Meter Swap ,
,
Request Number: 8820
Public Works Division
Service Request
Problem Address: 572 67th Ave Requested By: Shirley Backstrom
Department: WATER Address: No address provided
Problem/Lssue: INSTALL AMR METER Phone Number: 571-3461
Scheduled Date: 2014-08-21 Scheduled Time: 11:00:00
-S`� � ►
� �
ACTION NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-08-20
ACTION TAI�N:
...................................................................................................................................................................................................................................................................................._................................................._.........._............................_..�..._._..._.__.._
.
__o�.-�......._�.�.-��.._�:..._.......�.��...._�1..._�...`�...................................:........_........................................................._................._.........................._.........................._..........._:
._�,�..........._��:.►��z.,.�.�.....-............_�...�..�7....`�......._�....��.....................:............................_................................................................_........................___.
..........................
1�� �r��.� u�R 2 22 � q
............................................................................................................................................................................................................................................................................................................................................____......._............._.................._._.._........_.
_.._�U�w..........._���:�.�.......�.....�..............:........: , �
........................................._.........................................................._.................................__.__............._...._......._..__.........._..............._................
........���..�............_.t.�,...-�............3�._�.s..�.�.....�_�.............................................__....................................................._.................................... .
Status: in Progress Resident Contacted C�
Date Completed: Complete b : ,
�-2i�C�
Hiatt, W�ndy
Subject: Shirley Backstrom 763-571-3461 AMR install, got 2nd letter
- - �ocation: _.. _ _ . _ _ 572 67fh7�Ve N�-- ___ _ _ _ _ _ . _ . __: ___. __. _
Start: Thu 8/21/2014 11:00 AM
End: Thu 8/21/2014 11:30 AM
Show Time As: Tentative � / � t � '��
t/\J
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: Hara, Sandra
Required Attendees: Hiatt, Wendy
1
� - City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(7fi3)572-3566
I/we hereby authorize the City of Fridley and/or its
employees to do what is necessary to replace the water meter. i understand that the property owner
i�liabie for the water line ftom the main to the premise and afl interior plumbing. (Rer C'ity code _ _ _
402.06) 1 atso hold the Gty of Fridley and/its employees harmless for any amages a may -
while doing this operation. This to include,but not limited to;vaives,piping,walis,floors or the curb
stop box and service line. 1 understand 1 am atso required to obtain a permit Rflo�to anq work�if
necessary. O� ��
Finaf ineter reading{old meter) � �
C -��- /�v�
Name• Address• J�� �
Phone Number: Date: U��l�t �
Signature:.
�tness Signature:
FRIDLEY CITY CODE
C T R 402.WATER,STORM WATER,AND SANITARY SEWER
ADMIN15fRAT10N
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
' 402.05.RERMIT FEE
Prior to constructtng or repair of any water or sewer line conneding the existing municipal system and any hou5e
or 6uilding for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and sha14 pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shali be notified. it shall be unlawful�to cover any connecting line until an
inspection has been made and such connectian and the work incident thereto has been approved by the City as a
proper and suitable connedion.
4U2.06.REPAtRS AND MAINTENANCE T�CONNECTION -
������ .,,a�P tn the water service curh stoa box or the sewer lead at the propert�
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant ar user of such premises shall be liable for all repairs required ta any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the prope[ty owner requests
maintenance service or repairs be performed by the City,the property owner shail be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibiliCy of the applicant,awner,occupant or user to perform standard maintenance of
• the sewer service fine from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
_.. _._ ___.:.. ,. .____�:_.=,�rad�of'the land orproperi�: �Re€�3�,.15:��,1393� . _. . . . _ - __