Loading...
Meter Swap ` Request Number: 12238 Public Works Division Service Request Problem Address: 290 Ely St Requested By: Isabelle Motzko Department: WATER Address: No address provided Problem/Lcaue: INSTALL AMR METER Phone Number: 763-786-9489 Scheduled D te: 201b-I 1-18 � Sc6ednled'Rme: 11:00:00 d�� �� � ACITON NEEDED:AMIt.Old meter. Created by: Wendy Hiatt Date Created: 2016-11-16 ACIION TAI�N: Status: In Progress Submitter Has Been r Contacted Date Completed: Completed by: �vL-��_�� , Hiatt, 'dVendy . Subject: ISABELLE MOTZKO 763-786-9489 OLDER METER MAYBE STOPPING. INSTALL AMR Location: 290 ELY ST NE Start: Fri 11/18/2016 11:00 AM End: Fri 11/18/2016 11:30 AM Show Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: Hara, Sandra Required Attendees: Hiatt, Wendy 1 City of Fridley Water Department ' 6431 University Avenue NE 4 Fridley, MN 55432 763-572-3566 I/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all irrterior plumbing. (Per City code 402.06) I also hold the City of Fridtey and/its employees ha�mless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand i am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) `��C�l!/ � Name• Address Phone Number Date Signature�a�'�M�""� � Witness Signature ��3�a� S OLD METER# �a� � �'"�' � OLD READING �7 7�P �S� NEW METER# �'I�� 1 n�7� NEW READING �O ERT# � ���l�� FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113.464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for which the application is made,the owaer or contractor shali be required to obtain a permit for such connectio�,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines necessary for connedion of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applicant, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the fnished grade of the land or property. (Ref 638,1156,1191)