Meter Swap� Request Number: 8585
Public Works Division
� Service Request
j
Problem Address: 6631 Jackson St Requested By: ATom Heithoff
; Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone N�unber: 612-360-5503
Scheduled Date: 2014-07-31 Scheduled TSme: Ol:30:00
��i�r-s � 1 s7 c� '
ACTTON NEEDED:2013 AMR list
Created by: Wendy Hiatt Date Created: 2014-07-23
ACTION TAI�N:
........:...............................................................................................................................................................................................................................................................................................................................................................................................................
��:�......�.�....��:.�:..........:..................�1..._�7.�.._�...�.�....�'�....................................................................._................................................................
...._c�-.�............�.�.:......��...-.............._...�.C�..�`_�..�_�._�........:..._..............................................................__._..............................................:....._._.__.....................
..._��_�........._��T.._�..�-:�:.........�y9 21�.�3.....................................................:...............................:.................................................:_._. _. _
.. . ................ ...............
.....��.........._�.-�=��:.�._�...-.......�...................:.............................................................................................:......................_................................................................_.._.........................................
........�...R-�:.....�......_3�..1..:....��.....�.:�..._!..�..........................................................................................................................................................................__..............................................:. _. .
5tatus: in Progress Resident Contacted �
Date Completedc Comple d y:
Hours '
�� [���
�
i
� City of Fridley
. _. Water Department . _ _ __
6431 University Avenue NE-
Fridley,MN 55432
(763)572-3566
i/We herehv a�the�tze the.CiL�C.a�£Eii�and/o1'its
employees to do what is necessary to replace the water meter. I understand that the property ovmer
is liable fior the water line from the main to the premise and all interior plumbing. (Per C�ty code
4�2.06) 1 also haid the City of Fridley and/its employees harmless for arry damages that may acur
while doing this aperation. This#o include,but not limited to;+ralves,pipin,g,walls,floors or the curb
stop box and service line. i unde�stand 1 am also required to obtain a permit prior ta any work,if
necessary.
Final meter reading(Md meter) �`�'�" ��O
Name• Address• �ll/J� V ����- ��
Phone Number: Date� � J ` ,
- .
�
Signature•
Witness Signature•
FRIDLEY qTY CODE
CHAPTER 402.WATER,STORM WAIER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE �
Prior to canstructing or repair of any water or sewer line connecting the existing municipal system and any house
or building fo�which the application is made,the owner or contractor shall be required to obtain a permit for such
w�nection,and shall pay a permit fee as pruvided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shali be notified. It shall be unlawFul to cover any connecting line untfl an
inspection has been made and such connection and the work lncident thereto has been approved by the City as a
proper and suitable connection.
40Z.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initlal connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property Ilne for connection,the appflant,:owner,
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines
necessary for connection o#the premises from the main to the premises. If the prop�tty owner requests
maintenance service or repai�s be perfarmed by the qty,the property owner shali be cha�ged for the costs of the
maintenanoe and/or repairs, including any necessary street repairs,at a rate set annually by.an administrative
policy. It shail be the responsibility af the applicant,owner,occupant or user to perfortn standard maintenance of
' the sewer service line from the premises ta the main including debrls clearing or root tutting and to maintain the
water service curb stop box for operability and at such height as wiil ensure that it remains above the finished
� grade of the land oc property. {Ref 638,1156,1191)