Meter Swap ���7
-�c�S-�I'$7v�
�
Request Number: 6623
Public Works Division
Service Reqt,�est
Problem A�ddress: 6851 Oakley St Requested By: Corbin Schreiner
Department: WATER Address: No address provided
Problemllssue: INSTALL METER Phone Number: 612-282-1151
Scheduled Date: 201&0&07 Scheduled Time: 01:00:00
ACTION NEEDED: 2013 AMR
Created by: Wendy H'iatt Date Created: 2013-08-07
ACTION TAKEN:
Old meter#5909942 Old reading�60 New meter#44248372 ERT#35 91421
Status: Completed Resident Contacted ❑
Date Completed: 2013-0&07 Completed by: Keven Bec�n
Hours
���
07�0� _
Request Number: 6623
Public Works Division
Service Request �
Problem Acldress: 6851 Oakley St Requested Sy: Corbin Schreiner
Department: WATER Address: No address provided
Probfemllssue: INSTALL METER(WATER) Phone Number: 612-282-1151
Schedule�l 0�te: 2 13-08-07� Scheduled Time; 01:00:00
(/�-J �,�
ACTION NEEQED: 2013 AMR
��
Created by: Wendy Hiatt Date Created: 2013-08-07
ACTION TAKEN: •
_..._..............................................................................................................................................._....................................................................................................................................:..:.............._..............................._................._.:...._._................__........................_
Q. .. .... ...........r��:-:�.�:........:-�:__....................._�_�.a.....�.:::�_�_�:............................._.....................................................:...............................:............................................_.._...........__................._
�� ��
_. : d....._.........:_�.��l::l�_�:.. .........:...:................................ d 6 .��'� �
�
a� � .......__._......__...__..._......................................................�..........................................................................................................................................._............................._
e,�, e-E-� � �-� �1a`� ��7�
�................................._�'.:y..................:..................rt..............:......................................................................................................_..__._.__..._.._................................................................................._................_..........._................._........................
�ry.��,�..........,.....:...Y��.:�E�,........:...:...:..........................................................................................................................................................:
_..�.�.............:....�:........................:.................:.............._�_�.._�..�.......�.._�..�.�.....`.�._�..:.........................................................._.........................................................................................................................._..._........................
Status: In Progress Resider�t Contacted �
Date Completed: Compfeted by:
_. ���^
� �� ��
y �
_ City of Fridley
Water Department
6431 Uni�ersity Avenue NE
- Fridley,MN 5543Z
(763)572-3566
t/we hereby authorize the City of fridley and/or its oWner
employees to do what is necessary to replace tfie water meter. I understand that th�e prCo'��e
is fiabte for the water line from the main ta the premise and all interior plumbing. (
402.06) t atso hotd the City af Fridley and/its employees ha{�ml�`v�j p;ping w�15,flaors or he curb
while doing this operat�on. This to include,6ut not i�m�ted ,
stop box and service line. I understand 1 am alsu required to obtain a permit prior to any work,if
necessary.
� � �U6�6�
Finat meter reading{old meterj
Name: Address:___.��..__� �
Phone Number- Date:
g - �-
Signature: ,
Witness Signature:
FR{aLEY CITY CODE
CHAPTER 402.WA'fER,STORM WATER�AND SANITARY SEWER
ADMINISTRATIDN
(Ref Ord No 113,464,555,556,629,638,662,922,988,1144, 1156,1191) _ _
402.05. PERMIT FEE
Prior ta constructing or repair of any water ar sewer line connedi�Q shall he equiredto ob ain a perrr►�t fo�such
or building for which the application is made,the owner or cont a
connection,and shail pay a permit fee as Phaif be noYfed.tlt shall be untawful to cover any conne`cting�in euntii an
made,the VVater and Sewer Department
inspection has been made and such cannection and the work incident thereto has been approved by the Gity as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTiON
After the initial connection has been made to the water service curb stap box or the sewer I t�d at t j can��Wner,
line or a water service or sewer lead has been e�ended to the praperty line for connection, e aPP
or the occupant or user af such premises shall be liable for all repairs required to any wate��ne requests`��nes
necessary for connection�o a`hs be e erfar ed by the Citytthe p operty owlner shatl be harged for the costs af the
maintenance service or r p p
maintenance andjor repairs, inciuding any necess C��wner,occupant or u er to perform standa d maintenaince of
po(icy. It shail be the responsibitiry of the applican �
• the sewer service line from the premises to the mai c���tdn ad W�i ensure hat it ema ns abo e the fin shed he
water service curb stop box for operability and at su g
grade of the land or property. (Ref 638,1156,1191)