Meter Swap �-a,-I�--
`��a�,s`�a��
Request Number: 6891
Public Works Division
Service Request
Problem Address: 6521 Cbv+er PI Requested By: Dave Linton
Department: WATER Address: No address provided
Problemllssue: INSTALL N�TER Phone Number: 651-375-2589
Scheduled Date: 2013-09-05 Scheduled Time: 07:00:00
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-09-04
� �
ACTION TAKEN:
Old meter#28833771 Old readin 551 20 New meter#44922434 ER7#35159533
Status: Completed Resident Contacted ❑
Date Completed: 2013-09-05 Completed by: Pete Gunderson
Hours
�
��
Request Number: 6891
Public Works Division
Service Request
Problem Address: 6521 Clover PI Requested By: Dav�e Linton
Department: WATER Address: No address provided
Problemllssue: INSTALL METER(WATER) Phone Number: 651-375-2589
Scheduled Date: 2013-09-05 Schedufed Time: 07:U0:00
-� � �, � �,,y.�
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-09-04
ACTION TAKEN:
....................................................................................................................................................................................:...................................................................................................................................................................................................................................
_..............._�_��-�r�..-..�........_-....:..................�._�..`�►. .....�.�...�.........��...�1....~�...._.1...................:.:..................................................................._..............._.......................................
�,�,�, �—P�catu(,, j�j� `7 �
_........ ......................................................... .......................................................................................................... ................................ ..............................................................................................................._......................._.........:..............
_..........._,�_�,�........��--z�;-�:.�........................`.-�._`�.�aa�l 3�1.....................:..............................................................:.......:.__...................:.
_.....:........,���-t�s:......_1�......�.c._�L.-..................._4�................................................:...............:.......:.........................................................................::..................__.................................:. _. . .
........ ........................
_..............................��:.7....�.................................:....35 t..5.._a._�_3`�3........................................................................:................................................................................................__._........
Status: In Progress Resident Contacted ❑
Date Completed: Comp d by:
�� � I
� ,
- City af Fridley
Water Department
6431 University Avenue NE
_._ ___ Fridiey,MN 55432
(7b3)572-3556
I/we hereby autharize the City of�ridtey and/ar its
employees to da what is necessary to replace the water meter. i understand that the property own�r
is liable far the water line from the main to the p�emise and afl interior plumbing. (Per City code
402.06) i also hold the City of Fridiey and/its employees harmless for any damages that may ixcur
while doi�g this operation. This to inctade,hut not limited to;vatves,piping►walis,flaors 4r the curb
stop box and service line. 1 understand!am also required to obtain a permit prior to any work,if
necessary. �� � �%��
1�
F1nal meter reading(old meter) ��w � / �
a L
Name�
Address• �� �`�'��,
Phone Number• Date: �� J�1�
Signature: �� �
Witness Signature:
FRIDLEY CITY CODE
CHAPTER 402.WATER,ST�RM WATER,AND SANITARY SEWER
ADMINISTRATICEN
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191} - _ -
402.05. PERMIT FEE
Priar to constructing or repair of any water or sewer line connecting the existing municipat system and any house
or building for which the apptication is made,the owner or contractor shaii he required to vbtain a permit for such
connection,and shall pay a permit fee as provided in Chapter li of thi$Code. After such connection has been
made,the iNater and Sewer Department shall be notified. It shall be uniawful to cover any connecting line until an
inspection has been made and such cannection and the wo�k incident thereto has been approved by the City as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or 5ewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shail be liable for alt repairs required to any water line and sewer lines
necessary for connection uf the premises frorn the main to the premises. If the praperty owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annual(y by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance af
• the sewer service line fram the premises to the main including debris dearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref b38,2156,1191}