provided.
My response... D. Kent Landscaping 571-6889
Shades of green Landscaping 427-3710
2) All lien waivers.
My response... All lien waivers will be provided at final
payment, assuming that final payment is received within 120
days of the last day of work. If final payment is not received
within 120 days of the last day of work, no lien waivers
will be given.
3) Warranties.
My response... Warranties if any, are provided by state
statute.
4) Receipts or bills for allowance items that you had not
previously agreed to. Also the bill from Classic Construction
for spreading your black dirt.
My response... They are attached.
Items attached to this letter...
1) Your list of concerns
2) Final statement
3) Letter from R. Miller construction, Inc. to Mark Daly
4) Proposal from D. Kent Landscaping
5) Statement from Classic Construction
Thank You,
Rona�dMil er, it�sp esident
OUR REMAINING CONCERNS
G Trim around front door not replaced properly.
,Shingle above bay window not patched as promised-..
VSiding on West Side is losing insulation.
V o pen spaces between foundation and sill allowing bugs and spiders easy V
access.
Cracks in upstairs bathroom where floor meets walls. �
Cracks around o d windows.
'-'Nail pops e.g. basement bath.
VLow block in retaining wall collects water, will freeze and heave the cement
and retaining wall.
VAluminum trim near lower entrance was scratched by contractor during
installation.
'Classic Construction said they would re -seal the cement work before winter. V
0
/o- 3,6- 'P 7
Written documentation forverbal agreements...
#r,1 Tree removal Is part of the landscape allowance.
92 The exterior door is a S00.
N3 Any room that needs patching because of the house move will be painted
94 The deduct for C.0, #3 ($975.00) will be deducted from the window payment or $2,800.00 making n $1,82500
9S The shower door is to be chrome with obscure glass
93 The heating is to be done by the Home Owner.
97 Regarding existing wall repalr : In the dining rm A living rm Curtis will remove and replace all moldings.
Ron will rock walls with 316 rock tape & sand. The balance of the walls will be patched. The cost will be $900.00.
98 Under amount paid to G.C. on Contract above: Ne 54,750.00 paid from G.C. to Buyer is for credits due for allowances
and change orders, The $975,00 from Prbu'a to O.C. is for a accou riling error in the $4,750 D0 regarding C 0.93.
43 In lieu of interior draintile the Builder will install exterior drairtile as follows.. North slde: 171, west total, South 15
The exlonor draintile will be Inspected by a city inspector,. There will be no adjustment to the contract price.
includes daylight to North property Line.
9l0 When the backhoe Is on site I will relocate two trees to a place in the front yard marked by the owner.
1111 The hvo trees referred to in c o. 910 will be moved by a spade. The expense for the the move will be paid by the G.C.
$012 13 G C will spilt the cost of duct cleaning with the Buyer op to $200 00ndles 1be 24 ( up to $100 00 to G.C.)r at no nge to the contract price.
Ronald Mdier its President Dale
— ......
Signature Date
F{NAL Cogstruction stateme
From:
R. Miller Construction, Inc, (G.C.) To. Curtis & lmaRivPribula
953 Mississippi St 6880 East Rcad(Buyer)
Fridley, Minn. 55432 Fridley, Mn. 55432
571-3514 571-6433
Job:
Note:
Same
This FINAL statement is a extension ofour Agreement dated 10-03-96
91,600.00
Contractamount.....................................................................
(7.786.00)
Allowance adjustment - ..... ........... _......_......,.... .......... ....................
(76350)
Change order adjustment .. ..................... .......... ....................................
.......
---•------
.......... ----------- ---
Adjusted contract amount .............................. ... ....,............ ......
................
83,050 50
Amount paid to O.C. on Contract Draw 91
5.000.00
Draw 92
20.D00.00
Draw #3
20,000.00
Draw 54
1,82500
Draw 55
20,000 00
Draw $6
13,000.00
Miller to Pribula
(4750.00)
Pributa to Miller
975.0
-
76,050.00
76.050 00
........
Balanceon Contract...............................................................
.......................
..........
aaasesr_sseooa_ez=aa�sa
$7,000.50
Allowances (amt used to date) Amount in bid Amount used
Adjustment
Cabinetry 25000
900.00
0.00
900.00
25000)
0 W
Existing wall repair
Malntanee free exterior 2,500.00
2,500.00
0.00
Landscape 4,75000
1,375.00
(3.375 00)
vee removal $850.00
relocate apple trees $25.00
Kent Landscaping (retaining wall) $500.00
200.00
(1,800.00)
Soil corrections 2,00no
650 W
0.00
(650 00)
Water softener
Show. -,r door 350.00
279.00
(71 00)
H-vAC. 2,00000
360.00
(1,640.00)
Concrete exterior $2.00 SQ'
0.00
0.00
Allowance adjustment lotal.,...,,....._....................................................
(57.786,00)
Change orders (C.O.)
12500
N1Concrete
for shed..............................................................................
32500
M2Upgrade
93
to a 200 Amp. panel........................................................................
The replacement of the two windows (Main Ii associated work will be done by others
(905
14
Wire mesh In basement concrete .............. ..........................................
.........
00)
7500
95
Move outside water faucet ..,..—.................. ..... .,,......,...................
.,,,..I ........ .._
(6500)
tl6
Credit for main level tollet........... ......,,.,,...,...,..,,,................
....,...... ,....
130.50
#7
bolt south side of porch to house. 4.5 hrs @ $29.00 .....................,,...............................
ria
Credit for fire alarm per agreement dated 6-23-97 . .........................
............... _
(25 00)
99
St Marie Sheet Metal Proposal dated 6-23-97: V ball valve
60.00
910
St. Marie Sheet Metal Proposal dated 6-23-97: 1/r" copper gas line
75.00
911
St Marie Sheet Metal Proposal dated 6-23-97: Removal of const furnace, gas line&vent
I
912
St Marie Sheet Metal Proposal dated 6-23-97 Seal bottom of chimney
25.00
913
Spread black dirt .........,......................................................
60.00
(200-00)
914
Exterior handrail .......................
500)
915
Loeksets(Estimated)................ ,,,,...,.,..,,,.,...................
I—, 1...
((4500)
#16
Phone hook up (Estimated)1.1.1111'...." ...................................................
100 00
( )
917
Duct cleaning per change order 9 13 below (Estimated:.....................................................
(9.00)
918
Ektenor Iight Fxluro............ ......................................................
(225.D0)
919
Gravel for parking area _ .....................................................
Change order total - ............ ............_,,,.......,............. ,...................
........__--($763.60)
Written documentation forverbal agreements...
#r,1 Tree removal Is part of the landscape allowance.
92 The exterior door is a S00.
N3 Any room that needs patching because of the house move will be painted
94 The deduct for C.0, #3 ($975.00) will be deducted from the window payment or $2,800.00 making n $1,82500
9S The shower door is to be chrome with obscure glass
93 The heating is to be done by the Home Owner.
97 Regarding existing wall repalr : In the dining rm A living rm Curtis will remove and replace all moldings.
Ron will rock walls with 316 rock tape & sand. The balance of the walls will be patched. The cost will be $900.00.
98 Under amount paid to G.C. on Contract above: Ne 54,750.00 paid from G.C. to Buyer is for credits due for allowances
and change orders, The $975,00 from Prbu'a to O.C. is for a accou riling error in the $4,750 D0 regarding C 0.93.
43 In lieu of interior draintile the Builder will install exterior drairtile as follows.. North slde: 171, west total, South 15
The exlonor draintile will be Inspected by a city inspector,. There will be no adjustment to the contract price.
includes daylight to North property Line.
9l0 When the backhoe Is on site I will relocate two trees to a place in the front yard marked by the owner.
1111 The hvo trees referred to in c o. 910 will be moved by a spade. The expense for the the move will be paid by the G.C.
$012 13 G C will spilt the cost of duct cleaning with the Buyer op to $200 00ndles 1be 24 ( up to $100 00 to G.C.)r at no nge to the contract price.
Ronald Mdier its President Dale
— ......
Signature Date
11/06/97 o9:57FAX 612 754 3532 A"VIV" — ••.. - -- -
r.
JOV-`6-97 T'HU 8:12 AM R MILLER CONSTRUCTIOV FAX NO, 6125713 14
R. Miller coast.ruetion, Inc.
9S3 Mississippi STRSRT MR.
FRIDLEY, M9. 55432
612-571-3514
Zoic. 46354
November 4, 1997
Attn: Mark Daly
Anoka County Hwy. Department
1440 Bunker Dake Blvd, N.W.
Andover, Mn. 55304
Phone: 754-3520
Fax: 754-3532
RE: Drainage at 5880 E. River Rd. Fridley, Mn.
Dear Mark,
This letter is to provide written documentation for our recent
conversations.
on or about october 31, 1997 I called you to discuss the drainage
problem at the above mentioned address. The things that you told
me were as follows...
- You have visited the Site.
