Loading...
Meter Swap . Request Number: 12239 Public works Division Service Request Problem Address: 5523 E Bavarian Pass Requested By: Sue-Utility Billing Department: WA1ER Address: No address provided Problem/Issue: FINAL ME1ER READING Phone Number: Schedul ed Date: 5c6ednled'IYme: � .� ACIION NEEDED:Final reading.Clo ing 11/10/16 T#68880014 Created by: We�y Hiatt Date Created: 2016-11-16 ACIION TAKEN: �t�� l � Status: In Progcess Snbmitter Has Been r Contacted Date Completed: Compteted by: � � ` �� � �� Hiatt, Wendy Frrm: Johnson, Susan E. Sent: Wednesday, November 16, 2016 12:04 PM To: Hiatt, Wendy Subject: 5523 E Bavarian Pass NE-Final meter reading Request for a finai meter reading: 5523 E Bavarian Pass NE Closing date: 11/10j16 Ert#688800i4 Thank you! Sue�u�.aa� City of Fridley Utility Billing 763-572-3529 My office hours: Tuesday-Friday 9:OOam-3:OOpm i A V� Request Number: 10580 Public Works Division Service Req�st Problem Address: 5523 E Bavarian Pass Requested By: Jim-Plumber Department: WATER Address: No address provided Problem/Issue: TURN WATER ON/OFF Phone Number: 763-286-0731 Scheduled Date: 2015-09-28 Scheduled'ISme: 02:00:00 � o � '{' � �-• ACTiON NEEDED:Turn off water for repair.Leave key.****BILL**** Created by: Wendy Hiatt Date Created: 2015-09-28 ACTION TAI�N: .�,,�.�...�.�............._�VC�_. �U.`.��..__._�.�.�.'...__��`......�'�_�.........____..._......__..... ........................................................................... . _..............................._......._. ............................................................ ....0.........._�0�.._......1��...�.._(..._���::�..........................�.��..1....1...�fl,..._�......_�(,�._......_._:�..._____...________ ...................�1..(.�..��........_�N..�.............�.....:...::..�.R�......_.....�—.......�........_.._T�.�........._1._.�C:s�r�c�C�..:.._��_��r._-____._....... ....................�I_�_�.�t_�.......,............��.......�..��........_�....��:....�-�.�.....�1.�...._,�If..�...���...,._...._.............................__.........:......_ .......:............�._��.......�.�.....L.�M..'����...._w_�R�.........._��............�...�_�.�_�.............__.....__....:...............................___................_._.._ .........................a.:�.......�'..�.....�_a.�-......�.-�...W..�...................._.....�c�c� ��z� m��-+�� 15 M�ss��� Status; in Progress Resident Contacted ❑ Date Completed: Completed by: - �- �'t5 � City of Fridley - , �Uater Department �. � 6431 University Avenue NE Fridley MN 55432 • (763) 572-3561 Uwe hereby authorize the City of Fridley and/or its employees to do what is necessary to shut offthe water at the curb stop box. I understand that the properiy owner is liable for the water li.ne from the main.to the premise. (Per City code 402.0� I also hold the City of Fridley and/or its employees haYmless for any dam.ages that may occur wlule doing this operation. Thi.s to include,but not limited to, sod,yard,landscaping,trees,shrubs,driveways,sidewalks or the curb stog box and service line. i understand I am also required to obtain a permit prior to any work. Name: J'-e� Address:��rJ� v ��f�NIV� Phone Number: ?�p�.-��o--0�"1�7__ Date: 1'� �'� Signature: - Witness Signature: � ��N� �� r � . �,�L. �t�'"� FR�}L�Y CTTY CODE CHAPTER 402.R'A7'FR�STORM WATER AND SANTrARY SEWER ADMI�STRATION (Ref OrdNo 113,464,565,566,629,638,662,922,988, 1144,1156,1191) 402.05. PERMTT FEE . Prior to constructin.g or repair of auy water ar sewer line connecting the existing municipal system and any house or buildi.ng for which the application is made,the owner or contractor shall be required.to obtam a pemiit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After snch connection has been made,the VJater and Sewer Department shall be natified. It shall be imlawfiil to cover any connectmg line until an anspection has been made and such connection arid the work incident thereto has been agproved by the City as a proper and suitable connection. 402.06. REPAIl2S AND MAINTENANGE TO CONNECTION Aftar the initial conn.ection has been made to the water service curb stop box or the sewer lead at the property line or a water service or sewer lead has been extended to the property line for cflmiection,�e applicant,owner,or the occtipant or user of such premises shall be liable for all repairs requited to any water line and any sewer lines necessary for connection of the premises from the m�n to the premises• If the property owner requests maintenance services or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs,including any necessary street repairs,at a rate set ann.ually by an admin.istrative policy. It shall be the responsbility of the applicant,owner,occupant or user to'perform standard maintenance of the sewer service line i`rom the premises to the main including debris clearing ar roat cutting and to maintain the water service curb stop box for operab�7�ity and at such height as will ensure ti�at it remains abovc the finished grade oftixe land or property. (Ref 638,1156,1191j