Loading...
Meter Swap . E Request Number: 6395 Public Works Division Service Request Problem Address: 6767 7th St Requested By: John Zurawski Department: WATER Address: No address provided Problem/Issue: INSTALL METER(WATER) Phone Number: 763-571-7423 , Scheduled Dat : 201 08-07 w Scheduled Time: 08:00:00 !-� ACTION NEEDED: 2013 AMR Prgm Created by: Wendy Hiatt Date Created: 2013-07-11 ACTION TAKEN: ..................................................................................................................................................................................................................................................................................................................................:.................._....__...._._..........................._................._ �_�...............�._�._:+��....�:.............................................1........�.�:._�..._1..._v...._`.-./...3......................................................................................................:_......�_....................__. .._ ............... o._I._d..................._l ea��'�.�............................................................._�...v $ � �7 U ............................... . ..................................................................................................................................................................................._..._.......................__......._............._ I1�v�............_�e:_-E-�....._....�..................................:...............�.��°�.:._�......._�.._�a.....�...................................................... (I ew v e��;�q ......................................................................................................................................................................�..........................................................................................._._. .. ................................................................._....................................._......._ _....��..�........_:�:.:.......................................:...............................:�:.....�...:�.a...._�..._�_`��......................................:.....................................:......................................_...._..:........_..__......_.._._:..._ Status: In Progress Resident Contacted �- Date Completed: Completed by: � � � � ` � � Hiatt, Wendy Subject: John Zurawski, 763-571-7423, AMR @ 8:00 AM Location: 6767 7th St NE Start: Wed 8/7/2013 8:00 AM End: Wed 8/7/2013 8:30 AM Show Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: White, Karen Required Attendees: Hiatt, Wendy 1 � , . • - City of Fridley Water Department 6431 University Avenue NE Fridley,MN 55432 (763)572-3566 ��We hereby authorize the City of Fridiey and/or its , empioyees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 402.06) I also hold the City of Fridley and/its employees harmless far any damages that may occur while doing this operation. This ta inctude,bat nat limited to;valves,piping,walis,fioors or the curb stop box and service line. 1 understand 1 am also required to obtain a permit prior to any work,if riecessary. Final meter reading(old meter) � � � � � Name: Address: Phone Number: Date� U � r � ,.�.__.. _ . C . Signature: \ Witness iginature: FRIDLEY CITY CODE - CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER � ADMINISTRATI�N (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.05. PERMIT FEE Prior to constructing ar repair of any water or sewer line connecting the existing municipai system and any house ar building for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shaA be unlawful to cover any connecting line until an inspection has been made and such cannection and the work incident thereto has been approved by the City as a proper and suitable cannedion. 402.06.REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer(ead at the property line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner, or tf�e occupant or user of such premises shall be liable for all�epairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance senrice or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of • the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)