- You saw that the drainage area to the South of the building was
scoured.
You told me that during the summer of 1997 we experienced some
very severe rainfalls. These rainfalls were much greater than
what normal highway deeign will support.
You stated it is your opinion that the reason for the scouring
is because of inadequate drainage at the South side of the
South retaining wall.
Your suggestions for correcting this problem are as follows...
1)Drain tile could be installed at the South property line.
2)Rai6e the existing retaining wall and add fill next to the
retaining wall in order to create a swale approximately two feet
away from the retaining wall. you caution
Ist this
or thebecause
you are unsure if the retainingdesigned
proper
height.
3)lnstall a drainti,le system at either the top or bottom of the
existing retaining wall. This draintile system should daylight
into the backard at the low end of the said wall•
4)Cut a Swale into the existing grade two feet away from the
retaining wall.
hank .�u,
Ronald Miller, its President
I a r th eve.
Mark Sly
D. KENT LANDSCAPING
No. of Po
PROPOSAL AND
ACCEPTANCE
Adan Baker Avenue Northeast e Fridley, Minnesota 55432 a 1-800-453-9856 a 612.571-6889
DATE
;ITy, sTAu AND ZIP CC'
-E—=
ARtH1TfCT
✓v
DATE Of PIANS
We hereby submit specilications and estimates for:
I
ON
r
JOB NAME
C' ,, �
JOB t!O_Cc"ON
ILI Cciticottons sor me -.v...
-
lOB PNONE
We Propose hereby to furnish material and labor — complele in occordonce with above spe
00
dollors (S
Payment to be reode as fo ows:
Alt tnotorlof Is guaranteed to be as specilted. AN work to be completed in o worktrwn•
riz
Uke manner occor4in9 to standard practicer. Any ottcrotiors on or writ en norders, ode Signature
e '
spkcif cotaons Involving extra costs will be executed only up
will become an extra charge over and above the estimate. ate: "'s propofol may be
withdrown by us it not accept -H within
Acceptance of Proposal -The above prices, specifications
and conditions are wtistactory and are JMreby accepted. rou ore outhorieed
to do the work as SPecilied, Payment will be made os outlined above.
Dole of Aceeplance
sigma
'CLASSIC, CONSTRUCTION
CONCRETE & MASONRY WORK • COMMERCIAL & RESIDENTL L
18542 ULYSSES ST. N.E. EAST BETHEL MN. 55012 (612) 434-8870 Fax: (612) 434-7120
STATEMENT
FR. Miller Construction
Job Address: 6880 E River Road
Fridley, Mn
L
DATE
DESCRIPTION
CHARGES
7/10/97
Work Completed
Per bid less Post footings
not done, Front Step &
Concrete Steps in new walk-
out entrance.
$1829.00
Sidewalk
752.00
Patio
1318.00
Spread & Grade black dirt.
60.00
Total Amount Due
$3959.00
Thanks, Curt
PAY LAST AMOUNT IN 13ALANQC GULUMN A
OXNNESG�.
�O yo
� a
OF TVkr40
Curtis and Ann Pribula
6880 East River Road
Fridley, Minnesota
Subject: Relocation of Mama
Ann's Daycare and Home
Dear Mr. and Mrs. Pribula
EXHIBIT # -6 c
Minnesota Department of Transportation
METROPOLITAN DIVISION
State Aid Office
Waters Edge Building
1500 West County Road B2
Roseville, Minnesota 55113
Date: March 25, 1998
You have asked me to express my opinions regarding the above Relocation in writing. My thirty-four
years of experience as a Professional Engineer and Contract Administrator gives me some licence
to provide a standard of judgement in these type proceedings.
Original efforts to relocate your home and business deeper on your lot resulted in various delays and
misunderstandings. Despite previous problems, however, relocating your home was the outcome
desired by all parties. To that end, a meeting was held on July 29, 1996 at the daycare home.
Participants included Anoka County representatives Mike Kelly, Chief Right -of -Way Agent, and
Jacquelyne Wentworth, Relocation Consultant; Robert Brown, District State Aid Engineer, your
attorney Teri Melcher and myself Robb Urquhart
I felt the results of the meeting were quite positive. A timetable was set for your relocation with your
interim needs being satisfied. First mid-August, the architectural specification being approved with
bids for the relocation being opened in late -August. We expected bids to be approved in September
with ground breaking in October. During construction you and your business were relocated at county
expense to a temporary home which the county has been maintaining and acceptable to you.
Construction and house relocation would be completed by January 1997.
On November 1. 1997. 1 inspected the project and found it incomplete. The site grading and backfill
was not shaped and compacted to industry standard. Also, the work inside the home required
finishing. Ceiling tiles and insulating still needed to be done. This is an unacceptable delay. The Work
was not done there fore in my opinion the contract is breached
Sincerely,, /
Robb Urquhart, P.E.
State Aid Construction Engineer
WIEA IL REI(SIEDLER-JOHNSUN
NOTARY PUBLIC - MINNESOTA
N Comm. E)Ores Jan. 31, 2001
PA1JL D. WELLSTONE
MINNESOTA
MINNESOTA TOLL FREE NUMBER:
1_600-642-6041
August 9, 1996
'United Mates senate
WASHINGTON, DC 20510-2303
Ms. Anna Wichern
6880 East River Road
Fridley, MN 55432-4115
Dear Ms. Wichern:
COMMITTEES:
ENERGY AND NATURAL RESOURCES
LABOR AND HUMAN RESOURCES
SMALL BUSINESS
INDIAN AFFAIRS
VETERANS'AFFAIRS
Charles Siggerud with the Minnesota Denartment of.. Transportation
has responded to my inquiry on your behalf. Mr. Siggerud states
that he has directed his staff to research the problems you are
experiencing, offer you technical assistance, and help facilitate
an equitable solution. He also informed me of the meeting that
took place at your home on July 29, stating that the results of
the meeting were very positive. A copy of his letter is
enclosed.
I hope that you are pleased with the response. If I can be of
further assistance to you, please do not hesitate to contact me
again. My best to you.
Sincerely,
f3.%, W
Paul David Wellstone
United States Senator
PDW:lmf:pca
Enclosure
717 HART SENATE OFFICE BUILDING 2550 UNIVERSITY AVENUE, WEST POST OFFICE Box 281 417 LITCHFIELD AVENUE, SW
WASHINGTON, DC 20510-2303 COURT INTERNATIONAL BUILDING 105 20 AVENUE, SOUTH WILLMAR, MN 56201
(2021224-5641 ST. PAUL, MN 55114-1025 VIRGINIA, MN 55792 (612) 231-0001
(612) 645-0323 1218) 741-1074
1-0
D {=
� la
AZ
'4014N., V-1.0
OF TV
Date: August 1, 1996
Minnesota Department of Transportation
METROPOLITAN D�V
Waters Edge Building `'
1500 West County Road B2
Roseville, Minnesota 55113
The Honorable Senator Paul Wellstone
2550 University Ave. West
Court International Bldg.
St. Paul, MN 55114-1025
Dear Senator Wellstone:
Commissioner Denn has asked me to respond to a letter forwarded to Mn/DOT by your
office concerning Ms. Anna Wichern's problems related to recent widening of East River
Road in Fridley, Minnesota. Ms. Wichern, owner of Ma Ma Ann's Day care, has been
adversely affected by the construction and the loss of a portion of her front yard. I
have directed my staff to research these problems, offer technical assistance to Ms.
Wichern and Anoka County, and help facilitate a solution and establish a time schedule
satisfactory to all parties involved.
Ms. Wichern's main concern appears to be her loss of current and potential business
customers. She feels her business is at risk due to the fact that construction has
placed her home quite close to a busy street and out of compliance with property set-
back regulations which, understandably, could prevent parents from placing their
children in her home. She is also concerned about her lack of ability to offer potential
customers the stability that comes from long-term care by one provider. The
uncertainty due to the unresolved nature of the right-of-way settlement has left Ms.
Wichern unable to tell customers they can count on her to provide their children with a
long-term relationship.
Ms. Wichern, Anoka County, and the City of Fridley have been working together to
propose alternatives for Ms. Wichern. The alternatives range from complete relocation
to another site, leaving the home "as is" with a City set -back variance, or relocating the
house deeper on the lot with interim provisions to allow her business to function as work
progresses.
Original efforts to relocate Ms. Wichern's home deeper on her lot resulted in various
delays and misunderstandings. Despite previous problems, however, relocating Ms.
Wichern's home appears to be the outcome desired by all parties. To that end, a
meeting was held on July 29, 1996 at Ms. Wichern's home. Participants included Anoka
County representatives Mike Kelly, Chief Right -of -Way Agent, and Jacquelyne
Wentworth, Relocation Consultant; Mn/DOT representatives Robert Brown, Metro State
Aid Engineer, and Robb Urquhart, Assistant Metro State Aid Engineer (Acting); Ms.
