Meter Swap . Request Number: 12239
Public works Division
Service Request
Problem Address: 5523 E Bavarian Pass Requested By: Sue-Utility Billing
Department: WA1ER Address: No address provided
Problem/Issue: FINAL ME1ER READING Phone Number:
Schedul ed Date: 5c6ednled'IYme:
�
.�
ACIION NEEDED:Final reading.Clo ing 11/10/16 T#68880014
Created by: We�y Hiatt Date Created: 2016-11-16
ACIION TAKEN:
�t�� l �
Status: In Progcess Snbmitter Has Been r
Contacted
Date Completed: Compteted by:
� � ` �� � ��
Hiatt, Wendy
Frrm: Johnson, Susan E.
Sent: Wednesday, November 16, 2016 12:04 PM
To: Hiatt, Wendy
Subject: 5523 E Bavarian Pass NE-Final meter reading
Request for a finai meter reading:
5523 E Bavarian Pass NE
Closing date: 11/10j16
Ert#688800i4
Thank you!
Sue�u�.aa�
City of Fridley
Utility Billing
763-572-3529
My office hours:
Tuesday-Friday
9:OOam-3:OOpm
i
A
V�
Request Number: 10580
Public Works Division
Service Req�st
Problem Address: 5523 E Bavarian Pass Requested By: Jim-Plumber
Department: WATER Address: No address provided
Problem/Issue: TURN WATER ON/OFF Phone Number: 763-286-0731
Scheduled Date: 2015-09-28 Scheduled'ISme: 02:00:00
� o � '{' � �-•
ACTiON NEEDED:Turn off water for repair.Leave key.****BILL****
Created by: Wendy Hiatt Date Created: 2015-09-28
ACTION TAI�N:
.�,,�.�...�.�............._�VC�_. �U.`.��..__._�.�.�.'...__��`......�'�_�.........____..._......__.....
........................................................................... . _..............................._......._.
............................................................
....0.........._�0�.._......1��...�.._(..._���::�..........................�.��..1....1...�fl,..._�......_�(,�._......_._:�..._____...________
...................�1..(.�..��........_�N..�.............�.....:...::..�.R�......_.....�—.......�........_.._T�.�........._1._.�C:s�r�c�C�..:.._��_��r._-____._.......
....................�I_�_�.�t_�.......,............��.......�..��........_�....��:....�-�.�.....�1.�...._,�If..�...���...,._...._.............................__.........:......_
.......:............�._��.......�.�.....L.�M..'����...._w_�R�.........._��............�...�_�.�_�.............__.....__....:...............................___................_._.._
.........................a.:�.......�'..�.....�_a.�-......�.-�...W..�...................._.....�c�c� ��z� m��-+�� 15 M�ss���
Status; in Progress Resident Contacted ❑
Date Completed: Completed by: -
�- �'t5 �
City of Fridley - ,
�Uater Department
�. � 6431 University Avenue NE
Fridley MN 55432
• (763) 572-3561
Uwe hereby authorize the City of Fridley and/or its
employees to do what is necessary to shut offthe water at the curb stop box. I understand
that the properiy owner is liable for the water li.ne from the main.to the premise. (Per
City code 402.0� I also hold the City of Fridley and/or its employees haYmless for any
dam.ages that may occur wlule doing this operation. Thi.s to include,but not limited to,
sod,yard,landscaping,trees,shrubs,driveways,sidewalks or the curb stog box and
service line. i understand I am also required to obtain a permit prior to any work.
Name: J'-e� Address:��rJ� v ��f�NIV�
Phone Number: ?�p�.-��o--0�"1�7__ Date: 1'� �'�
Signature: -
Witness Signature:
� ��N� �� r � .
�,�L. �t�'"�
FR�}L�Y CTTY CODE
CHAPTER 402.R'A7'FR�STORM WATER AND SANTrARY SEWER
ADMI�STRATION
(Ref OrdNo 113,464,565,566,629,638,662,922,988, 1144,1156,1191)
402.05. PERMTT FEE .
Prior to constructin.g or repair of auy water ar sewer line connecting the existing municipal system and any
house or buildi.ng for which the application is made,the owner or contractor shall be required.to obtam a
pemiit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After snch
connection has been made,the VJater and Sewer Department shall be natified. It shall be imlawfiil to cover
any connectmg line until an anspection has been made and such connection arid the work incident thereto
has been agproved by the City as a proper and suitable connection.
402.06. REPAIl2S AND MAINTENANGE TO CONNECTION
Aftar the initial conn.ection has been made to the water service curb stop box or the sewer lead at the
property line or a water service or sewer lead has been extended to the property line for cflmiection,�e
applicant,owner,or the occtipant or user of such premises shall be liable for all repairs requited to any
water line and any sewer lines necessary for connection of the premises from the m�n to the premises• If
the property owner requests maintenance services or repairs be performed by the City,the property owner
shall be charged for the costs of the maintenance and/or repairs,including any necessary street repairs,at a
rate set ann.ually by an admin.istrative policy. It shall be the responsbility of the applicant,owner,occupant
or user to'perform standard maintenance of the sewer service line i`rom the premises to the main including
debris clearing ar roat cutting and to maintain the water service curb stop box for operab�7�ity and at such
height as will ensure ti�at it remains abovc the finished grade oftixe land or property. (Ref 638,1156,1191j