Meter Swap Request Number: 6383
Public Works Division
Service Request
Problem Address: 6873 7th St Requested By: Lawrence Doth
Department: WATER Address: No address provided
Problemllssue: INSTALL METER(WATER) Phone Number: 763-571-1821
Scheduled Date: 2013-07-11 .� Scheduled Time: 10:30:00
� � �l. ' � � �4�d
ACT{ON NEEDED: 2013 AMR Prgm
Created by: Wendy Hiatt Date Created: 2013-0?-11
ACTION TAKEN:
.......................................................................................................................................................................................................................................................................................................
..._�../1'1.�-z........"�.-�-:�..........._-:......................`�:...��_C�.._��-:1_C�.�......................__.............................,:........................................_.........:.......................................... :
_.......�
_ _ � ��d ��o
_......._Q..:�.-.�.........`�.�.:�:!�......................................................................................................................�.-.......................................................................:..............:.....................................................................__.............._
�� �z- �- �:.....-..........._�_`�.��1 ��j 1._`�.............................:........................:................................:...........:......__............_......:................_:.......................
..........,.J.�............................................................�...............
.:.........�(,����........_'��',�.._►�.m.-.-..............�....................................:...............................................:. .............__...........:..:............................................................._.__
................................_...............................
.............................��-�-�......._:�.....�..............�_`�._a�..._`�_�..��I................................................................................................................_.........................:..................._.........._................_.
Status: In Progress Reside�t Contacted �
Date Completed: Comple by:
� � � � ~ ��
�
Hiatt, Wendy
Subject: Lawrence Doth, 763-571-1821, AMR @ 10:30 AM
Location: 6873 7th St NE
Start: Thu 7/11/2013 10:30 AM
End: Thu 7/11/2013 11:00 AM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: White, Karen
Required Attendees: Hiatt,Wendy
1
City of Fridley
� • - � Water Department
6431 University Avenue NE
Fridley, MN 55432
(763)572-3566
��We hereby authorize the City of Fridley and/or its
employees to do what is necessary to replace the water meter. 1 understand that the property owner
is liable for the water line from the main to the premise and all interior plumbing. (Per City code
402.06) (a(so hold the City of Fridley and/its employees harmless for any damages that may occur
while doing this operation. This to include,but nat limited to;valves,piping,walls,floars or the curb
� stop box and service line. I understand 1 am also required ta obtain a permit prior to any work,if
necessary.
Final meter reading(old meter�
� �� ��Q
Name: Address:^ ��� ` � ���
Phone Number• � e' �� '_ '� '
S
. Witness Signature:
FRIDLEY CITY CODE
CHQPTER 40Z.WATER,STQRM WATER,AND SANITARY SEWER
ADI1111N15TRATION
(Ref Ord Na 113,464,565,566,629, 638,662,922,988,1144,1156,1191)
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permitfor such
seflnes�ien,an�'�^.a�,J��^,°rmifi fPP aG rovided in Chapter il of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connec ing�in ���
inspection has heen made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.Ofi. REPAIRS AND MAINT�NANCE TO CONNECTION
After the initial connection has been made to the water service curh stop box or the sewer lead at the property
line or a water se�vice or sewer lead has been extended to the property line for connection,the applicant,awner,
or the occupant or user of such premises shall be liable for all repairs required to any v�rater line and sewer fines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs he performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a�ate set annualty by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard►naintenance of
the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191