Anna Wichern, and her attorney, Teri Melcher.
I feel the results of this meeting were quite positive. A timetable has been set for the
relocation with Ms. Wichern's interim needs being satisfied. In mid-August, the
architectural specifications will be approved with bids for the relocation to be opened in
late August. We expect the bids will be approved by mid-September with around
breaking taking place by October. Construction and house relocation should be
completed by December of 1996. During construction, Ms. Wichern and her business
will be relocated at county expense to another home which the county has been
maintaining and is acceptable to Ms. Wichern.
Thank you for bringing this matter to our attention. We appreciate being given the
opportunity to work with our partners in local government and the public in order to
provide services that are both responsive to individual concerns and
sensitive to public policy issues.
Sincerely,
• ✓`��
Charles Siggerud
cc:
James Genn, Commissioner
n111N A1! Nkl' IN MIIC
. /iMNu F'usl Itk err Ittl. rrw Urµ ►w ; ;s:iT . I!i l :t1 ,57; •i;d:l:f
April 24, 1991
Questions and concerns regarding the moving of our home at 6880 E. River Road.
* The back porch is still awayfromthgee house. XY ;
* Some concern the pine corne e"��ip' ort of the south-west corner of the
basemen ecause it is so close to dirt this will be covered by siding
and the retaining wall will assure that the wood doesn't come into contact
with moisture from the ground.
Th -e blueprint specifies drainage tile around the perimeter of the basement.
This was not done and has led to water seeping into basement. We need this
corrected before the landscaping is done.�>Wvlc
When the permanent concrete steps are put in place, we would like deeper
steps like the ones on the south side of the retaining walls. Children
will be using them. Z'G —,4M C AO-gb�D M0Z,95_ -_Z: LZ�Z—e-
;7D Pge6S -;:!T- o ff M )11-00
The holes in the siding where electricity went to the garage and the water
water spigot was moved need to be taken care of. ,brvlrc
* There is a gap between the foundation and the bay window. Building
�f inspectors said this needs to be filled, the wood sill needs to be coverer, _bang
the exposed wood on the bottom of he bay needs to be covered alsog .,o
Top of Egress block needs to be'fille and ca" pped. Recommended that a
fence be put on to protect chi Idrer�",r ,gyp
* /Front steps need to be installed. /e s
* The water spigot on the North side of the house needs a back flow stopper.aow✓
'*! The solidness of the structure remains an overall concern ,Jhe siding
needs to be repaired or replacer s, —,6,^4c
* The flowering trees need to be moved very soon if they are to be saved gyp, 6_'
* Homeowner requests drawings and price list for materials and work involved
in the landscaping. This is an allowance item and a very recent bid./kb
* Homeowner wants wooden fence to be removable it was originally. P<:5
* The gas meter needs to be tidied up. See photos taken in your preparation
for this project. i(.40
* There is still debris in the yard from the basement as well as from
clearing out the yard in preparation for the project.i�lo�A{-"�'=s
b--27 9 7
CINOF
FRIDLEY
FRIDLEY MUNICIPAL CENTER • 6431 UNIVERSITY AVE. N.E. FRIDLEY, MN 55432 - (612) 571-3450 • FAX (612) 571-1287
July 2, 1997
Mr. Ron Miller
Ron Miller Construction Inc.
953 Mississippi St NE
Fridley, MN 55432
Re: Final Inspection at 6880 East River Road NE, Fridley
Dear Mr. Miller:
A final inspection was conducted on June 30, 1997 of the above noted address. We found that
the new foundation and the alterations after moving the house are approved as completed and
the dwelling is hereby approved for occupancy.
If you have any questions on this matter, please feel free to contact me at 572-3603.
Sincerely,
...✓6,20 -, 471 -W -A F //
Building Inspector
Anoka County Government Center
2100 3rd Avenue - 5th Floor
Anoka, MN 55303
TOJI111 rI-1 wo,
(Name & Address)
CORRECTION ORDER
FAMILY DAY CARE RULES 9502.0300 TO 9502.0445
ANOKA COUNTY DAY CARE LICENSING
DATE: ��&/ A z Class License: L —/
Provider Directions: The following violations of Rule were documented on
and must be corrected. In the space provided, state how each violation was corrected and th,
date the correction wasde. t the bottom, sign and date this form and return the original
to your licensor by / 97
FROM:
Rule Part/Citation
Violation
Deadline
for
Correction
How Corrected
Date
Corrected
❑9502.0315 Subp. 29A Supervision
❑9502.0365 Licensed Capacity
❑9502.0385 Training
❑ 9502.0405, Subp. 6 Records
❑9502.0425, Subp. 9 Cribs
❑ 9502.0425, Subp. 10 Stairs
i
El 9502.0425, Subp. 16/17 Fire Equip
❑ 9502.0425, Subp. 18 Electrical
❑ 9502.0435, Subp. 4/6 Toxics
❑9502.0435, Subp. 7/8 First Aid/Enver
9502.0435, Sub 12 Rabies
J J
't b� ,� i�L�Ciil r
V
❑ 9502.0435, Subp. 13 Diapers
❑9502.0435, Subp. 15((Handwashin
I
Other: 450 , 04a5 J . %E .
ff�
0 LiJta
"31 'j%
❑ Other:
❑ Other:
❑Other:
Provider. Signature:
.L/FORKS/CR(-T-ORD.005/I-97; SSMH-DCL-005
Date:
D G Welding & Mfg. Invoice
11988 Riverwood Dr.
Burnsville, MN. 55337 DATE INVOICE NO.
[6121 890-4073 8/25/97
BILL TO
Curtis Pribula
6880 E. River Road
Fridley, MN 55432
P.O. NO. TERMS FOB PROJECT
4413 Net 30 D G Curtis
DESCRIPTION AMOUNT
3 Hours of Field Labor 150.00
4 Hours of Shop Labor 160.00
Material 45.00T
Mn. Sales Tax 2.93
Thank you for your business.
Total $357.93
THE HOME DEPOT
2802
hLi_r'1;;� t�U 1:i11t.4i Ni"Ek1CA'S HEARTLAND
5650 MAIN STREET
FRIDLEYr MN 55432 (612)571-9600
IY E N A k G S
2802 00002 23735
06/14/97
t!?ii97
n_ca,l transaction
SALE 541
09:27 FM
h�
0:;' FLUSH INTEHOK G
020967418625 2 PK AC -DC
18.97
+43.97
038613184596 BERING HIN
10.90
�
L.;i: F4lx t; IiTEn1OR D
4.x.u.7
043156961252 GEO FASSAG
13.41
iia'. F: t ` ! !N i ff, D
015231077035 STRIKE
6.58
,.-.?�`� 47.57
�„J1
r 2. 2
)43156961 5 GEO FASSAG
13.41
: - -: r1 ! <•E ItT^ -^ 1:::
nT 1.!:\G� 1 vJL.I 1 ,,zRY1LZ _ , J1y Gtr_
1. 5'01; ' 'IJ
E:1 F ,�►_.. �_� ��, i,.�Y.
043156961238 FRVCY LOCK
14.96 v
; .' ,`i. J' 4 ; -V-L-
1;? i; : { . F ?:;-5 Ctx)
li.."��•r,6 h..L,.;114Ii
090100003704 2X4X8 FT
2.E8
_;'S":�.; =t44.36 i %6.S6
2 2
09x)100003755 X4-1 PT
4,g$
r.l ^n -r r. : r .1:
%;;; v3-v-vif.11 i-vJ .4� ILn 1 T r�
. - t t
: t.i:ut ii. ( t -i•. CYL HiE
090100003759 2X4-12 FT
4.88
t r.:�l:tr n.: 1
= %� vu-v-Yvu- ry W JI't: t _, • •
-
ll. i. 24.99
r- p
T •.Ij`. Y. $COW
2• ?
09010000'x759 �C4-1 FT
4.88
LgTT.I1 .x -Tr^ T •u n."
•: v•} L•JJ'v t: •ILVIJ t:V 11VFt :L I L4 { C7. t t
H!B
1h.Tt p
�.1 r., 17 .98
' Ji �vVl 1 7
090100003759 2X4-12 PT
4.88
^•1l.TAT lI .ti r.":
t�::IvtnL .,v•1,
Shi:tS PINE 3ISXI--1/"2
05330017304957 GLOVES
1.27N
`""l'
07'7758x25518 SCALGSNFE
4.0x)
tV 1:,.. J: •J:
V
I�IiItJ
077758325518 SCALGSAFE
4.00)
n.41.i8
now
077758325518 SCALGSAFE
4.00)
077758325518 SCALGSAFE
4.00
TDI ;1
031492366003 SINE; FIAT
3.24
_
2
Ttij.r. :rt.. 6.5;: 25.5-
081492366$.0x)3 SINK MAT
3.24
To?, -al Sale 4$8.28
132979 SINK. SAGGL3.24Fil
42.i8
SUBTOTAL
127.62
c:r:L iin i ivi� n 1115761774
126.35 TAX I.1N 6.500
8.21
3 29571 6/21/97 1:26F'M 3x-x1J
TOTAL
'$135.83
135.83
•• r nnT^-
n�-�rtlt_a �i4i 1 h1L'i.
iiis Cordhold;',- 7,cknawiEds9s receivt Ct
sni d /se -,vat=s in the total amount shown
TA
7txr.t•I,f FOR, S101PPINr+ f.T ,.ITr.r.rr.T
I\J VI\ Jt�:J 11 V ftl • Irti\VLI
a -)n d X1:1 to .ag the card issuer
Ij _t' .1 (i 7'L,-_
tl.rt.
