Loading...
Meter Swap ��-�� ��g3S-y��`�� Request Number: 7028 Public Works Division Service Request Prob{em A�ddress: 6534 Oaldey�r Requested By: James Tauer Department: WATER A�ddress: No address provided Problemlissue: INSTALL MEIER Phone Number: 571-5921 Scheduled Date: 2013-09-24 Scheduled Time: 10:00:00 ACTION NEEDED: 2013 AMR Created by: Wendy Hiatt Date Created: 2013-09-23 ACTION TAFCEN: � Oid meter#84619129 Old readin . 290 New meter#44922360 ERT#35172445 ..............._.._..._..._.�.__....._..._._ .... ..._....._..�........_......_.._..................�.........._...___�.._�..........._..._.. ..._.__.__. __......_ Status: Completed , Resident Contacted ❑ Date Completed: 2013-09-24 Completed by: Pete Gunderson Hours �1173 . . Request Number: 7028 Public Works Division Service Request Problem Address: 6534 Oakley Dr Requested By: James Tauer Department: WATER Address: No address provided Problemllssue: INSTALL METER(WATER) Phone Number: 571-5921 Sch�duled Date: 2013-09-24 � ; Scheduled Time: 10:00:00 � th � ACTION NEEDED: 2013 AMR Created by: Wendy Hiatt Date Created: 2013-09-23 ACTION TAKEN: ......................................................................................................................................................:......................................................................................................................................................_........................................__.,.............................................................. � � �- � � c� q � �� ......c........ ... .......�n..�...................................................................................... ...............C:....._..1...........................................................................................................................__............_.__......._......_......_.._._........._ � . _....._a t�...._��---,c�..._�_��....._`:...............................��......._�.....�'.:�:...1............�_��.................................__.....................................................__:_._...............__ _........��-�..........�_�..z.....-�....:-�-,..:...-....................`�_��_`�.�....�..�..�.�...........................:.................._........................................................................................... ��.� 2�°�l t��� - ..................................................._........................._....................__....................._..._............_ _........:........ ....................................................................................................................................... . ............................................................................................ ..........................................'............:.._�...�.......-................._�.'.�..�..�1.....:....�`�......_`�.._`�.....:��.............................................................:........................_.....................................: _._�._. __. _ ........... .. ............ .... Status: In Progress Resident Contacted ❑ Date Completed: Completed � �� � � � � � . City of Fridley Water Department -- __ 6431 University Avenue NE Fridley,MN 55432 (?63)572-3566 ��w� hereby authurize the City of�ridley and/or its oWner � employees to do what is necessary to replace the water meter. 1 understand that thP prope�e is liable for the water line from the main to the Prio ees harmless fo rany damiages that may occur 402.06) I also hold the Gty of Fridiey andi�ts emp Y � i� ���5����or the curb while doing this operation. This to include,but not limited to;valves,p'p �, stop box and service line. i understand I am alsu required to obtain a permit prior to any work,if necessary. �� � � � � Final meter reading(old meter) �� ��� Address: � ` � � Name• � . Date:_ � `� `� Phone Number: l Signature• Witness Signature: FRIDLEY CITY CUDE CHAPTER 402.WATER,STORM WA7ER,AND SANtTARY SEWER A�MINISTRATION (Ref Ord No 123,464,565,566,6Z9,638,662,922,988,1144,1156,1191) _ 402.45.PERMIT EEE Prior to const�ucting or repair of any water ar sewer li�e connecting th hall be emu redto b ain a pemi�t for such or buiiding for which the application is made,the owner or contractor s 4 connection,and shall pay a permit fee as Phall be n tif ed.tltrshall behunlawful to cover anyconn Ict�g���euntil an made,the Water and Sewer Department s inspectian has been made and such cannection and the work incide�t thereto has been app�oved by the C+ty as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTIDN After the l�itial connection has been made to the water sQ he op S�Pine forrconnection'the ppl cant owner, line or a water service or sewer lead has been extended t P or the occupant or user of such premises shail be liable for af1 repair5 required to any wat��ner requests r I�nes necessary fo�connection of the premi5es from the main t�„ee p�ree iseow'ner hatf be charged far the costs of the maintenance senrice or repairs be performed by the City, P P � an administrative maintenance andjor repairs, �n'f��o f he anpl'�cant ow ert o cupant or user to perfo m standard maintenance of policy. It shall be the responsib I ty P • the sewer service line from the premises to th�mai c��e d�aa w���nsure hat it ema ns above the fin shed e water service curb stop box for opera6ility and at su g grade of the land or property. (Ref 638,1156,1191j