Meter Swap .
�
Request Number: 8336
Public Works Division
Service Request
Problem Address: 509 Mississippi St. NE Requested By: Melanie Hershey
Department: WATER Address: No address provided
Problemllssue: INSTALLAMR METER Phone Number: 763-571-0618 H
Scheduled Date: 2014-08-27 Scheduled Time: 09:00:00
ACTION NEEDED: Install AMR
Created'b�y: Cheryl PeBegrin Date Created: 201407-03
�
ACTION TAKEN:
,
.......�.�.�.,...........a�e�::.._�...................... ..�.......�...�......��.......`.�..�......................................................................................................................................._..............................................._...........................:...._...
�
_.�..�:............_�:�� .�.......�.... .........................5.:��:...�.:..°.�...........................................................................................:..........................................:............_............................_...................................__..............._
n��............._�_�:....._�-............................._`��_y....._�aa...2.._s�..................:................................................................................................:.
1fk,�.w...................�_!°.`.:�.'.'�:`.5........................:...................�..�.............................................................................................................................:....._............:.__.._..........................._........:...._........._._.......................__._....._.........__..........
� �I..................._�,............................................................:...............:...........:...._3_�I..s.�..._"....7.......��...................__...._.......................:...........:
_......:..........................................................................................._.........................._.._.......__..........................._............................................_...:................._.......................�..._.................................................................................._.._._.........�._._......_............
Status: In Progress Resident Contacted �-
Date Completed: Completed by:
g�2`7 - � `'( _
s
C
- _. _ E��y of Fridley
. --. Water Department . _... .
6431 University Avenue NE-
Fridiey,MN 55432
(763)57Z-3566
I/we hereby authorize the�ty of Fridiey and/or its
employees to do what is necessary to replace the water meter. I understand that the properly owner
is liable for the water line from the main to the premise and ail inte�ior plumbing. (Per City code
40Z.06) I also hold the City of Fridiey and/its employees harmless for any damages that may occur
while doing this operation. This to include,but not limited to;valves,piping,walis,floors or the curb
stop box and senrice line. 1 understand i am aisa required to obtain a permit prior to any work,if
necessary.
Final meter reading(old meter) �O� �'` � � �
Name• Address•
Phone Number:_ Oate:
(- -
�?i��
�
Witnes na
RIDLEY qTY COOE
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.�5.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal sy�tem and any hous.e
or building for which the application ts made,the owner or contractor shall be required to obtain a permit for such
cannection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such conrrection has been
made,the Water and Sewer Department shail be notified. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line ar a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liabie for all�epairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the prop�tty owner requests
maintenance service or repairs be performed by the�ty,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by.an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
� the sewer service line from the premises to the main including debris clearing or root cutting and to ma�ntain the
water service curb stop box for aperability and at such height as wfll ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)