�i1T S1!. l•If T:, ntl.^• rr1 Y`. II�tTTT�t•
vii- rnLl\ to { f l: iL,4Lt_L:
�.t i'I :r ti rii :' to its current terms.
ORIGINAL RECEIPT REQUIRED FOR REFUND
ttuv:\
'JI� Ltti LILT t't:I:L�{rt.iL J11[I..L tili:�
CREGIi CARE) S,%LES SLIP
THANK. YOU FOR SHOPPING AT THE
HOME DEPOT
Ti;ice i. i YCUZ;
FILA E RETIlj I VOR YOUR RECO;:U .
CASHIER OF THE MONTH SHERRI COX
1-1-I t-4 K. Y O U
F C --)R c:;E-10PpYt•4 3
1iv-1-42-IN171S
:.F11;.; AdbUSTA PRIE.ULA
LUMMES -•
COMMUNICATIONS
Time and Materials Invoice
SERVICE ORD/TICKET #
ADDRESS 6 D
CITY, STATEZ,�Wley
BILLING TN (�� - 6'->
CUSTOMER NAME
Circle One: H&PS B&GS Carrier FED SBS
RG 25-0015 (7-94)
INSTALLATION VISIT ❑ REPAIR VISIT
REQUEST FOR CWD/SWO
TECH' S NAME/OCB .' y
RC GEO LOC
TODAY'S DATE
TOTAL LABOR HOURS MINUTES
USOC
MATERIALS ITEMIZATION DESCRIPTION
COST
QTY EACH
LINE
TOTALS
NRAC/NRTCY/SCO
Trip Charge Applies ❑ Yes No
HRD11
Initial Increment Charged 30 Minutes)S
HRDA1
Addition Increments Char ed 15 Minutes
AKT
Jacks
AKT
Wiring
LTESX/LTECX
Trouble Isolation Charge Applies ❑ Yes ❑ No
MCE
WA Trouble Isolation Charge/1st Increment 15 Minutes
MNT
WA Additional Increment 15 Minutes
HRDJ1
Residence First Jack
U
HRDS 1
Additional Residence Jack
�2
—
Overtime or Other
a! 1 ..,-r
Total amount plus taxes will be billed on yo6r mondily statement.
TOTAL COST
This receipt for above work and materials will,
Customer Representative Authorized Signature
your warragty for �-Wrioq of 30 days.
White - Customer fellow - Billing Center Pink - Technician Timesheet
Minnegasco°
Home Care Services
SERVICE ORDER
CUMNAME
HOME PHONE NUMBER
—r
WORK PHONE NUMBER
SERVIC7 ADDREUNIT
SERVI N
SERVICE TE
ZIP CODE
C19 ACCOUNT NUM ER
C. .D. AMOUNT
BILLING NAME
PHONE NUMBER
BILLING ADDRESS
UNIT
BILLING TOWN
BILLING STATE
ZIP CODE
NATURE OF CUSTOMER REOUEST:
WHAT DID YOU FIND? 4 L) ii J d C
-T z Z-xiu f� �
DESCRIPTION OF SERVICE:
Service Order Number
ET
BT
M
Sc
ime
Sten
Time
Arrive
Tim
Complete
Amount
Dollars Cells
Sbres Code
alum o
Truck Stock?
Oty.
Material Used
Unit Price
Dollars Cents
Yes
No
Applmu" Make
MPA Number
PO. Number
PART TOTAL
PART SALES
1AX
Model Number
Meter Number
PERMIT
Serial Number
Meter Reading
EXCISE TAX
LABOR TAX
CU ER SIGNATURE
X'
j�.
TOID4L
FOR OFFICE USE ONLY
ODORANT IS DETECTABLE O YES O NO 0 NOT APPUCABLE
CO CHECK ❑ X -METER
CHECK ❑
SUPERVISOR'S ATTENTION O
ARPS ATTENTION ❑
OTHER ATTENTION 0
SUPPLEMENT ATTACHED ❑
Fo^n,MRI THANK Ynll FnR CAI I IN(; MINNF(IW4rn n InQ5 AAinnnnacpn
0
Z
c
3
v
m
3
9
r�_��11011
H�' illy
�q
W4 V2 A" d
\I1)1u.sllike1u iIw
6881) Htisl Hit rf I?(I Pridit'y. .11.A' 5,4:1: . iti1-') 571.11431
May 5, 1997
Dear Mr. Miller,
At our meeting on April 24, 1997 you asked for a copy of the list from
the city of Fridley inspectors. I am forwarding it to you along with some of
our thoughts and concerns from that meeting.
The meeting on Thursday night (4-24-97) was very unprofessional. In
your contract you, .. guarantee your work to be completed in a workmanlike
manner for $91,600. The physical intimidation was unacceptable as well as
very unprofessional. When you open a meeting with "This is going to be
aggressive and then we will see where it goes..." assures that the meeting
will not go well.
When Ms. Melcher, Mr. Kelly, personnel from the Dept. of Transportation,
Ms. Wentworth, and myself met to move this project forward, Ms. Melcher gave
assurances that you could/would finish this job in three months. It has now
been seven months. At a meeting you told us you would be done in 60 days,
though not guaranteed, it indicated how badly you wanted to get started with
this project. At that point we moved out quickly hoping we could return home
for Christmas.
Before I hired you, you said, "trust me it will he done right." In some
instances it has been done right, but with considerable prodding from Curtis
and myself. In other instances you have done things as expected. At this
point we are frustrated; we expected to be home months ago.
When we have asked you questions, often you tell us, "Quite honestly, I
don't know." Because you did not have answers for us, I learned the codes and
how to read blueprints. I'm sorry if you feel I now use that knowledge
against you. I am trying to protect myself from future problems because, in
our experience with you, some things have not been done according to code or
specifications.
You have ignored our suggestions on more then one occasion, which has
cost both you and us. Curtis called you several times to get you to come take
action on the shower drain before the concrete was poured. Even then there
were problems due to carelessness either on your part or the part of people
you hired which resulted in cement plugging our drain system.
You have proposed ideas to save money. You ask me to cut quality at the
expense of the children I care for. This may speak clearly about the quality
of your work.
Now you say we could move back in before the deck is completed and the
sod is laid as the blueprint indicates. However my floors would be marred
by grit on the feet of my little ones. I was led to helieve we would be able
to use the back door when we moved home.
It is likely that we will need the carpets cleaned because the workmen
you hired did not cover the floors properly as they did repairs. This
indicates clearly how you feel about us and our home. It is just a joh to
you.
You said it was hard to get landscapers because you felt it was your
responsibility to tell them how unreasonable we are to work with. Such
slander is most unprofessional! Did you also tell them how long we have been
out of our home? Did you tell them how long you have extended this project?
Did you tell them you have not always done the work according to code or the
Z1I IrlUllll�''� III
6-11-97
Dear Friends in Child-care,
Today I received notice from my licensor that Anoka County will not
renew my Child -dare license at this address. My license will expire on June
30th. I am asking you to write to the General Contractor,
Ronald Miller
953 Mississippi St. N.E.
Fridley, MN
55432
and encourage him to complete this job so we can go back to our home and I can
continue to care for your children.
Mr. Miller assured me this project would be complete in a timely manner and
that has not happened. We have been here for 9 months. This is unfair to the
children as well as Curtis and I.
This letter serves also to give all of you time to start looking for
alternative care for your children. My last day will be June 30th unless or
until I am back at 6880 E. River Road.
I thank all of you for your patience through the winter and spring months.
Sincerely,
P. S. You can call Karen Evans, I know she has openings until school starts
and as soon as I'm back home you could come back if you want to. Her number
is 784 - 1572.
