Loading...
Meter Swap " Request Number: 9359 Public Works Division . Service Request Problem Address: 1548 S Bavarian Pass Requested By: Theona Murphy Department: WATER Address: No address provided ProblemfIssue: INSTALL AMR METER Phone Number: 574-1961 Scheduled Date: 2014-11-OS Scheduled 1ime: 08:30:00 �j�� G:J G� ` ACTTON NEEDED:Change stopped meter Created by: Wendy Hiatt Date Created: 2014-11-03 � ACTION TAI�N: _........................................................................................._..........................................._...............................................................................................................,......_......................_....__..._.�..._..�..._...._..........._......._............_..................................._.._.__.__ " �� .............�.I�:.__...._w�.�...�-.tJ._�.....-�.-�...�...._�...�......_�...�-.�....._����...._y...................................._..................._...._...................................._. ,� .. .......:........�..\_.�_�:.............q_.��.v�t�.r"1....�'..._'........:..�........:...'�.�,...�:....`.!i..��...�...�................................................................................�............._..._..........................._...._.._.....�.....__._...._.................._.__...._......................._.. � _..........ti�:,�..........��.�:.:��:....��......�......_�.`�.�....a...:.....�...�_�:;7:.__.__......_...........__...................._...................._..................................................._._._. _._._. _ . . ...... .. ........... ................__._.__._............................... � . , �ewd� �� ...........�'._�:._`�.._____. ................................... ..:.......�.......�........................_. � ...............�..�.:�.......=:�.................._�._�t_7.....:�...`.]....:�.....3....................................................................................................._.._......._.._...�._._. _. £ ... ........................................__..____..........__..........._........_..�. -,P - .x � Status: In Progress Resident Contacted ❑ Date Completed: Completed by: �1� s' �� � � ;���' ��� l ��� �' , f . , � - City of Fridley - -�.: WatPrDppartment . .. ,_., .6...... 6431 University Avenue NE Fridley,MN 55432 (763)572 3566 I/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water fine from the main to the premise and all interior ptumbing. (Per Gty code 4a2.06{ !alsa hold the C�ty of F�idtey and/its employees harmless o�any amages a may�o [r- whiie doing this operation. This to include,but not limited to;vaNes►piping,walis,ftoors or the turb stap bax and service line. I understand i am also required to ohtain a perrt►it Prior to any work,if necessary. Final meter readtng(old meterj �o��� I '�/ Name• Address: � ���y'� S �a ilc�t'+i0.n �G15 5 Rhone Num6er t�' ����`�y Signature: Witness Signature: FRIQLEY CITY CODE �,. CHAPTER 402.WATER,STORM WATER,AND SANI'f'ARY SEWER ADMINISTRATION (Ref Ord No�.131464,565,566,629,fi38,6b2,922,988,1144,1156,1191) ' 402A5.PERMIT FEE Prior to constructing or repair af any water ar sewer li�e connecting the existing municipai system and any house or buiiding fo�which the application is made,the owner or cantractor shal{be required to obtafn a permit for such coanection,and shal!pay a permit fee as pruvided i�Chapte�11 of this Cade. After such connection has been made,the 1Nater and Sewer DePartment shafl be notified. ft shal{be uniawful to cover any connecting line until an inspection has been made and such connection and the work incident thereta has been approved by the City as a proper and suitable connection. 40Z.06.REPAiRS AND MAiNTENANCE TO[ONNECf10N ��b�p����k.,e.,.���o r�ri,p warer servlce curh stop box orthe sewer lead at the propert' line or a water service or sewer�ead has been extended to the property line for cannection,the applicant�owner, ar the occupant or user of such premises shall be liabfe for all�epairs required Co any water tine and sewer lines necessary for cannection of the prernises from the main to the premises. tf the propgCry awner requests maintenance service vr repairs be performed by the Clty,the property owner sha11 be charged for the cnsts of the . maintenance and/or repairs, including any neces�ary street repairs,at a rate set annually by an administrative poticy. It shall be the respansibility of the appficant,awner,occupant or user to perForm standard maintenance af • the sewer service line from the premises to the main includtng debri5 clearing flr roat cutti�g and to maintain the water service curh stop box for operability and at such height as wifl ensure that it remains above the finished . . . _ ,..gracte of�tf�e lassd ar-�rope�ty.�jRe#63�,1�5,_t�gi� .. --