Meter Swap `�
_ ��
� �
/ �
-�-� Request Number: 6859
Public Works Division
Service Request
Problem Address: 6578 Cbver PI Requested By: John Atkinson
Department: WATER Addreas: No address provided
Problemllssue: INSTALL AAETER Phone Number: 5741153
Scheduled Date: 2013-0&30 Scheduled Time: 11:00:00
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-08-30
ACTION TAKEN: �
Old meter#97132695 Old reading 1882 80 New meter#44922502 ERT#35159036
...................... ...._��_._�_._ ._.___.____..__.__ ..._...................._........_._.__.._...._._._._._ .�....._._.___�
Status: Completed Residerrt Contacted O
Date Compieted: 2013-08-30 Corr�leted by: Pete Gunderson
Hours
�
Rs3g
Y
Request Number: 6859
Public Works Division
Service Request
Probkm Address: 6578 Clo�ner PI Requested By: John Atkinson
Department: WATER �uldress: No address provided
Problemlissue: INSTALL METER(WATER) Phone Number. 5741153
Scheduled Dat • 2013-08-30 Scheduled Time: 11:00:00
� _ x��
�
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-0&30
ACTION Ti4KEN:
................................................................._..........................................................................................................................................................................................................................._........_.._._...................._......................_......._........................._.................
,
...... .... .
...._o...�._�-.-����-..................................................._�...I'�...�.`�.._�....:.......................:......_..:........._....................__......__......_...__...._..:......................_. _. _._._
::...:��.�����.�............................................_j..�..��'�....��.�....��._............_....._.....:....................._...............:................__......._.............................................................._...._
,.....:...�.�_m�.-�.-�........ _�_�._�...�.....�.._�_�a........................................................._...........................................�.........................: .
..........................
_............�u�.....��._���.........................�..................:........................_............:............................:.
......................................................................................................................_........................................
....................................�--�...._�.-::..................._�_�.�...�:.._`�o_��...................................:.......:...:.:..._�....._...................................................:...............:.����......W.:_...T................._
Status: In Progress Resident Contacted ❑
Date Completed: Completed by:
_ �
� �
r
� ,.
City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the City of Fridley and/or its
employees ta do what is necessary to repiace the water meter. i understand that the property owner
is liable for the water line from the main to the premise and a!I interlor piumbing. (Per City code
402.Q6) 1 also hotd the City of Fridley and/its employees harmless for any damages that may occur
while doing this operation. This to include,but not iimited to;valves,pipjng,walls,flours or tf�e curb
stop box and service line. 1 understand t am also�equired to obtain a permit prior to any work,if
necessary.
Finat meter reading(old meter) � ��� ���
Name: Address: IE1��� 1 ���� ��
Phone Number: Date: (���'' ��,._...
� , ;��:;.�
5ignature•
Witness Signature:
FRIDLEY CITY CODE
CHAPIER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATION �`�
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144, 1156,1141�
402.05. PERMIT�EE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any hous.e
or building for which the apptication is made,the owner or contractor shail be required to obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connectton has been
made,the Water and Sewer Department shali be notified. It shal!be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitahle connection.
402.06. REPAIRS AND MAINTENANCE t0 CONNEC7lON
After the initiai connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended tothe praperty tine for connection,the applicant,owner,
or the occupant or user of such premises shall be liable for ail repairs requireci to any water(ine and sewer lines
necessary for connection of the prernises from the main to the premises. If the propetty owner requests
maintenance service or repairs be performed by the City,the property owner shalt be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. it shall be the responsibility of the appiicant,owner,otcupant or user to perform standard maintenance of
� the sewer service line from the premises to the mairt induding debris clearing ar root cutting and to maintain the
water service curb stop box for operability and at such height as wiil ensure that it remainsabove the finished
grade of the tand or property. (Ref 638,1156,1191)
. , �
���u