I
CURTIS & ANN PRIBULA
6880 E. RIVER RD.
FRIDLEY, MN 55432
T. J. B. HOMES INC.
13455 HWY 65 NE
HAM LAKE, MN 55304
BUILDER LIC. 1845
REMODELING DIVISION
780-2944
PROJECT
REPAIR WORK CAUSED
BY HOUSE MOVING
REMODELING BID
REHANG FRONT STORM DOOR APPEARS TO
HAVE MOVED OUT OF ALIGNMENT WITH
REINSTALATION OF RIM UNDER FRONT DOOR $75.00
REPAIR SHINGLE ABOVE BAY WINDOW $20.00
REPAIR LOOSE SIDING CAUSED BY TWIST IN
HOUSE. REPAIRS TO BE MADE, NO GUARANTEE
AS TO FUTURE SIDNG BECOMING LOOSE. $950.00
REPAIR SETTLING CRACKS IN UPSTAIRS
BATH FLOOR AND WALL TILE $220.00
REPAIR SETTLING CRACKS AROUND WINDOWS
AND DOORS IN BOTH FIRST AND SECOND FLOOR
APPEAR TO BE CAUSED BY HOUSE SETTLING
AND DRYING $175.00
REPAIR PEELING VARNISH ON WINDOW SILLS,
SAND AND REFINSISH $150.00
PAINT HANDRAIL $45.00
REPLACE ALUMINUM TRIM NEAR LOWER DOOR
ENTRANCE $50.00
BACKYARD DRAINAGE INADEQUIT, RETAINING
ALL NEEDS TO RAISED, FILL BROUGHT IN AND
NEW SOD. ( ALLOWANCE $1000.00) $1300.00
SIDEWALK DRAINAGE POOR WATER
COLLECTING DUE TO LOW SIDEWALK $500.00
TOTAL COST OF REPAIRS
THANK YOU FOR YOUR BUSINESS
$3,485.00
Ron Miller Construction - Project Conclusion 10-16-97
Outstanding Costs — (updated 11-25-97)
Telephone hook up $ 97.25
Lower exterior motion sensor and light $ 26.61
Handrail — labor, material & installation $ 357.93 not incl. paint/labor
Air duct cleaning $ 79.85
Hardware for bathroom door. $ 15.93
Hardware for exterior entrance door. $ 47.89
Blueprint or Specs that were bid but not done nor reimbursed.
-Bid clear cedar and used construction grade green treated.
-Post support not used in West End of basement.
-Exterior board on SW corner untreated.
-4x4 posts replaced by 6x6 posts under deck.
-A 4" bed of sand was to be put under the concrete floor. Not done nor reimbursed.
This would have been about 13 yards of sand for a 26' X 40' area. _ $350.00
not including labor & general contractor's fee.
-Sand was not removed in yard area as requested but was simply mixed in with black
topsoil, which we purchased as underlayment for the sod we laid. Both contractor and
subcontractor ignored this specific request; contractor saying that he informed
subcontractors and subcontractors saying he had not informed them.
Notes:
Helped install wire in preparation for concrete floor — 3 hours of labor.
Noting the lack of a shower drain hook up night before pour. — 1 '/Z hours
The flowering crab trees have died. Careless handling by contractor.
We did some of contractor's work by getting Minnegasco to move the gas meter
(This, after contractor steadfastly refused to do anything, suggesting that
homeowners do it themselves without authorization.)
- We repeatedly did some of the general contracting, which was bid but released to us.
-The promise to bring the house back to code was not done by contractor, but cost us
extra. Also contractor delays kept us out of our home and business at extra cost.
-Extra lawyer expenses because contractor resisted doing what was part of project.
Things done by homeowner neither recognized nor compensated.
-We dissembled and removed the furnace.
-Helped remove water softener canisters.
-We removed several (18-20) yards of dirt in preparation of the floor being poured.
-Drew up plans for retaining walls and submitted to City Coordinator.
-Replaced washout after rain due to contractor dismantling the retaining wall
Costs which were purported to be under the heating/air/ venting bid of $2000.00:
-Removal of ductwork as needed.
-Removal of old furnace.
-Reinstallation of old furnace and gas hook up for construction heating.
-Purchase and installation of new furnace including all venting.
-Supplying new ducts where needed.
-Relocating the air conditioner to a new concrete pad.
-Reconnecting air conditioner to working condition.
As the project progressed it became more and more clear that Ron was no longer
supportive but rather became antagonistic by:
-Misspelling our names,
-Resisting suggestions from us, at times his manner was abusive,
-Giving conflicting instructions to subcontractors and us,
-Taking short cuts against our expressed wishes,
-Dragging out the project beyond reasonable delays,
-Not providing adequate support for the half -completed deck throughout the
winter,
-Not tending to water problems while he was on vacation with his family leaving
the project unattended, without talking to us about the risk to the deck.
-Repeatedly refusing to live up to portions of the contract.
OUR REMAINING CONCERNS
Trim around front door not replaced properly.
Shingle above bay window not patched as promised.
Siding on West side is losing insulation.
Open spaces between foundation and sill allowing bugs and spiders easy
access. (This was repaired)
Cracks in upstairs bathroom where floors meet the walls.
Hairline cracks around windows.
Nail pops e.g. basement bath.(painter remedied)
Low block in retaining wall collects water, will freeze and heave the cement
and retaining wall.
Aluminum trim near lower entrance was scratched by contractor during
installation.
Classic Construction said they would re -seal the cement work before winter.
Finale grade of yard does not accommodate the water runoff.
rnUr
mill
i .
m4 w4 A" d
Alnuut like home
(3880 Last Ricer Rd.. r ridleq. MN 55432 . (G 12) 571 -6433
December 6, 1997
Mr. Ronald Miller
R. Miller Construction, Inc
953 Missippi Street N.E.
Fridley, MN
55432
Dear Mr. Miller,
We have received your request for final payment dated November 12,
1997. In receiving your final bill request we can now address our issues
with you. We thank you for the reminder dated December 2, 1997.
First let us assure you that Curtis and I intend to pay you in full when
you complete the project you started October, 1996. In the past you were paid
promptly. The only time there was an issue was when we required a list of
vendors as a condition of getting your next payment. When you came with that
list you were paid. Please finish your work in a professional way and we will
pay you.
You stated your final statement was difficult to prepare because we did
not furnish you with our paper work at our meeting on 10-16-97. We had
repeatedly requested you bring information prior to that meeting. Because you
chose to withhold our requested information we were unable to complete our
paper work. We did withhold a project conclusion report, which we have since
updated and enclosed.
We heard you say you feel you have no more responsibilities to us; we do
not agree. It is hard to know if you will be tending to our remaining
concerns. If not, tell us which ones specifically and why you feel you are
not responsible in writing as we have requested in the past. You have never
given us clear written reasons why you have refused to complete work which you
bid and assured us would be done in the moving of our home.
When you wanted this project, you said my home would be better than it
was. In some areas it is but our list of remaining concerns reflect areas
where our home is not in as good shape as it was when you started. When the
walls cracked and we began to have problems, you told us you hadn't wanted
this project but Ms. Melcher talked you into doing it for us.
You had your insurance adjuster out to review these problems. You never
responded with your adjusters' thoughts nor have they contacted us about our
concerns.
R. Miller Const., Inc
Page 2
You have asked for our outstanding bills yet you have not provided us
with:
1. A final complete list of actual vendors used on which particular jobs.
2. Lien waivers are a requirement of final payment.
You stated if we pay you within 120 days you will give us lien waivers;
if we don't, you will not supply them. It is our belief, because of our
experience with you, that once you're paid we will have no leverage to get you
to do what you promised. Your continued reluctance and dragging out of a two-
month project for over a year does not leave us confident that you will honor
your contract.
3. We are still requesting warranty statements from your sub -contractors.
Since we have not received warranties from your sub -contractors via you
this suggests that your sub -contractors may not have guaranteed their work.
Aware of what the state statue says, we want to know exactly what your
warranty covers and for how long.
November 11, 1997 was your last working day here for warranty purposes.
That is the day your painter finished painting the lower bathroom, thirteen
months and two weeks after starting this project.
The day you told us to get a fixture for the door, you did not specify
how much we were to spend nor is an amount specified on the blueprint or your
spec booklet. However we do remember you did ask if it was okay for you to
install the fixture rather than call your electrician back out to do it.
In your change orders you have billed us or bolting the porch to the
house. We did not tell you to bolt the porch to the house. You were to
restore it as it was. When your mover, moved the house he did not put the
porch back against the house. This is not our cost. That was the mover's
responsibility. On the Blue Print it clearly states, "Building mover shall be
responsible for repairing any damage to existing building as a result of the
move. This includes, but is not limited to any cracks in walls, floors and
ceilings and window breakage." That porch was part of our home before you
started this project.
In regards to Mark Daly's conversation with you:
Our retaining wall, sidewalk, and steps to the lower level were
completed before Classic Construction did the final grade. At that time you
assured us the retaining wall didn't need to he any higher and that your sub-
contractor would provide a suitable grade for adequate drainage of the yard.
You and Curtis talked extensively about this because of the steps going down
to the walkout. The final grading is your responsibility.
We requested that you remove the sand as stated in the contract,
"Fill will be... Balanced / Trucked in / Trucked out." This your sub-
contractor did not do. In the letter from Ms. Melcher, June 16, 1997 you were
also asked to remove the sand. We requested in writing that the sand in the
front yard be removed before spreading the black dirt for sod. Instead your
sub -contractor simply mixed them together wasting our black dirt which we paid
for to insure a good base for sod. We feel you should pay for the dirt we had
R. Miller Const., Inc
Page 3
purchased ourselves and we will not pay for the spreading of the black dirt.
