Loading...
Meter Swap Request Number: 6383 Public Works Division Service Request Problem Address: 6873 7th St Requested By: Lawrence Doth Department: WATER Address: No address provided Problemllssue: INSTALL METER(WATER) Phone Number: 763-571-1821 Scheduled Date: 2013-07-11 .� Scheduled Time: 10:30:00 � � �l. ' � � �4�d ACT{ON NEEDED: 2013 AMR Prgm Created by: Wendy Hiatt Date Created: 2013-0?-11 ACTION TAKEN: ....................................................................................................................................................................................................................................................................................................... ..._�../1'1.�-z........"�.-�-:�..........._-:......................`�:...��_C�.._��-:1_C�.�......................__.............................,:........................................_.........:.......................................... : _.......� _ _ � ��d ��o _......._Q..:�.-.�.........`�.�.:�:!�......................................................................................................................�.-.......................................................................:..............:.....................................................................__.............._ �� �z- �- �:.....-..........._�_`�.��1 ��j 1._`�.............................:........................:................................:...........:......__............_......:................_:....................... ..........,.J.�............................................................�............... .:.........�(,����........_'��',�.._►�.m.-.-..............�....................................:...............................................:. .............__...........:..:............................................................._.__ ................................_............................... .............................��-�-�......._:�.....�..............�_`�._a�..._`�_�..��I................................................................................................................_.........................:..................._.........._................_. Status: In Progress Reside�t Contacted � Date Completed: Comple by: � � � � ~ �� � Hiatt, Wendy Subject: Lawrence Doth, 763-571-1821, AMR @ 10:30 AM Location: 6873 7th St NE Start: Thu 7/11/2013 10:30 AM End: Thu 7/11/2013 11:00 AM Show Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: White, Karen Required Attendees: Hiatt,Wendy 1 City of Fridley � • - � Water Department 6431 University Avenue NE Fridley, MN 55432 (763)572-3566 ��We hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 402.06) (a(so hold the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,but nat limited to;valves,piping,walls,floars or the curb � stop box and service line. I understand 1 am also required ta obtain a permit prior to any work,if necessary. Final meter reading(old meter� � �� ��Q Name: Address:^ ��� ` � ��� Phone Number• � e' �� '_ '� ' S . Witness Signature: FRIDLEY CITY CODE CHQPTER 40Z.WATER,STQRM WATER,AND SANITARY SEWER ADI1111N15TRATION (Ref Ord Na 113,464,565,566,629, 638,662,922,988,1144,1156,1191) 402.05. PERMIT FEE Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house or building for which the application is made,the owner or contractor shall be required to obtain a permitfor such seflnes�ien,an�'�^.a�,J��^,°rmifi fPP aG rovided in Chapter il of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connec ing�in ��� inspection has heen made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.Ofi. REPAIRS AND MAINT�NANCE TO CONNECTION After the initial connection has been made to the water service curh stop box or the sewer lead at the property line or a water se�vice or sewer lead has been extended to the property line for connection,the applicant,awner, or the occupant or user of such premises shall be liable for all repairs required to any v�rater line and sewer fines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance service or repairs he performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a�ate set annualty by an administrative policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard►naintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191