Meter Swap ��-��
��g3S-y��`��
Request Number: 7028
Public Works Division
Service Request
Prob{em A�ddress: 6534 Oaldey�r Requested By: James Tauer
Department: WATER A�ddress: No address provided
Problemlissue: INSTALL MEIER Phone Number: 571-5921
Scheduled Date: 2013-09-24 Scheduled Time: 10:00:00
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-09-23
ACTION TAFCEN: �
Oid meter#84619129 Old readin . 290 New meter#44922360 ERT#35172445
..............._.._..._..._.�.__....._..._._ .... ..._....._..�........_......_.._..................�.........._...___�.._�..........._..._.. ..._.__.__. __......_
Status: Completed , Resident Contacted ❑
Date Completed: 2013-09-24 Completed by: Pete Gunderson
Hours
�1173
.
.
Request Number: 7028
Public Works Division
Service Request
Problem Address: 6534 Oakley Dr Requested By: James Tauer
Department: WATER Address: No address provided
Problemllssue: INSTALL METER(WATER) Phone Number: 571-5921
Sch�duled Date: 2013-09-24 � ; Scheduled Time: 10:00:00
� th
�
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-09-23
ACTION TAKEN:
......................................................................................................................................................:......................................................................................................................................................_........................................__.,..............................................................
� � �- � � c� q � ��
......c........ ... .......�n..�...................................................................................... ...............C:....._..1...........................................................................................................................__............_.__......._......_......_.._._........._
�
.
_....._a t�...._��---,c�..._�_��....._`:...............................��......._�.....�'.:�:...1............�_��.................................__.....................................................__:_._...............__
_........��-�..........�_�..z.....-�....:-�-,..:...-....................`�_��_`�.�....�..�..�.�...........................:.................._...........................................................................................
��.� 2�°�l t��� -
..................................................._........................._....................__....................._..._............_
_........:........ ....................................................................................................................................... . ............................................................................................
..........................................'............:.._�...�.......-................._�.'.�..�..�1.....:....�`�......_`�.._`�.....:��.............................................................:........................_.....................................: _._�._. __. _
........... .. ............ ....
Status: In Progress Resident Contacted ❑
Date Completed: Completed �
�� � �
� � �
. City of Fridley
Water Department
-- __
6431 University Avenue NE
Fridley,MN 55432
(?63)572-3566
��w� hereby authurize the City of�ridley and/or its oWner
� employees to do what is necessary to replace the water meter. 1 understand that thP prope�e
is liable for the water line from the main to the Prio ees harmless fo rany damiages that may occur
402.06) I also hold the Gty of Fridiey andi�ts emp Y � i� ���5����or the curb
while doing this operation. This to include,but not limited to;valves,p'p �,
stop box and service line. i understand I am alsu required to obtain a permit prior to any work,if
necessary. �� � �
� �
Final meter reading(old meter) �� ���
Address: � ` � �
Name• �
. Date:_ � `� `�
Phone Number:
l
Signature•
Witness Signature:
FRIDLEY CITY CUDE
CHAPTER 402.WATER,STORM WA7ER,AND SANtTARY SEWER
A�MINISTRATION
(Ref Ord No 123,464,565,566,6Z9,638,662,922,988,1144,1156,1191) _
402.45.PERMIT EEE
Prior to const�ucting or repair of any water ar sewer li�e connecting th hall be emu redto b ain a pemi�t for such
or buiiding for which the application is made,the owner or contractor s 4
connection,and shall pay a permit fee as Phall be n tif ed.tltrshall behunlawful to cover anyconn Ict�g���euntil an
made,the Water and Sewer Department s
inspectian has been made and such cannection and the work incide�t thereto has been app�oved by the C+ty as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTIDN
After the l�itial connection has been made to the water sQ he op S�Pine forrconnection'the ppl cant owner,
line or a water service or sewer lead has been extended t P
or the occupant or user of such premises shail be liable for af1 repair5 required to any wat��ner requests r I�nes
necessary fo�connection of the premi5es from the main t�„ee p�ree iseow'ner hatf be charged far the costs of the
maintenance senrice or repairs be performed by the City, P P � an administrative
maintenance andjor repairs, �n'f��o f he anpl'�cant ow ert o cupant or user to perfo m standard maintenance of
policy. It shall be the responsib I ty P
• the sewer service line from the premises to th�mai c��e d�aa w���nsure hat it ema ns above the fin shed e
water service curb stop box for opera6ility and at su g
grade of the land or property. (Ref 638,1156,1191j