We have talked about our siding on many occasions. You had your
insurance adjuster out. Photos prior to start of project show no
loose siding. You walked around the house many times as you were deciding to
do this job you even took photos. If there had been loose siding you would
have had photos of that and noted it to us.
As we stated often during the project, "Do the work right and there will
be no problem." This you have failed to do. The consequence of that is we
will not pay you till you complete the job. When you finish we will pay you.
We fail to understand how you could put a lien against our property back
dated to August 24, 1997. This backdating of a lien against our home was
intimidating and speaks of how little trust remains in this relationship. In
September we approached you for a final walk through and you said you did not
have your paper work ready for a final walk through and billing. How could we
pay a bill you had not submitted at that point? How can you charge interest
from that point? You continued to work on site until November 11 and did not
furnish a bill until November 1?.
Having received a final bill from you we are now sending you copies of
the hills we paid. We are sending you things we noted as this project moved
along. Enclosed you will find a copy of your Final Construction Statement.
We are unwilling to sign this statement because we do not agree with you in
several areas. We also need paperwork for the tree removal and relocation
since you have claimed them as "allowance" items after you told us you would
have to "eat the cost" because you forgot to bid them.
In trying to be fair we have given a list of our concerns about our home
to another contractor for a bid because we did not know the cost of completing
your work. We are enclosing this bid so there is a basis for withholding
payment. We understand this work will not be done until your warranty has
expired. If you continue to refuse to do warranty work the bid may increase
if more damage occurs because of warranty work failed to be completed by you.
We are extremely reluctant to repair anything on this list because as
you told us several times if we do anything you will no longer be responsible.
Whatever we repair voids the warranty. We know the house was twisted and
stressed by the move so evident in the cracks, bulging walls, bathroom floor
cracking, and continued stressing around the windows. This suggests that
there will he further repairs needed. As you have been hostile and reluctant
to complete the project, our only recourse is to withhold payment until you do
what your contract says.
We are willing to give you until May 15, 1998 to finish your work
because of the yard work. We are not willing to pay interest on bills for
work not completed.
R. Miller Const., Inc.
Page 4
At this point we are unwilling to pay you for:
tree removal $850.00 You did not inform us of this bill before I signed
the 10-15-96 construction statement. I signed with
the understanding you had failed to bid the tree
removal so you were going to have to, "eat the cost"
if we didn't split the soil correction monies with
you and not inform the county of the extra money.
You said, "I've taken care of it."
relocate trees 25.00 no bill received and they died. If you had moved
them like we asked they might still be alive.
Will pay when we receive proper paperwork.
bolt porch 130.50 included in bid for relocating the home
spread black dirt 60.00 sand was not removed first as specifically requested
Total: $1065.50
You credited us these amounts:
Exterior handrail $200.00
Lock sets
Phone hook up
Duct cleaning
Exterior light
45.00
125.00
100.00
fixture 9.00
We actually spent with receipts and reason:
$357.93 This was a code requirement.
You were aware it was also a
business issue needing immediate
attention. You didn't bring us a
bid. A month after moving home I
was issued a correction order
from Child-care licensing. You
said it would take you six weeks.
We did your work so we could
comply with Rule II.
63.82 Tax included
86.27 MN tax included
79.85
2.6.61 tax included
as stated earlier no light
fixture allowance was quoted
until 10-16-97.
Totals: 479.00 614.48
Difference owed to Anna and Curtis pribula $135.48
It feels like we did an inordinate amount of the work in order to move
the project forward.
We have not billed you for time or mileage to take care of these things
for you. A general contractor gets paid via his bid for his time and
expertise.
We have not billed you for the added stress of living out of our home
six months longer then promised.
We have not billed you for the stress produced by nearly loosing my
child-care license because of your delays. The temporary housing we were
living in could not be re -licensed and the pain of telling my children I
couldn't care for them was caused by your lack of moving this project along.
You may want to refer to the May 5, 1997 letter addressing the stress
you have introduced into our lives.
R. Miller Const., Inc.
Page 5
We realized how little concern you had for us when you suggested we move
the gas meter using your tools. That could have endangered our home not to
mention our lives and putting the children we care for in jeopardy.
You never credit nor even mention what we did to move the project along,
sometimes at great expense to our health, business, and often introduced
unneeded stress into our marriage.
We have spoken to several engineers and contractors to find out what is
standard procedure when we have to withhold monies to complete a project and
do repair work. We heard we should withhold 12 the amount of the bid. We are
doing that.
If other contractors are hired to complete this job does it void your
warranty? They will not guarantee the rest of your work. T.J.B. said there
may be more cracks by the time they would do this work resulting, from
settling and the drying out of our home. There was an excessive amount of
moisture from the cement pour pumped into a cold house last January. He also
said more siding could come loose in the wind because of the one that is so
loose now. So while this is a bid the actual cost a year from now could be
substantially higher. We feel based on our experience with you we need to add
a minimum of $1000.00 in the event you do not fulfill your obligations to us
and more damage occurs. This does not account for the extra One Hundred
Eighty dollars($180.00) we paid under duress to have the gas line brought up
to code.
Our adjustment to your 11-12-97 final payment request:
You requested $7,000.50
Our documented costs: 135.48
1,065.50
T.J.B. bid X # 5,227.50
Our anticipated increase in repair cost 1,000.00+
So we will withhold the entire remaining payment until we reach a
workable understanding with you, our requests are answered, and the lien is
removed.
Then Mr. Miller we have every intention of paying you.
Sincerely,
AnnA A. & C rtis A. Pribula
cc Rebecca Frederick, Attorney at Law
Michael Kelly, Chief Right of Way Agent, Anoka County Highway Department
Michelle Maiers-Atakpu, Morrison/Walijarvi Architects, Inc.
Richard L. Muske, Attorney at Law
Barry Riesch/Ron Julkowski, City of Fridley Building Inspectors
Robb A. Urquhart, Metro Division State Aid construction Engineer
R. Miller Construction, Inc.
953 Mississippi Street
Fridley, Minnesota 55432
November 18 1997
Anna A. Pribula f/k/a Anna A. Wilchern and Curtis Pribula
6880 East River Road
Fridley, MN 55432
Dear Anna A. Pribula f/k/a Anna A. Wilchern and Curtis Pribula:
Enclosed and served herewith by Certified Mail, please find a copy of a Mechanic's
Lien Statement. According to state statute, a copy of the Mechanic's Lien Statement must be
mailed by certified mail to owners of the property. The original Mechanic's Lien Statement has
been forwarded to the county identified in the Statement for filing.
Generally speaking, the Mechanic's Lien Statement is standard procedure to secure a
subcontractors rights in your property until they have been paid and should not be viewed as a
negative reflection on your general contractor.
Sincerely Yours,
R. Miller Construction, Inc.
By: Lies. ces f Minnesota C
Enclosure
ML 1339-9704369
COPYI
MECHANIC'S LIEN STATEMENT by Corporation
Pursuant to Minn. Stat. See. 514.08, Subd. 2.
The undersigned hereby gives notice to the public and states as follows:
1. I am acting at the instance of the lien claimant, R. Miller Construction, Inc., a corporation under the laws of the State
of Minnesota, (License 6354) as its agent.
2. The lien claimant hereby gives notice of intention to claim and hold a lien upon the land lying in the County of Anoka,
State of Minnesota, described as follows:
Lot 9, Block 2, Sandhurst Addition (commonly known as 6880 East River Road, Fridley, Minnesota)
3. The name and mailing address (and license number, if applicable) of the lien claimant is: R. Miller Construction, Inc.,
(License 6354) with its address at 953 Mississippi Street, Fridley, Minnesota.
4. The amount of the lien claimed is Seven Thousand and 50/100s Dollars ($7,000.50) with interest thereon from the 24th
day of August, 1997, and is due and owing to the lien claimant for labor performed or skill, material or machinery furnished
to the land.
5. The lien claimant did or supplied the following in conjunction with improvements to an existing structure on the
property: General Contracting/Carpentry Material and Labor
6. The lien claimant's contribution to the improvement was performed or furnished from the 7th day of October, 1996 to the
25th day of July, 1997, for or to the following person(s):
Anna A. & Curtis Pribula
7. That the name(s) of the present owner(s) of the land according to the best information lien claimant now has or is able to
ascertain, is/are: Anna A. Pribula f/k/a Anna A. Wilchern and Curtis Pribula
8. The lien claimant acknowledges that a copy of this statement must be served personally or by certified mail on the owner,
the authorized agent of the owner or the person who entered into the contract with the lien claimant within 120 days of doing
the last work or furnishing the last item of such skill, material or machinery.
