Meter Swap .
Request Number: 8118
Public Works aivision
Service Request
Problem Address: 6729 Kennaston Dr NE Requested By: Jeremy Neal
Department: WATER Address: No address provided
Problem(Issue: INSTALLAMR METER Phone Number: 651-260-8715
Scheduled Date: 2014-06-23 Scheduled Time: 02:00:00
�
ACTION NEEDED: Install AMR for Non Responder List
Created by: Sandra Hara Date Created: 2014-06-17
;<;�
ACTION TAKEN:
_........................................................................................................................................_.............,........................................................................................................................_....................................................................._......................._........._............__._.._
�� �5 Z� �I
_.._C7LD......_��-t."�..�-...�..............................._........................_�.........................................................................................................................................................._._........................_..._...�................._.�.
....(�L-D__.f.�-�.��_�...C�....-�....�.:�:��0......:................................................................................................................_ _.
_. ................__.__.................._._..._...._
... ... .. �..f�.�........:..:....... ._.m._:..__�..�.......,�.......���2....�_`.`��............................................................................................................._...................:.._.__._....................�.:......_._
�� ��
� C �r
��J . .........................................................................................................................................................................................__..............:..........__.._.............................._..
..���.................................................`....'..`.....r�...........................
��-� � 3�� 7 ���e�
Status: In Progress Resident Contacted ❑
Date Completed: Comp d by:
i �
r��
�
� - City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(763j572-3566
��We hereby authorize the City of Fridfey and/or its
employees to do what is necessary to replace the water meter. I understand that the propertY owner
is liable for the water line from the main to the premise a�d ali interior plumbing. (Per qty code
402.06) I afso hold the City of Fridley andiits employees harmless for any damages that may occur
while doing this operation. This to include,but not limited to;valves,piping,walis,floors or the curb
stop box and service line. I understand 1 am also required to obtain a permit prior to any work,if
necessary.
Final meter reading(old meter)
�3�Z�t�O
Name: Address• lO� v I .,���-�`'�� �
Phone Number. Date: ��L�� ` r -
Slgnature�
Witness Signature:
,/ FRiDLEY CITY CODE
R A02.WATER,STURM WATER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord Na 113,464,565,566,629,638,662,922,988,1144,1156,1141)
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or buitding for which the application is made,the owner or contractor shal{be required to obtain a permit far such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connectiun.
402.06.REPAIRS AND MAtNTENANCE TO C�NNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line os-a water service or sewer lead has been e�ttended to the property line for connection,the applicant,owner,
or the occupant or user of such premises sha11 be liable for a41 repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shali be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annualiy by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including deb�is clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as wiil ensure that it remains above the finished
grade of the tand or property. (Ref 638,1156,1191)