Meter Swap - �t�q�ft�r�r� ��.
� �iiy►of FriicN�r
_ s�t�-��-� €�: t.�zn��
�T�: �c�r �►� .
. wa�es f�!�: �w Par�d�
�: �#E FA'�1� �aba�ic Phme� �12-2"8���96
:�duted�: 1l�7�17�I�M�.— �op�ely{3w�er_
��: I Ve�� ��: T��.��
��.
�`� � �
��.
���i ��ter# ��,�j� Q C� f� _
..., ,
���d��re��dir�g� `� ��;, ��� _ `.. ..
� h�e�v �A��r# �l�it�,�, l�`i �� �� � �
N�nr ��ading: �
,��-� -�y �--� --��, �8
����
� �______ _..
. ���� r� �
. � —�
_�_ �_____. _a ,.
Hiatt, Wendy
From: Hara, Sandra
Sent: Tuesday, January 22, 2013 3:04 PM
To: Hiatt, Wendy
Subject: Appt scheduled to turn meter around
i scheduled an appointment to turn around a backwards meter at 5474 East Brenner Pass NE on Tuesday January 29th at
11am. 1'he meter is from 1980 so they can install an AMR as long as they are there. Drew Pandolso is owner and his
phone#is 612-280-1998.
I put it on the calendar.
Sandi Hara
City of Fridley
Utility Billing
763-572-3529
�
- City of Fridley
Water Department
_
6431 University Avenue NE
Fridiey,MN 55432
(763)572-3566
1/we hereby authorize the City of Fridley and/or its _
employees to do what is necessary to replace the water meter. I understand that the property owner
is liable for the water{ine from the main to the premise and all interior plumbing. (Per City code
402.06) I also hold the City of Fridley and/its employees harmless for any damages that may occur
whife doing this operation. This to include,but not fimited to;�alves,piping,walls,floors or the curb
stop box and service line. 1 understand I am also requtred to obtain a permit prior to any work,if
necessary.
Ftnal meter reading(old meter)
Name: Address: �y'7 y � �l''�I1 I�1�P� C�S
Phone Number: Date•
Slgnature:
Witness Signature:
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER�ANQ SANITARY SEWER
ADMINISTRATIUN
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144, 1156,1191)
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipai system and any house
or building for which the application is made,the owner or contractor shall be required ta obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shail be unlawful Co cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06. REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,ihe applicant,owner,
or the occupant or user of such premises shall be liable for atl repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annuaNy by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
• the sewe�service line from the premises to the main including debris clearing or root cutting and to maintain the
water se�vice curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)