Loading...
2009 Rice Creek WayMetropolitan Conservation Districts Anoka - Carver - Chisago - Dakota - Hennepin - Isanti - Ramsey - Scott - Sherbure - Washington - Wright AND THE Anoka Conservation District Hawkinson Residence -- 59 Rice Creek Way, Fridley, MN 55432 LOCKE LAKE ESTIMATED ❑ 6"RockTube Qty ❑ 16"Biolog A mt ost Amount Potential Source Sheet 4 of 4 SITE PREP / GRADING / EROSION CONTROL Transitional Zone Silt Curtain -Tough Guy Floating Silt Barrier 0229308 (CM7000 over SC75BN) 3'x100' $ 700.00 $ 700.00 Brock white Shredded Hardwood Mulch (3" depth) 8 cu yd $ 20.00 $ 160.00 Landscape Supplier Boulder Wall 15 ton $ 100.00 $ 1,500.00 Landscape Supplier Trap rock (2-1/2" diam) 11089 -Hedberg 1 ton $ 50.00 $ 50.00 Landscape Supplier Mesh Sock 9 8' $ 9.00 $ 81.00 Brock White Rock Delivery 1 load $ 150.00 $ 150.00 Coir Log (16" 9 Ib CN) 7 10' log $ 130.00 $ 910.00 't .,- - - ✓� moo; _ Wooden Stakes \1 36" stake $ - - - t t Coconut E.C. Matting (CF7 or similar) Cocomat 7000 1 each $ 350.00 $ � Stone Steps SC75BN (6.5'x108.5') 1 roll $ 80.00 $ Restoration Notes: Brock White 6" Netting Pegs (bio -stakes) (1 box=576 stakes) 1 box $ 32.00 Boulder wall \New Fire Ring 32.00 \� -Install Silt Curtain 3 feet out from and parallel to shoreline. 1 Upland Zone $ 150.00 Secure at property lines and lake bed. 150.00 (2 -inches, shredded Herbivore Exclusion Fence 2 -Regrade slope as shown in section. Make final slope 3:1 or $ hardwood mulch) $ \, lesser. Use cut material from lower area to build up area to level PLANTS above rock wall. SHRUBS -Install 16" biologs (9 Ib density) across entire shoreline. A A' \ -Install rock tube in front of biolog to prevent carp from Dragonfly, Outback, Landscape Alternative, Prairie Resto. or similar , 12 1 gal burrowing under biolog. 8.00 ` -Lay SC75BN straw blanket followed by CM7000 geojute blanket 14 Fill to level and 3-6"Berm re -sod $ \ over Transitional area. Trench blanket edges 6" under soil on all PERENNIALS 217 sides to prevent erosion under blanket. $ Transitional Zone Upland Zone $ 399.50 Dragonfly, Outback, Landscape Alternative, Prairie Resto. or similar 827' 27 '\ -Spread 2" shredded hardwood mulch over areas shown on plan. NEW ENGLAND ASTER Plant sedges, grasses, and shrubs through mulch as shown on 826 WESTER SUNFLOWER 25 � plan. 825'- 25'824' PRAIRIE BLAZING STAR 824'- 821.2'= 821.2'= 819.8'= OHW�- Existing R CARDINAL FLOWER 24 823 LEVE / / Grade 9/15/09 / Boulder Wall -2ft 1 \ 822 / 821' - - - - - - - - - -�� - - - 2" Shredded PURPLE CONEFLOWER ` Hardwood Mulch 820, CM7000 over 26 Shoreline Stabilization/ Restoration Plan SC SC75BN CULVER'S ROOT 15 16" Biolog 7:�_6" Sheet 2 of 4 Rock Tube GRASSES 172 plugs $ III II $ ANOKA COUNTY HAWKINSON RESIDENCE BIG BLUESTEM 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Shoreline Stabilization/Planting 59 Rice Creek Way 18 Fridley, MN 55432 BLUEJOINT GRASS is September 16, 2009 Prepared by: LAKE SEDGE 24 Anoka Conservation District LITTLE BLUESTEM in association with Metro Conservation Districts PRAIRIE DROPSEED 25 ANOKA - CARVER - CHISAGO - DAKOTA - HENNEPIN - ISANTI - RAMSEY - SCOTT- SHERBURNE -WASHINGTON -WRIGHT 1 O O S and the ESTIMATED TOTAL COST FOR MATERIALS1 $ 5,034.50 USDA - Natural Resource Conservation Service Metropolitan Conservation Districts Anoka - Carver - Chisago - Dakota - Hennepin - Isanti - Ramsey - Scott - Sherbure - Washington - Wright AND THE Anoka Conservation District Hawkinson Residence -- 59 Rice Creek Way, Fridley, MN 55432 ESTIMATED MATERIALS Qty Unit mt ost Amount Potential Source Sheet 4 of 4 SITE PREP / GRADING / EROSION CONTROL Silt Curtain -Tough Guy Floating Silt Barrier 0229308 1 3'x100' $ 700.00 $ 700.00 Brock white Shredded Hardwood Mulch (3" depth) 8 cu yd $ 20.00 $ 160.00 Landscape Supplier Boulder Wall 15 ton $ 100.00 $ 1,500.00 Landscape Supplier Trap rock (2-1/2" diam) 11089 -Hedberg 1 ton $ 50.00 $ 50.00 Landscape Supplier Mesh Sock 9 8' $ 9.00 $ 81.00 Brock White Rock Delivery 1 load $ 150.00 $ 150.00 Coir Log (16" 9 Ib CN) 7 10' log $ 130.00 $ 910.00 Brock White Wooden Stakes 56 36" stake $ 0.75 $ 42.00 Coconut E.C. Matting (CF7 or similar) Cocomat 7000 1 each $ 350.00 $ 350.00 Brock White SC75BN (6.5'x108.5') 1 roll $ 80.00 $ 80.00 Brock White 6" Netting Pegs (bio -stakes) (1 box=576 stakes) 1 box $ 32.00 $ 32.00 Brock White Delivery for Landscape Supplies 1 load $ 150.00 $ 150.00 Brock White Herbivore Exclusion Fence 2 4'x100' $ 25.00 $ 50.00 PLANTS SHRUBS 26 $ 208.00 Dragonfly, Outback, Landscape Alternative, Prairie Resto. or similar BLACK CHOKEBERRY 12 1 gal $ 8.00 DWARF BUSH HONEYSUCKLE 14 1 gal $ 8.00 PERENNIALS 217 plugs $ 1.25 $ 399.50 Dragonfly, Outback, Landscape Alternative, Prairie Resto. or similar FRAGRANT HYSSOP 27 NEW ENGLAND ASTER 18 WESTER SUNFLOWER 25 PRAIRIE BLAZING STAR 29 CARDINAL FLOWER 24 BLACK-EYED SUSAN 33 PURPLE CONEFLOWER 20 BLUE VERVAIN 26 CULVER'S ROOT 15 GRASSES 172 plugs $ 1.00 $ 172.00 Dragonfly, Outback, Landscape Alt. Prairie Resto., or similar BIG BLUESTEM 58 SIDE OATS GRAMA 18 BLUEJOINT GRASS is LAKE SEDGE 24 LITTLE BLUESTEM 29 PRAIRIE DROPSEED 25 ESTIMATED TOTAL COST FOR MATERIALS1 $ 5,034.50 ESTIMATED LABOR Q Unit Unit Cost Amount Notes QUALIFIED SHORELINE CONTRACTOR (4 -person crew, 10 -hr day) Equipment 2 day $ 500.00 $ 1,000.00 Skid Steer Grading, Mulching and Planting 3 day $ 2,000.00 $ 6,000.00 If mulch blown in place subtract one half day and add $1000 to materials Site Restoration 1 $ 200.00 $ 200.00 Sodding of areas disturbed during project 3 visits/year maintenance (weeding) 2 year $ 750.00 $ 1,500.00 1. Hiring a qualified contractor to weed the project during the period of establishment is highly recommended and is considered part of the Installation phase. 2. Plant establishment requires 1 -inch of water/week divided between 2-3 waterings. If no rain occurs within 3 days of watering, water site. Water for first growing season. If project was not planted until after July of first season, water the second season as well. ESTIMATED TOTAL COST FOR LABORI $ 8,700.00 TOTALESTIMATED --• Amount MATERIALS $ 5,034.50 LABOR $ 8,700.00 ESTIMATED TOTAL RANGE FOR PROJECT r :-10% :+10%