Loading...
Meter Swap �*"��' �,`,` ,� ;. � v r� �t � ���� � �� + $s � �� ��&� � h � � " � '��` Old Meter Nuxnber � � ��'�� Old Meter Reading ��`v Replacement No. d ` � �+�� Replacement Reading � Replacement Make 0. _ ERT# Replacement ERT# Remarks: f1' Signed Request Number: 6443 Public Works Division Service Request Problem Address: 540 68th Av�e Requested By: Brad Bulger Department: WATER Address: No address provided Problemllssue: INSTALL METER(WATER) Phone Number: 763-571-9299 Sch d led Date: 20 3-07-22 �o( Scheduled Time: 07:30:00 � � ` ACTION NEED : 2013 AMR Prgm Created by: Wendy Hiatt Date Created: 2013-07-17 ACTION TAKEN: _.................................................................................................................................................................................................................................................................:.............................................................................................................._....................................... c�� — ��� l `�� `-�� ...._��-J..�:�..................................................................................................................................................................................................................... ..........................................................................._. . _:......:�....���:.+..�_-........................._��...C...�...`�.`..�.......................................................:.........:............ ..:...................................................: _..........���....._m�rz..�:..�._-............................:.,.:.:.................:':................................:....................::.............���.::��R,.A�.�:.�.............................................._ �J������� � ................ .. ........................................................................................................................................................................................................................................................................................................................................................................................... _......:....................-��.�....:-�....-.........................._�:�_�...��....:._�.�._1.....................:...............................:.....:.......................�.......:..................:........................:. _. ............ ........................................ Status: In Progress Resident Contacted ❑ Date Completed: Completed by: �-��� �� t Hiatt, Wendy Subject: Brad Bulger, 763-571-9299, AMR @ 7:30 AM Location: 540 68th Ave NE Start: Mon 7/22/2013 7:30 AM End: Mon 7/22/2013 8:00 AM Show Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: White, Karen Required Attendees: Hiatt, Wendy � 1 , i ` - City of Fridtey Water Department 6431 University Avenue NE Fridiey,MN 55432 (763?572-3566 i/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line firom the main to the premise and alf irrterior plumbing• (Per Cit11 cade 402.06) 1 also hald the City of�ridley andjits employees harmless for any damages that may occur whife doing this oper�aUon. 7his to include,but not limited to;valves,ptping,walls,fluurs or the curb stop box and service line. I understand I am aiso required to obtain a permit prior ta any work,if necessary. Final meter reading(old meter) ����� `�-' Name. Address• *� `� 'E-�'�'--� Phone Number: Date: ���/'� `� Signature: r � Witness Signature: FRIDLEY CITY CODE CHAPTER 40Z.WATER,STt�RM WATER,ANO 5ANtTARY SEWER ADMINISTRATIUN (Ref Ord No 113,464,565,566,624,638,662,922,988, 1144,1156,1191) 402.Q5.PERMIT FEE Prior to constructing or repair of any water or sewer line cannecting the existing municipal system and any house o�buiiding for which the application is made,the owner or contractor shall 6e required to obtain a permit fior such connection,and shafl pay a permit fee as pravided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shait be unlawfu{to cover any cannecting line until an inspection has been made and such connection and the wo�k incldent thereto has been app�oved by the Gity as a propec and suitable connection. 402.06.REPAIR5 AND MAINTENANCE TO CONNECTION After the initlaf connection has been made to the water service curb stop bax or the sewer lead at the property Iine or a water service or sewer lead has been extended to the property line for connection,the applicant,owner, or the occupant or user of such pcemises shail be liabie for all�epairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenanee service or repairs be performed by the�ty,the property owner shaif be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annualiy by an administrative poticy. ft shalf be the responsibi{ity of the app4icant,owner,accupant or user to perform standard maintenance of • the sewer service line from the premises to the main including debris dearing or root cutting and ta maintain the water se�vice curb stop box for operability and at such height as wiii ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)