Meter Swap Req uest N u m ber: 6293
Public Works Division
Service Request -
Problem Address: 6858 7th St Requested By: Marvin Mickelsen
Department: WATER Address: No address provided
Problem/Issue: INSTALL METER(WATER) Phone Number: 763-5741092
Scheduled Date: 2Q13-06-26 Scheduled Time: 10:00:00
c� �- a-
ACTION NEEDED: AMR-2013 AMR Program
Created by: Wendy Hiatt Date Created: 2013-06-25
ACTION TAKEN:
.....:......................................................................................................................................................................................................................................................................................................................................................................._....._..__..._......................
� � � 3 5��� ��.5�.
................................................................................................................................................................................................................................................................................................................................................................................._._.....................................
o L� r-�� c �)6$ �[o
................................................................................................................................................................................................................................................................................................................................................................................................._.._...................
n� � ��I �����
..............................................................................................................................................................................................................................................................................................................................................................................................._...._._...._....
� �� �
. ... ................................................................................................................................................................................................................................................................................................................................................................................................
�T� .........:,�..�.I..._a......��......-�....�..,5�...................................................................................................................................................................._......................................................_..................._............._.........................._
Status: In Progress Resident Contacted �
c
Date Completed: �`,`� Completed by:
� �,,� �7 `L��:
Hiatt, Wendy
Subject: Marvin Mikkeisen 763-574-1092 AMR install 10am
Location: 6858 7 St NE
Start: Wed 6/26/2013 10:00 AM
End: Wed 6/26/2013 10:30 AM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: Hara, Sandra
Required Attendees: Hiatt, Wendy
1
. � .
.
- City of Fridley
Water Department
__ ___
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the City of Fridley and/ar its
employees to do what is necessary to replace the water meter. i understand that the property owner
is liable for the water line from the main to the premise and all interior plumbing. (Per City code
402.06) 1 also hoid the City of Fridtey andJits employees harmless for any damages that may occur
;''�� whi{e doing this operation. This to include,but not limited to;valves,piping,walis,floors or the curb
'F stop box and service line. I understand t am also reqaired to obtain a permit qrior to any work,if
necessary.
Final meter reading(old meter) � �
Name: ' Addcess:
Phone Number. Date•
Signature:
Witness Signature:,
i!1/ •V
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATIUN
(Ref Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191)
402.05.PERMtT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the appl+cation is made,the owner or contractor shall be required to obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the VNater and Sewer Department shall be notified. It shail be unlawful to cover any connecting lir�e antil an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.Q6.REPAIRS AND MAINTENANCE TO CONNECt10N
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shali be liable for a(I repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the propeety owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annualfy by an adminisCrative
poticy. It shall be the responsibility of the appiicant,awner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water sen►ice curb stop box for operability and at such height as wiil ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191}