Loading...
Meter Swap �j � x l � � � Re uest Number: 6857 S� �� q Public Works Division Service Request P�oblemAddress: 775 Mississippi St Requested By: Steve Baker Department: WATER Address: . No address provided ProblemJlssue: INSTALL METER Phone Nurr�ber: 571-2076 Scheduled Date: 2013-09-04 Scheduled Time: 10:00:00 ACTION NEEDED: 2013 AMR Created by: Wendy Hiatt Date Created: 201�08-30 ACTION TAKEN: �d meter#36720121 Old reading• 604 30 New meter#44922424 ERT#35159532 Status: Completed Residerrt Contacted ❑ Date Completed: 2013-09-04 Completed by: Pete Gunderson Hours V � �� ♦ s Req uest N u m ber: 6857 Public Works Division Service Request ProblemAddress: 775 Mississippi St Requested By: Stev�e Baker Department: WATER Address: No address provided Problemllssue: INSTALL METER(WATER) Phone Number: 571-2076 . Scheduled Da : 201 09-04 C�.�_ Scheduled Time: 10:00:00 4'•� � �1 ACTION NEEDED: 2013 AMR Created by: Wendy Hiatt Date Created: 2013-08-30 ACTION TAKEN: _..................................................................................................................................................................................._................................................................................................................................................._............_.................__._........_.._...........__............ _....�...�.�n..��-�.-.�:...........-.................................�...�...��.,�.._.......�....�......_.I_....�.._�........_.........................._..................................:............................._........... ���v� � ba��� ��� _.._c��..........�.....�............................................................................................................................................................................................................................................................................_._.........................._.__._._........................._............_ _..........�_�.._�.E�.-��--�.-...._�.-........................_��-.-�`�..�.._�._�-:1'._�.�...:................_........................................................................................:...........:............:......:..._ _......._�.�......_��..._���..........:............._�...............:.......................:...................................................................................................................................: ...................................................._..__.................._ _..........................:.........:......_�".._�......................_�_�.�...�..�...�_�.�..:..................................:.....:.................:............................_................__.._._�... _.�._ Status: In Progress Resident Contacted � Date Completed: Completed by: �L(.. �� � J . _ City of Fridley Water Department 6431 University Avenue NE - Fridley,MN 55432 (763)572-3566 ��We hereby authorize the City of Fridley and/or its oWner employees to do what is necessary to replace the water meter. I understand that the property is liable far the water line from the main to the premise and al��ss for�an'dam,a�es that may occur 402.06) I also hold the City of Fridley and/its emploYees harmle Y while doing this operation. This to inciude,but not limited t obtain a�perm t/priur to any wo k e f urb stop box an d service line. 1 u n d e r s t a n d I a m a l s o r e q u i r e d t o necessary. � Final meter reading�old meter) V Name• Address: ��� �'�,�1 . Date: `w�✓i� Phone Number. Signature: .r-- Witness Signature: FRIDLEY CI'TY CODE CHAPTER 402.WATER.STORM WATER�AND SANITARY SEWER ADMINISTRATIDN (Ref Ord No 113,454,565,566r 629,638,662,922,988,1144,1156,1191) _ _ 402.05.PERMIT FEE Prior to constructing or repair of any water ar sewer line connecting�t shall be equiredto'bt in a perm'rt for such or buiiding for which the application is made,the owner or contract connection,and shall pay a permit fee as prol�be not f ed.tit shail be unlawful to cover any conne'cti g lineeuntil an made,the Vllater and Sewer Department sha �oved h the City as a tnspection has been made and such connection and the work incident thereto has been app Y proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stopine forrconnect onI the appficantpovi►ner, line or a water service or sewer lead has been extended to the property or the occupant or user of such premises shall be fiable for all�epairs required to any wate��ne�nduestsef��nes necessary for connection of the premises fram th�e Ci n tthe p operty owlne shati be harged for he costs of the maintenance service or repairs be performed by th tY, maintenance and/or repairs, including any neces5ary�w e�t occupant or user to perform sta da d ma ntenaince of policy. It shall be the responsibility of the applicant, • the sewer service line from the premises to the mai c�nn�dn adebii ensure hat t ema ns above the fin shed he water service curb stop box for operability and at su g grade of the tand or property. (Ref 638,1156,1191}