Meter Swap .
E
Request Number: 6395
Public Works Division
Service Request
Problem Address: 6767 7th St Requested By: John Zurawski
Department: WATER Address: No address provided
Problem/Issue: INSTALL METER(WATER) Phone Number: 763-571-7423 ,
Scheduled Dat : 201 08-07 w Scheduled Time: 08:00:00
!-�
ACTION NEEDED: 2013 AMR Prgm
Created by: Wendy Hiatt Date Created: 2013-07-11
ACTION TAKEN:
..................................................................................................................................................................................................................................................................................................................................:.................._....__...._._..........................._................._
�_�...............�._�._:+��....�:.............................................1........�.�:._�..._1..._v...._`.-./...3......................................................................................................:_......�_....................__. .._
...............
o._I._d..................._l ea��'�.�............................................................._�...v $ � �7 U
............................... . ..................................................................................................................................................................................._..._.......................__......._............._
I1�v�............_�e:_-E-�....._....�..................................:...............�.��°�.:._�......._�.._�a.....�......................................................
(I ew v e��;�q
......................................................................................................................................................................�..........................................................................................._._.
.. ................................................................._....................................._......._
_....��..�........_:�:.:.......................................:...............................:�:.....�...:�.a...._�..._�_`��......................................:.....................................:......................................_...._..:........_..__......_.._._:..._
Status: In Progress Resident Contacted �-
Date Completed: Completed by:
�
� � � ` �
�
Hiatt, Wendy
Subject: John Zurawski, 763-571-7423, AMR @ 8:00 AM
Location: 6767 7th St NE
Start: Wed 8/7/2013 8:00 AM
End: Wed 8/7/2013 8:30 AM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: White, Karen
Required Attendees: Hiatt, Wendy
1
� , .
•
- City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the City of Fridiey and/or its
, empioyees to do what is necessary to replace the water meter. I understand that the property owner
is liable for the water line from the main to the premise and all interior plumbing. (Per City code
402.06) I also hold the City of Fridley and/its employees harmless far any damages that may occur
while doing this operation. This ta inctude,bat nat limited to;valves,piping,walis,fioors or the curb
stop box and service line. 1 understand 1 am also required to obtain a permit prior to any work,if
riecessary.
Final meter reading(old meter) � � � � �
Name: Address:
Phone Number: Date� U � r �
,.�.__..
_ . C .
Signature: \
Witness iginature:
FRIDLEY CITY CODE -
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER �
ADMINISTRATI�N
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05. PERMIT FEE
Prior to constructing ar repair of any water or sewer line connecting the existing municipai system and any house
ar building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shaA be unlawful to cover any connecting line until an
inspection has been made and such cannection and the work incident thereto has been approved by the City as a
proper and suitable cannedion.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer(ead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or tf�e occupant or user of such premises shall be liable for all�epairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance senrice or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)