9. Notice as required by Minnesota Statutes Section 514.011, subdivision 2, if any, was given.
Dated this e`2
day of ✓✓ e- 199/,-
R.
99
R. Miller Const on, Inc.
By.
Thomas E. Lundy Agent
Check here if part or all of the land is Registered (Torrens) ❑
Document Prepared by Lien services of Minnesota, LLC ML: 1339-9704369
STATE OF MINNESOTAMECHANIC'S LIEN STATEMENT — by CORPORATION
I
COUNTY OF HENNEPIN
Thomas E. Lundy being duly sworn, on oath, says, that he is the agent of R. Miller Construction, Inc., the claimant in the
within statements, that he has knowledge of the facts stated in said statement by reason of the following facts, to wit:
information furnished by the claimant; that he makes said statement at the instance of said co ration claiming said lien;
and that the statement is true of his own knowledge.
......................., .E-..................................................................... v
NOTORIAL STAMP OR SEAL OR OTHER TITLE OR RANK
Thomas E. Lundy
rn• -IGl
.-,�. LORI SHERRETT
NOTARY Pusuc MINNESOTA Subscribed and sworn to before me this /� day
MY COMMISSION EXPIRES
JANUARY 31, 2000 of 19
................................................................................... ..
NOTARY PUBLIC
This instrument was drafted by
► Lien Services of Minnesota, LLC; 275 Market Street, Suite 564; Minneapolis, Minnesota 55405 (612) 673-9445
AFFIDAVIT OF SERVICE BY CERTIFIED MAIL
STATE OF MINNESOTA 1
COUNTY OF HENNEPIN f
Thomas E. Lundy of the City of Minneapolis, County of Hennepin, State of Minnesota, being duly sworn, says that on the
18th day of November, 1997, he served the foregoing Mechanic's Lien Statement upon Anna A. Pribula f/k/a Anna A.
Wilchern and Curtis Pribula (the owner(s) therein named) by mailing to said Anna A. Pribula f/k/a Anna A. Wilchern and
Curtis Pribula a copy thereof by certified mail, enclosed in an envelope, postage prepaid, and by depositing the same in the
post office at Minneapolis, Minnesota, directed to said Anna A. Pribula f/k/a Anna A. Wilchern urtis Pribula, at
6880 East River Road, Fridley, Minnesota 55432, the last known address of said Anna A. Pribu a Anna A. Wilchern
and Curtis Pribula. /
NOTORIALSTAMP OR SEAL OR OTHER TITLE OR RANK
Thomas E. Lundy
LORI SHERRETT Subscribed and sworn to before me this / day
NOTARY PUSUC - M,INNESOTA
MY COMMISSION EXPIRES of
JANUARY 31, 2000 '
.................................................................................................: NOTARY PUBLIC
AFFIDAVIT OF SERVICE BY CERTIFIED MAIL
STATE OF MINNESOTA
COUNTY OF HENNEPIN
....................................................................................................................
NOTORIAL STAMP OR SEAL OR OTHER TITLE OR RANK
For Property in the State of Minnesota, County of Anoka
Thomas E. Lundy
Subscribed and sworn to before me this
of
19
day
NOTARY PUBLIC I I - 13-39-9704369
R. MILLER CONSTRUCTION, INC.
953 MISSISSIPPI STREET NE.
FRIDLEY, MN. 55432
612-571-3514
Lic. #6354
December 2, 1997
Attn: Curtis and Anna Pribula
6880 East River Rd.
Fridley, Mn. 55432
Phone: 571-6433
Re: Final payment Demand
Dear Curtis and Anna,
Demand is made herein for the full and immediate payment of the
amount of $7,000.50 balance due and owing on the contract entered
into for the relocation of your residence. Payment must be
remitted to the above address, made payable to R. Miller
Construction, Inc.
Be advised, if FULL payment is not made within the next ten (10)
days, R. Miller Construction, Inc. will immediately seek to
foreclose the mechanic's lien on the property (commence
litigation) pursuant to state lien laws and our contract. R.
Miller Construction, Inc. may also seek to recover attorneys'
fees, court costs and other collection expenses.
Thank You,
L=61Ay&&
Ronald Miller' fts President
cc Richard L. Muske, Attorney at Law
iaiil= '
1 II'lllllll�' illll
�
� i�
Almost like home
6880 Fast River Rd., Fridley, MN 55432 . (612)571-6433
December 7, 1997
Barry Riesch/Ron Julkowski
Building Inspectors
Fridley Municipal Center
6431 University Ave. N.E.
Fridley, MN
55432
Dear Barry and Ron,
Now that the project of moving our home is drawing to a conclusion we
want to thank you for giving so much information to us about building codes
and doing your inspections so promptly.
We also want to share some concerns about our general contractor because
you may not be aware of some details. The enclosed correspondance may give
some understanding about the project's progress and conclusion.
Again we thank you for your help and professional manner you brought to
your work with us.
Sincerely
Anna A. and Curtis A. Pribula
R. MILLER CONSTRUCTION, INC.
953 MISSISSIPPI STREET NE.
FRIDLEY, MN. 55432
612-571-3514
Lic. #6354
November 12, 1997
Attn: Curtis and Anna Pribula
6880 East River Rd.
Fridley, Mn. 55432
Phone: 571-6433
RE, F nal b-3.1.1_ing for contract dated 10-3-96
Dear Curtis and Anna,
I have reviewed your list of concerns (attached). We have
discussed all of the issues listed. As I have told you I do not
feel that the balance of items listed are part of my contract.
I am requesting final payment. I have attached a final statement.
The attached final statement has been difficult to prepare
because for months I have asked you for a written list and
receipts for your expected deductions, but you have refused to
provide me with any written list, amounts or receipts. In our
meeting on 10-16-97 I asked you again what items you expected to
be credited for. You would not give me any dollar amounts, but
you did say that you were expecting credit for...
- Locksets.
- A motion detector light fixture (I agreed to a credit for a
light fixture, but not a motion detector light fixture).
- Class 5 in the driveway.
- A bill from the phone company.
- Duct cleaning as per our earlier agreement.
The two of you have in the past stated that before final payment
you would require...
1) Updates to the vendor list previously provided.
My response... D. Kent Landscaping 571-6889
Shades of green Landscaping 427-3710
2) All lien waivers.
My response... All lien waivers will be provided at final
payment, assuming that final payment is received within 120
days of the last day of work. If final payment is not received
within 120 days of the last day of work, no lien waivers
will be given.
3) Warranties.
My response... Warranties if any, are provided by state
statute.
4) Receipts or bills for allowance items that you had not
previously agreed to. Also the bill from Classic Construction
for spreading your black dirt.
My response... They are attached.
Items attached to this letter...
1) Your list of concerns
2) Final statement
3) Letter from R. Miller construction, Inc. to Mark Daly
4) Proposal from D. Kent Landscaping
5) Statement from Classic Construction
Thank You,
Ronald Miller, its President
OUR REMAINING CONCERNS
Trim around front door not replaced properly.
,/Shingle above bay window not patched as promised.
W)-
,
vSiding on West Side is losing insulation. C',,4, g
Vbpen spaces between foundation and sill allowing bugs and spiders easy t/
access.
Cracks in upstairs bathroom where floor meets walls.
` Cracks around windows.
'Nail pops e.g. basement bath.
✓Low block in retaining wall collects water, will freeze and heave the cement
and retaining wall.
VAluminum trim near lower entrance was scratched by contractor during
installation.
'Classic Construction said they would re -seal the cement work before winter.
RL -y 71f-3s,;w
/u- 36- F 7
FINAL Construction statement
From:R Miller Construction, Inc. (G.C.) To: Curtis & Anna Pribula (Buyer)
953 Mississippi St. 6880 East River Road
Fridley, Minn 55432 Fridley, Mn. 55432
571-3514 571-6433
Job: Same
Nwe This FINAL statement is a extension of our Agreement dated 10-03-96
Written documentation for verbal agreements...
#1 Tree removal is part of the landscape allowance.
#2 The exterior door is a S00.
#3 Any room that needs patching because of the house move will be painted
#4 The deduct for C.O. #3 ($975.00) will be deducted from the window payment of $2,800.00 making it $1,825.00
#5 The shower door is to be chrome with obscure glass
#6 The heating is to be done by the Home Owner.
#7 Regarding existing wall repair: In the dining rm 8 living rm Curtis will remove and replace all moldings.
Ron will rock walls with 318" rock, tape 8 sand. The balance of the walls will be patched. The cost will be $900.00
#8 Under amount paid to G.C. on Contract above the $4,750.00 paid from G.C. to Buyer is for credits due for allowances
and charge orders. The $975.00 from Pribula to G.C. is for a accounting error in the $4,750.00 regarding C.O. #3.
#9 !n lieu of interior draintile the Builder will install exterior draintile as follows... North side: 17', west: total, South: 15'
The exterior draintile will be inspected by a city inspector. There will be no adjustment to the contract price.
Includes daylight to North property Line.
