Meter Swap �.j-I (o
1-i�,��5 -�f�'sS�`-�v
Request Number: 6496
Public Works Division
Service Request
Problem A�ddress: 6870 Monroe St Requested By: Joan Maznio
Department: WATER Address: No address provided
Problemllssue: INSTALL ME7ER Phone Number: 571-4015
Scheduled Date: 2013-07-29 Scheduled T1me: 10:00:00
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-07-24
ACTION TAKEN: �
Old meter#86445893 Old reading 18 80 New meter#44248424 New reading: 0 ERT#35191539
Status: Completed itesident Contacted ❑
Date Completed: 2013-07-29 Corrq�ieted by: Pete Gunderson
Hours
� �� �
Request Number: 6496
Public Works Division
Service Request
Problem A�ddress: 6870 Monroe St Requested By: Joan Maznio
Department: WATER Address: I�b address provided
Problem/Issue: INSTALL METER(WATER) Phone Number: 571-4015
Scheduled Date: 2013-07-29 � Scheduled Time: 10:00:00
���
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-07-24
ACTION TAKEN:
..........................................................:.................................................................................................................:......................................................._...._....._._....._..._...................................................................,............_............._............................................._
_...........��................. .......... -:�_�-...._�..-.......................... ....:..�...._�._�-:�....._�.�..�._�......:...........................................:...__.._..___._....�_.........................__......_
�� �
_..�._o�.��...........2�_1�......�..........................................C...�....��b:.._��.�..............:..................................................................._�.
. ................................................._
_........1�:.�-�...._�'��:.�_..._.~...-............�'�_��.....�..�......��......_�..`..'_�...�L,........................................................................................................:.....:._..........................................:.._
_ -
............::�!�.:....���.................:..�.................................:.............:...:.............._._.._..._...................._...:...................................:..................:....:....................................._......_..._..........:...........................
..........:......................�"......��..........�..._..::�...............�................3.5�:.�....._�.....�...�9.......................................:.......................................................:.....:.........:.....:........................_....................:._......�.
Status: In Progress Resident Contacted ❑
Date Completed: Completed by:
����� �
�
, � � - City of Fridley
` Water Department
6431 University Avenue N�
Fridley,MN 55432
(763)572-3556
IJwe hereby authorize the City af Fridley andJor its
employees to do what is necessary to replace the water_meter. I understand that the property owner
is liable for the water line from the main to the premise and ail interior ptumbing. (Per City cade
402.06j I also hofd the City of Fridley and/its employees harmless for any damages that may occur
while doing this operation. This to include,but not limited ta;vafves,piping,wa{{s,floors or the curb
stop box and service tine. I understand 1 am alsa required to obtain a permit prior to any work,if
necessary. ����
Ftnal meter readin old meter} ��
ef
Name. Address:,, (t'�_Tl [U� 1 e `�-�'��
Phone IVumber: Date� ` ���`—�,�___?----
Stgnature.
Witness Signature:
FRIDLEY CITY CODE
CHAPTER A02.WATER,STORM WATER�AND SANiTARY SEWER
ADMINISTRA7i�N
(Ref Ord fVo 113,464,565,566,629,638,662,922,988, 1144,1156,1191)
402.QS.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which tfie application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shait pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be untawfui to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.a6.REPAIRS AND MAINTENANCE TO CONNECTION
Afterthe initial connection has been made to the water service curb stop box or the sewer lead at the p�operty
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shafl be liable for atl repairs required to any water tine and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be perfarmed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibility of the applicant,awner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing vr raot cutting and to maintain the
water service curb stop box for operability and at such height as wifl ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191}