Loading...
Meter Swap ���7 -�c�S-�I'$7v� � Request Number: 6623 Public Works Division Service Reqt,�est Problem A�ddress: 6851 Oakley St Requested By: Corbin Schreiner Department: WATER Address: No address provided Problemllssue: INSTALL METER Phone Number: 612-282-1151 Scheduled Date: 201&0&07 Scheduled Time: 01:00:00 ACTION NEEDED: 2013 AMR Created by: Wendy H'iatt Date Created: 2013-08-07 ACTION TAKEN: Old meter#5909942 Old reading�60 New meter#44248372 ERT#35 91421 Status: Completed Resident Contacted ❑ Date Completed: 2013-0&07 Completed by: Keven Bec�n Hours ��� 07�0� _ Request Number: 6623 Public Works Division Service Request � Problem Acldress: 6851 Oakley St Requested Sy: Corbin Schreiner Department: WATER Address: No address provided Probfemllssue: INSTALL METER(WATER) Phone Number: 612-282-1151 Schedule�l 0�te: 2 13-08-07� Scheduled Time; 01:00:00 (/�-J �,� ACTION NEEQED: 2013 AMR �� Created by: Wendy Hiatt Date Created: 2013-08-07 ACTION TAKEN: • _..._..............................................................................................................................................._....................................................................................................................................:..:.............._..............................._................._.:...._._................__........................_ Q. .. .... ...........r��:-:�.�:........:-�:__....................._�_�.a.....�.:::�_�_�:............................._.....................................................:...............................:............................................_.._...........__................._ �� �� _. : d....._.........:_�.��l::l�_�:.. .........:...:................................ d 6 .��'� � � a� � .......__._......__...__..._......................................................�..........................................................................................................................................._............................._ e,�, e-E-� � �-� �1a`� ��7� �................................._�'.:y..................:..................rt..............:......................................................................................................_..__._.__..._.._................................................................................._................_..........._................._........................ �ry.��,�..........,.....:...Y��.:�E�,........:...:...:..........................................................................................................................................................: _..�.�.............:....�:........................:.................:.............._�_�.._�..�.......�.._�..�.�.....`.�._�..:.........................................................._.........................................................................................................................._..._........................ Status: In Progress Resider�t Contacted � Date Completed: Compfeted by: _. ���^ � �� �� y � _ City of Fridley Water Department 6431 Uni�ersity Avenue NE - Fridley,MN 5543Z (763)572-3566 t/we hereby authorize the City of fridley and/or its oWner employees to do what is necessary to replace tfie water meter. I understand that th�e prCo'��e is fiabte for the water line from the main ta the premise and all interior plumbing. ( 402.06) t atso hotd the City af Fridley and/its employees ha{�ml�`v�j p;ping w�15,flaors or he curb while doing this operat�on. This to include,6ut not i�m�ted , stop box and service line. I understand 1 am alsu required to obtain a permit prior to any work,if necessary. � � �U6�6� Finat meter reading{old meterj Name: Address:___.��..__� � Phone Number- Date: g - �- Signature: , Witness Signature: FR{aLEY CITY CODE CHAPTER 402.WA'fER,STORM WATER�AND SANITARY SEWER ADMINISTRATIDN (Ref Ord No 113,464,555,556,629,638,662,922,988,1144, 1156,1191) _ _ 402.05. PERMIT FEE Prior ta constructing or repair of any water ar sewer line connedi�Q shall he equiredto ob ain a perrr►�t fo�such or building for which the application is made,the owner or cont a connection,and shail pay a permit fee as Phaif be noYfed.tlt shall be untawful to cover any conne`cting�in euntii an made,the VVater and Sewer Department inspection has been made and such cannection and the work incident thereto has been approved by the Gity as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTiON After the initial connection has been made to the water service curb stap box or the sewer I t�d at t j can��Wner, line or a water service or sewer lead has been e�ended to the praperty line for connection, e aPP or the occupant or user af such premises shall be liable for all repairs required to any wate��ne requests`��nes necessary for connection�o a`hs be e erfar ed by the Citytthe p operty owlner shatl be harged for the costs af the maintenance service or r p p maintenance andjor repairs, inciuding any necess C��wner,occupant or u er to perform standa d maintenaince of po(icy. It shail be the responsibitiry of the applican � • the sewer service line from the premises to the mai c���tdn ad W�i ensure hat it ema ns abo e the fin shed he water service curb stop box for operability and at su g grade of the land or property. (Ref 638,1156,1191)