Loading...
Meter Swap 8/21/13 ���� ���� � � �-�� Request Number: 6709 Public Works Division Service Request ProbtemA�ddress: 740 Pandora Dr Requested By: Jack Larson Department: WATER Address: No address provided Problemllssue: INSTALL METER Phone Number: 571-�85 Scheduled Date: 2013-0&21 Scheduled Time: 01:00:00 ACTION NEEDED: 2013 AMR Created by: Wendy Hiatt Date Created: � 2013-08-15 ACTION TAKEN: � � Old meter#14910003 Oid reading: 838370 New meter#44921332 ERT#35172425 Status: Completed Resident Contacted ❑ Date Completed: 2093-0&21 Completed by: Pete Gunderson Hours C�'�7 ��� Req uest N u m ber: 6709 Public Works Division Service Request Problem Address: 740 Pandora Dr Requested By: Jack Larson Department: WATER Address: No address provided Problem/Issue: INSTALL METER(WATER) Phone Number: 571-5685 Schedul Date: 2013-08-21 Scheduled Time: 01:00:00 �S� , ACT�N NEEDED: 2013 AMR Created by: Wendy Hiatt Date Created: 2013-08-15 ACTION TAKEN: ' ...............................................................................................................................................................:.........................................................................................................................................................................................................._...._._............................... ............:�:�.-.��..:..�'�t.:.-.-���_-�.........._�.-..........................�.:..�._�:..�....�"��....................:...........................:.............................................................:.........:..._...._._.:............._ _..._........�L�.....1Z�_��.....}..-............:.............._.....�'...�....3_�:3`�Z�...........:..................................:....................................................................__......................._...........:..:.:__....._ _.............._��.��...���.._�.......................�.`�a..�.......�._�.��...___..............................................................................................._.._:. _:. ... ..........................._ ...................���._.::�.�_��.�..:....-.-................:....:..:..........:...�. ........................................................................................................................................................................_.....................--.----_.._._ .........................:.....................�.........-�z..�...........�_�....-....:.....:....:..........._:�....�...._`:_�.....�a.�...`�_�.................:...................:...................................................................._..__.............................: _ Status: In Progress Resident Contacted ❑ Date Completed: Completed by: �- a���3 ` Hiatt, Wendy Subject: Jack Larson, 763-571-5685, AMR @ 1:00 PM Location: 740 Pandora Dr NE Start: Wed 8/21/2013 1:00 PM End: Wed 8/21l2013 1:30 PM Shaw Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: White, Karen Required Attendees: Hiatt,Wendy , � � . City uf F�idley Water Department 6431 University Avenue NE Fridley,MN 55432 [763)572-3566 ��we fiereby authorize the City af Fridley and/ar its employees to do what is necessary to replace the water meter. i understand that the property owner is liabie for the water line frorn the main to the premise and alt interior piumhing. (Per City cade 402.06� i also hofd the City af Fridley and/its empfoyees harmless far any damages that may accur while doing#his operatian. This to inc{ude,but not limited#o;valves,piping,walls,ffQars or the curb stop box and service line. t understand I am aisti required to obtain a permit prior to any work,if necessary. final meter reading(o{d meter) �- � '�-�����.f Name• Address: ��( , ��'� Phone Numbe Date:_ � ��, �� Signature• Witness Si ature: � FRIDLEY CITY C4DE CHAPTER 402.WATER,5TORM WATER,AND SANt7ARY SEWER ADMINiSTRA7i0N (Ref Ord No 113,464,565,566,629,638,662,9Z2,988,1144, 1156,1141) 402.05. PERMIT FFE Prior to constructing or repair of any water ar sewer line connecting the existing municipal system and any house ' or bui{ding for which the applicatian is made,the owner or contractoc shall6e required to abtain a permit for such con�ection,and shali pay a permit fee as provided in Ghapter 11 of this Code. After such connectian has been made,the INater and Sewer Department shall be natified. !t shati be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been appraved by the Cfty as a proper and suitab{e connectian• 402.Q6.REPAlRS AND iIAAfN7EwANCE TO CONNECTION After the initial connection has been made t�the water service curh stap box or the sewer lead at t i`an�'�Wner, line or a water service o�sewer lead has been extended to the property fine for connection,the app' or the accupant or user of such premises shail be liable far all�epairs required to any water line and sewer lines necessary for cAnnection of the premises from the main to the prernis o�ne shati be harged for the co ts nf the maintenance service�r repairs be performed by the City,the praperty maintenance andjur repairs, inctuding any necessary street repairs,at a rate set annuaHy by an administrative poticy. It shall be the responsibil'rty of the applicant,owner,occupant or user to perform standard maintenance af • the sewer service line from the premises to the main inctuding debris ciearing or root cutting and to maintain the water service curb stop bax for operability and at such height as wiff ensure that it remains above the finished grade af the land or property. (Ref 638,1156,1191}