#10 When the backhoe is on site it will relocate two trees to a place in the front yard marked by the owner.
#11 The two trees referred to in c.o. #10 will be moved by a spade. The expence for the the move will be paid by the G C.
#12 Deck joist 8 decking is to remain treated & the handrail spindles will be 2x2 cedar at no change to the contract price.
#13 G.0 will split the cost of duct cleaning
with the Buyer up to $200.00 ( up to $100.00 to G.C.).
Ronald Mdler its President Date
Signature Date
Description
Contract amount ......
91,600.00
Allowance adjustment....................................................... I ..........
(7,786.00)
Change order adjustment .... ............. ..................._.............,................ ..........
(763.50)
--------------------------------------
Adjustedcontract amount ................................................................................
83,050.50
Amount paid to G.C. on Contract Draw #1 5,000.00
Draw #2 20,000.00
Draw #3 20,000.00
Draw $4 1,825.00
Draw $5 20,000.00
Draw $6 13,000.00
Miller to Pribula (4,750.00)
Pribula to Miller 97500
------------------------------------------
76,050.00
76,050.00
--------------------------------------
Balance on Contract ........... ................... $7,000.50
e.ea..eeaee�saas�c�emas
Allowances (amt. used to date) Amount in bid Amount used
Adjustment
Cabinetry 250.00 0.00
(250.00)
Existing wali repair 900.00 900.00
0.00
Maintance free exterior 2,500.00 2,500.00
0.00
Landscape 4,750.00 1,375.00
(3,375.00)
tree removal $850.00
relocate apple trees $25.00
Kent Landscaping (retaining wall) $500.00
Soil corrections 2,000.00 200.00
(1,800.00)
Water softener 650.00 0.00
(650.00)
Shower door 350.00 27900
(71.00)
H V.A.C. 2,000.00 360.00
(1,640.00)
Concrete exterior $2.00 SQ' 0.00
0 00
-------------------------------------
Allowance adjustment total................................................................................
-----------------------
($7,786.00)
-----------------------
Change orders (C.O.)
#1
Concrete for shed...................................................................
125.00
#2
Upgrade to a 200 Amp. panelI I ..........................................................1
325.00
#3
The replacement of the two windows (Main FI.)& associated work will be done by others
(975.00)
#4
Wire mesh in basement concrete................................................................................
105.00
#5
Move outside water faucet................................................................................
75.00
#6
Credit for main level toilet................................................................................
(65.00)
#7
Bolt south side of porch to house. 4.5 hrs @Z $29 00 ......................................................
130.50
48
Credit for fire alarm per agreement dated 6-23-97 ......................................................
(25.00)
#9
St Marie Sheet Metal Proposal dated 6-23-97 1" ball valve
60.00
#10
St Marie Sheet Metal Proposal dated 6-23-97 1/2' copper gas line
75.00
#11
St. Marie Sheet Metal Proposal dated 6-23-97: Removal of const furnace, gas line&vent
25.00
#12
St. Marie Sheet Metal Proposal dated 6-23-97: Seal bottom of chimney
2500
#13
Spread black dirt ........................... .....................................................
60.00
#14
Exterior handrail................................................................................
(200.00)
#15
Locksets (Estimated) .......................... ..................................................... 1
(45.00)
#16
Phone hook up (Estimated)................................................................................
(125.00)
#17
Duct cleaning per change order # 13 below (Estimated......................................................
(100.00)
#18
Exterior light fixture .......................... _.....................................................
(9.00)
#19
Gravel for parking area................................................................................
(225.00)
--------------------------------------
Change order total.........................._...................................................
-----------------------
-----------------------
($763.50)
Written documentation for verbal agreements...
#1 Tree removal is part of the landscape allowance.
#2 The exterior door is a S00.
#3 Any room that needs patching because of the house move will be painted
#4 The deduct for C.O. #3 ($975.00) will be deducted from the window payment of $2,800.00 making it $1,825.00
#5 The shower door is to be chrome with obscure glass
#6 The heating is to be done by the Home Owner.
#7 Regarding existing wall repair: In the dining rm 8 living rm Curtis will remove and replace all moldings.
Ron will rock walls with 318" rock, tape 8 sand. The balance of the walls will be patched. The cost will be $900.00
#8 Under amount paid to G.C. on Contract above the $4,750.00 paid from G.C. to Buyer is for credits due for allowances
and charge orders. The $975.00 from Pribula to G.C. is for a accounting error in the $4,750.00 regarding C.O. #3.
#9 !n lieu of interior draintile the Builder will install exterior draintile as follows... North side: 17', west: total, South: 15'
The exterior draintile will be inspected by a city inspector. There will be no adjustment to the contract price.
Includes daylight to North property Line.
#10 When the backhoe is on site it will relocate two trees to a place in the front yard marked by the owner.
#11 The two trees referred to in c.o. #10 will be moved by a spade. The expence for the the move will be paid by the G C.
#12 Deck joist 8 decking is to remain treated & the handrail spindles will be 2x2 cedar at no change to the contract price.
#13 G.0 will split the cost of duct cleaning
with the Buyer up to $200.00 ( up to $100.00 to G.C.).
Ronald Mdler its President Date
Signature Date
11/06/97 09:57 FAX 612 754 3532 AKOKA CO HWY DPT
NOV- 6-97 THU 8:12 AM P, MILLER CONSTRUCTION RAS: NO. 6125713514
R. Miller Construction, Inc.
953 MISSISSIPPI STREET HE.
FRIDLEY, MN. 55432
612-571-3514
Lic. #6354
November 4, 1997
Attn: Mark Daly
Anoka County Hwy, Department
1440 Bunker Lake Blvd. N.W.
Andover, Mn. 55304
Phone: 754-3520
Fax: 754-3532
RE: Drainage at 6880 E. River Rd. Fridley, Mn.
Dear Mark,
This letter is to provide written documentation for our recent
conversations.
]Vjuui
P. I/ I
On or about October 31, 1997 1 called you to discuss the drainage
problem at the above mentioned address. The things that you told
me were as follows...
You have visited the Site.
You saw that the drainage area to the South of the building was
scoured.
You told me that during the summer of 1997 we experienced some
very severe rainfalls. These rainfalls were much greater than
what normal highway design will support.
- You stated it is your opinion that the reason for the scouring
is because of inadequate drainage at the South side of the
South retaining wall.
Your suggestions for correcting this problem are as follows...
1)Drain tile could be installed at the South property line.
2)Raise the existing retaining wall and add fill next to the
retaining wall in order to create a swale approximately two feet
away from the retaining wall. You caution against this because
you are unsure if the retaining wall was designed for the proper
height.
3)Install a draintile system at either the top or bottom of the
existing retaining wall. This draintile system should daylight
into the back yard at the low end of the said wall.
4)Cut a Swale into the existing grade two feet away from the
retaining wall.
.� haW..elL
Ronald Miller, its President
I ar �th ove.
/►
Mark aly
Page No. of Pages
w A A A AIts tl tt1
D. KENT LANDSCAPING f KUrUbAL ANU
ACCEPTANCE
6440 Baker Avenue Northeast e Fridley, Minnesota 55432 a 1-800-453-9856 a 612-571-6889
PROPOSAL SUBMITTED PHONE-) -7/`} �C EDATE S��—STREET
JOB NAME
ClJf
CITY, STATE AND ZIP CODE!! r /
� 1 d f rN
ARCHITECT DATE OF PLANS
JOB LOCATION
C /
JOB PHONE
We hereby submit specifications and estimjotes for.
/- ' q
Ir
.,
We Propose hereby to furnish material and labor — complete in accordance with above specifications. for the sum of
Soo -o >.
dollars cs Soo-od
Payment to be made as fo lows.
All material is guaranteed to be as specified. All work to be completed in a workman•
like monner according to standard practices. Any alteration or deviation from above Authorized
spec) canons involving extra costs will be executed only upon written orders. and Signature
wilt become an extra charge over and above the estimate.
ole: This proposal may be
...its..lr�,.,n by us if not occeoted within Boys.
Acceptance of Proposal .The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are outhorized
to do the work as specified. Payment will be made as outlined above.
Date of Acceptance
I
CLASSIC
. �P3a
CONCRETE & MASONRY WORK • COMMERCIAL & RESIDENTIAL
18542 ULYSSES ST. N.E. EAST BETHEL MN. 55011 (612) 434-8870 Fax. (612) 434-7120
STATEMENT
FR. Miller Construction
Job Address: 6880 E River Road
I Fridley, Mn
L___
DATE
DESCRIPTION
CHARGES
7/10/97
Work Completed
Per bid less Post footings
not done, Front Step &
Concrete Steps in new walk-
out entrance.
$1829.00
Sidewalk
752.00
Patio
1318.00
Spread & Grade black dirt.
60.00
Total Amount Due
$3959.00
Thanks, Curt
rAT LA,{ AMOUNT IN BALANCE COLUMN I